Provide an overview of the development proposal including projected site traffic volumes;

Similar documents
Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID


Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

LOST LAKE CORRIDOR REVIEW

Re: Cyrville Road Car Dealership

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

886 March Road McDonald's Transportation Study

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

Weaver Road Senior Housing Traffic Impact Analysis

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Traffic Impact Analysis Farmington Center Village

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

APPENDIX G. Traffic Data

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Village of Richmond Transportation Brief

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

MEMORANDUM November 19, 2012

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Appendix B: Traffic Reports

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

(A) Project Manager, Infrastructure Approvals

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

Sugarland Crossing Gwinnett County, Georgia

10 th Street Residences Development Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis

Date: December 20, Project #:

1012 & 1024 McGarry Terrace

Wellington Street West

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

1140 Wellington Street West Transportation Brief

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

267 O Connor Street Residential Development

C. iv) Analysis/Results

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

One Harbor Point Residential

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

STANDARD LIMITATIONS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Interstate 80 Corridor Study

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

Alpine Highway to North County Boulevard Connector Study

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

CitiGate Retail Development

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

MEDICAL COUNCIL OF CANADA 1021 THOMAS SPRATT PLACE TRANSPORTATION BRIEF

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

City of Fairfax, Virginia City Council Work Session

Mobilia Centre Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study

Proposed Hotel and Restaurant Development

TECHNICAL MEMORANDUM

Proposed Pit Development

Lakeside Terrace Development

Downtown One Way Street Conversion Technical Feasibility Report

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

Minto Mahogany Stage 2

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

CastleGlenn Consultants Inc.

Appendix A City of Sammamish Town Center Sub-Area Plan FEIS September 2007

Oakbrook Village Plaza City of Laguna Hills

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

6111 and 6141 Hazeldean Road Stittsville, Ontario. Proposed Residential Development Transportation Impact Study

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

LEMON FLATS SECOND ACCESS

Parking/Traffic Assessment Study

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Appendix E: Emission Reduction Calculations

Appendix H: Construction Impacts H-2 Transportation

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

Traffic Impact Analysis Update

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F

Transcription:

December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation Brief Introduction Carl Elliott Limited is seeking a zoning by-law amendment to allow an auto body shop to be a permitted use at two sites located at 2235 and 2265 Robertson Road in Bells Corners, Ottawa. Stantec Consulting Ltd. was retained to undertake a Transportation Brief to determine the potential transportation implications of the proposed change in land use. This Transportation Brief will: Provide an overview of the development proposal including projected site traffic volumes; Provide an overview of the current transportation environment; Assess the intersection operations of the easterly building signalized site access using the Synchro 8 TM software package; Assess the need for an eastbound left turn lane at the westerly building site access; and Determine the potential transportation upgrades required to support the proposed development application. Description of the Proposed Development The two subject sites are located in the Bells Corners community in the City of Ottawa along the northern side of Robertson Road. Figure 1 illustrates the location of the sites located at 2235 and 2265 Robertson Road.

December 19, 2013 Troy Elliott Page 2 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief Figure 1 Location of the Sites Existing Uses The westerly site used to contain a car dealership which included service bays. The easterly site was a car dealership and has since been used by small dealers for inventory and showroom. The easterly site currently has one service shop that is in operation. Proposed Uses The zoning amendment for both sites is to permit an auto body shop at both locations. These auto body shops will be located in the existing service bays. While some retrofitting may be required, no building expansion is currently proposed. Site Accesses Westerly Site Easterly Site The access to the westerly site forms the north leg of the Robertson Road at Mill Hill Road intersection. The intersection is stop-controlled. The site access forms the north leg and Mill Hill Road forms the south leg of the intersection. There is an existing westbound left turn lane on Robertson Road. The access to the easterly site forms the north leg of the Robertson Road at Westcliffe Road intersection. This intersection is currently signalized. Exclusive left turn lanes are provided in the northbound, eastbound and westbound directions.

December 19, 2013 Troy Elliott Page 3 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief Site traffic generation To determine the potential transportation impacts of the auto body shop designation it is necessary to estimate the additional demands that will be placed on the transportation network. The Institute of Transportation Engineers (ITE) Trip Generation Manual, 9 th Edition, was used to estimate the volume of traffic generated by both sites during the AM and PM peak hours. Land use code 841: Automobile Sales was thought to be the most representative of the proposed land use as it includes auxiliary uses such as leasing options, truck sales and automobile servicing. Table 1 summarizes the estimated vehicular trips expected to be generated during the morning and afternoon peak hours. It is projected that westerly site will generate 16 and 23 vehicular trips during the AM and PM peak hours respectively. Similarly, it is projected that the easterly site will generate 42 and 62 vehicular trips in the AM and PM peak hours respectively. Table 1 Site Traffic Generation ITE Trip Generation Rates Site Land Use Code 1000's SF AM Peak Hour PM Peak Hour Inbound Outbound Total Inbound Outbound Total Westerly 841: Automobile Sales 8.3 1.44 0.48 1.92 1.12 1.68 2.80 Easterly 841: Automobile Sales 22.1 1.44 0.48 1.92 1.12 1.68 2.80 Generated Vehicular Trips Westerly 841: Automobile Sales 8.3 12 4 16 9 14 23 Easterly 841: Automobile Sales 22.1 32 11 42 25 37 62 Total 841: Automobile Sales 30.4 44 15 58 34 51 85 The proposed body shops will be located within the existing service bays at each location. The turnaround time for an auto body shop is much longer than a typical service bay, which is likely to result in fewer vehicle trips generated by the proposed land use. Existing Transportation Environment Roads and Traffic Controls The major roadways in the study area are as follows: Robertson Road Robertson Road is a four-lane urban arterial that provides access to the two subject sites. It has a posted speed limit of 60 km/h and sidewalks are provided along both sides of the road. There is currently a painted median in the centre of Robertson Road that facilitates left turn movements at

December 19, 2013 Troy Elliott Page 4 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief intersections and private accesses. Just west of the westerly site a median exists along Robertson Road. Westcliffe Road Westcliffe Road is a two-lane urban collector with a posted speed limit of 40 km/h. Sidewalks are provided along both sides of the road until approximately 100 m south of Robertson Road, at which time sidewalks are only provided along the eastern side. The intersection with Robertson Road is currently signalized and includes pedestrian crosswalks. Transit Service Transit service is currently provided within close proximity of the subject sites by routes 69, 97, and 118. Route 69 is an express route that operates between Bells Corners and Hurdman Station and travels along Westcliffe Road. Route 97 is a regular route that runs along Robertson Road and Westcliffe Road and operates between Bells Corners and the Ottawa International Airport. Route 118 operates between Terry Fox Station and Hurdman Station and travels along Robertson Road. Figure 2 illustrates the local transit routes. Figure 2 Study Area Transit Routes - Site Locations Cycling and Walking Facilities Robertson Road and Westcliffe Road have sidewalks along both sides of each facility.

December 19, 2013 Troy Elliott Page 5 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief Figure 3-2a of the City of Ottawa s Cycling Plan depicts the existing cycling facilities within the study area. Robertson Road includes paved shoulders for cyclists and there is currently a City-Owned pathway facility within the study area. Figure 3 illustrates the existing cycling facilities within the study area as per the City of Ottawa s Cycling Plan. Figure 3 Existing Cycling Network Site Locations Source: City of Ottawa s Cycling Plan As per Figure 3-5b of the City s Cycling Plan, the study area will undergo some improvements to the existing cycling facilities. As seen in Figure 4 below, the NCC-Owned Capital Pathway will extend beyond Robertson Road. This is a long term plan that is scheduled to take place between 2018 2028. Figure 4 Future Cycling Network Source: City of Ottawa s Cycling Plan Site Locations

December 19, 2013 Troy Elliott Page 6 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief Transportation Impacts Intersection Capacity Analysis Based on the anticipated negligible change in traffic generated by the two sites, the intersection operations at both sites are projected to be similar to the previous land uses. The intersections turning movement counts at the Robertson Road at Haanel Drive (2012) and the Robertson Road at Westcliffe Road (2013) intersections were obtained from the City of Ottawa. Assuming both sites will be in operation by 2014, a 2% annual rate of growth was applied to the existing counts in order to project 2014 traffic volumes at both site accesses. Intersection operations at the site access for the easterly building were analyzed using the methodologies of the Highway Capacity Manual 2000, (HCM 2000), and facilitated by the Synchro 8 TM software package. The projected traffic generated by the easterly site was distributed according to the existing traffic patterns along Robertson Road. These volumes were then added to the existing counts obtained by the City of Ottawa. Since a portion of the easterly building is currently in use, a conservative approach was used whereby the traffic generated by the entire site was applied to the City s existing traffic counts. Upon analyzing the Robertson Road at Westcliffe Road / Easterly Site Access intersection, it was found that the addition of the auto body shop designation is projected to have a negligible impact on the transportation network. No data existed at the westerly site access, however, given the negligible volume expected to be generated by the site, the site access is expected to operate no differently than it did previously, or than at other unsignalized private commercial accesses along Robertson Road. Attachment 1 contains the detailed Synchro reports. Left turn lane warrants Throughout Bells Corners along Robertson Road there are currently left turn auxiliary lanes at the major intersections. Between intersections, a two way left turn lane facilitates left turn movements at private accesses. As such, driver expectation is that left turn movements along Robertson Road occur in dedicated turn lanes. An eastbound left turn lane warrant analysis was performed using the methodologies set forth in the Ministry of Transportation s Geometric Design Standards for Ontario Highways for the westerly site to determine whether an eastbound left turn lane is required. It was found that the Robertson Road at Mill Hill Road / Westerly Site Access intersection does not meet the warrant for the implementation of an eastbound left turn auxiliary lane. Attachment 2 contains the left turn lane warrant analysis.

December 19, 2013 Troy Elliott Page 7 of 7 Reference: 2235 and 2265 Robertson Road Transportation Brief Conclusions This transportation brief has found the following: The proposed sites will be undergoing a major zoning by-law amendment in order to accommodate an auto body shop at both locations. The proposed new land use designation to permit an auto body shop is expected to generate fewer trips than the existing service bays that will be retrofitted to accommodate the new use. The proposed change in land use will have a negligible impact on the transportation network. No transportation upgrades are required to accommodate permitting the auto body shop designation at both sites. Based on the transportation evaluation and the negligible impacts that have been identified in this Transportation Brief, the proposed addition of the auto body shop at both subject sites will not have a significant impact on the transportation network and should be permitted to proceed. Regards, Stantec Consulting Ltd. Robert Vastag, MCIP, RPP Lauren Mercer, B.A.Sc. Senior Transportation Planner Transportation Engineering Intern Phone: 613-724-4354 Phone: 613-784-2264 Fax: 613-722-2799 Fax: 613-722-2799 Robert.Vastag@stantec.com Lauren.Mercer@stantec.com Attachment: Attachment 1 Detailed Synchro Reports Attachment 2 Left Turn Lane Warrant Analysis

Attachment 1 Detailed Synchro Reports

Lanes, Volumes, Timings Robertson Road 2: Westcliffe Road/Easterly Site Access & Robertson Road 2014 Total AM Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 36 1268 58 27 314 18 75 2 96 15 1 8 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Storage Length (m) 40.0 0.0 40.0 0.0 0.0 0.0 0.0 0.0 Storage Lanes 1 0 1 0 0 1 0 0 Taper Length (m) 25.0 25.0 25.0 25.0 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.993 0.992 0.850 0.953 Flt Protected 0.950 0.950 0.953 0.970 Satd. Flow (prot) 1695 3366 0 1695 3363 0 0 1700 1517 0 1649 0 Flt Permitted 0.536 0.108 0.714 0.847 Satd. Flow (perm) 956 3366 0 193 3363 0 0 1274 1517 0 1440 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 10 13 63 9 Link Speed (k/h) 48 48 48 48 Link Distance (m) 179.9 209.4 64.7 53.9 Travel Time (s) 13.5 15.7 4.9 4.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 39 1378 63 29 341 20 82 2 104 16 1 9 Shared Lane Traffic (%) Lane Group Flow (vph) 39 1441 0 29 361 0 0 84 104 0 26 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.7 3.7 0.0 0.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 1.6 1.6 1.6 1.6 Two way Left Turn Lane Headway Factor 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 Turning Speed (k/h) 24 14 24 14 24 14 24 14 Number of Detectors 1 2 1 2 1 2 1 1 2 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 6.1 30.5 6.1 30.5 6.1 30.5 6.1 6.1 30.5 Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Size(m) 6.1 1.8 6.1 1.8 6.1 1.8 6.1 6.1 1.8 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(m) 28.7 28.7 28.7 28.7 Detector 2 Size(m) 1.8 1.8 1.8 1.8 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 2 6 Detector Phase 4 4 8 8 2 2 2 6 6 12/19/2013 Synchro 8 Report LM Page 1

Lanes, Volumes, Timings Robertson Road 2: Westcliffe Road/Easterly Site Access & Robertson Road 2014 Total AM Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 Total Split (s) 64.0 64.0 64.0 64.0 26.0 26.0 26.0 26.0 26.0 Total Split (%) 71.1% 71.1% 71.1% 71.1% 28.9% 28.9% 28.9% 28.9% 28.9% Maximum Green (s) 58.0 58.0 58.0 58.0 20.0 20.0 20.0 20.0 20.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Max Max Max Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 42.7 42.7 42.7 42.7 20.4 20.4 20.4 Actuated g/c Ratio 0.57 0.57 0.57 0.57 0.27 0.27 0.27 v/c Ratio 0.07 0.75 0.27 0.19 0.24 0.23 0.07 Control Delay 6.9 14.6 14.5 7.4 27.7 14.1 20.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 6.9 14.6 14.5 7.4 27.7 14.1 20.0 LOS A B B A C B B Approach Delay 14.4 7.9 20.2 20.0 Approach LOS B A C B Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 75.3 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.75 Intersection Signal Delay: 13.8 Intersection Capacity Utilization 63.6% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service B Splits and Phases: 2: Westcliffe Road/Easterly Site Access & Robertson Road 12/19/2013 Synchro 8 Report LM Page 2

Queues Robertson Road 2: Westcliffe Road/Easterly Site Access & Robertson Road 2014 Total AM Lane Group EBL EBT WBL WBT NBT NBR SBT Lane Group Flow (vph) 39 1441 29 361 84 104 26 v/c Ratio 0.07 0.75 0.27 0.19 0.24 0.23 0.07 Control Delay 6.9 14.6 14.5 7.4 27.7 14.1 20.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 6.9 14.6 14.5 7.4 27.7 14.1 20.0 Queue Length 50th (m) 2.3 72.2 1.9 11.2 9.3 4.4 1.8 Queue Length 95th (m) 5.7 93.0 7.1 16.5 24.9 18.6 8.8 Internal Link Dist (m) 155.9 185.4 40.7 29.9 Turn Bay Length (m) 40.0 40.0 Base Capacity (vph) 750 2643 151 2641 344 456 396 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.05 0.55 0.19 0.14 0.24 0.23 0.07 Intersection Summary 12/19/2013 Synchro 8 Report LM Page 3

HCM Signalized Intersection Capacity Analysis Robertson Road 2: Westcliffe Road/Easterly Site Access & Robertson Road 2014 Total AM Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 36 1268 58 27 314 18 75 2 96 15 1 8 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.99 1.00 0.85 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.97 Satd. Flow (prot) 1695 3368 1695 3362 1701 1517 1650 Flt Permitted 0.54 1.00 0.11 1.00 0.71 1.00 0.85 Satd. Flow (perm) 957 3368 193 3362 1274 1517 1441 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 39 1378 63 29 341 20 82 2 104 16 1 9 RTOR Reduction (vph) 0 4 0 0 6 0 0 0 46 0 7 0 Lane Group Flow (vph) 39 1437 0 29 355 0 0 84 58 0 19 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 2 6 Actuated Green, G (s) 42.7 42.7 42.7 42.7 20.4 20.4 20.4 Effective Green, g (s) 42.7 42.7 42.7 42.7 20.4 20.4 20.4 Actuated g/c Ratio 0.57 0.57 0.57 0.57 0.27 0.27 0.27 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 544 1914 109 1911 346 412 391 v/s Ratio Prot c0.43 0.11 v/s Ratio Perm 0.04 0.15 c0.07 0.04 0.01 v/c Ratio 0.07 0.75 0.27 0.19 0.24 0.14 0.05 Uniform Delay, d1 7.3 12.2 8.2 7.8 21.3 20.7 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 1.7 1.3 0.0 1.7 0.7 0.2 Delay (s) 7.3 13.9 9.5 7.9 23.0 21.4 20.4 Level of Service A B A A C C C Approach Delay (s) 13.7 8.0 22.1 20.4 Approach LOS B A C C Intersection Summary HCM 2000 Control Delay 13.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.59 Actuated Cycle Length (s) 75.1 Sum of lost time (s) 12.0 Intersection Capacity Utilization 63.6% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 12/19/2013 Synchro 8 Report LM Page 4

Lanes, Volumes, Timings Robertson Road 2: Westcliffe Road/Easterly Access & Robertson Road 2014 Total PM Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 15 546 102 119 1190 26 86 3 66 40 4 47 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Storage Length (m) 40.0 0.0 40.0 0.0 0.0 0.0 0.0 0.0 Storage Lanes 1 0 1 0 0 1 0 0 Taper Length (m) 25.0 25.0 25.0 25.0 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.976 0.997 0.850 0.930 Flt Protected 0.950 0.950 0.954 0.979 Satd. Flow (prot) 1695 3309 0 1695 3380 0 0 1702 1517 0 1625 0 Flt Permitted 0.126 0.356 0.664 0.847 Satd. Flow (perm) 225 3309 0 635 3380 0 0 1185 1517 0 1406 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 45 4 72 51 Link Speed (k/h) 48 48 48 48 Link Distance (m) 179.9 209.4 64.7 53.9 Travel Time (s) 13.5 15.7 4.9 4.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 16 593 111 129 1293 28 93 3 72 43 4 51 Shared Lane Traffic (%) Lane Group Flow (vph) 16 704 0 129 1321 0 0 96 72 0 98 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(m) 3.7 3.7 0.0 0.0 Link Offset(m) 0.0 0.0 0.0 0.0 Crosswalk Width(m) 1.6 1.6 1.6 1.6 Two way Left Turn Lane Headway Factor 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 Turning Speed (k/h) 24 14 24 14 24 14 24 14 Number of Detectors 1 2 1 2 1 2 1 1 2 Detector Template Left Thru Left Thru Left Thru Right Left Thru Leading Detector (m) 6.1 30.5 6.1 30.5 6.1 30.5 6.1 6.1 30.5 Trailing Detector (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Position(m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Size(m) 6.1 1.8 6.1 1.8 6.1 1.8 6.1 6.1 1.8 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(m) 28.7 28.7 28.7 28.7 Detector 2 Size(m) 1.8 1.8 1.8 1.8 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 2 6 Detector Phase 4 4 8 8 2 2 2 6 6 12/19/2013 Synchro 8 Report LM Page 1

Lanes, Volumes, Timings Robertson Road 2: Westcliffe Road/Easterly Access & Robertson Road 2014 Total PM Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 Total Split (s) 62.0 62.0 62.0 62.0 28.0 28.0 28.0 28.0 28.0 Total Split (%) 68.9% 68.9% 68.9% 68.9% 31.1% 31.1% 31.1% 31.1% 31.1% Maximum Green (s) 56.0 56.0 56.0 56.0 22.0 22.0 22.0 22.0 22.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Max Max Max Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 39.9 39.9 39.9 39.9 22.4 22.4 22.4 Actuated g/c Ratio 0.53 0.53 0.53 0.53 0.30 0.30 0.30 v/c Ratio 0.13 0.39 0.38 0.73 0.27 0.14 0.21 Control Delay 10.5 9.6 13.0 15.3 26.4 7.7 15.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.5 9.6 13.0 15.3 26.4 7.7 15.0 LOS B A B B C A B Approach Delay 9.6 15.1 18.4 15.0 Approach LOS A B B B Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 74.6 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.73 Intersection Signal Delay: 13.7 Intersection Capacity Utilization 66.2% Analysis Period (min) 15 Intersection LOS: B ICU Level of Service C Splits and Phases: 2: Westcliffe Road/Easterly Access & Robertson Road 12/19/2013 Synchro 8 Report LM Page 2

Queues Robertson Road 2: Westcliffe Road/Easterly Access & Robertson Road 2014 Total PM Lane Group EBL EBT WBL WBT NBT NBR SBT Lane Group Flow (vph) 16 704 129 1321 96 72 98 v/c Ratio 0.13 0.39 0.38 0.73 0.27 0.14 0.21 Control Delay 10.5 9.6 13.0 15.3 26.4 7.7 15.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.5 9.6 13.0 15.3 26.4 7.7 15.0 Queue Length 50th (m) 1.0 25.7 9.6 67.3 10.1 0.0 4.7 Queue Length 95th (m) 4.0 35.2 20.2 86.7 27.4 9.9 18.8 Internal Link Dist (m) 155.9 185.4 40.7 29.9 Turn Bay Length (m) 40.0 40.0 Base Capacity (vph) 172 2542 485 2587 356 506 458 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.09 0.28 0.27 0.51 0.27 0.14 0.21 Intersection Summary 12/19/2013 Synchro 8 Report LM Page 3

HCM Signalized Intersection Capacity Analysis Robertson Road 2: Westcliffe Road/Easterly Access & Robertson Road 2014 Total PM Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 15 546 102 119 1190 26 86 3 66 40 4 47 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Total Lost time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frt 1.00 0.98 1.00 1.00 1.00 0.85 0.93 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.98 Satd. Flow (prot) 1695 3310 1695 3379 1702 1517 1623 Flt Permitted 0.13 1.00 0.36 1.00 0.66 1.00 0.85 Satd. Flow (perm) 225 3310 635 3379 1185 1517 1406 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 16 593 111 129 1293 28 93 3 72 43 4 51 RTOR Reduction (vph) 0 21 0 0 2 0 0 0 50 0 36 0 Lane Group Flow (vph) 16 683 0 129 1319 0 0 96 22 0 62 0 Turn Type Perm NA Perm NA Perm NA Perm Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 2 6 Actuated Green, G (s) 39.9 39.9 39.9 39.9 22.4 22.4 22.4 Effective Green, g (s) 39.9 39.9 39.9 39.9 22.4 22.4 22.4 Actuated g/c Ratio 0.54 0.54 0.54 0.54 0.30 0.30 0.30 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 120 1777 341 1814 357 457 423 v/s Ratio Prot 0.21 c0.39 v/s Ratio Perm 0.07 0.20 c0.08 0.01 0.04 v/c Ratio 0.13 0.38 0.38 0.73 0.27 0.05 0.15 Uniform Delay, d1 8.6 10.0 10.0 13.1 19.7 18.4 19.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.5 0.1 0.7 1.5 1.8 0.2 0.7 Delay (s) 9.1 10.2 10.7 14.6 21.6 18.6 19.7 Level of Service A B B B C B B Approach Delay (s) 10.2 14.2 20.3 19.7 Approach LOS B B C B Intersection Summary HCM 2000 Control Delay 13.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.56 Actuated Cycle Length (s) 74.3 Sum of lost time (s) 12.0 Intersection Capacity Utilization 66.2% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group 12/19/2013 Synchro 8 Report LM Page 4

Attachment 2 Left Turn Lane Warrant Analysis

Robertson Road at Mill Hill Drive / Westerly Site Access Eastbound Left Turn Auxiliary Lane Warrant