STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE

Similar documents
List of Grid Disturbances above 10 MW. Page 1 of 8

No. NERPC/SE (O)/PCC/2013/ Date: 16th August, 2013

Agenda of 11 th System Studies Meeting in NER

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

North Eastern Regional Power Committee

North Eastern Regional Power Committee Agenda For

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Reactive Power Document and Voltage Control of North Eastern Region

December-2017 Edition-9

North Eastern Regional Power Committee Agenda

PDF processed with CutePDF evaluation edition

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

24X7 POWER FOR ALL TRIPURA A JOINT INITIATIVE OF GOVERNMENT OF INDIA AND GOVERNMENT OF TRIPURA

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 82/MP/2014

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

Report. the feasibility of

RUBBER FOOTWEAR. Introduction :

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

24X7 POWER FOR ALL MEGHALAYA. A Joint Initiative of Government of India and Government of Meghalaya

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

Completion Report. Project Number: Loan Number: 1405 September India: Power Transmission (Sector) Project

BRIEF OF ALL PROJECTS

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Cross Border Energy Trade by Bhutan. By Gem Tshering, BPC

Thereafter, the agenda items were taken up.

Future Power Supply Scenario

Draft National Electricity Plan

Black StartDrill in Eastern Regional Power System-Case studies

Overview of Indian Power Sector. February 29, 2008

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Indian Power System Framework

CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

Bangladesh s Power Sector : At a Glance

Battery Energy Storage System Pilot Project, Puducherry Power Grid Corporation of India Limited. Manish Kumar Tiwari

OPERATION & MAINTENANCE OF HVDC STATION

HVDC Systems in India

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

MINUTES OF THE 47 th SLCF MEETING HELD ON

Generating unit functional document submission form

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

PRAGATI ENGINEERING COLLEGE

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

BRIEF OF ALL PROJECTS

Chapter 1 POPULATION

Roadmap for providing banking services in every village having population below 2000-Progress June, 2017

Gujarat Power Sector A Statistical Profile

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Bihar: Transmission System Study for 13 th Plan

Agenda Note for Standing Committee Meeting of Power System Planning in ER

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

New 115 kv Disconnect Switches at Bloomsburg MTS

POPULATION. Chapter 1

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to )

प व र स म र ल ( नम ण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION)

14.Storage Infrastructure

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

LIST OF MOTOR DRIVING SCHOOL UNDER WEST TRIPURA DISTRICT.

Jemena Electricity Networks (Vic) Ltd

System Impact Study Report

Unit-wise production details with reasons for shortfall have been given in following subsections:

Address List. 2. CEO,POSOCO B 9, Qutab Institutional Area, Katwaria Sarai, New Delhi Fax

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

In view of the above list of important grid element & exception list is as below:-

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

The Evolution of System Protection Schemes for the Sarawak Power System By Victor Wong Sarawak Energy Berhad Presented at PQSynergy 2012, Sarawak

Introduction to PowerWorld Tutorial Created by the University of Illinois at Urbana-Champaign TCIPG PMU Research Group 1

India Power Generation March 2018

IJRASET 2013: All Rights are Reserved

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transcription:

Updated on 20.06.2011 LIST OF UNITS IN NER THAT REQUIRE APPROVAL OF OCC AS WELL AS NERLDC FOR PLANNED SHUT DOWN & MANUAL DESYNCHRONISATION / SYNCHRONISATION. TRIPPING OF THESE UNITS ALSO NEED TO BE INTIMATED TO NERLDC. SL NO STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE 1 KHANDONG HEP NEEPCO 1 & 2 25 HYDEL 2 KOPILI ST II HEP NEEPCO 1 25 HYDEL 3 DOYANG HEP NEEPCO 1, 2 & 3 25 HYDEL 4 AGBPP (KATHALGURI) NEEPCO 1, 2, 3 & 4 33.66 G.T. 5 AGBPP (KATHALGURI) NEEPCO 5 & 6 35.01 G.T. 6 AGBPP (KATHALGURI) NEEPCO 7, 8 & 9 30 STEAM 7 A G T P P ( R C NAGAR) NEEPCO 1, 2, 3 & 4 21 G.T. 8 LOKTAK HEP NHPC 1, 2, & 3 35 HYDEL 9 KOPILI HEP NEEPCO 1, 2, 3 & 4 50 HYDEL 10 RANGANADI HEP NEEPCO 1, 2 & 3 135 HYDEL LIST OF UNITS IN NER WHOSE SHUTDOWN, SYNCHRONISATION, TRIPPINGS AND MANUAL DESYNCHRONISATION NEED INTIMATION TO NERLDC. SL NO STATION OWNER UNIT NOS. UNIT CAPACITY (MW) TYPE 1 UMIUM ST 1 HEP MeSEB 1, 2, 3 & 4 9 HYDEL 2 UMIUM ST II HEP MeSEB 1 & 2 9 HYDEL 3 UMIUM ST III HEP MeSEB 1 & 2 30 HYDEL 4 UMIUM ST IV HEP MeSEB 1 & 2 30 HYDEL 5 LANGPI HEP ASSAM 1,2 50 HYDEL 6 LTPS ASSAM 1-7 15/30 G.T. 7 NTPS ASSAM 1-6 23/30 G.T. 8 LIKIMRO HEP NAGALAND 1, 2 & 3 8 HYDEL 9 BARAMURA TRIPURA 4,5 21 G.T. 10 ROKHIA TRIPURA 3-8 8/21 G.T. 11 GUMTI TRIPURA 1-3 5 HYDRO 1

LIST OF LINES / ICTs / REACTORS WHOSE PLANNED SHUTDOWNS REQUIRE APPROVAL IN OCC, (TRIPPINGS / SWITCHINGS OF THESE ELEMENTS ALSO NEED INTIMATION TO / APPROVAL OF NERLDC) CENTRAL SECTOR LINES A. 400 kv LINES OWNER 1 MISA BALIPARA D/C POWERGRID 2 BALIPARA BONGAIGAON D/C POWERGRID 3 BALIPARA RANGANADI D/C POWERGRID B. 220 kv LINES 1 MISA KATHALGURI S/C POWERGRID 2 MISA MARIANI S/C POWERGRID 3 MARIANI KATHALGURI S/C POWERGRID 4 BTPS SALAKATI D/C POWERGRID 5 KOPILI MISA D/C POWERGRID 6 KOPILI MISA III POWERGRID 7 MISA SAMAGURI D/C POWERGRID 8 MISA DIMAPUR D/C POWERGRID C. 132 kv LINES 1 KHANDONG HAFLONG S/C POWERGRID 2 HAFLONG JIRIBAM S/C POWERGRID 3 KHANDONG KHLIERIAT I & II POWERGRID 4 KHLIERIAT BADARPUR S/C POWERGRID 5 BADARPUR JIRIBAM S/C POWERGRID 6 BADARPUR KOLASIB S/C POWERGRID 7 BADARPUR KUMARGHAT S/C POWERGRID 8 JIRIBAM AIZAWL S/C POWERGRID 9 AIZAWL KUMARGHAT S/C POWERGRID 10 LOKTAK JIRIBAM II POWERGRID 11 DIMAPUR IMPHAL S/C POWERGRID 12 R C NAGAR AGARTALA D/C POWERGRID 13 GOHPUR NIRJULI S/C POWERGRID 14 AIZAWL ZEMABAK S/C POWERGRID 15 IMPHAL (PG) IMPHAL (MANIPUR) S/C POWERGRID 16 KOPILI KHANDONG D/C POWERGRID 17 DIMAPUR DOYANG D/C POWERGRID 18 KHLIERIAT (PG) KHLIERIAT (MeSEB) I POWERGRID 19 R C NAGAR KUMARGHAT S/C POWERGRID 20 RANGANADI NIRJULI S/C POWERGRID 21 AIZAWL KOLASIB S/C POWERGRID 22 BADARPUR PANCHGRAM S/C POWERGRID 23 RANGANADI ZIRO S/C POWERGRID 24 LOKTAK IMPHAL (PG) S/C POWERGRID 25 BALIPARA KHUPI S/C NEEPCO 26 KHUPI KIMI S/C NEEPCO D. INTER REGIONAL LINES 1 400 kv BONGAIGAON NEW SILIGURI D/C POWERGRID 2 220 kv BIRPARA SALAKATI D/C POWERGRID 2

LIST OF LINES /ICTS /REACTORS WHOSE PLANNED SHUTDOWNS REQUIRE APPROVAL IN OCC (TRIPPINGS / SWITCHINGS OF THESE ELEMENTS ALSO NEED INTIMATION TO /APPROVAL OF NERLDC) CENTRAL SECTOR ICT / OTHER ELEMENTS E. ICT (INTER CONNECTING TRANSFORMER) OWNER 1 400/220 kv, 1X315 MVA at MISA POWERGRID 2 400/220 kv, 1X315 MVA at BALIPARA POWERGRID 3 400/220 kv, 1X315 MVA at BONGAIGAON POWERGRID 4 220/132 kv, 2X100 MVA at DIMAPUR POWERGRID 5 220/132 kv, 2X50 MVA at SALAKATI POWERGRID 6 132/33 kv, 2X10 MVA at NIRJULI POWERGRID 7 132/33 kv, 1X15 MVA at ZIRO POWERGRID 8 400/132 kv, 2X360 MVA at RANGANADI NEEPCO 9 220/132 kv, 60 MVA at KOPILI NEEPCO 10 220/132 kv, 160 MVA at KOPILI NEEPCO 11 220/132 kv, 2X50 MVA at BALIPARA NEEPCO / AEGCL F. LINE REACTORS 1 BONGAIGAON: 2X63 MVAR at 400 kv (For NEW SILIGURI I & II) POWERGRID 2X50 MVAR at 400 kv (For BALIPARA I & II) POWERGRID 2 BALIPARA: 2X63 MVAR at 400 kv (For BONGAIGAON I & II) POWERGRID 2X50 MVAR at 400 kv (For RANGANADI I & II) POWERGRID 3 MISA: 1X50 MVAR at 400 kv (For KATHALGURI LINE) POWERGRID 1X50 MVAR at 400 kv (For MARIANI LINE) POWERGRID G. BUS REACTORS 1 BONGAIGAON : 2X50 MVAR at 400 kv POWERGRID 2 BALIPARA : 50 MVAR at 400 kv POWERGRID 3 MISA : 50 MVAR at 400 kv POWERGRID 4 AIZAWL : 20MVAR at 132 kv, POWERGRID 5 KUMARGHAT : 20 MVAR at 132 kv POWERGRID H. TERTIARY REACTORS 1 BONGAIGAON : 2X25 MVAR at 33 kv POWERGRID 2 BALIPARA : 4X25 MVAR at 33 kv POWERGRID 3 MISA : 4X25 MVAR at 33 kv POWERGRID 3

LIST OF LINES /ICTS /REACTORS WHOSE PLANNED SHUTDOWN REQUIRE APPROVAL IN OCC (TRIPPINGS / SWITCHINGS OF THESE ELEMENTS ALSO NEED INTIMATION TO / APPROVAL OF NERLDC) STATE SECTOR LINES / ICT / OTHER ELEMENTS A. 220 kv LINES OWNER 1 SAMAGURI SARUSAJAI D/C AEGCL 2 BALIPARA SAMAGURI S/C POWERGRID/AEGCL 3 BTPS-AGIA D/C AEGCL 4 AGIA-SARUSAJAI S/C AEGCL 5 AGIA-BOKO S/C AEGCL 6 BOKO-SARUSAJAI S/C AEGCL B. 132 kv LINES 1 BALIPARA-GOHPUR S/C AEGCL 2 BTPS DHALIGAON D/C AEGCL 3 UMIAM NEHU S/C MECL 4 NEHU KHLIERIAT S/C MECL 5 NEHU NEIGRIHMS S/C 6 NEIGRIHMS-KHLIERIAT S/C 7 UMIUM ST I UMIUM ST III D/C MECL 8 UMIUM ST III UMTRU D/C MECL 9 LUMSHNONG KHLIEHRIAT S/C MECL 10 KHLIERIAT (PG) KHLIERIAT (MeSEB) II MECL 11 UMTRU UMIUM STG-IV D/C MECL 12 UMIUM ST I UMIAM S/C MECL 13 SARUSAJAI UMTRU D/C AEGCL/ MECL 14 P K BARI KUMARGHAT S/C TESCL 15 AGARTALA DHALABIL (KHOWAI) S/C TSECL 16 DHALABIL KAMALPUR S/C TSECL 17 KAMALPUR P K BARI S/C TSECL 18 LOKTAK NINGTHOUKHONG MANIPUR 19 DIMAPUR (PG) DIMAPUR (NAGALAND) D/C NAGALAND 20 UMTRU KAHILIPARA D/C AEGCL/ MECL 21 LUMSHNONG PANCHGRAM S/C AEGCL/ MECL 22 DULLAVCHERRA DHARMANAGAR S/C AEGCL/TSECL 23 KOHIMA KARONG S/C MANIPUR/NAGALAND 24 MARIANI-MOKOKCHANG S/C AEGCL/NAGALAND 25 MARIANI GOLAGHAT S/C AEGCL 26 DIMAPUR BOKAJAN S/C AEGCL/NAGALAND 27 BOKAJAN - GOLAGHAT S/C AEGCL 28 AGARTALA BODHJANNAGAR S/C TSECL 29 BODHJANNAGAR JIRANIA S/C TSECL 30 JIRANIA GAMAITILA S/C TSECL 31 GAMAITILA AMBASA S/C TSECL 32 AMBASA-KAMALPUR S/C TSECL 4

33 AMBASA-PK BARI S/C TSECL C. ICT (INTER CONNECTING TRANSFORMER) 1 3X50 MVA, 220/132 kv at SAMAGURI AEGCL 2 3X100 MVA, 220/132 kv at SARUSAJAI AEGCL 3 2X80 MVA, 220/132 kv at BTPS AEGCL 4 2X100 MVA, 220/132 kv at MARIANI AEGCL 5 1X50 MVA, 220/132 kv at BALIPARA AEGCL 6 1X160 MVA, 220/132 kv at BTPS AEGCL LIST OF LINES / ICTS/ REACTORS WHOSE SHUTDOWNS / TRIPPINGS / SWITCHINGS REQUIRED APPROVAL OF / INTIMATION TO NERLDC ONLY. STATE SECTOR LINES / ICT / OTHER ELEMENTS A. 220 KV LINES OWNER 1 SAMAGURI MARIANI D/C AEGCL 2 KATHALGURI TINSUKIA S/C AEGCL 3 KATHALGURI DEOMALI S/C ARUNACHAL PRADESH 4 MISA-BYRNIHAT D/C MECL B. 132 KV LINES 1 DHALIGAON - NALBARI S/C AEGCL 2 DHALIGAON BARNAGAR S/C AEGCL 3 RANGIA - NALBARI S/C AEGCL 4 RANGIA - BARNAGAR S/C AEGCL 5 RANGIA - KAHILIPARA S/C AEGCL 6 RANGIA SISHUGRAM S/C AEGCL 7 SISHUGRAM KAHILIPARA S/C AEGCL 8 SARUSAJAI KAHILIPARA Q/C AEGCL 9 JIRIBAM - PAILAPOOL S/C AEGCL 10 SRIKONA - PAILAPOOL S/C AEGCL 11 SRIKONA - PANCHGRAM S/C AEGCL 12 PANCHGRAM - DULLAVCHERRA S/C AEGCL 13 LTPS NTPS D/C AEGCL 14 TINSUKIA DIBRUGARH S/C AEGCL 15 TINSUKIA - NTPS S/C AEGCL 16 DIBRUGARH MORAN S/C AEGCL 17 LTPS MORAN S/C AEGCL 18 LTPS MARIANI S/C AEGCL 19 MAWLAI - NEHU S/C MECL 20 NEHU NEIGRIHMS S/C MECL 21 NEIGRIHMS KHLIEHRIAT S/C MECL 22 KHLIEHRIAT KHLIEHRIAT II MECL 23 UMIUM ST I MAWLAI S/C MECL 24 NEHU MAWLAI S/C MECL 25 UMIUM ST III UMIUM ST IV D/C MECL 26 BALIPARA-DEPOTA AEGCL 5

27 P K BARI - DHARMANAGAR S/C TSECL 28 LOKTAK RENGPANG MANIPUR 29 RENGPANG JIRIBAM MANIPUR 30 NINGTHOUKONG IMPHAL S/C MANIPUR D. BUS REACTORS 1 MARIANI - 2X12.5 MVAR AEGCL 2 SAMAGURI - 2X12.5 MVAR AEGCL 6