MEETING DATE: October 9, 2015 ITEM 7. Authorize Expenditure of Funds and Contract Actions to Support Locomotive Lease from BNSF Railway Company

Similar documents
SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 PURCHASE OF HYBRID SEDANS APPROVE CONTRACT AWARD ACTION: RECOMMENDATION

APPROVE VANPOOL VEHICLE SUPPLIER BENCH CONTRACTS

COMPRESSED NATURAL GAS (CNG) BUS ENGINES

APPROVE CONTRACT MODIFICATION AWARD

35 One Gateway Plaza Los Angeles, CA

P2000 RAIL CAR AUXILIARY INVERTERS

Los Angeles County One Gateway Plaza q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA metro.4 I

congestion management program

ACTION: ESTABLISH LIFE-OF-PROJECT BUDGET FOR UP TO 100 NEW COMPO BUSES

Metro OPERATIONS COMMITTEE JANUARY 20,201 1 SUBJECT: CNG ENGINE OIL AWARD CONTRACT FOR CNG ENGINE OIL RECOMMENDATION

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

AWARD CONTRACT FOR LINE BREAKERS

Tel metro. net

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA EXECUTE CONTRACT MODIFICATIONS FOR BUS INSPECTION SERVICES

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report

congestion management program

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

SUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE

Transit Project Delivery Status Report. Significant Issues

TORONTO TRANSIT COMMISSION REPORT NO.

Greater Cleveland Regional Transit Authority

Update of the Midwest Regional Rail Initiative. Tim Hoeffner Michigan Department of Transportation Director, Office of Rail Lansing, MI

Too Good to Throw Away Implementation Strategy

Peninsula Corridor Electrification Project Cost / Schedule Update

Metro. Board Report. SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE MAY 21, 2015 SUBJECT: PURCHASE OF MID-SIZE SUVs

Russell Thompson, Public Works Director Michael Hanlon, Principal Engineering Technician

Vehicle and Equipment Services (4760P)

v Deborah Flint - Chief ecutive e, ficer

MOTION No. M Purchase of Five 40-foot Buses PROPOSED ACTION

Board 8/24/2017 Final Action Bonnie Todd, Executive Director of Operations Martin Young, Commuter Rail Manager

Merger of the generator interconnection processes of Valley Electric and the ISO;

City Council Report. Mayor and City Council

STAFF REPORT ACTION REQUIRED

Commuter Rail Vehicle Technology Analysis

City Transfer Stations: Loading Services and Fees

Contract Award for Rideshare Services to Supplement GoLink Service

4 COSTS AND OPERATIONS

Department of Legislative Services

Commuter Rail Vehicle Technology Analysis

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

CITY OF VANCOUVER ADMINISTRATIVE REPORT

. Honorable Mayor and City Council

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm

U.S. Environmental Protection Agency Diesel Emission Reduction Program

The Regional Municipality of York. Purchase of Six Battery Electric Buses

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Consent Workshop [ ]

Electric Vehicle Program

Update on Refuse Truck Purchase. Transportation and Environment Committee December 10, 2007

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Washington Metropolitan Area Transit Authority Recommended Contracting Actions For Up To 217 Hybrid Electric & Clean Diesel Buses

DATE: June 12,2007 CONSTRUCTION AND MAINTENANCE CONTRACTS AND PURCHASING

Metro. Board Report CONTRACT OP29199, BYD BATTERY ELECTRIC ARTICULATED TRANSIT BUSES AND CHARGING EQUIPMENT FOR DEPLOYMENT ON THE METRO ORANGE LINE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

LEADING GATEWAY FOR U.S.-ASIA TRADE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Capital Project Tracking Report

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

USING TELEMATICS IN THE FLEET. Real World Experiences from 3 Major Fleets

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

Draft Results and Recommendations

Final Report. Hollywood Street Services Yard CNG Fueling Station. City of Los Angeles Department of General Services

FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

One Gateway Plaza Los Angeles, CA

STAFF REPORT ACTION REQUIRED

The Denton County Transportation Authority Thomas M. LeBeau Vice President Rail Development

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

East San Fernando Valley Transit Corridor. Information Session, October 10, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TORONTO TRANSIT COMMISSION REPORT NO.

MOTION NO. M Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade PROPOSED ACTION

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

The $600 Million Rebirth of San Diego Trolley

County of Sonoma Agenda Item Summary Report

CITY OF LOS ANGELES DEPARTMENT OF AIRPORTS

City of Grand Island

Department of Market Quality and Renewable Integration November 2016

Sound Transit Operations July 2016 Service Performance Report. Ridership

CITY OF SIMI VALLEY MEMORANDUM

Mobile Food Vendors Policy. 1.0 Purpose. 2.0 Policy NO Virginia Polytechnic Institute and State University

City of Grand Forks Staff Report

The Director, Purchasing and Materials Management recommends that:

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Caltrain Modernization EMU Procurement

Request for Proposal for Trolley Security Services

One Gateway Plaza Mctropoliin Tknsmon Authority Los Angeles, CA OP , SOUTH REGION CONTRACT BUS SERVICES MV TRANSPORTATION, INC.

Metro REVISED SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE OCTOBER 16, 2014 SUBJECT: ALTERNATORS AWARD CONTRACT FOR ALTERNATORS RECOMMENDATION

Locomotive Building Project

AGENDA STAFF REPORT FISCAL YEAR FLEET REPLACEMENT

MEMORANDUM SUBJECT: CONSIDERATION TO AUTHORIZE AN AWARD OF BID FOR THE PURCHASE OF A TRUCK AND DECLARING EXISTING VEHICLES AS SURPLUS PROPERTY

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

DART Priorities Overview

BUS RAPID TRAN SIT. Institute of Tra nsporta tion Engineers October 17, 2013

PROGRESS ON BUDGET THEMES AND PERFORMANCE METRICS RECEIVE AND FILE PROGRESS REPORT ON BUDGET THEMES AND PERFORMANCE METRICS

Commuter Transit Service Feasibility

Progress Report Sounder Program

Transcription:

SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY TRANSMITTAL DATE: October 2, 2015 MEETING DATE: October 9, 2015 ITEM 7 TO: FROM: SUBJECT: Board of Directors Arthur T. Leahy Authorize Expenditure of Funds and Contract Actions to Support Locomotive Lease from BNSF Issue Approval is required to amend the FY2015-16 Operating Budget and execute the contract actions required to support the lease of 40 locomotives from BNSF. Recommendation It is recommended that the Board amend the FY2015-16 Operating Budget by $17.892 million and authorize the Chief Executive Officer to take the contract actions identified in Table 3 to modify, maintain, and operate the locomotives leased from BNSF. Alternatives The Board may decline to authorize the action and amend the Operating Budget. If the Board selects the alternative the current operating plan would require that Metrolink service be reduced by approximately half, from 165 daily trains to 80 or 90 daily trains. Background At its September 25, 2015 meeting, the Board approved an increase the FY2015-16 Operating Budget by $5.275 million and authorized the Chief Executive Officer (CEO) to execute a lease of 40 locomotives from BNSF in order to address a temporary need to place a locomotive in the lead position on all Metrolink trips. While the September 25, 2015 Board action was specific to the FY2015-16 lease, delivery and return costs totaling $5.275 million, the staff report detailed the full costs of putting the BNSF leased locomotives in service under the Authority s operations, including ensuring Positive Train Control (PTC) compatibility. Because the BNSF locomotives are dissimilar to Metrolink s existing locomotive fleet in many respects, the Authority s current maintenance staff would need to be augmented and trained to maintain the leased locomotives. Additionally, spare parts would need to be procured and some modification would be required to make these locomotives compliant and compatible for Metrolink service. The September 25, 2015 Board item included cost estimates to lease, modify, operate, fuel, and maintain the leased locomotives for One Gateway Plaza, 12 th Floor, Los Angeles, CA 90012 41

Page 2 FY2015-16 totaling $12.9 million and costs for PTC modifications totaling $6.22 million, similar to Tables 1 and 2 provided below. The current request is to obtain budget authorization for the remainder of the costs associated with putting the BNSF locomotives in service as detailed in Tables 1 and 2 below. These tables reflect the total estimated cost for utilizing the leased locomotives over a 12-month period. Table 1: BNSF Locomotive Lease Cost Not Including PTC Modifications FY2015-16 FY2016-17 1 Cost Item (Oct-Jun) (Jul-Sept) BNSF Lease Cost: $500/Day ($15,000/locomotive month) Staggered arrival of units (Oct-Dec): 15 units x 9 mos. (Oct-Jun) = 135 locomotive months 15 units x 8 mos. (Nov-Jun) = 120 locomotive months 10 units x 7 mos. (Dec-Jun) = 70 locomotive months 40 units total FY16: 325 locomotive months $4,875,000 40 units total FY17: 155 locomotive months $2,325,000 Delivery of locomotives ($5,000/locomotive) $200,000 Return delivery ($5,000/locomotive) $200,000 Major Component Parts - from GE or certified GE parts distributor minus main engine covered by BNSF lease/warranty $800,000 ($20,000/locomotive) Additional Labor for Maintenance 10 persons from TCS, a new, specialized equipment maintenance contractor, additional Bombardier equipment maintenance labor ($300,000/mo.) $2,700,000 $900,000.00 Additional Fuel @ $2.20 Gal (2.8GPMI x 4,600 miles/mo. = $28,340/locomotive month) $9,210,500 $3,400,800 Diesel Fuel Offset - from forecasted underrun of FY16 fuel ($7,010,500) ($2,588,492) Wheel Truing (6 axles/locomotive @ $1500/axle = $9,000/locomotive) $360,000 Work Management System Software Modification ($2,000/locomotive) $80,000 Potential Brake, PEI, ATS, Train Line, Door Stop, Other Modifications, Parts, Development And FRA Submittals $1,000,000 ($25,000/locomotive) 1 FY2016 17 dollars are included for informational purposes only at this time and will be included in the FY2016 17 budget. 42

Page 3 Temporary Facility Modifications, Security, Miscellaneous Items - CMF, Keller Yard, and other storage yard modifications to accommodate locomotives or displaced fleet storage, equipment rental, trailers, test tools, manuals, etc., increased track inspection, repair, lubrication at LAUS and Dayton, CMF, other yards and track. PNA Ramps and Signage at Stations ($50,000/mo.) $450,000 $150,000 SUBTOTAL NOT INCLUDING PTC MODIFICATIONS $12,665,000 $4,387,308 Table 2: BNSF Locomotive Modification, Testing and Documentation for Authority s Positive Train Control Program FY2015-16 FY2016-17 Cost Item (Oct-Jun) (Jul-Sept) PTC Consultants - design, QA/QC, FRA coordination, $1,620,000 $540,000 documentation, PM/CM PTC Contractors - software/hardware installation, modification, unit testing, configuration management ($30,000/locomotive) Additional PTC Equipment/Hardware modifications or relocations from cab cars and back - SLOT 10, TMC, event recorder, etc. ($30,000/locomotive) PTC Contractors - removal of software/hardware, restore to original condition, configuration management ($20,000/locomotive) $1,200,000 $1,200,000 Test Trains Staffing & Operation (50 test runs @ $5,000/run) $250,000 $800,000 PTC Back Office Modifications for Revised Consists $400,000 $100,000 Contingency $557,000 $174,000 SUBTOTAL PTC MODIFICATIONS $5,227,000 $1,614,000 NET TOTAL Including Potential Fuel Offset Costs $17,892,000 $6,001,308 Member agency shares will be allocated based on budgeted train-miles. For FY16, the allocation percentages are: 43

Page 4 In order to put the BNSF leased locomotives in service, operate and maintain them, the Authority must issue contract task orders or change orders to a number of existing contracts. Contract actions will be executed with existing contractors, consultants and vendors in accordance with the budget provided in Tables 1 and 2 above. Due to limited contract authority or contract expirations, Board approval is needed to authorize the following changes to the existing contracts as provided in Table 3. Table 3: Contract Actions Needed to Support BNSF Leased Locomotives NON-PTC CONTRACT ACTIONS Firm Contract # Board Action Bombardier Fuel (Merit Oil and SC Fuels) General Electric or Authorized Distributor TCS Maintenance Support for Locomotives Various Yards, Facility Modifications, Rentals and Security OP120-03 PO577-15 & PO651-15 TBD TBD Various PTC CONTRACT ACTIONS Extend term and increase contract funding authorization Increase contract authority Non-competitive award and contract funding authorization Non-competitive award and contract funding authorization Increase contract funding authorization Firm Contract # Board Action AECOM Systra E737B-08 E733-09C Parsons Transportation Group H1636-10 No cost time extension to existing General Engineering Contract - 9 month term, from 12/31/15 to 9/30/16. No cost time extension to existing Signal contract of 10.5 months, from 11/19/15 to 9/30/16. There is a separate Board Item to increase Contract Authority by $5M (for Perris Valley Line and BNSF lease) Wabtec Railway Electronics H1655-14 Increase Contract Authority by $300k Telco Vendors (ATT, Verizon) Various Increase budget authority 44

Page 5 A wide variety of contract actions will be required to quickly implement the maintenance, service and parts support of the BNSF s locomotives lease. In general these contract actions are listed in the Table 3. At its September 25, 2015 meeting, the Board authorized the lease with BNSF. This approval was in accordance with Board-approved Contract Administration Policies and Procedures, CON- 18, Emergency Procurement, which allows entering into contracts without observance of competitive bids, advertisement or notice, and CON-19, Non-Competitive Procurements, which authorizes the Board to enter into non-competitive procurements when goods or services are available only from a single source and when it is in the Authority s best interest. Staff has analyzed the prices and found them to be competitive, fair, and reasonable, as well as available on the short notice. Risks Several low to moderate risks have been identified in association with these actions and are categorized below: 1) In order for the leased BNSF freight locomotives to be compliant with Federal Railroad Administration (FRA) regulations, modifications or approved FRA waiver requests will be required. These modifications or waivers would include Passenger Emergency Intercom (PEI), Automatic Train Stop (ATS), Door Stop Interlock, and certain brake modifications. There is a low risk that the modifications cannot be effectively made and a low to moderate risk that the FRA may not grant requested waivers in a timely manner or grant waivers at all. 2) Because the Authority is now at a relatively advanced stage of operating with PTC in FRA-approved Revenue Service Demonstration (RSD), it is highly desirable to maintain this status. The BNSF locomotives are being delivered equipped with PTC but must be modified to work within the Authority s PTC System. Authority staff must perform tests and submit documents to the FRA in order to qualify this type of locomotive for Authority PTC service. There is a low to moderate risk that the PTC on-board equipment cannot be modified to operate within the Authority s PTC system or that the FRA may not grant requested waivers in a timely manner. Next Steps Staff will finalize the contact actions identified in the Table 3 in order to execute the lease of locomotives from BNSF and put them in service. Staff will return on a quarterly basis, or more frequently if desired, to keep the Board apprised of status. Budget Impact The budget for the items described in this item will come from an increase in the FY2015-16 Operating Budget in the amount of $17.892 million and would be allocated based on budgeted 45

Page 6 train-miles formulae. Staff will continue to explore additional funding offset opportunities (i.e., diesel fuel savings) as a way to decrease the overall project budget. Prepared by: Darrell Maxey, Deputy Chief Operating Officer, PTC & Engineering Kimberly Yu, Deputy Chief Operating Officer, Planning and Project Delivery Lia McNeil-Kakaris, Assistant Director, Contacts and Procurement Gary Lettengarver Chief Operating Officer 46