TO Approved for public release, distribution unlimited

Similar documents
ENGINE, AIRCRAFT, GAS TURBINE MODEL T63-A-720 P/N NSN

LM2500 BORESCOPE INSPECTION REPORT

TECHNICAL MANUAL AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE MANUAL ENGINE, GAS TURBINE MODEL T55-L-714 NSN

UNCLASSIFIED R-1 ITEM NOMENCLATURE

CHAPTER 3 LIFE-LIMITED COMPONENTS

AVIATION INVESTIGATION REPORT A02P0168 ENGINE POWER LOSS

TECHNICAL MANUAL AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE MANUAL ENGINE, GAS TURBINE MODEL T55-L-714 NSN

RFP # ADDENDUM #1

Rolls -Royce M250--B17 SERIES OPERATION AND MAINTENANCE. Table 602 Inspection Checksheet Owner Date. A/C Make/Model S/N Reg No.

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

CONTINENTAL AIRCRAFT ENGINE service bulletin

Rolls-Royce Corporation M250-B15G COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

CHAPTER 3 LIFE-LIMITED COMPONENTS

SERVICE LETTER TITLE EXHAUST - TRANSMITTAL OF LYCOMING SERVICE BULLETIN NO 627C, EXHAUST SYSTEM INSPECTION SERIAL NUMBERS

SERVICE BULLETIN MANDATORY

MINI PACK N/A N/A N/A N/A FA0995 N/A

Rolls -Royce M250--C20R SERIES OPERATION AND MAINTENANCE

AIRCRAFT HOLDINGS AND LEASING LLC. 50 CENTRAL AVENUE SARASOTA FL LAST ACTUALS

LESSONS LEARNED WHILE MEASURING FUEL SYSTEM DIFFERENTIAL PRESSURE MARK HEATON AIR FORCE FLIGHT TEST CENTER EDWARDS AFB, CA 10 MAY 2011

Aircraft No. 6 N925AU, T-25; P3-A; Serial Number

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 1E8

HARTZELL PROPELLER INC.

l~adi Technical Information Report TX HYDROKINETIC TRANSMISSION Interim Report March 1969

Generator Rebuild and Unit Refurbishment for the Wells Hydroelectric Project. NWHA Spokane October 30, 2014

PC Hour Meter Jul-09 Hour Meter m3 Bucket Into Service Nov. 2000

TO Approved for public release, distribution unlimited

AIR TRANSPORTABILITY GUIDANCE TWO M151 1/4-TON TRUCKS AND ONE 1/4-TON TRAILER IN CH-47 HELICOPTER

Cycles values Cycle Name Value Cycle Name Value Cycle Name Value Cycle Name Value

Chromalloy. Borescope and Test Report. Prepared for. Triumph Air Repair A Triumph Group Company

United States Air Force Aircraft History Cards Microfilm

ACCESSORY GEARBOX NSN APPENDIX C EQUIPMENT

(b) This AD supersedes AD R1, Amendment

SERVICE BULLETIN MANDATORY

APS 2000 Shop Findings Report

TECHNICAL MANUAL OPERATOR, AVIATION UNIT, AND AVIATION INTERMEDIATE MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST CHAPTER 1 INTRODUCTION

FAA T53-L-13L Turbine Fragment Containment Test

Page 1 of 6 MAI RECORDS - MEB MECH INITIAL. Changes Made to Approved Limitations Registration: N139MH By: SBS Initials

[Docket No. FAA ; Directorate Identifier 2016-NE-09-AD] Airworthiness Directives; Pratt & Whitney Division Turbofan Engines

Presented by Mr. Greg Kilchenstein OSD, Maintenance. 29August 2012

Airworthiness Directive Schedule

MINI PACK BUILD SPEC. 885 ESN: FA0278 TSN: 15, CSN: 15,815 TSO: N/A CSO: N/A TSHSI: 2, CSHSI: 2,373 RGB SN. FA0278

GUADALUPE POWER PARTNERS, LP Section MAINTENANCE GT1 CI WORK SCOPE

[Docket No. FAA ; Directorate Identifier 2008-SW-44-AD; Amendment ; AD ]

Fuse: On-wing engine inspection

TCDS NUMBER E00078NE U.S. DEPARTMENT OF TRANSPORTATION REVISION: 3 DATE: April 12, 2011

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. A19SO

Helicopter Dynamic Components Project. Presented at: HCAT Meeting January 2006

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

Service Bulletin No: Ref No: 170 Modification No: EC ATA Chapter: 53

icollective PROTECTION FOR COMMAND POST VEHICLES

TRAFFIC VOLUME TRENDS July 2002

TYPE CERTIFICATE DATA SHEET

TRANSMITTAL SHEET CFM INTERNATIONAL CFM56-7B SERVICE BULLETIN , REVISION 10 APRIL 14, 2014

UNCLASSIFIED AD ,3 ARMED SERVICES TECHNICAL INFORMATION AGENCY ARLINGTON HALL STATION ARLINGTON 12, VIRGINIA UNCLASSIFIED

CSB Technical Portions FAA Approved Aileron Pushrod to Aileron Control Circuit Clearance Inspection & Rework

TYPE CERTIFICATE DATA SHEET NO. A8SO

Up and Down Months of the Stock Market

TYPE-CERTIFICATE DATA SHEET

European Aviation Safety Agency

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Singapore Airlines Flight 368 Engine Fire. Ng Junsheng Head (Technical)/Senior Air Safety Investigation Transport Safety Investigation Bureau

TYPE-CERTIFICATE DATA SHEET

United States Army Aviation Center of Excellence. Fort Rucker, Alabama JULY 2011 STUDENT HANDOUT

Aircraft Propulsion Technology

Rolls -Royce M250--C20R SERIES OPERATION AND MAINTENANCE. Table 602 Scheduled Inspections. Inspection Checksheet. A/C Make/Model S/N Reg. No.

UNIT MAINTENANCE INSTRUCTIONS PAGE 2-1 DIRECT SUPPORT

MANDATORY SERVICE BULLETIN

Date: 04 October 2013

F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel

AIRWORTHINESS DIRECTIVE

Airworthiness Directive

Cessna Aircraft Company: Amendment ; Docket No. FAA ; Directorate Identifier 2012-NM-020-AD.

CONFERENCE ON AVIATION AND ALTERNATIVE FUELS

Supplement No. 1. Service Bulletin No Crankshaft Replacement in Lycoming Engines

Airworthiness Directive Schedule

United States Army Warfighting Center Fort Rucker, Alabama NOVEMBER 2006

Airworthiness Directive

F100 ENGINE NACELLE FIRE FIGHTING TEST MOCKUP DRAWINGS

MOONEY INTERNATIONAL CORPORATION The Symbol of Performancet MOONEY SPECIAL LETTER Date:

MANDATORY SERVICE BULLETIN

DATE: February 24, 2014 Service Instruction No. 1009AW (Supersedes Service Instruction No. 1009AV) Engineering Aspects are FAA Approved

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Mr. John Aitken June 6, 2017 Page 2

Airworthiness Directive Schedule

AIRWORTHINESS DIRECTIVE. Date: 18 December 2013 SUPERSEDED

Peninsula Corridor Electrification Project (PCEP)

Maintenance For Financiers

SUBJECT: Single Engine Service Bulletin SB Revision 1: Cosmetic Window Repair

Single Engine. Service Bulletin TITLE ELEVATOR TRIM TAB ACTUATOR ASSEMBLY INSPECTION EFFECTIVITY. Group A airplanes: Serial Numbers

DSCC Annual Tire Conference CATL UPDATE. March 24, 2011 UNCLASSIFIED: Dist A. Approved for public release

Crew integration & Automation Testbed and Robotic Follower Programs

IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER

buuuuuui itw-itol STDYOF SUBSTITUTE MATERIALS FOR mis (NATIONAL ItUREAU OF STA. (U) ARMY MATERIEL COMMAIND

TYPE CERTIFICATE DATA SHEET NO. E14EA. Avco Corporation Williamsport, Pennsylvania 17701

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 1E12

Current GE Frame Spare Parts Manufacture Capabilities

Airworthiness Directive Schedule

FAA approval has been obtained on technical data in this publication that affects airplane type design.

US Army Non - Human Factor Helicopter Mishap Findings and Recommendations. Major Robert Kent, USAF, MC, SFS

REMOTE MINE AREA CLEARANCE EQUIPMENT (MACE) C-130 LOAD CELL TEST DATA

Transcription:

UNCLASSIFIED AD NUMBER AD869088 NEW LIMITATION CHANGE TO Approved for public release, distribution unlimited FROM Distribution authorized to U.S. Gov't. agencies and their contractors; Critical Technology; APR 1970. Other requests shall be referred to Army Aviation Systems Command, Attn: AMSAV-A-PWB, ST Louis, MO 63166. AUTHORITY USAAVSCOM ltr, 7 Nov 1973 THIS PAGE IS UNCLASSIFIED

BY A4dIL YCOMINr DlVIION STRATFORqO. CONNECTICUT PROGRESS REPORT NO. 11 Covering Period 1 March through 31 March 1970 3 5 T55-L- 11 ENGINE SUPPORT FOR CH-47C AIRCRAFT U.S. ARMY TEST PROGRAMS = '"""--"lri n % CONTRACT, Amend 1 SAT f T #2 UNCLASSIFIED This document is subject to special export controls,nd each transmittal to foreign governmie.ts 9.r foreig9, nationals pay bt mats only with prdop approvel of - - - - April 1970 Reproduced by the CLEARINGHOUSE 3 APR P (d for Federal Scientific & Technical information Springfield Va. 22151 7", "...-

1) AD-ML. 290 3-2) "dn 4) -I J/ Check List 4) - / )4 DO NOT PUNCH for Fields/- 5) Avco Lycoming Div., Stratford, Conn. D ) T5-L-U1 Engine Support for CIj =27C Aircraft Added Entry 1 / U. S. Army Test ProgrqD. 9) Progress rept. no. o8,, if31 Dec 69, 4 10) - (11) Jan 70, (120 7P_-(14)-. 5 5) Coniract DAAJ01-69-C-0. 901II (16) - (17) - 6, 38) - (19)- 8 21) See also Progress rept. no. 7, AD-863 484. 9/ 22) 2 Commanding Officer, AzW Aviation Systems Command 10 - Attn: AAV-A4i-B. St. Louis, Mo. 63166. 11/ / mwb 2-3-70-12 14 16 Release / Date 18/ 17 23) D escriptors i.,-,. 21 ) I',I' "+ '23 303 a 33 / 25) Idetifie5 27) Page(s27 bstrct e 332it Cd, 25) Identifiers 27) Abstract-' See reverse0 4 0.e (s) -- 29) Inventory 19 30) Annotated Title FORM NBS-803 (1(}-es) DOCUMENT PROCESSING WORKSHEET 33) Dist,. Code 2 "34) Serial 8 35) Code 213 150 U.S. DEPARTMENT OF COMMERCE NATIONAL BUREAU OF STANL'ARDS USCOMM-DC 35168-Pea

AIdY-VeMINO DIVISION PROGRESS REPORT NO. 11-1- (1 March through 31 March 1970) TITLE PURPOSE T55-L-ll Engine Support for CH-47C Aircraft U.S. Army Test Programs To provide services and supplies (exclusive of spare parts) required through July 1970 to support T55-L-11 aircraft engines being used in the U.S. Army CII-47C Test Programs at Eglin Air Force Base, Florida; Fort Rucker, Alabama; Edwards Air Force Base, California, and other sites. ENGINE ALLOCATIONS AND CUMULATIVE ENGINE OPERATING TIME Under this program, Avco Lycoming is responsible for support of engines being used in the U.S. Army CH-47C/T55-L-11 Test Programs. However, since Avco Lycoming does not control either shipping destination or usage of engines shipped, it is not possible to establish a clear allocation of actual engines to be used in the test aircraft covered under this contract. Information provided in Table I covers only those engines actually used, serviced, and firmly assigned during the reporting period. Table I records the status of T55-L-11 engines under the support program for the current reporting period, including monthly operating time and cumulative engine time. TEST SITE/AVCO LYCOMING ACTIVITY Monthly test site activity of the T55- L- 11 engines and Avco Lycoming investigations and repairs, as well as technical difficulties encountered on individual engines, are presented below under the site where the engines are assigned. Fort Rucker Engines LE-19138 and LE-19191 Engines LE-19138 and LE-19191 are operational and installed in CH-47C Aircraft No. 68-15858. LE-19138 (T.T, 330 hours) was installed on 29 March 1970 to replace LE-19Z69 (T.T. 444 hours), which was removed for a scheduled hotend inspection. Engine LE-19138 had been removed from CH-47C Aircraft No. 68-15860 on 18 March for low torque and high turbine inlet temperature during starting. The engine was sent to Avco Lycoming where inspection revealed that the variable inlet guide vane feedback rod was not properly rigged. This problem was corrected and the engine was returned to Fort Rucker. Engine LE-19191 E 240A - r

AILYCOMING IVI9ION PROGRESS REPOIPT NO. 11-2- (1 March through 31 March 1970) (T. T. 317 hours) was installed in this aircraft on 21 March to replace LE-19237 (T. T. 152 hours), which was removed for oil contamination. LE-19191 had been removed from CH-47C Aircraft No. 68-15860 o/p 17 March for a scheduled hot-end inspection. The fourth turbine disc assembly (P/N 2-141-170-01, S/N M76181) was shipped to Avco Lycoming for inspection of the blade outer shroud gaps, and replaced by the disc assembly (S/N M76245)from engine LE-19269. LE-19191 was returned to service on CH-47C Aircraft 68-15858. LE-19216 and LE-19244 Engines LE-19Z16 and LE-19244 are operational and installed in CH-47C Aircraft No. 68-15860. LE-19216 (T. T. 0 hours) is new to the support program and was installed on 18 March to replace LE-19191, which had been removed for a scheduled hot-end inspection. Engine LE-19244 (T. T. 211 hours) was installed on 18 March to replace LE-19233, which had been removed for low torque. LE-19237 and LE-19369 Engines LE-19237 and LE-19369 are operational and installed in CH-47C Aircraft No. 68-15861. LE-19237 (T. T. 152 hours) was installed on 31 March to replace LE-19181 (T. T. 706 hours), which had been removed for oi0 system contamination. LE-19119 Engine LE-19119 (T. T. 449 hours) is undergoing investigation at Fort Rucker for excessive oil consumption. LE-19122 Engine LE-19122 (T. T. 146 hours) was removed during the last reporting period for excessive oil consumption. The number two bearing assembly (I/N 2-101-640-08, S/N 11811) was replaced by the assembly (S/N 90001) from Engine LE-19225. During reassembly, it was not possible to obtain proper face runout on the first gas producer disc. The engine is now awaiting disposition. LE-19225 Engine LE-19Z25 is a flight spare engine. to support other engines. The engine has been used for spare parts E 249A

4dL,,,N.OVI,,ON PROGRESS REPORT NO. 11-3- (1 March through 31 March 1970) LE-19231 and LE-19233 Engines LE-19231 (T.T. 555 hours) and LE-19233 (T.T. 453 hours) are at Fort Rucker awaiting test stand run for investigation of low torque conditions. LE-19181 Engine LE-19181 (T.T. 706 hours) was removed from CH-47C Aircraft No. 68-15861 on 30 March for investigation of continued chip detector activations. The engine had undergone a scheduled hot-end inspection on 21 March (T. T. 672 hours). The power turbine assembly (P/N 2-141-140-03, SIN LC-177) was replaced due to tip clearances below limits on the first power turbine disc assembly. Power turbine assembly (P/N 2-141-140-03, S/N LC 146) was installed as the replacement. The engine will be shipped to Lycoming for investigation of the chip detector activations. LE-19243 Engine LE-19243 is a flight spare engine. The engine is awaiting the return of the fourth turbine disc assembly (P/N 2-141-170-01), which was sent to Lycoming for inspection of tip shroud clearance. LE-19269 Engine LE-19269 (T. T. 444 hours) was removed at the end of this reporting period from CH-47C Aircraft No. 68-15858 to undergo a scheduled hot-end inspection. LE-19298 Engine LE-19298 (T.T. 75 hours) was removed from CH-47C Aircraft No. 68-15860 on 17 March for investigation of excessive oil consumption. The engine had consurned 18 quarts of oil in five hours of operation. Engine LE-19118 Engine LE-19118 (T. T. 258 hours) is at Avco Lycoming for investigation of high oil consumption. LE-19280 Engine LE-19-80 (T. T. 205 hours) is at Avco Lycoming for investigation of a circumferential crack in the fourth turbine nozzle assembly. AVSCOM-A-PWB Message No. 771-S authorized use of parts from Engine LE-19118 hot section to rebuild LE-19Z80. E 249A

NN Ad LYCOMING GIVIGION PROGRESS REPORT NO. 11-4- (I March through 31 March 1970) LE-i9230 Engine LE-19230 (T. T. 147 hours) is at Avco Lycoming for repair of broken studs (P/N 2-131-097-01) that mount the fuel manifolds and fireshield. LE-19295 Engine LE-19295 (T. T. 190 hours) is at Avco Lycoming for repair of foreign object damage sustained during the last reporting period. LE-19130 Engine LE-19130 (T. T. 598 hours) is being rebuilt at Avco Lycoming after undergoing a detailed engineering inspection. The rebuild will incorporate an improved combustor liner (P/N 2-131-110-17) and the new power turbine bearing face seal and jet pump package. Boeing Vertol Engines LE-19240 and LE-19260 Engines LE-19240 and LE-19260 are operational and installed in CH-47C Aircraft No. 66-19103. LE-19208 and LE-19213 Engines LE-19208 and LE-19213 have been dropped from the test program and returned to production engine status. The engines had been used in torque system accuracy testing at Boeing Vertol and at Lycoming. LE-19187 Engine LE-19187 is currently at Boeing Vertol and will be shipped to Avco Lycoming and rttxrned to the production engine status. The engine had been used in torque system accuracy testing at Boeing Vertol and Lycorning. Edwards Air Force Base Engines LE-19110 and LE-19146 Engines LE-19110 and LE-19146 are operational and installed in CH-47C Aircraft No. 68-15859. E 249A

A ILCOMING.DIVION PROGRESS REPORT NO. 11-5- (1 March through 31 March 1970) DAAJ01-69 -C-0590(55) LE-19258 Engine LE-19258 (T. T. 45 hours) was returned to Avco Lycoming during the last reporting period for investigation of an excessive vibration condition. This problem was not confirmed in testing at Lycoming. The engine will be calibrated and and returned to Edwards AFB. AVCO LYCOMING ENGINE SERVICE AND SUPPORT Engineering Effort (Item 1AA) Engineering assistance was provided during this reporting period to aid in coordination of activities under this program. Technical assistance was also provided to the various facility engineering staffs, and liaison with these facilities was maintained throughout the reporting period. Specific sites visited were Boeing Vertol and Fort Rucker. One time mandatory inspection of free manifold studs, Per TB 55-1520-Z27-Z0/9, then at 25-hour intervals,was initiated 30 March 1970. Field Service Representative (Item lab) One field service representative was assigned to the flight test program at Boeing Vertol during this reporting period. Specific activities included continuous support of torque system tests being conducted using CH-47C Aircraft No. 66-19103. Engine Calibration (Item lac) No T55-L-I1 engines were calibrated at Avco Lycoming under this contract during this reporting period. Engine Inspection (Item lad) Engine LE-19130 (T. T. 598 hours) is at Avco Lycoming completing a detailed engineering inspection. The engine will be rebuilt using an improved combustor liner (P/N Z-131-110-17) and thenew power turbine bearing face seal and jet pump package. Z 249A 2

A.VCOM, N DIVISION PROGRESS REPORT NO. 10-6- (I March through 31 March 1970) DAAJO1-69-C-0590(55) Engine Tools and Ground Handling/Ground Support Equipment (Item 1AE) During this reporting period, work was continued on the engine torque system comparator tool, LTCT 13608, which is being evaluated and demonstrated under this program. Special Engine Test Instrumentation (Item 1AF) No special engine test instrumentation was required during this reporting period.,-.h. Schaefer Engineering Projects CE 24A

PROGRESS REPORT NO. 11-7- (I March through 31 March 1970) TABLE I ENGINE STATUS UNDER T55-L-11/CH-47C SUPPORT PROGRAM Aircraft Time This Total Engine Engine S/N Number Month Time Current Status Fort Rucker (1)(2)(3) LE- 19138 68-15858 1 331 Operational (1) LE-19191 68-15858 109 352 Operational LE- 19244 68-15860 52 263 Operational LE-19216 68-15860 51 51 Operational (1) LE- 19237 68-15861 125 152 Operational (1) LE-19369 68-15861 124 125 Operational (2) LE- 19119 - - 449 Investigation at Ft. Rucker LE-19122 - - 146 Investigation at Ft. Rucker LE- 19181-123 706 Investigation at Lycoming LE-19Z25 - - - Awaiting parts LE-19231 - - 555 Awaiting test stand run LE-19233 - - 453 Awaiting test stand run (2) LE- 19243 - - 488 Awaiting parts (1) LE- 19280 - - 205 Investigation at Lycoming (1) LE- 19298-74 75 Investigation at Ft. Rucker LE- 19118 - - 258 Investigation at Lycoming (2)(3) LE- 19130 - - 598 Lycoming for inspection LE- 19230 - - 147 Repair at Lycoming (1)(2) LE- 19269-159 444 Inspection at Ft. Rucker LE- 19295 - - 190 Repair at Lycoming Edwards AFB * LE-19110 68-15859 2 27 Operational * LE- 19146 68-15859 2 100 Operational * LE-19258 - - 45 Lycoming for investigation (1) Ten-point Tt 7 Thermocouple system, and ECP LY-GT-55-56 fuel manifold teflon seals. (2) Improved combustor liner P/N 2-131-110-17. (3) Power turbine bearing face seals. * Calibrated engines -T-

4 1.vGOMING CiViisfat PROGRESS REPORT NO. 1-8- (I March through 31 March 1970) TABLE I (Cont'd) ENGINE STATUS UNDER T55- L- 11/CH-47C SUPPORT PROGRAM Time Engine This S/N Total Aircraft Engine No. Month Time Current Status Boeing Vertol LE- 19240 66-19103 5 22 Operational LE- 19260 66-19103 5 41 Operational LE-19187 LE-1920E- LE-19213 At Boeing Vertol Dropped from program Dropped from program Total time accumulated this period Total time accumulated since program inception 832 Hrs. 6, 431 Hrs. V -E- - - - ~ _ -- - F- 2ASA I~