DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)

Similar documents
NEWS RELEASE November 8, 2017

A Cal Trans District 10 TANK(S) SIZE

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

ODOT District Two Monthly Construction Update

CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT

F:\Application Forms & Handouts\Fire Forms and Handouts\Fire Road Handout.doc Revised ( )

APPENDIX H. Transportation Impact Study

CITY OF BEVERLY HILLS STAFF REPORT

I-405 Sepulveda Pass Improvements Project

ODOT District Two Monthly Construction Update

SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards

EXHIBIT D. Fuel System Improvements Project Elements East Bay Fuel Facilities

FREQUENTLY ASKED QUESTIONS

Lacey Gateway Residential Phase 1

Project Working Group Meeting #5

FREQUENTLY ASKED QUESTIONS

More than $9 Million coming to Central Valley for transportation

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

December 12, Dear Secretary Foxx:

State Route 1 Auxiliary Lane Bus-on-Shoulder Concept of Operations DRAFT. Santa Cruz County Regional Transportation Commission

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Welcome. Please Sign In

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD)

Mountain Area Transportation Study Model Methodology and Assumptions Final

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Proposed Project I 35 Improvements from SH 195 to I 10

Metro Highway Program

Chapter 7: Corridor Visions

Section 5.0 ENVIRONMENTAL ANALYSIS

Appendix H: Construction Impacts H-2 Transportation

Lee County DOT Traffic Section Design Standard for Sign Installation

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Traffic Study for Barstow 2014 General Plan Amendment. Prepared for: The City of Barstow. Prepared by: ADVANTEC Consulting Engineers

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

PG&E s 2012 Request Window Proposals

Wentzville Parkway South Phase 2 & 2A

ACEforward. BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016

Click to edit Master text styles

Plan Check Policies and Guidelines

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

LCV Operating Conditions & Routes (August 2017) Page 1 of 5

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

Sepulveda Pass Corridor Systems Planning Study Update

30-Day Look Ahead Summary August 2011

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

Develop ground transportation improvements to make the Airport a multi-modal regional

An Inside Look at Electric Reliability 2016 Electric Reliability Report

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

Impacts to street segments were analyzed based on procedures detailed in the Highway Capacity Manual for levels of service related to roadways.

IH 35 FEASIBILITY STUDY

Plan Check Policies and Guidelines

Brent Spence Bridge Design Exceptions - Alternative I

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

The Design-Builder shall meet local road criteria provided by the local governing agencies.

Rural Planning. Highway Projects - CULLMAN COUNTY

I-225 Rail Line Iliff and Florida Stations Information Meeting

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

DIVISION V SURFACINGS AND PAVEMENTS

Appendix G Traffic Study Methodology

MO 370 Interchange Ramp at Salt River Road - Phase 1

NOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

Traffic Feasibility Study

Sepulveda Pass Corridor Systems Planning Study

Winter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015

SMOKY LAKE COUNTY IN THE PROVINCE OF ALBERTA BYLAW NO

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Loop 375 Border Highway West Extension Project

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

Local Public Agency Obligated Projects SFY 2018

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

IMPROVEMENT CONCEPTS

noise ContoURs C APPENDIX

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Public Works. Capital Projects FY

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

PASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST:

Table of Contents SR-91 IMPLEMENTATION PLAN i

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

Mid-Coast Corridor Transit Project

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

ACEforward. ACEforward includes a range of potential near-term and longer-term improvements.

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Transcription:

Additional formation C4KC 4 CC 48.34 48.39 03/03/19 03/09/19 19:01 5:01 EB/WB Begin: Old River Bridge : Old River Bridge Reason: Pile Driving P4AA 4 SJ 8.7 12.6 03/04/19 03/08/19 8:01 15:01 WB Begin: Whiskey Slough : Port of Stockton Parkway P4AA 4 SJ 15.6 15.6 03/04/19 03/08/19 7:30 17:01 EB/WB Begin: Argonaut Street : Argonaut Street, left shoulder C4SB 4 SJ 16 16 03/03/19 03/08/19 21:01 5:01 EB/WB Begin: terstate 5/Crosstown Freeway : terstate 5/Crosstown Freeway Restriction: Full connector ramp closures M4JA 4 SJ 18.1 17.1 03/04/19 03/04/19 8:30 14:30 WB Begin: Main Street : Stanislaus Street Restriction: #1 of 3 lanes, left shoulder Reason: Guardrail Repair P4AA 4 SJ 19.9 19.9 03/04/19 03/08/19 8:01 17:01 WB Begin: Stagecoach Road : Stagecoach Road Reason: Shoulder Work M5OA 5 MER 17.6 18.5 03/04/19 03/04/19 7:01 15:01 SB Begin: State Route 152 : California Aqueduct Bridge Restriction: #2 of 2 lanes Reason: Roadway wash-out Page 1 of 11 4:01

Additional formation M5OA 5 MER 17.6 18.5 03/04/19 03/04/19 7:01 15:01 SB Begin: WB State Route 152 : WB State Route 152 Restriction: Connector Ramp Closure Reason: Roadway wash-out C5OB 5 SJ 3.4 3.4 03/03/19 03/08/19 20:01 6:01 NB/SB Begin: State Route 132 : STate Route 132 Restriction: Various off and on-ramp closures C5OB 5 SJ 3.4 3.4 03/04/19 03/08/19 7:01 17:01 NB/SB Begin: State Route 132 : State Route 132 Restriction: Various off and on-ramp closures C5BC 5 SJ 19.6 22.5 03/04/19 03/08/19 20:01 4:59 SB Begin: French Camp Road : Roth Road Restriction: #1, #2 of 3 lanes C5SB 5 SJ 25.6 26.5 03/03/19 03/08/19 20:01 7:01 NB Begin: Anderson Street : Weber Avenue Restriction: #3, #4 of 4 lanes P12BA 12 SJ 18.6 19.5 03/04/19 03/05/19 7:01 16:01 WB Begin: Guild Avenue : Tecklenburg Road P26CA 26 CAL 10 10.3 03/04/19 03/05/19 7:01 17:01 WB Begin: Nove Way : WB State Route 12 Restriction: Left shoulder Reason: Shoulder Work T26CA 26 CAL 28.6 31.1 02/14/19 Not determined 0:01 23:59 EB/WB Begin: Deardorff Road : Wood House Mine Road Restriction: Long-term full highway closure Reason: Slide Removal/Repair 30 mins Page 2 of 11 4:01

Additional formation P33EA 33 STA 25.3 25.3 03/07/19 03/07/19 8:30 16:01 NB/SB Begin: Orchard Road : Orchard Road M49VA 49 MPA 18.5 48.8 03/06/19 03/07/19 9:01 16:01 NB/SB Begin: WB State Route 140 : Mariposa/Tuolumne County Line Restriction: Moving closure Reason: Pavement Marker Replacement P49BA 49 TUO 6.1 5.7 03/05/19 03/08/19 7:01 16:01 NB/SB Begin: Moccasin Switchback Road : Marsh Flat Road C88XA 88 AMA 5.5 6.2 03/04/19 03/08/19 7:01 17:01 EB/WB Begin: State Route 124 : Ione-Buena Vista Road Reason: Shoulder Work P88UB 88 SJ 14.8 14.8 03/04/19 03/08/19 7:01 17:01 WB Begin: View Drive : View Drive Restriction: #1 of 2 lanes, right shoulder C99CC 99 SJ 0 6.7 03/03/19 03/08/19 21:01 5:01 NB Begin: Stanislaus/San Joaquin County Line : State Route 120/Yosemite Avenue Restriction: #1 or #3 of 3 Lanes C99CC 99 SJ 0 6.7 03/03/19 03/08/19 21:01 6:01 SB Begin: Stanislaus/San Joaquin County Line : State Route 120/Yosemite Avenue Restriction: #1 or #3 of 3 Lanes C99CC 99 SJ 0.9 0.9 03/03/19 03/08/19 21:01 6:01 SB Begin: Main Street : Main Street Page 3 of 11 4:01

Additional formation C99CC 99 SJ 0.9 0.9 03/03/19 03/08/19 21:01 5:01 NB Begin: Main Street : Main Street C99CC 99 SJ 1.7 1.7 03/03/19 03/08/19 20:01 5:01 NB Begin: Fulton Avenue : Fulton Avenue Restriction: Full on-ramp closure C99CC 99 SJ 2.5 2.5 03/03/19 03/08/19 20:01 6:01 NB/SB Begin: Jacktone Road : Jacktone Road Restriction: Full on-ramp closures C99CC 99 SJ 6.7 6.7 03/03/19 03/08/19 20:01 6:01 NB Begin: State Route 120/Yosemite Avenue : State Route 120/Yosemite Avenue Restriction: Full connector ramp closures P99AA 99 SJ 4.9 5.8 03/04/19 03/08/19 7:30 17:01 NB/SB Begin: Austin Road : State Route 120/Manteca Bypass Restriction: Left shoulder, right shoulder Reason: Core Drilling P99AA 99 SJ 31.3 31.7 03/04/19 03/08/19 8:01 17:01 SB Begin: Turner Rd. : Mokelumne River Bridge Reason: Survey Work C99ZC 99 STA 0 15.1 03/04/19 03/08/19 21:01 6:59 NB/SB Begin: Merced/Stanislaus County Line : ulumne Boulevard Restriction: #1, #3, #2 of 3 lanes, left shoulder C99ZC 99 STA 6.4 0 03/04/19 03/08/19 21:01 6:59 SB Begin: North Turlock Overhead (South of Taylor Road) : Merced/Stanislaus County Line Restriction: #2, #1, #3 of 3 lanes, left shoulder Page 4 of 11 4:01

Additional formation C99XC 99 STA 13.9 15.1 03/03/19 03/08/19 20:01 5:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA 13.9 15.1 03/08/19 03/09/19 22:01 6:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA 13.9 15.1 03/09/19 03/10/19 22:01 8:59 NB Begin: South Modesto Undercrosssing : Tuolumne Boulevard Restriction: #2, #1 of 3 lanes, left shoulder C99XC 99 STA 14.5 14.5 03/03/19 03/08/19 20:01 5:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA 14.5 14.5 03/08/19 03/09/19 22:01 6:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA 14.5 14.5 03/09/19 03/10/19 22:01 8:59 NB/SB Begin: Crows Landing Road : Crows Landing Road C99XC 99 STA 15.1 15.1 03/03/19 03/08/19 20:01 5:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard C99XC 99 STA 15.1 13.9 03/08/19 03/09/19 22:01 6:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard Page 5 of 11 4:01

Additional formation C99XC 99 STA 15.1 13.9 03/09/19 03/10/19 22:01 8:59 NB/SB Begin: Tuolumne Boulevard : Tuolumne Boulevard C99XC 99 STA 15.1 13.9 03/03/19 03/08/19 20:01 6:59 SB Begin: Tuolumne Boulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA 15.1 15.1 03/08/19 03/09/19 22:01 6:59 SB Begin: Tuolumne Boulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA 15.1 15.1 03/09/19 03/10/19 22:01 8:59 SB Begin: Tuolumne Bloulevard : South Modesto Undercrosssing Restriction: #1, #2 of 3 lanes, left shoulder (alternately) C99XC 99 STA 15.5 15.5 03/03/19 03/08/19 20:01 6:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99XC 99 STA 15.5 15.5 03/08/19 03/09/19 22:01 6:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99XC 99 STA 15.5 15.5 03/09/19 03/10/19 22:01 8:59 SB Begin: 5th Street/G Street : 5th Street/G Street Restriction: Full on-ramp closure C99CC 99 STA 20.2 24.8 03/03/19 03/08/19 21:01 5:01 NB Begin: Beckwith Road : Stanislaus/San Joaquin County Line Restriction: #1 of 3 lanes, left shoulder Page 6 of 11 4:01

Additional formation C99CC 99 STA 20.2 24.8 03/03/19 03/08/19 21:01 6:01 SB Begin: Beckwith Road : Stanislaus/San Joaquin County Line Restriction: #1 of 3 lanes, left shoulder,median C99CC 99 STA 21.7 24.3 03/03/19 03/08/19 21:01 5:01 NB/SB Begin: Sisk Road : Hammett Road Restriction: Full off and on-ramp closure P108BA 108 STA 24.4 24.6 03/07/19 03/07/19 9:01 15:01 WB Begin: Coolidge Avenue : Granger Avenue Restriction: #2 of 2 lanes, right shoulder C108ZA 108 STA 32.5 32.7 03/04/19 03/08/19 6:59 17:01 EB/WB Begin: First Street (Riverbank) : Fourth Street Reason: Curb/Gutter/Sidewalk Work C108UA 108 TUO 0 2.8 03/03/19 03/08/19 20:01 5:59 EB/WB Begin: State Route 120/Yosemite Junction : WB State Route 49 Reason: Shoulder Work P120CA 120 SJ 6.6 6.6 03/04/19 03/08/19 7:01 16:01 WB Begin: Vasconcellos Avenue : Vasconcellos Avenue Reason: Curb/Gutter/Sidewalk Work C120BB 120 STA 11.2 18.2 03/03/19 03/08/19 20:01 5:59 EB/WB Begin: Lancaste Road : Stanislaus/Tuolumne County Line C120BB 120 TUO 0 6.8 03/03/19 03/08/19 20:01 5:59 WB Begin: Stanislaus/Tuolumne County Line : Divided Highway Restriction: #2 of 2 lanes, right shoulder Page 7 of 11 4:01

Additional formation C120BB 120 TUO 0 6.8 03/04/19 03/08/19 6:01 17:59 EB Begin: Stanislaus/Tuolumne County Line : WB State Route 49 Restriction: #1 of 2 lanes, right shoulder C120BB 120 TUO 0 6.8 03/04/19 03/08/19 8:01 15:59 WB Begin: Stanislaus/Tuolumne County Line : Divided Highway Restriction: #2 of 2 lanes, right shoulder C120BB 120 TUO 6.8 24.1 03/03/19 03/08/19 20:01 5:59 EB/WB Begin: Divided Highway : Moccasin Creek Bridge C120BB 120 TUO 12.6 24.1 03/04/19 03/08/19 6:01 17:59 EB/WB Begin: Mountain Bluff Road : Moccasin Creek Bridge M132OA 132 MPA 12.4 18.7 03/04/19 03/07/19 9:01 16:01 EB/WB Begin: Shimer Drive Way : State Route 49/Coulterville Restriction: Moving closure Reason: Pavement Marker Replacement C132JA 132 SJ 0.2 7.1 02/24/19 03/15/19 0:01 12:59 EB/WB Begin: Chrisman Road : San Joaquin/Stanislaus County Line Restriction: Long-term #1 of 2 lanes, left shoulder C132JA 132 SJ 2.2 2.2 03/03/19 03/08/19 20:01 6:01 EB/WB Begin: Bird Road : Bird Road C132JA 132 SJ 2.2 2.2 03/04/19 03/08/19 7:01 17:01 EB/WB Begin: Bird Road : Bird Road Page 8 of 11 4:01

Additional formation C132JA 132 SJ 3.2 3.2 03/04/19 03/08/19 7:01 17:01 EB/WB Begin: terstate 5 : terstate 5 C132JA 132 SJ 3.2 3.2 03/03/19 03/08/19 20:01 6:01 EB/WB Begin: terstate 5 : terstate 5 M132OA 132 STA 0 14.7 03/04/19 03/07/19 9:01 16:01 EB/WB Begin: San Joaquin/Stanislaus County Line : State Route 99 Restriction: Moving closure Reason: Striping Operation C132SA 132 STA 15 16.7 03/03/19 03/08/19 20:01 5:59 EB/WB Begin: H Street/9th Street : Conejo Ave Restriction: #2 of 2 lanes Reason: Curb/Gutter/Sidewalk Work P132AA 132 STA 16.6 16.8 03/04/19 03/08/19 20:01 5:01 WB Begin: Empire Avenue : San Juan Drive/Daly Avenue Restriction: #2 of 2 lanes, right shoulder C140RA 140 MPA 37.1 51.8 03/04/19 03/08/19 7:30 19:01 EB/WB Begin: Slate Gulch : Yosemite National Park Boundary Reason: Slope Repair/Clearing C140BA 140 MER 37.9 38.7 03/04/19 03/08/19 6:01 14:59 EB/WB Begin: Moomjean Avenue : Kibby Road C140BA 140 MER 38.7 37.9 01/07/19 12/31/19 0:01 23:59 WB Begin: Kibby Road : Moomjean Avenue Restriction: Long-term right shoulder 1 Page 9 of 11 4:01

C140QA 140 MPA MER 0 37.4 21.2 50 Additional formation 03/04/19 03/08/19 6:01 18:59 EB/WB Begin: 3rd Street : Santa Fe Ave Reason: Striping Operation P165EA 165 MER 0.3 0 03/04/19 03/08/19 7:01 17:01 NB/SB Begin: Pole Line Road : Pole Line Road C165GA 165 MER 10.9 27.9 03/04/19 03/08/19 8:01 15:59 NB/SB Begin: Del Rio Road : 3rd Avenue Reason: Striping Operation P580AA 580 SJ 12.4 13.4 03/04/19 03/08/19 21:01 4:01 WB Begin: East Midway Overhead : Patterson Pass Road Restriction: #2 of 2 lanes, right shoulder Reason: Sign Work P580AA 580 SJ 13.4 13.4 03/04/19 03/08/19 21:01 4:01 WB Begin: Patterson Pass Road. : Patterson Pass Road Restriction: Full off-ramp closure Reason: Sign Work P580AA 580 SJ 13.7 13.7 03/04/19 03/08/19 21:01 7:01 EB Begin: Patterson Pass Road. : Patterson Pass Road Restriction: Full off-ramp closure Reason: Sign Work P580AA 580 SJ 14.7 13.8 03/04/19 03/08/19 21:01 7:01 EB Begin: Alameda/San Joaquin County Line : Patterson Pass Road. Restriction: #2 of 2 lanes Reason: Sign Work C580UB 580 ALA 1.037 0.074 03/03/19 03/09/19 20:01 12:01 EB Begin: Midway Road : Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works 1 Page 10 of 11 4:01

Additional formation C580UB 580 ALA 1.037 0.074 03/03/19 03/09/19 20:01 4:01 WB Begin: Midway Road : Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works 1 NOTE: Unexpected schedule changes can occur due to weather, traffic, availability of equipment and material, and related issues. For updates on California State Highways, please visit the Caltrans Quickmap at http://quickmap.dot.ca.gov or call 1-800-427-ROAD. The Caltrans District 10 website is at www.dot.ca.gov/dist10. Page 11 of 11 4:01