(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Similar documents
(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana)

Bihar: Transmission System Study for 13 th Plan

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

2681-IND: Bihar Power System Improvement Project

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Report. the feasibility of

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Agenda Note for Standing Committee Meeting of Power System Planning in ER

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

I. Operational Feedback from NLDC:

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

List of the participants is enclosed at Annexure I.

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Indian Power System Framework

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

132 kv Transmission Lines in BSPTCL

RFP Corrigendum No. 01

Thereafter, the agenda items were taken up.

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

Additional Agenda-I for 19 th Standing Committee Meeting on Power System Planning of Eastern Region

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

HVDC Systems in India

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

Annexure. Technical Details Package 1

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

Scanned by CamScanner

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Need Assessment Document (NAD) DDUGJY

The Electric Power System

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Power Transformers in BSPTCL

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore. Status of Powergrid Projects: Transmission Lines. Annexure_I(A)

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013.

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

CUSTOMER/ TWIN ARROWS PROJECT

fctwr / Ministry of Power fct'wr!.ll ct, 0 1 / Central Electricity Authority m\iat '!, icf>.=t wwr - I Power System Planning & Appraisal Division-I

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Bangladesh s Power Sector : At a Glance

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

Agenda of 11 th System Studies Meeting in NER

PRAGATI ENGINEERING COLLEGE

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Reactive Power Compensation using 12 MVA Capacitor Bank in 132/33 KV Distribution Substation

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

North Eastern Regional Power Committee

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Generation Interconnection Facilities Study For

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Sub Regional RTEP Committee Mid-Atlantic

IJRASET 2013: All Rights are Reserved

Pacific Gas and Electric Company s Revised 2016 Annual Progress

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

MILLIGAN SOLAR PROJECT

Evacuation system from Chamera III HEP (231 MW).

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

No. 1/9/SP&PA-2013 / Dated:

Functional Specification Revision History

'J!TW ~ / Government of India ~ ~ / Ministry of Power ~ ~ ~1~<t1~UI / Central Electricity Authority ~ ~ ~ 4~~'1\J1-11 ~q;-;y ~

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay.

PDF processed with CutePDF evaluation edition

Before the. Case No. 106 of 2009

Q0044 interconnection at

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Transcription:

Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi 1.0 The Minutes of 36 th meeting of the Empowered Committee on Transmission were issued vide our letter No. 100/1/EC (36) 2016-PSP&PA-I/963-978 dated 9 th August 2016. Following corrigendum is issued based on the observations received from POWERGRID vide their letter dated 19-09-2016 and 14-10-2016. Item No. 12.2: Transmission system for Ultra Mega Solar Park in Fatehgarh, distt. Jaisalmer Rajasthan The scope of above mentioned transmission scheme after incorporating the modifications suggested by Powergrid is as under: Scope of the Transmission Scheme (i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Capacity (MVA/ km) Estimated Cost 84 (ii) 765 kv Fatehgarh Pooling sub-station - Bhadla (PG) D/C line (initially to be operated at 400kV) (iii) 2 nos of 400kV line bays at Fatehgarh Pooling substation (iv) 1x125 MVAR Bus reactor at 400kV Fatehgarh Pooling sub-station (v) Space for future 220 kv ( 6 Nos), 400 kv ( 6 Nos) and 765 kv (4 nos.) line bays along with line reactors at Fatehgarh Pooling station (vi) Space for future 220/400 kv transformers ( 2 nos.), 400/765 kv transformers (2 nos) along with associated transformer bays at each level (vii) Space for future 765 kv bus reactor along with associated bays Total Estimated Cost 536 Note: a. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. b. Park Developer to construct 400 kv line from M/s AREPL solar park along with 1x125 MVAr bus reactor at generation switchyard. 110 424 20 8

c. Powergrid to provide 2 nos. of 400 kv line bays at Bhadla ( PG) for Fatehgarh Pooling Station- Bhadla D/C line ( initially to be operated at 400 kv) d. The Solar park developer (M/s AREPL) to provide adequate land for 765/400 kv pooling station adjacent to the proposed solar park for which transmission licensee shall coordinate with M/s AREPL including commercial aspects for transfer of land. e. Solar park developer(m/s AREPL) to provide 2 nos. of 400kV line bays at Fatehgarh Pooling Station for termination of 400kV D/C line from AREPL solar park to 400kV Fatehgarh Pooling station. Item No. 12.3: Additional 400 kv feed to Goa The Note section pertaining to above mentioned scheme after incorporating the modification is as follows: Note: a. The line lengths mentioned above are approximate as the exact length shall be obtained after the detailed survey. b. Narendra (existing) Narendra (New) 400kV D/c (quad) line: 178KM is without Line Reactor at both ends. After LILO of this line at Xeldem S/s (considering LILO length as 120KM), the length of modified sections i.e. Narendra (existing) - Xeldem 400kV (quad) line: 120KM (approx.) and Narendra (New) Xeldem 400kV (quad) line: 298KM (approx.). Accordingly, Powergrid to provide 1X 80 MVAR, 420 kv switchable line reactor along with 500 Ohms NGR and its auxiliaries at Narendra (New) S/s c. Powergrid to provide 2 nos of 400kV line bays at Mapusa s/s for termination of Xeldem Mapusa 400kV D/c (quad) line Item No. 12.6: Inter State Transmission system strengthening in Chhatarpur area in Madhya Pradesh In the heading of the column no. 3 of the table elaborating the scope of the above mentioned scheme, km may be read as ckm. Item No. 12.7: Connectivity and Long Term Access (LTA) to HPPTCL 450 MW from Shongtong Karcham HEP Item no (iv) under the above mentioned scheme i.e PTCUL to provide space for 2 Nos. of 400 kv Bays at Wangtoo S/s is replaced as given below: iv) HPPTCL to provide space for 2 Nos. 400 kv bays at Wangtoo S/stn. Item No. 12.8 :Eastern Region Strengthening Scheme XXI (ERSS-XXI) The Note section pertaining to above mentioned scheme after incorporating the changes is as follows: Note: (a) Rating of 400 kv, 220 kv and 132 kv level line bays at new substations (Sitamarhi, Chandauti and Saharsa, )should match with the rating of the associated transmission lines. - 2 -

(b) Darbhanga and Motihari substations belong to Darbhanga Motihari Transmission Company Ltd. (subsidiary of Essel Infra). DMTCL to provide space to successful bidder for extension works. (c) BSPTCL would implement following lines: (i) Sitamarhi (New) Motipur (BSPTCL) 220kV D/c line (ii) Sitamarhi (New) Motihari (New of BSPTCL) 220kV D/c line (iii) Sitamarhi (New) Sitamarhi 132kV D/c (Single Moose) line (iv) Sitamarhi (New) Pupri 132kV D/c line (v) LILO of Gaya (POWERGRID) Sonenagar 220kV D/c at both Bodhgaya (BSPTCL) and Chandauti (New) substations, so as to form Gaya (POWERGRID) Bodhgaya (BSPTCL) Chandauti (New) Sonenagar 220kV D/c line (vi) Reconductoring of Chandauti (BSPTCL) Rafiganj Sonenagar 132kV S/c line with HTLS conductor of 240MVA (ampacity - 1050A) (vii) LILO of Chandauti (BSPTCL) Rafiganj 132kV S/c line at Chandauti (New) (viii) Reconductoring of Chandauti Sonenagar 132kV S/c line with HTLS conductor of 240MVA (ampacity - 1050A) (ix) LILO of Chandauti Sonenagar 132kV S/c line at Chandauti (New) (x) Saharsa (New) Begusarai 220kV D/c line (xi) Saharsa (New) Khagaria (New) 220kV D/c line (xii) Saharsa (New) Saharsa 132kV D/c The systems listed under (b) are intra state systems to be implemented by BSPTCL as agreed in the SCM. These systems should come in matching timeframe with the ISTS substations. BSPTCL has to sign IA with implementing agency for these substations. Item No. 13.3 : Eastern Region Strengthening Scheme XX (ERSS-XX) The capacity for item no (vi) under the above mentioned scheme is modified as given below: Scope of the Transmission Scheme Capacity (MVA/km) Estimated Cost(Rs. Crore) (vi) Replacement of 220/132kV, 1x50MVA ICT at Malda with 220/132kV, 160MVA ICT along with suitable modification in bay equipment 160 (Replacement against 50 MVA) 18.4 Item No. 13.8 : Transmission System for Ultra Mega Solar Parks in Bhadla, Distt. Rajasthan The scope of the above mentioned scheme after incorporating the minor changes is as under: Sl. Scope of the Transmission Scheme Capacity Estimated - 3 -

No. (MVA/KM) Cost Transmission system for Ultra Mega Solar Parks in (i) Bhadla, Distt. Rajasthan Establishment of 765/400/220kV (765/400kV: 3x1500MVA, 400/220kV : 3x500 MVA) Pooling Station at Bhadla (PG) along with associated bays. 765/400kV: 3x1500MVA 400/220 kv: 3x500 MVA 560 (ii) 765kV Bhadla (PG) Bikaner (PG) D/c along with associated bays (iii) 400kV Bhadla (PG)- Bhadla (RVPN) D/c (Quad) along with associated bays (iv) 2 nos. 400kV & 4 nos. 220kV line bays line bays at Bhadla (PG) for interconnection of solar parks (v) 1x240 MVAr switchable line reactor at each end (each ckt) of the 765kV Bhadla(PG)- Bikaner(PG) D/c line (vi) 1x240 MVAr (765kV) & 1x125MVAr (400kV) Bus reactor at Bhadla Pooling Station along with associated bays (vii) Space for future expansion. Estimated Cost 1429 New Transmission Schemes to be taken up through Regulated Tariff Mechanism Under New Transmission Schemes to be taken up through Regulated Tariff Mechanism, the following may be added as 13.11 and 13.12 13.11 Name of the scheme: Provision of 2 nos. of 400 kv line bays at Bhadla ( PG) under Transmission System for Ultra Mega Solar Park in Fatehgarh, distt. Jaisalmer Rajasthan Scope of the transmission Scheme Estimated Line Length (km)/ Capacity (MVA) (i) 2 nos. of 400 kv line bays at Bhadla ( PG) for Fatehgarh Pooling Station- Bhadla D/C line ( initially to be operated at 400 kv) Estimated Cost 20-4 -

13.12 Name of the scheme: Provision of 1X 80 MVAR, 420 kv switchable line reactor along with 500 Ohms NGR under the scheme Additional 400 kv feed to Goa. Scope of the transmission Scheme Estimated Line Length (km)/ Capacity (MVA) (i) 1X 80 MVAR, 420 kv switchable line reactor along with 500 Ohms NGR and its auxiliaries at Narendra (New) S/s { for Narendra (New) Xeldem 400 kv (quad) line formed after LILO of one ckt of Narendra ( existing) Narendra (New) 400 kv D/c quad line at Xeldem} 80 MVAR Estimated Cost - 5 -