Project Overview CreekSide XVI & XVIII Building Dimensions CreekSide XVI - 155,866 square feet CreekSide XVIII - 236,140 square feet 32 clear height 50 x 54 column spacing and 60 speed bay CreekSide Advantage Industrial and Distribution Center 500-acre master-planned park ideal for distribution and light manufacturing Strategically Located within 500 miles of 60% of North America s population Norfolk-Southern Intermodal - Conveniently located within 3 miles of new Norfolk-Southern Intermodal facility; within 1 mile of Alum Creek and I-270, minutes from I-70 and I-71 Industrial Distribution Corridor features multiple transportation options, including highway, air, rail and major delivery systems; just minutes from Port Columbus International Airport and Rickenbacker Air Industrial Park Unparalled Tax Incentives 15-year, 100 percent real estate tax abatement Utility Savings zone provides electricity and natural gas designed to capture to benefits of competition; lower prices, better service and newer products; Municipal utility offers savings over competing rates Overview Location 5 Lockbourne, OH 43125 Economics Asking Rate $4.50-$4.75 PSF Operating Expenses $0.50 PSF Leasing Contact The Pizzuti Companies Phil Rasey 614/280-4008 (P) 614/280-5000 (F) prasey@pizzuti.com
Project Overview HVAC Warehouse heated by gas-forced air rotation units System will maintain 60º F at 0º F outside Concrete Work Floor is a 7 slab in warehouse area and traffic lanes Dowelled construction joints and saw cut control joints Concrete floors with a minimum compressive strength of 4,000 psi Floor flatness minimum of Ff45 per the acceptable Face flatness standards Dock Layout 60 concrete apron in dock area 28 dock openings equipped with 9 x 10 insulated sectional steel overhead doors, pits, 40,000 lb. 9 x 10 levelers, shelters and bumpers with provisions for additional doors Four 14 x 16 drive-through doors Lighting Two high bay per bay with motion sensors Plumbing 2 domestic water service main 8 fire main with 6 sprinkler laterals Electrical Three 600 AMP, 277/480 volt 3-phase service located on the dock side of building Additional power available as needed via four transformer locations Roof White TPO roof with 10-year warranty Insulation Values Walls = R10 Roof = R20 Downtown Columbus Fire Protection ESFR Sprinkler system 8 fire loop around building with hydrants 70 315 71 270 23 71 104 670 Port Columbus International Airport Alum Creek Drive 70 33 creekside Rickenbacker Airport
10' PARKING SETBACK 25' BUILDING SETBACK 160 PARKING SPACES SHARED TRUCK COURT FUTURE PARKING 25' BUILDING SETBACK 10' PARKING SETBACK 10' PARKING SETBACK 25' BUILDING SETBACK A A B B 7 C 6 5 4 3 2 1 LEASED 162'-10" x 311'-8" 50,660 S.F. 6 5 4 3 2 1 C 32'-0" CLEAR HEIGHT TO BOTTOM OF STRUCTURE IMMEDIATELY AFTER GIRDER D 32'-0" CLEAR HEIGHT TO BOTTOM OF STRUCTURE IMMEDIATELY AFTER GIRDER 54'-0" D 19'-0" 22'-0" 19'-0" E E F G H 54'-0" CREEKSIDE 18 2353 GLOBAL DRIVE AVAILABLE 270'-0" x 311'-8" 84,329 S.F. 50'-0" F 2373 GLOBAL DRIVE 595'-8" x 261'-8" BUILDING - 155,871 S.F. G H 50'-0" CREEKSIDE 16 FULLY LEASED J J K K L M LEASED 324'-10" x 311'-8" 101,156 S.F. L M 20 FUTURE PARKING N P PROPOSED 50' BUILDING LINE SITE ANALYSIS SITE AREA 1,230,556 SF BUILDING AREA 392,016 SF SITE COVERAGE 31.86% Q 52 FUTURE PARKING 10' PAVING SETBACK PROPOSED R.O.W. LINE ORIGINAL R.O.W. LINE A L U M C R E E K D R I V E PAVEMENT (INCLUDING FUTURE PARKING) 286,985 SF TOTAL IMPERVIOUS (INCLUDING FUTURE) 679,001 SF TOTAL COVERAGE 55.1% CURRENT PARKING 246+12 ADA FUTURE PARKING 113 WIDTH OF EAST TRUCK DRIVE AT R/W 37.05' WIDTH OF AUTO DRIVEWAY AT R/W 22.12' WIDTH OF WEST TRUCK DRIVEWAY AT R/W 36.21' 1 SP-1 ARCHITECTURAL SITE PLAN 1" = CREEKSIDE 16 & CREEKSIDE 18 r e d SITE PLAN SP-1 OBETZ, OH MAY APRIL 16, 7, 2017 2018
CreekSide XVI & XVIII
CreekSide XVI & XVIII
CreekSide Industrial Center