VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report Volume I SCH No. 2014092038 Prepared for: City of Roseville Planning Department 311 Vernon Street Roseville, California 95746 Prepared by: Impact Sciences, Inc. 505 14 th Street, Suite 1230 Oakland, California 94612 (510) 267 0494 October 2016
TABLE OF CONTENTS Section 1.0 Introduction... 1.0 1 2.0 Summary... 2.0 1 3.0 Project Description... 3.0 1 4.0 Environmental Setting, Impacts, and Mitigation Measures... 4.0 1 4.1 Air Quality... 4.1 1 4.2 Biological Resources... 4.2 1 4.3 Cultural Resources... 4.3 1 4.4 Greenhouse Gas Emissions... 4.4 1 4.5 Hydrology and Water Quality... 4.5 1 4.6 Noise... 4.6 1 4.7 Water... 4.7 1 4.8 Transportation and Traffic... 4.8 1 4.9 Energy... 4.9 1 5.0 Alternatives... 5.0 1 6.0 Other CEQA Considerations... 6.0 1 7.0 Report Preparation... 7.0 1 Appendices 1.0 Notice of Preparation (NOP), Initial Study, and comments on the NOP 4.1 Air Quality Impact and Greenhouse Gas Analysis 4.2 Biological Resources Documentation Biological Habitat Evaluation Report California Natural Diversity Database Search Results 4.3 Cultural Resources Documentation 4.6 Noise Documentation Environmental Noise Assessment Noise Modeling Data 4.8 Transportation Impact Study 6.0 Urban Decay Analysis Impact Sciences, Inc. i VillaSport Athletic Club and Spa Draft EIR
LIST OF FIGURES Figure 3.0 1 Regional Location... 3.0 2 3.0 2 Project Vicinity... 3.0 3 3.0 3 Site Overview... 3.0 4 3.0 4 Site Plan... 3.0 9 3.0 5 Floor Plan Level 1... 3.0 10 3.0 6 Floor Plan Level 2... 3.0 11 3.0 7 Building Elevations... 3.0 12 3.0 8 Building Elevations... 3.0 13 4.8 1 Study Area... 4.8 3 4.8 2 Bicycle/Pedestrian Facilities Existing Conditions... 4.8 7 4.8 3a Peak Hour Traffic Volumes and Land Configurations Existing Conditions... 4.8 10 4.8 3b Peak Hour Traffic Volumes and Land Configurations Existing Conditions... 4.8 11 4.8 4 AM Peak Hour Trip Distribution... 4.8 23 4.8 5a Existing Plus Project Trip Distribution Inbound... 4.8 24 4.8 5b Existing Plus Project Trip Distribution Outbound... 4.8 25 4.8 6a AM and PM Peak Hour Traffic Volumes and Lane Configurations Existing Plus Project Conditions... 4.8 27 4.8 6b AM and PM Peak Hour Traffic Volumes and Lane Configurations Existing Plus Project Conditions... 4.8 28 Impact Sciences, Inc. ii VillaSport Athletic Club and Spa Draft EIR
LIST OF TABLES Table 2.0 1 Summary of Project Impacts and Mitigation Measures... 2.0 6 2.0 2 Comparison of Alternatives to the Proposed Project... 2.0 20 4.1 1 Ambient Air Quality Standards... 4.1 5 4.1 2 Placer County Attainment Status... 4.1 7 4.1 3 Ambient Pollutant Concentrations Registered Nearest to the Project Site... 4.1 9 4.1 4 Placer County Air Pollution Control District Recommended Significance Thresholds... 4.1 24 4.1 5 Maximum Project Specific Construction Emissions... 4.1 29 4.1 6 Maximum Project Specific Operational Emissions... 4.1 30 4.4 1 Top Five GHG Producer Countries and the European Union (Annual)... 4.4 5 4.4 2 GHG Emissions in California... 4.4 6 4.4 3 Placer County Air Pollution Control District Efficiency Thresholds... 4.4 18 4.4 4 Project Construction GHG Emissions... 4.4 20 4.4 5 Project (2020) Operational GHG Emissions... 4.4 21 4.6 1 Outside to Inside Noise Attenuation... 4.6 3 4.6 2 Existing Roadway Modeled On Site Noise Levels... 4.6 5 4.6 3 City of Roseville Maximum Allowable Noise Exposure for Transportation Noise Sources... 4.6 8 4.6 4 City of Roseville Performance Standards for Non Transportation Noise Sources... 4.6 8 4.6 5 Operational Roadway Noise Levels Existing plus Project Conditions... 4.6 14 4.6 6 Construction Equipment Noise Emission Levels... 4.6 15 4.6 7 Operational Roadway Noise Levels Cumulative (2025 CIP) plus Project Conditions... 4.6 20 4.7 1 City of Roseville Surface Water Contracts... 4.7 2 4.8 1 Level of Service Thresholds Intersections... 4.8 8 4.8 2 Intersection Levels of Service Existing Conditions... 4.8 9 4.8 3 Freeway Level of Service Existing Conditions... 4.8 12 4.8 4 Project Trip Generation... 4.8 21 4.8 5 Intersection Levels of Service Existing Plus Project Conditions... 4.8 29 4.8 6 Freeway Facilities Level of Service Existing Plus Project Conditions... 4.8 31 4.8 7 Citywide PM Peak Hour Intersection LOS Results Cumulative (2025 CIP) Conditions... 4.8 37 4.8 9 Freeway Level of Service Cumulative (2025 CIP) Conditions... 4.8 39 4.9 1 Off Road Construction Equipment Diesel Fuel Consumption... 4.9 10 4.9 2 Construction Worker Gasoline Consumption... 4.9 11 4.9 3 Estimated Petroleum based Fuel Usage at Project Buildout... 4.9 14 5.0 1 No Project/Existing Zoning Alternative Trip Generation... 5.0 4 5.0 2 Reduced Footprint Alternative Trip Generation... 5.0 11 5.0 3 Reduced Footprint/Reduced Intensity Alternative Trip Generation... 5.0 17 5.0 4 Comparison of Alternatives to the Proposed Project... 5.0 24 Impact Sciences, Inc. iii VillaSport Athletic Club and Spa Draft EIR