Power of motor (KW) Power supply(v) Please note that if you use 220V power supply, you need to have a manostat.

Similar documents
QJY245DS~DA. Two Post Lift Installation & Adjustment Manual

2 POST LIFT INSTALLATION MANUAL

Index. 1. Important safety instructions Overview of the lift Installation instructions Operation instructions 8-9

Three Lobes Roots Blower. Instruction Manual

Model: Q11-3x1250 Q11-3x2050

Jema Autolifte A/S. Manual Release INSTALLTION, OPERATION AND MAINTENANCE MANUAL JA3500F ORIGINAL FOUR POST LIFT. Capacity: 3500KG

Instruction Manual. Hydraulic Jack. Note: The Owner/Operator must read carefully and understand all the information presented here before operation.

Instruction Manual. Low Profile Lift Table

HYDRAULIC WINCH LV-HV200kN. Manual OPERATION INSTRUCTION

Picture 1a: Model CD1 1-5t H=6-9m Model CD1 0.5t H-6-12m

(OPERATION INSTRUCTION)

WIND TURBINE ELECTRICAL AUTOCONTROLLOR

(OPERATION INSTRUCTION)

OPERATION MANUAL OF TYPE SE 350 TON CASING ELEVATORS/SPIDER

CONTENTS. Product Features and Specifications...1. Installation Requirement...3. Steps of Installation...4. Exploded View Test Run...

TW 250 B4.5 Clear Floor Two Post Lift Lifting Capacity 5000KG

SLIDING DOOR OPERATOR INSTRUCTION MANUAL

OPERATION & MAINTENANCE MANUAL FOR SCEN-206 LED & MULTI-FUNCTION TYPE CENTRIFUGE PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION.

FTS420 USER INSTRUCTION MANUAL

PWM WIND SOLAR HYBRID CHARGE CONTROLLER USER MANUAL

Dust cover. Plug. Outlet. Wire pole holder

Hand Pallet Truck NC. Operation Manual

Solar charge controller. Manual

PPI - 90 Portable Power Pallet Inverter Instruction Manual

RollSeal 1733 County Road 68 Bremen, Alabama Part No Rev Owner s Manual RS-Divider Curtain

FTS600P FTS800P FTS1200P

The Specification EB12E Series Semi-Electric Stacker

SGL2 Solar LED landscape Lamp. Instruction manual

4 - Way Control 4 - Way Control 4 - Way Control with lock

CONTENTS. Product Features and Specifications Installation Requirement Installation Exploded View Operation Instruction...

INSTALLATION MANUAL. Table of Contents

Installation, operation and maintenance manual

PD350 Hydraulic Rock & Concrete. Splitter (Diesel motor) Operation manual XIAMEN PRODRILL EQUIPIMENT CO.,LTD

Model No. 42CE 2 POST LIFT

HM WIND TURBINE. Operation Manual. **Please read the manual carefully before using **

MODEL SCA Installation and Operation Manual Important:

Model No. EE-6215E. Installation, Operation and Parts Manual. Distributed by. Clear Floor Two Post Lift, Electrical Release Lifting Capacity 5000KG

Read this entire manual before operation begins.

Low Frequency Pure Sine Wave Inverter. Operatinal Manual

MODEL BA735QC. Instruction Manual. Qwik Change Extension Arm

LR-26B, LR-27B, LR-28A, or LR-623 INSTALLATION AND OWNER'S MANUAL

HARRINGTON PEERLESS ELECTRIC CHAIN HOIST CODE SH (SINGLE PHASE)

Distribution Limited. Petrol Power Float Operator s Manual BT900 FOR YOUR SAFETY READ AND UNDERSTAND THE ENTIRE MANUAL BEFORE OPERATING THIS MACHINE

maintenance of the winch. All information in this publication is based on the latest production information available at the time of printing.

FOUR POST LIFT STRONGMAN TOOLS. Manual to be used with only Strongman Tools Ltd 4 Post Lift

Aspen Lift Part Number Spectrum Lane ~ Missoula MT ~

Foreword Safety warning General Function Technical parameters: Structure and main components

4 B High Do not allow anyone except the signal person in the working area

SAC2200S SANY All Terrain Crane 220 Tons Lifting Capacity

Quiet Collector. Model No & Up

Merits. P326A series

Quiet Collector. Model No & Up

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

Coupling & Uncoupling a Tractor-Trailer

Page 1 Instructions Manual for LTH-500 (J055)23/06/201 INSTRUCTION MANUAL. LTH-500 Hydraulic Lifter Trolley 500kg Load Capacity J055

Instruction Manual Pallet Truck with Load Indicator

ABACO MACHINES OPERATION MANUAL STONE/STEEL/GLASS/WOODS LIFTER (ASSGWL20) ABACO MACHINES (USA)

Sectional and Tilting Door Opener Installation Instructions and User Guide

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1

MODEL NO: EE-6263C / 6264C INSTALLATION OPERATION AND PARTS MANUAL

Atlas PV-9WP Addendum

INSTALLER S MANUAL FOR THE AHT ALL-ALUMINUM TAIL LIFT

WELDING POSITIONER S OPERATION MANUAL CWP40

Operating manual & book of parts

Pallet Truck with Scale Instruction Manual

INDEX RECOMMENDATIONS AND SUGGESTIONS... 3 CHARACTERISTICS... 6 INSTALLATION USE MAINTENANCE... 33

CONTENTS. Product Features and Specifications Installation Requirement Steps of Installation 4. Exploded View Test Run...

AU DU PONT DE LUTTRE BRUSSELS BELGIUM PHONE: FAX: OPERATING MANUAL. Electric Fully Automatic Floor Saw FS 1218 EX

INSTALLER S MANUAL FOR THE AHT STEEL TAIL LIFT

TW 250 B4.5 HEAVY-LINE 2-post lift

EFC Instructions Manual

Securitex SBR120 & SBR121 Road Blocker

CRANE OPERATION INSTRUCTION AND GUIDELINES

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1

Troubleshooting of the LubeTech Grease System

Bluedy Lighting Technology Co.,Ltd. LED T8 tube

FBD-NT Press Brake Installation Guide

Freedom Lift. Part Number 57961

OPERATION & MAINTENANCE MANUAL HANGZHOU FLYING TECHNOLOGY CO., LTD.

PWM WIND(SOLAR) CONTROLLER USER MANUAL

I: INSPECT AND CLEAN, ADJUST, LUBRICATE OR REPLACE IF NECESSARY C: CLEAN A: ADJUST R: REPLACE L: LUBRICATE I: INSPECTION D: DIAGNOSE

Maxx-Mini Lift MMLE-50D Service Manual

Instruction manual for our serial Screw conveyor

Code MD.K.007 Rev 00 Edition

MODEL TB-8, TB-10, TB-12, & TB-14 TRAILER HOIST INSTALLATION AND OPERATION MANUAL

GM Full-Size Trucks Repair Information

HCS14/16/18 Hydraulic Cut-off Saw. Prior to Operation. We thank you for choosing a HYCON cut-off saw.

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

USER MANUAL. GASOLINE SCOOTER (4 Stroke engine) OFF ROAD USE ONLY. Read these instruction carefully before using

3/16 BC20001, Rev 6. Brakes. free-backing ASSEMBLY CALIBRATION OPERATION REPLACEMENT PARTS. Page 1

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

3.1 DISPENSER BLACK SHADOW SERIES. Tools Needed for Mounting SCS Dispenser Hammer

Instruction Manual. 231HUD-F Head Up Display Parking Sensor 232HUDS-F Head Up Speed Display Parking Sensor 233HUDS-F Head Up Speed Display.

Product Code * Mammoth800

CONTENTS. Model & Parameter List 3. Installation Specification of Guyed Tower 5. Installation Specification of Tapered Tower 13

Enelion Vertica. Installation manual. 22 kw. for the specialists

PTOG SERIES GENERATORS

PROPELLER SHAFTS 16-1 PROPELLER SHAFTS CONTENTS

EE-6214EKZ INSTALLATION, OPERATION AND MAINTENANCE MANUAL

3/18 BC20002, Rev 7. Brakes ASSEMBLY CALIBRATION OPERATION REPLACEMENT PARTS. Page 1

Transcription:

Ⅰ. Introduction 1. Abstract The double-cylinder hydraulic lift is a hydraulic drive vehicle lift equipment developed by our company. It is designed briefly and reasonable. It select hydraulic power unit, having merits of low noise, smooth rise-and-fall. The machine has lift carriage, safety device against falling, qualification equipment for ultimate load, lock equipment of revolution angle of lift arm, and the forced same step of the steel wires of lift carriage. 2. Use The machine can be used in lifting saloon car, beach wagon and station wagon which have lower than 4000kgs deadweight. It fixes them at operational height needed in order to repair, service and clean. 3. Parameter Model Capacity (T) Lift height (mm) Rise time (S) Drop time (S) Power of motor (KW) Power supply(v) Machin e height (mm) Machine width (mm) Width between pillars (mm) Machine weight (KGS) Two post hydraulic lift Gantry hydraulic lift A Gantry hydraulic lift B 3.5 1850 50s 20s 2.2 380/220 2826 3200 2830 680 4.0 1850 52s 22s 2.2 380/220 3600 3200 2882 760 4.0 1850 54s 24s 2.2 380/220 3600 3200 2830 780 Please note that if you use 220V power supply, you need to have a manostat. 4. Basic structure of product The machine mainly has double-pole, double oil cylinders, hydraulic power unit, lift carriage, steel wire in-step equipment, safety mechanism, and rotation-angle lock equipment of lift arm which can be operated simply. When you push the switch on the electric motor of hydraulic power unit, the machine will rise. If you loosen, it will stop. If you want to fall it down, you must pull the safety unlocked wire to apart the safety bracing plate from the safety seat firstly, and open the handle bar on the hydraulic power unit. Gyration lift arm is telescopic and rotatable. Height of pallet can be adjusted in order to meet the different need of different kinds of vehicle. Our company can customize the machine with high pallet. - 1 -

Ⅱ. Profile Two post hydraulic lift - 2 -

Gantry hydraulic lift A - 3 -

Gantry hydraulic lift B Ⅲ. Installation and debugging 1. Ground demand: The ground on which the jack will be install should be prefabricated, and be maintained dry not less than 15 days in order to assure the concrete has enough intensity. Basic dimension: length as 4000mm, width as 1000mm, depth as 350mm. Adding more concrete reinforced bars are advised in order to increase the hardness of ground base. Normally, the depth of concrete base is not less than 200mm. 2. Confirm the dimension of installed place: Stick up the two poles individually. At the mid between them, install a figured veneer to guarantee the two pole on the same line, drill holes with ø16 bit and fix left and right poles on the concrete floor stably. The poles must be vertical to the floor. If there exists error, full the gap with the - 4 -

skims. 3. Install and connect in-step steel wire and long oil pope: Move away the figured veneer. Place in-step wire directed from the lift carriage of minor pole around the steel wire wheel of minor pole through the bottom of minor pole. After pulled up around the top wire wheels, it should be fixed in the square hole on the top of carriage with two M16nuts. Place the wire of lift carriage on the minor pole fixed on the major pole with the same method. Before fixing wires, we can lift the carriage in order to fix well. After wire fixed, the cushion block should be moved away. To see whether the left and right carriage are at the same level. If right carriage is lower, heighten the wires on the left one to make the right rise a little and confirm the two carriage are at the same level. We can adjust the height of left one with the same method. Loosening wires can be used to adjust carriages level. But, normally, the two wires must be tightened to guarantee the in-step of two carriages. Pull the long high-pressure oil pipes to the bottom of major and minor poles individually from the floor and connect them with the junction of oil cylinder without leak. 4. Install the hydraulic oil pump station: Fix the hydraulic oil pump station on the major pole with four M8X25 hex bolts. Open the cover of oil tank and pour N46 hydraulic oil about 12L. Connect one side of the short soft pipe to the oil outlet and the other side with the junction of oil cylinder. Use short arm in the head direction of vehicle. 5. Install lift arm: Four lift arms are installed on the left and right lift carriages with long and short arms being at the different sides of pole. When rise vehicle, use the short arm in the vehicle head direction. 6. Turn on power and adjust the height of left and right lift carriage: Put the power plug contact of hydraulic driving pump into the power socket with fuse box needed compulsorily. Turn on the switch on the electric motor to see whether the lift carriage rises. If not, exchange the power phase to make oil pump work well. When the carriage rise, check whether the two carriages are at the same level and listen the noise of safety bracing plate to judge the height of carriages.adjust again the wire correctly to make the bracing plate at the same level, and the left and right carriages are at the same level accordingly. 7. Pull the safety unlocked wire to fall down the lift carriage: Before falling down the carriages, remember: we must pull the safety unlocked wire on the left and right lift carriage respectively to apart the safety bracing from the safety seat to realize the falling. Otherwise, the lift carriage can t fall or fall with only one side caused by only one side unlocked wire to make accident. So, we must always remember pull two sides safety wire to make safety bracing apart from the seat and push load relief switch to fall the carriages. 8. Clean the yard: Raise the carriages repeatedly to assure run well. If there are problems, check the deal with them according to the progress mentioned above until it runs well. Last, cover the figured veneer and assure grease lubricant in the guide rail of grease lubricant of poles. At the same time, add the grease lubricant or lubricating oil around the wheel rolls of wires to reduce the wear and enhance the life length. - 5 -

Shaft installation chart Expansible bolt fixation chart - 6 -

Steel rope installation chart Two post hydraulic lift - 7 -

Gantry hydraulic lift A Gantry hydraulic lift B - 8 -

Hydraulic system installation chart Two post hydraulic lift - 9 -

Gantry hydraulic lift A Gantry hydraulic lift B Part list Index No. Name QTY 1 Motor 1 2 M20*1.5 nut 1 3 Manual valve 1 4 Stopper 1 5 Downward throttle valve 1 6 Unilateral valve 1 7 Contact key 1 8 Screw cap 1 9 Relief valve 1 10 Valve base 1-10 -

11 Gear pump 1 12 Screw 2 13 Oil-tank 1 14 Screw 4 15 Flow control valve 1 Ⅳ. Hydraulic system 1. Hydraulic element chart - 11 -

2. Hydraulic items list Index No. Name Model QTY. Remark 1 Oil-tank 550 180 1 10 Liters 2 Oil-filter 1 3 Oil-pump 1 4 Motor 2.2KW 1 380V/50HZ 5 Unilateral valve 3.2 1 6 Overflow-valve 1 7 Manual-valve 1 8 Oil-cylinder 2 3. The principles of hydraulic system When hydraulic pod is pushed to start the engine button, the engine works on oil-pump to absorb oil and push it to oil-cylinder (No.8). Now overflow-valve (No.6) shuts. Pressure is adjusted properly when it leaves factory to guarantee the rated lifting-load.however, the system pressure exceeding the limited, the overflow-valve discharges oil. Loosen the start button to stopping oil-supply and lifting, and operation starts. Switch off the mechanizing safety-lock and push hand-valve to unload oil and descend. Ⅴ. Test-drive & Operation 1. Preparations before test-drive a. Spread lithium-based lube(gb7324-87) on each slide-touch plate equably from the top down. b. Top up the hydraulic-system oil N32(SY1227-84) or N46 into the hydraulic-rod oil-box. c. Switch on power-supply according to the engine nameplate. Pay attention to revolve direction of 3-dimension engine. 2. Operation a. Check-up whether the engine power is switched alright. b. Check-up whether all the link-bolts are located. c. Push on the switch on the engine and the slide-plate ascend: stop pushing and the slide-plate stops. Pull the safety-lock operation-rod to down the slide-plate. If it can not be pulled, make it ascend before pulling. Push the unload-oil handle of the hydraulic-rod to descend the slide-plate; loosen the handle and the slide-plate stops. When repair auto, when the auto ascend alright, please push the unload-oil handle to make the mechanic safety-lock works. Make sure operation is safe. d. For the first operation, there maybe air into the hydraulic-system. Ascend and descend for several times to push off the air. - 12 -

3. Proceedings in auto-repair operation a. Different auto may have different center of gravity cg).first see the auto s cg. When an auto enters the lift close the cg with the plate by two rods. Adjust rocker to support the auto s support plate. b. Strictly prohibit open the observe-hole plate when start the engine. c. Read carefully the caution marks. d. Kinds of hydraulic valves are adjusted properly. User can not adjust it himself; otherwise, all the relevant results are due to the user. Ⅵ. Safety device The machine has safety device guard against crack falling, no-pressure protection defending oil pipe overload, lift carriage in-step forced by steel wire equipment, and revolution angle lock equipment of lift arm. Safety bracing plates are designed on the left and right lift carriages. When lift pallet rise, safety bracing plate dragged by spring jumps in the safety block of pole. When stop to rise, safety bracing plate dragged by spring is on the safety block and defends carriage falling. If the carriage would fall, crawling the hydraulic pump switch make the carriage rise a little firstly. Then draw the unlocked line to the left and right carriage in order to draw safety bracing apart from safety seat. Last, open the pressure relief valve on the hydraulic pump to make the carriage fall. The left and right carriages are in-step forced individually by the two steel wires. If the left and right carriages are not at the same level, the length of wires should be adjusted. In order to make them at the same level, we must tighten the wires and assure them unloosened. Otherwise, they can not be in-step. Lock devices are install on the four lift arms in order to lock automatically at any angle work need. When carriage is at the bottom, lift arm can rotate freely. - 13 -

Ⅶ. Matters need attention 1. Before lifting vehicle, we must adjust the height of four pallets to assure them at the same plane. At the same time, try to divide the longer and the shorter lift arm into two sides in order to get the supporting area gravity in the optimizer situation. 2. The lifted periphery and beam of vehicle must be placed correctly on the center of the rubber pallet in order to make the gravity on the center of supporting area. When the vehicle is lifted on the ground about 100mm, stop rising, shake the vehicle and check the bracing.after all run correctly, we can lift it continually. 3. Strictly prohibit people under the vehicle during the lifting. After arriving a stable height and in a safety situation, workers can go to operate under it. 4. Before falling down the vehicle, open the switch of electric machine a little to make the carriage rise a little, then draw the unlocked line ton the major-minor poles in order to draw safety bracing apart from safety seat. Last, open the pressure relief valve on the hydraulic pump to make the carriage fall. Special attention must be paid to see the major and minor can fall synchronously. If the can not, we must draw repeatedly until the vehicle fall well-balanced. Confirm that there are no goods under the lift arms, or the equipment may be damaged. 5. Change new hydraulic oil after running half a year. 6. Check the steel rope frequently, if there is damage, please change them in time. 7. The machine use 380V electric source. During installing the electric source, make sure to have reliable ground protection defending electric shock. Ⅷ. Problem and solution Problem Possible cause Solution Electric appliance fail, can t start Carriage crawl during rising The left and right carriages don t rise synchronously Carriage can t fall or fall unwell-balanced Electric source phase lack or electric appliance failure Air existing in the hydraulic system or oil lack in oil tank In-step forced wire becomes loose Operation mistake without pull the safety apart Check resource, fuse box, contactor in connection box of electric machine Pour oil into tank, oil cylinder run total excursion some times, or discharge the air in the oil tank Readjust properly the wire screw, heighten the wires and measure to make the left and right carriages be at the same height Scrawl the switch to lift the carriage a little and open pressure relief valve for falling after pall off the safety hook to make it run well - 14 -

Ⅸ. The electric principle chart Two post hydraulic lift electric principle chart Gantry hydraulic lift A, Gantry hydraulic lift B electric principle chart Index No. Name Spec. QTY. QC Alternating touch CJX2-6.3/10 1 D Engine 380V/2.2KW 1 QA Spot-button Z-ISO-B 1 CK Journey-switch LX19-121 1-15 -