A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

Similar documents
Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H)

Medium Voltage Metal-Enclosed Switches

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Medium Voltage Metal-Enclosed Switches

A. Submit manufacturer's literature and technical data before starting work.

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

Metal-Enclosed Switches. Medium Voltage. Medium Voltage Metal-Enclosed Switches Contents

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

7. SERVICES OVER 600 VOLTS

University of Houston Master Construction Specifications Insert Project Name

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage

16.13 Unit Substation to 15kV Construction Standards Page 1 of 7

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

Descriptive bulletin. Medium voltage load interrupter switchgear Reliable, low maintenance and economical for distribution applications

AIR INSULATED METAL ENCLOSED SWITCHGEAR AND CONTROLGEAR

ME Switchgear with Vacuum Circuit Breaker and Auto-jet II Switch with Ground Position

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

BGE STRATEGIC CUSTOMER ENGINEERING

www. ElectricalPartManuals. com lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts Ratings:

5kV to 38kV, 630 Amp to 4000 Amp Indoor or Outdoor Application

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

www. ElectricalPartManuals. com r" n;;-==- Westinghouse Ventilated Dry Type Transpac Power Centers Page 1 Descriptive Bulletin

Power Break II Switchboard

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

SWITCHGEAR DIVISION PRODUCT PROFILES

Horizontal Circuit Switchers

Horizontal Circuit Switchers

Unit Substation Transformers 5 and 15 KV Class

University of Houston Master Construction Specifications Insert Project Name

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified.

AIR COOLED RECTIFIER SPECIFICATION S-50-A

Chapter 6 Generator-Voltage System

BHARAT HEAVY ELECTRICALS LIMITED, JHANSI

A. This section includes unit capacitors for power factor correction.

ATLV MaxSG. Low Voltage Metal Enclosed Switchgear

SECTION MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS. This section is organized as indicated below. Select desired Paragraphs.

VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

Issued Revised Approved Reviewed October 31, 1984 October 22, 2002 J. Ross J. Fuller

Pretest Module 29 High Voltage Unit 1

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

Critical Power Switchboards. Selection and Application Guide

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SECTION PANELBOARDS

Customer Substation Manual

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

CONTROLLIX CORPORATION CONTROLLIX.COM LOW VOLTAGE AUTOMATIC SWITCH CAPACITOR BANK SPECIFICATIONS

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system.

Typical Specification

MEDIUM VOLTAGE AIR INSULATED ARC-RESISTANT LOAD BREAK AND DISCONNECT SWITCHES

SECTION 16311A INTEGRATED UNIT SUBSTATIONS (IUS) SECONDARY LESS THAN 1000 V

SafeGear TM Motor Control Center Arc resistant metal-clad construction Motor Control Center Descriptive bulletin

C1000 Series Automatic Cap Bank

SafeGear TM Motor Control Center Arc resistant metal-clad construction

Unified requirements for systems with voltages above 1 kv up to 15 kv

SECTION MOTOR CONTROLLERS

Specification Guide. for RMAX. Direct Replacement. AC Low Voltage. Power Circuit Breakers

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

with Vacuum Circuit Breaker HAF

Electrical Switchgear Replacement Montgomery County Community College

SafeGear Motor Control Center Arc Resistant Metal-Clad Construction Brochure

MESG 12 / 17.5 / 24 / 36 KV

24kV Medium Voltage Switchgear Metal-Enclosed (LSC2A)

33KV INDOOR SWITCHGEAR

Extensible Unit - VCE2a

Descriptive bulletin. ReliaGear ND ANSI narrow frame metal-clad switchgear

Key features. DESIGNS: - Conservator type - Hermetically sealed

Power/Vac OEM Express Switchgear

MV Air Insulated Switchgear TAP17. Technical Data TGOOD

www. ElectricalPartManuals. com Substation Transformers Primary or Secondary Unit

MaxSG Low Voltage Switchgear

Features, Benefits and Functions

AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE

SECTION MOTOR CONTROL

Recommended Procedures

POWER-ZONE 4 Low Voltage Metal-Enclosed Drawout Switchgear with MASTERPACT NW Low Voltage Power Circuit Breakers

SafeGear Motor Control Center Arc Resistant Metal-Clad Construction Descriptive Bulletin

SECTION 16426B. RELATED SECTIONS Section 16671A Transient Voltage Surge Suppression Section Microprocessor-Based Metering Equipment

Figure 1. Single-phase pad-mounted voltage regulator. STANDARD FEATURES

Zenith ZTGSE/ZTGDSE. GE Energy Digital Energy. Service Entrance Rated Automatic Transfer Switches. Introduction. Features and Benefits

SIMOVAC and SIMOVAC-AR. Medium-voltage controllers 2.3 kv kv. usa.siemens.com/simovac

Cutler-Hammer May 2001

Westinghouse Electric Corporation Distribution and Control Business Unit Assemblies Division Bloomington, Indiana

Low Voltage Automatic Transfer Switch Systems

Electromagnetic Industries LLP

Advantage-D. Operating Instructions and Maintenance Manual. Central Vacuum Systems (Expandable/Modular Models) (Ver.

www. ElectricalPartManuals. com WeSTinghouse Secondary Unit Substation Transformers (Power Centers) Descriptive Bulletin Page 1

E-12 Low-voltage Switchboard

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Single-Phase Step Voltage Regulators

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

Issued Revised Approved Reviewed September 9, 1984 December 2008 G. Saini J. Fuller

Magnum IEC Low Voltage Air Circuit Breakers

WARREN COUNTY, N.Y. M/E REFERENCE

Transcription:

General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail 16313001 for single-ended substations and Standard Electrical Detail 16313002 for double-ended substations, A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. In general, size a unit substation so that the transformer's AA rating (or the combined transformer AA ratings in a double-ended unit substation) equals roughly 150 percent of the projected peak demand. Rooms or vaults for indoor unit substations shall be adequately ventilated for equipment cooling, and adequately sound-proofed to significantly reduce the transmission of sound to adjacent areas. All bus bars shall be copper. All bus connections shall have at least two bolts All medium voltage insulators shall be porcelain or cyclophatic epoxy Provide rear access to all unit substations. Provide drip shields for unit substations installed in areas with fire protection sprinkler systems. Feeder breakers shall be 800-ampere minimum. All incoming cable connectors shall be compression type, with NEMA standard lugs and bolt spacing. Two-bolt or 4-bolt connectors are required for each connection. Incoming Line Section Requirements Provide incoming line sections with two loop switches for the two incoming lines, and a fused load interrupter transformer primary switch. The transformer primary switch shall be key-interlocked with its associated secondary main breaker so that the secondary main breaker closes after and must be opened before the transformer primary switch. Provide space for distribution class surge suppressors on each incoming primary line. Primary switches shall be metal enclosed and rated as follows: Voltage: 15 kv. FEBRUARY, 2005 PAGE 1 OF 5

Continuous current: 600 amperes. Momentary short circuit and fault closing current: 61,000 amperes Basic Impulse Level: 95 kv Primary switches shall be two position, of the quick make/quick break type and shall be bottom hinged. Switch mechanisms shall be direct coupled. Chain or cable drives are not acceptable. Exception: Powercon chain driven switches, if supplied as a complete unit (switch, operator, enclosure) by Powercon. The phase bus bars shall be routed across the top of the switch compartments to eliminate unnecessary transition sections. All primary cable connections shall be provided with NEMA 2-hole, solderless cable lugs. Allow space in the loop-switch cubicles for stress cones for top or bottom cable entry. Provide a copper ground bus bar that is connected to the transformer and secondary switchgear section ground bus bars. Transformer Requirements Provide only dry type transformers, unless an alternate for a given project is specifically approved by the University. Transformers (dry type) shall have a 220 o C insulation system, and shall be designed for a maximum temperature rise at full load of 115 o C above a 40 o C ambient. The transformer coils shall be rigidly clamped to the core. The coil and core assembly shall mechanically and electrically isolated from the transformer frame and enclosure. Transformers shall have primaries rated 95 kv BIL and secondaries rated 10 kv BIL. Transformers shall either be equipped with forced air cooling fans and controls, or equipped with needed support equipment and accessories to support future forced air rating fans. The transformers FA ratings shall equal 133 percent times of their AA ratings. Control power transformers supplied with the transformers shall power the fans. Transformers shall be equipped with temperature switches that start the fans on high (FA operating) temperature and close a dry contact on high-high (alarm) temperature. The temperature monitor shall be mounted on a hinged front plate of a flush mounted box. The electrical connections shall be accessible and the monitor shall be removable without deenergizing the transformer. Wiring to the temperature monitor shall be routed and supported independently of the transformer enclosure so that enclosure panels can be removed without affecting the wiring. PAGE 2 OF 5 FEBRUARY, 2005

The temperature monitor shall include three hot spot temperature sensors, one for each transformer phase. The temperature monitor shall start the fans at a temperature of 100 degrees C. It shall initiate an audible alarm, close an alarm contact, and illuminate a red alarm LED at 135 degrees C. It shall close a breaker trip contact and illuminate a second red alarm LED at 175 degrees C. The temperature set points shall be adjustable. The contacts shall be Form C and wired out to a terminal strip inside the box. The temperature monitor shall include an LED or LCD display to allow reading of the hot spot temperature in each phase, and the highest temperature seen on each phase since the last reset. A reset button shall be provided to reset the maximum readings. The temperature monitor shall include LED s indicating "power on" and "fans running". The temperature monitor shall include an RS422 data port for future connection to a remote monitor. A Hand-Auto control switch shall be connected in parallel with the temperature monitor fan control contacts. Full capacity, 2.5 percent taps shall be provided on the primary winding, three below, and one above the rated voltage tap (five total taps). Transformers for the North Campus, initially served at 4800-volts, shall be equipped with dual wound primaries; 13.2 kv and 4.8 kv. The 13.2-kV primary shall be equipped with taps as noted above. Secondary Switchgear Section Requirements Provide secondary main breakers in all unit substations. Secondary main, tie breakers, and feeder breakers shall be: 1. Individually mounted, draw out, metal-clad, mechanically operated, stored energy type, quick-make and quick-break air circuit breakers. A. Unless noted otherwise, the breakers shall be manually 'charged'. B. Electrically operated (electrically charged) breakers shall be supplied where called for on the drawings. Each electrically operated breaker shall be powered by a dedicated, charging motor. 2. Breakers shall be equipped with removable arcing contacts and operation counters. 3. Breakers shall be rated for 100 percent continuous duty, with frame and trip (sensor) ratings as shown on the drawings. Sensor size (and design application) will typically be 75%, or more, of the frame size 4. Breakers shall be capable of being manually racked into three positions; connected, test and disconnected. The breaker frames shall be grounded in all positions. 5. The compartment front doors shall be closable in all breaker positions and shall permit breaker operation with door open or closed. The doors shall be capable of being opened without tripping breakers in the connected position. FEBRUARY, 2005 PAGE 3 OF 5

6. A breaker shall be tripped open and the stored energy in the breaker mechanism shall be discharged as the breaker is moved from one position to another. 7. Breaker compartments shall be deadfront. Shutters shall close automatically as a breaker is racked out of the 'connected' position. Control contacts shall be 'made' when breaker is in test or connected positions. 8. Breakers shall have a minimum of two spare Form C", isolated contacts brought out to an accessible terminal strip in the compartment. The contacts shall be rated 120 volts, 10 amperes, 60 Hz. 9. Each breaker shall be equipped with three-phase and one neutral current sensor, and a microprocessor-based trip unit. 10. Where shown on the drawings, breakers shall be equipped with a flux transfer shunt-trip. The flux transfer shunt trip wiring shall be terminated on an accessible terminal strip in the compartment. 11. Breakers shall be capable of being padlocked in the open position. 12. A Kirk Key interlock shall be provided to prevent the operation of the fused primary switch unless the main breaker is open. Each breaker shall be equipped with RMS sensing trip units as noted below. 1. Solid-state trip units shall be true RMS sensing, with trip ratings adjustable by removable rating plugs. The trip units shall be magnitude and time adjustable, and shall include a local indication of the cause of a trip. The trip units shall be rated as shown on the drawings. 2. The trip units shall coordinate with the primary fuses, main breaker and largest downstream feeder breakers. 3. The trip units shall allow adjustment without breaker trips and routine testing without removing the breakers from service. 4. The trip units (sensors) shall be rated for 100 percent continuous duty. 5. Trip units shall provide the following ranges and functions as a minimum. See drawings for specific requirements that vary from this configuration: A. Long time (L) current settings of at least 50-100 percent of the current sensor rating, divided into seven or more steps, and time delays of at least 2-22 seconds, at 600 percent of the long time current setting, divided into seven or more steps. B. Short time (S) current settings of at least 250-1000 percent of the long time current setting, divided into seven or more steps, and time delays of at least.1-.5 seconds, divided into seven or more steps, to include "flat response" and "I 2 T response" characteristics. C. Instantaneous (I) settings of at least 200-1000 percent of current sensor rating. The instantaneous setting shall be applied on the feeder circuit breakers only, not on the main breaker. PAGE 4 OF 5 FEBRUARY, 2005

D. Ground fault (G) current settings of 25-100% of current sensor rating, with a 1200 ampere maximum, divided in seven or more steps, with ground fault time delay settings of at least.1-.5 seconds, divided into five or more steps, to include "flat response" and "I 2 T response" characteristics. 6. Power for operating the solid state trip unit shall be obtained from within the circuit breaker assembly itself, or it shall be provided by a separate control circuit connected to the secondary bus ahead of the main breaker. The solid state trip units shall have nonvolatile memory to maintain all settings, trip indications and fault data during a power outage. Batteries to maintain the memory are not acceptable. The A/E shall design the overcurrent protective system so it can be set in a 'selective' manner, to minimize the disruption from any given fault, to as small an area as possible. The A/E shall also prepare, and/or approve the settings for the overcurrent protective system to insure proper selectivity and coordination. The contractor shall provide test reports showing that the overcurrent system has been set and tested, before the system is commissioned In double-ended unit substations, the two main breakers typically are interlocked with the tie breaker so that all three breakers can not be closed at the same time. The throw-over is normally done manually, unless noted otherwise Provide ground fault protection on all breakers rated 1200 amps or more. Avoid providing unnecessary ground fault protection that may cause nuisance outages. Bus bars shall be braced for the calculated short circuit current. Provide a voltmeter with selector switch, and an ammeter with selector switch. Selector switches shall have also off position. Provide a Power Measurement Limited (PML) 7330 ION three phase power, energy, demand, and harmonics meter for each transformer secondary. The PML meter shall be panel mounted with an FT (Flexi-Test) case at 60 inches above the finished floor. The meter shall be provided with an Ethernet port. Installation Requirements Instruct the Contractor to perform testing and do settings in accordance with manufacturer instructions and Section 16950, and to provide the University Project Coordinator with a test report. University will supply circuit breaker settings, and primary fuse sizes. 02/07/05 12:32 PM FEBRUARY, 2005 PAGE 5 OF 5