Flex Industrial with Yard

Similar documents
Hotel / Retail Site TAHOE RENO INDUSTRIAL CENTER MCCARRAN NEVADA FOR SALE > SOLD!

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF

GAYLE MANUFACTURING FACILITY AVAI LABLE FOR S ALE 1455 E. KENTUCKY AVE, WOODLAND, CA 95776

It s in the Details: A Deeper Dive to Maximize Network Analysis Value

Offering Memorandum. 4333, 4375 and 4415 Bandini Boulevard Vernon, CA June Prepared by: Cresa

2.44 $40,000 per acre. Dillon Cir, Spartanburg, SC. ±2.44 Total Acres Prime Commercial Land

PHOTOS TAKEN - OCTOBER 2017

Now Under Construction Sustainably Designed 23-Story Mixed-Use Tower

Porsche Experience Center Los Angeles (PEC)

U.S. System Summary: ARIZONA/SOUTHWEST

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

FOR LEASE PROCTOR AVENUE City of Industry, CA ±217,464 /SF WAREHOUSE ACRES OF LAND. lee-associates.com

1570 OLD TROLLEY ROAD Summerville, South Carolina

Heightened Expectations

STAFF REPORT CITY COUNCIL MEETING SEPTEMBER 15, 2015

Toyota might look at Tennessee 'megasite' outside Memphis

Dulles Corridor Air Rights Study Investigation

Coliseum Centre Five 2810 Coliseum Centre Drive Charlotte, NC 28217

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

Workforce Development Rankings Site Selectors Survey E-Commerce Asia Pacific

JIFFY LUBE 670 W RAY ROAD GILBERT, AZ 85233

Available Land - Sacramento

INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/ GROSS ACRES DLH PARCELS #114 & #115 +/ GROSS ACRES

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Robb Drive Development

The Millenia Town Center consists of a ±12.58 acre portion of the ±210 acre. The Millenia Town Center is currently planned to include two projects

2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

Rail alignment and benefits (rab) study

RETAIL INVESTMENT GROUP, LLC

RDO. Tesla Motors Indianapolis, Indiana RYAN D. O CONNELL OFFERED BY: P INVESTMENTS

Los Angeles and California: Leading in Clean Technology

Autonomous Vehicles: A look into the past - a look into the future

Wildewood Shopping Center //

JIFFY LUBE - HESPERIA, CALIFORNIA

ELKO JUNCTION. Meridian Pacific, Ltd. CINEMA 6. RETAIL SPACES AVAILABLE 5,350 SF to 7,000 SF Pad/End Cap. ElkoJunction.com.

PLANNING TO START OR EXPAND A BUSINESS?

Southern California - CHSRA

$2,046, Cap / Absolute NNN Lease 2374 Old Fort Parkway, Murfreesboro, TN Circle K (Kangaroo Express)

11012 FIRESTONE BLVD., NORWALK, CA 90650

FOR LEASE. For Lease - Great Rental Rates - Call Broker. West Sacramento, CA, FOR LEASE Sacramento Avenue

Changing Behavior and Achieving Mode Shi2 Goals

Implementing Regional Transit: The Utah Story. Matt Sibul Chief Planning Officer Utah Transit Authority

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

AMERICA. rides the BUS

OFFERING MEMORANDUM 1320 HOLIDAY LANE FAIRFIELD, CA 94534

Sales and Use Transportation Tax Implementation Plan

Resilient South Florida: How to Thrive (and Survive) in a Growing Region

The Case for. Business. investment. in Public Transportation

Measuring Accessibility. Andrew Owen Director, Accessibility Observatory May 17, 2017

Zero-Emission Vehicles:

The Brick Yard Buildings F & J Mid Atlantic Blvd. Laurel/Beltsville, Maryland. 10,000 to 122,136 SF

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

4.2 Acres Commercial Land Stone Oak Parkway San Antonio, Texas

TABLE OF CONTENT. Aerial Page 1. Executive Summary Page 2. Parcel Aerial Page 3. Rent Roll Page 4. Tenant Information Page 5

Rail alignment and benefits (rab) study

9909 MAIN ST. FAIRFAX VA 22031

WAKE TRANSIT PLAN Summer 2018

Gateway Business Park 2001 Gandy Blvd N Build to Suit Price per S F. Special Features/Amenities. Clear Height Fire Sprinkler Yes Buildings 3

Sujit M. CanagaRetna The Council of State Governments (CSG) Southern Legislative Conference (SLC)

Whose specialization is smarter? A Comparison of Tesla s Silicon Valley and Jaguar Land Rover s West Midlands

FOR SALE OR FOR LEASE SALE PRICE: $2,000, & 2950 Garnet Avenue

INVESTMENT OFFERING. OFFERING PRICE $1,346,000 (7.25% Cap Rate)

Coolidge gives green light to Nikola Motors agreement

Transit in Bay Area Blueprint

Performance Measures and Definition of Terms

The USDOT Congestion Pricing Program: A New Era for Congestion Management

Jiffy Lube 5600 N Dixie Dr, Dayton, OH 45414

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms

Grease Monkey E State St, Rockford, IL 61108

sonnen will take all the risk on the household s volatile electricity charges, and

NRG evgo. Arun Banskota President NRG evgo

BIGHORN INDUSTRIAL PARK LOTS AVAILABLE

Performance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms

Office/Warehouse for Sale on Hilton Head

Property details Harrison st. batesville, ar ROPERTY SUMMARY

Clean Transportation Program. 1. Why EVs

Jeff Hanley Vice President Sales Energy Tubulars

41 BUTTERFIELD TRAIL

VEHICLE SALES AND RECESSIONS

SOLD VISIT OUR WEBSITE

California s Petroleum Infrastructure Overview and Import Projections

SECTION CONTENTS. Transportation and Connectivity (including Airlift) Highway Infrastructure. Multi-Modal Options. Fiber and Cell Connectivity

UCLA Lake Arrowhead Conference. October 18, 2010

DOUBLING OUR SALES IN NORTH AMERICA IN 5 YEARS

NORTHSTAR RETAIL GROUP OFFERING MEMORANDUM STILLWATER, MINNESOTA. Presented By NORTHSTAR

$18.50/SF FOR HARAHAN LEASE OFFICE BUILDING PRIME LOCATION LARGEST BLOCK OF AVAILABLE SPACE IN JEFFERSON PARISH REAL ESTATE. 990 N. Corporate Rd.

Performance Measure Summary - New Orleans LA. Performance Measures and Definition of Terms

With New Programs and Renewable Resources, Xcel Energy Is Ready for the Future

Connected Vehicle and Autonomous Vehicle (CV/AV) Mobility and Technology

Ormat Technologies, Inc.

Logistics Costs: Trends and Implications. Joseph Bryan Managing Director, Global Trade and Transportation Global Insight

ALLSTATE CORPORATE CENTRE MARKHAM S PREMIER OFFICE HUB

600 WEST STREET ROAD. property highlights. stats. get in touch. JIFFY LUBE WARMINSTER, PA PHILLIP AZARIK

CONNECTING THE REGION

Presentation to the Senate Committee on Transportation. April 7, Carson City, NV

4 COSTS AND OPERATIONS

2040 REGIONAL TRANSPORTATION PLAN

Transcription:

6 ACRES Flex Industrial with Yard BRITAIN DRIVE AVAILABLE SPACE: 6 Acres: Equipment Yard Build To Suit Flexible Options - 1, 2, 3 acre parcels For more information, please contact: SALE PRICE: Negotiable PROPERTY DESCRIPTION: > APN: 005-041-07 > JV / For sale / BTS > Fenced Yard with Metal Building > Project is on the corner of Waltham Way and Britain Drive > Located in the heart of TRI > Tahoe Reno Industrial Center is the new home of Tesla TED STOEVER, II Vice President +1 775.823.4665 ted.stoever@colliers.com GREG SHUTT Vice President +1 775.823.4667 greg.shutt@colliers.com All information should be verified by the recipient prior to lease, purchase, exchange or execution of legal documents. Colliers International 5520 Kietzke Lane, Suite 300 Reno, Nevada 89511 P: 775.823.9666 F: 775.823.4699 www.colliers.com

AERIAL SITE 528 Britain Dr USA Parkway 954 Aerosol Area 5,722 3,425 1,140 005-041-07 SITE Waltham Way

TESLA SWITCH FERNLEY 12 MILES N RENO 12 MILES

FERNLEY RENO/SPARKS RENO/SPARKS TO TRIC = 15 MILES FERNLEY TO TRIC = 16 MILES SILVER SPRINGS TO TRIC = 22.9 MILES DAYTON TO TRIC = 33.0 MILES SILVER SPRING To Las Vegas DAYTON

6 M TO 24M SF 640,000 SF 566,875 SF FERNLEY APPLE CAMPUS TO LAS VEGAS 8,000,000 SF 873,000 SF 980,000 SF 980,000 SF 790,000 SF 525,000 SF 450,000 SF RENO/SPARKS 707,000 SF BATTERY SUPPLIES 200,000 SF 277,000 SF 350,000 SF

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Commu Tahoe-Reno Industrial Center Company Index - July 2018 80 Í 80 WILD HORSE CANYON DR 2 1 3 4 12 13 11 14 15 10 16 18 8 9 7 6 17 5 WALTHAM WAY 19 25 2324 21 2220 WALTHAM WAY 2627 28 29 30 31 32 33 PERU DRIVE WALTHAM WAY 34 353637 BRITTAIN DRIVE 5152 54 55 50 53 56 57 59 60 58 40 39 41 42 46 44 43 45 47 48 49 PITTSBURGH AVE PERU DRIVE 67 68 69 61 USA PKWY 62 38 ELECTRIC AVE VENICE DRIVE DENMARK DR 70 71 74 65 66 64 63 ITALY DRIVE VENICE DRIVE 72 73 98 99 ELECTRIC AVE 101 102 MILAN DR 100 103 104 105 106 107 90 91 92 75 Rail PERU DRIVE 77 76 79 78 80 86 81 82 87 8384 88 85 89 93 96 94 95 INFINITY HIGHWAY 97 INFINITY HIGHWAY 0.25 0 0.5 1 Miles

RENO/TAHOE OVERVIEW The Greater Reno-Tahoe s business and economic climate is experiencing a major boom and the ramifications are far reaching! As the announcements of large and recognizable companies that are moving to the area are publicized, businesses, investors and developers from all over the country are rushing to jump on the bandwagon. Companies are finding that the ease of doing business, coupled with favorable taxes and incentives, is creating an unparalleled motivation for business leaders to focus on Northern Nevada. With the area including major cities such as Reno, Sparks, Carson City, and Incline Village, there is plenty of room for expansion. With the benefits of Nevada s no tax on businesses and a satisfying quality of life, it s a wonder why a business or developer would choose anywhere else. The region s optimal location to San Francisco, Portland, Salt Lake City, Las Vegas, and Los Angeles all within a day s drive is just another added benefit. With Nevada having the third most business-friendly tax structures in the country, it opened up many possibilities of out-of-state companies to locate facilities here, including Apple, Tesla, and Switch. Apple recently chose Reno as its site for the massive icloud data facility, making the largest land purchase in its history. Tesla Motors also invested in Nevada and is currently building the world s largest lithium ion battery factory 20 miles east of Reno. This $5 billion lithium battery plant is projected to employ 6,500 people and 16,000 indirect jobs within the next few years. In addition, the Las Vegas based tech company, Switch, plans to invest billions in a projected 8 million square foot data center. It is projected that there will be 16,000 new jobs that are indirectly related to these companies. The population of Reno/Sparks is estimated to grow by 65,000 new residents over the next 5 years due to an unprecedented economic boom. The demand for housing and commercial services will soon outpace the supply. Developers are realizing that potential housing shortages will drive home prices higher and available land for housing development is disappearing quickly. Commercial development is looking for rare in-fill locations using urban building design to fit the ever growing need. Switch will be bringing the world s largest data center to Reno, and will invest billions in a nearly 8 million square feet of data centers. This center will make Reno the most digitally connected state in the nation. Switch s project will include the development of a fiber optic network that will connect Reno and Las Vegas to Los Angeles and San Francisco. The giant e-retailer, Amazon. com, will bring its new 750,000 square foot warehouse to the LogistiCenter industrial park. Currently, the LogistiCenter industrial park is comprised of two other warehouses for a combined total of 1.2 million square feet. After beating out giant states, such as Texas and Arizona, Nevada was chosen to be the home to the 5 million square foot Tesla Gigafactory, rumored to be as large as 24 million square feet. The $5 billion dollar project is expected to create 6,500 direct jobs and 16,000 indirect jobs in the community. Tesla s factory will rank as one of the world s largest buildings and will set a new precedent within Reno s industrial renaissance. Initially built in early 2013, Apple s data center is continually growing. Currently, Apple has 345 acres of land reserved in the Reno Technological Park and fully intends to continue expanding around the facility. Apple s land purchase for its icloud facility has been considered the largest land purchase in Reno s history. The information furnished has been obtained from sources we deem reliable and is submitted subject to errors, omissions and changes. Although Colliers Nevada, LLC has no reason to doubt its accuracy, we do not guarantee it. All information should be verified by the recipient prior to lease, purchase, exchange or execution of legal documents. Colliers International 5520 Kietzke Lane, Suite 300 Reno, Nevada 89511 P: 775.823.9666 F: 775.823.4699 www.colliers.com