Susan MacAdams Transit Consultant 269 S. Beverly Drive, Unit 1187 Beverly Hills, CA 90212

Similar documents
ADDITIONAL UTILITY RELOCATION COSTS ARE MISSING FROM THE ESTIMATE.

Peninsula Corridor Electrification Project (PCEP)

City of Palo Alto (ID # 6416) City Council Staff Report

JCP&L Verbatim Response to Middletown Township s Questions

U.S. System Summary: ARIZONA/SOUTHWEST

Update of the Midwest Regional Rail Initiative. Tim Hoeffner Michigan Department of Transportation Director, Office of Rail Lansing, MI

Susan MacAdams Transit Consultant 269 S. Beverly Drive, Unit 1187 Beverly Hills, CA 90212

High Speed Rail Conference

Merger of the generator interconnection processes of Valley Electric and the ISO;

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Challenges With Underground High Voltage Transmission SCE Tehachapi Renewable Transmission Project First 500 kv Underground T/L in North America

U.S. System Summary: CALIFORNIA

East San Fernando Valley Transit Corridor. Information Session, October 10, 2017

PUBLIC TRANSPORTATION

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS

DRAFT Subject to modifications

congestion management program

ARLINGTON COUNTY, VIRGINIA

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

UNION STATION MASTER PLAN STUDY

Leadership NC. November 8, 2018

Southern California - CHSRA

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

West Broadway Reconstruction/LRT Design. March 19, 2015

3.15 SAFETY AND SECURITY

Mobility Corridor Updates. Transit & Active Transportation Projects

TRANSPORTATION DEPARTMENT YEARS OF TRANSPORTATION REGULATION

4 COSTS AND OPERATIONS

for DRECP Alternatives

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

Pomona Rotary December 19, 2017

Mobility Corridor Updates. Transit & Active Transportation Projects

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 PURCHASE OF HYBRID SEDANS APPROVE CONTRACT AWARD ACTION: RECOMMENDATION

The Case for. Business. investment. in Public Transportation

Overview of Plug-In Electric Vehicle Readiness. Coachella Valley Association of Governments

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Improving Accessibility of Regional Bus Stops and Pathways

Decision on Merced Irrigation District Transition Agreement

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report

ACTION: ESTABLISH LIFE-OF-PROJECT BUDGET FOR UP TO 100 NEW COMPO BUSES

Presentation to the Senate Committee on Transportation. April 7, Carson City, NV

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

APPROVE VANPOOL VEHICLE SUPPLIER BENCH CONTRACTS

Update on Bus Stop Enhancements

METRO / DON SEPULVEDA ANSWERS to Questions from Northridge Residents July, 2015

All Electric Buses for Transit - Overview and Discussion

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Rail alignment and benefits (rab) study

CITY OF BEVERLY HILLS STAFF REPORT

City of Grand Island

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

PREPARED DIRECT TESTIMONY

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Department of Legislative Services

Transportation Coordination Toolkit

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Board of Directors authorization is required for all goods and services contracts obligating TriMet to pay in excess of $500,000.

congestion management program

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Alternatives to an Open Competitive Commercial Collection Program Presented by Robert Craggs RAM/SWANA Conference

LEAKING UNDERGROUND STORAGE TANKS

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Electrical District No. 3 SOLAR Q & A

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

Proposed Project I 35 Improvements from SH 195 to I 10

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Attachment D Environmental Justice and Outreach

AGENDA ITEM 1 F Consent Item

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

EMERGING REQUIREMENTS

San Francisco to San Jose Preliminary Alternatives Analysis


New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017

welcome to the BC Hydro community open house

March 31, 2014 VIA HAND DELIVERY & ELECTRONIC MAIL

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Develop ground transportation improvements to make the Airport a multi-modal regional

Peninsula Corridor Electrification Project (PCEP)

Program. presented by: September 22, 2010

LOS ANGELES POLICE DEPARTMENT

best to you all Gail Carbiener Page 1 of 5

Committee Report. Transportation Committee. Business Item No

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Transcription:

Susan MacAdams Transit Consultant 269 S. Beverly Drive, Unit 1187 Beverly Hills, CA 90212 March 19, 2014 The Honorable Jeff Denham 1730 Longworth Building House Office Building United States House of Representatives Washington DC, 20515 Dear Representative Denham: This letter is in regards to the Audit by the Federal Railroad Administration s (FRA) High Speed Intercity Passenger Rail Grant Oversight Processes. As the former High Speed Rail Planning Manager at the Los Angeles County Metropolitan Transportation Commission, METRO, I urge you to investigate the financial risks associated with the California High Speed Rail (HSR) project. The intended course of HSR development, written into the language of Proposition 1A, was to insure better transit options for the public at each of the HSR station hubs. In Los Angeles County, that ideal began to diverge as soon as the HSR funding was on the horizon, and then more blatantly once the money was approved. Since 2009, political wrangling transformed several local transit projects into honeypot deals, with ample funding and no oversight the cause. One way to put HSR back on track is to remove control of the project from the California High Speed Rail Authority and turn it over to the State of California Department of Transportation, Division of Rail and create a statewide organization that incorporates HSR, Commuter Rail, Light Rail and Heavy Rail. The topic of this memo is the electrical grid problems associated with HSR and the lack of true value in the current estimates. It appears that the costs associated with HSR have been repeatedly underestimated so that the federal money could be secured early in the planning process. In summary, with regards to the current HSR budget: 1. Request expert analysis of the true costs of building the new electrical grid system for HSR and compare that value to the current HSR estimate.

2. Request budgetary investigation into the true costs of raising and adjusting the current electrical grid wherever it comes in contact with HSR. 3. Request that new HSR clearances be analyzed and added to the CPUC regulations in order to estimate the true costs of item number two. General Overview HSR creates two problems for California's electrical power grid: the first, building a new power supply system for HSR, and the second, raising the height of the existing high voltage transmission lines (HVTL) wherever they intersect and cross over the catenary electrical supply system for HSR. Each item is estimated to cost around five billion dollars ($5,000,000,000). Total could exceed ten billion dollars ($10,000,000,000). With regards to the first item, from a recent California Public Utilities Commission (CPUC) report, signed December 31, 2013, and referenced below: "The California High Speed Rail Authority (CAHSRA) programmatic Environmental Impact Report / Environmental Impact Statement did not assess the electric infrastructure needed." How could a monetary value be given in the lump sum HSR estimate for the electric infrastructure if it had not been studied by the CPUC? For the second under-budgeted item, the existing high voltage transmission lines(hvtl) must be raised or relocated wherever they cross the HSR catenary lines. HVT lines cannot be buried, they must be raised. New towers must be built. In the last five years there does not appear to be coordination between California High Speed Rail Management (CAHSR), CPUC and Pacific Gas and Electric (PG&E) regarding the problems with the electrical grid. Ask for copies of meeting minutes and agendas. True estimates for the relocation of HVTL are missing from the construction budget. These total amounts are in the billions of dollars. It will take years of coordination to re-adjust the power lines and this item is missing from the schedule. The third item discussed involves the CPUC rules for clearances between high voltage lines and the HSR catenary lines. The current rules for clearances were written for trolley cars and are almost one hundred years old. There are rules for electrified commuter trains but the CPUC has no standard clearance for high speed trains passing under high voltage wires and needs to analyze the effect of trains traveling 220 miles per hour. This analysis has not been done and may take several years to determine. 2

Item 1). Cost of new electric infrastructure New infrastructure to build an electrical system to supply power to HSR, excerpt taken from the analysis of the Budget Change Proposal signed by the CPUC December 31, 2013: http://www.cpuc.ca.gov/nr/rdonlyres/bf95706a-50b5-46cd-877f- BFDA85F6DC89/0/BCP_6ElectricalInfrastructurePlanngforHSRInitiative.pdf "The project will take hundreds of megawatts of power from the 115 kilovolt (kv) electric transmission system at new substations placed at 30-mile intervals along the right of way. The electricity will be stepped down to 25 kv, which is the voltage used by the high speed trains. Unfortunately the current electric transmission grid is not currently aligned to provide this support. Major additions to the transmission grid will be required to ensure a safe and reliable power supply to the rail project. These include at least 25 new substations, and there will likely be a new 115 kv line needed north of Los Angeles. "The HSR system will require connection to the electrical grid every 30 miles at the transmission voltage level. In order to accommodate the new HSR interconnections to the electrical system, the electric utilities will need to expand their systems, with new transmission lines, substation upgrades, or both." The referenced CPUC document is a staffing request for additional personnel. After budget approval, it generally takes six months for the CPUC to hire staff. Therefore, at the present time, there is not a full time staff person at the CPUC assigned to address the HSR electrical infrastructure. Question: How were the previous costs for the new electrical subsystem estimated if there was no one at the CPUC dedicated to an estimate? Factors to be considered in sub-station design can be found in these documents: Capitol Costs for Transmission and Substations: http://www.wecc.biz/committees/bod/teppc/external/bv_wecc_transcostreport_fi nal.pdf Building Transmission Lines in the West: http://www.wiresgroup.com/docs/transhub_wecc_100812.pdf Cost factors include: substation equipment, transmission lines, high voltage towers, conductors, transformers, terrain difficulty, security, right-of way acquisition, eminent domain legal fees, land rentals, and contractor overhead at about 20% of total listed costs. 3

Referencing the Cost Calculator on pages 5-3 and 5-4 from the above document, estimated costs for new substations: twenty-five (25) sub-stations at one hundred million dollars each equals two and one half billion dollars ($2,500,000,000). This does not include the costs for a new 115 kv line north of Los Angeles and substation upgrades. Costs for right-of way acquisition, eminent domain legal fees, land rentals, high voltage tower construction, estimated at $100,000,000 per substation. Twenty-five (25) substations locations at one hundred million dollars each equals two and one half billion dollars ($2,500,000,000). Total costs for new electrical supply system for HSR: five billion dollars ($5,000,000,000). This is a very conservative estimate using values given in the referenced documents. My background is primarily track, alignment and coordination of large scale transportation projects. An estimate for the proposed new electrical grid should be investigated by an expert and that new amount compared to the budget from the CAHSR Board. As an example, Seattle built a new sub-station. The site acquisition and clean-up, SEPA review, design and construction of the Denny Substation Project is currently estimated to cost approximately $201.5 million. http://www.seattle.gov/light/dennysub/program.asp My estimate, per substation, is half that value. Request an investigation into the cost of the new electrical grid needed to supply power for HSR. Question: Where does the power come from that feeds this new system and who will pay for it? Item 2.) Cost of raising the current electrical lines over HSR High Voltage Transmission Lines (HVTL) criss cross Northern and Southern California. This electrical supply network intersects HSR in many locations and the wires need to be raised at every point of conflict. How the towers will be moved, where they will be moved, how high up the bottom wires need to be moved, and how the power supply will be affected has yet to be fully addressed. When Members of the HSR Board were asked these questions in 2011, they answered, it's in the lump sum estimate. This seemed a fiscally irresponsible response for any stage of design. This construction problem should be broken out as a separate line item in the budget, the costs are 4

enormous. Each single case of High Voltage Towers relocation takes years of negotiations, multi-agency involvement with massive calculations with regard to energy distribution. It is estimated that there are over fifty crossings throughout the state but a full analysis is difficult as access to the electrical grid maps are restricted by Homeland Security. Each set of conflicting high voltage lines will have to be raised higher due to the designated clearances from the CPUC, yet the critical distance has not been established. See item 3. In order to raise the power lines, newer high voltage towers on either side of the HSR alignment will have to be built. Power lines will have to be lengthened and nearby towers will require wires cut and adjusted using precise calculations. During construction, electricity will have to be diverted and re-routed in stages. HVTL relocations would have to be staggered in scheduling. For each case there will be road closures, detours, CPUC public participation hearings, EIR/EIS, community outreach, eminent domain legal fees, right-of-way agreements, rental fees established, permits and contractor review and supervision. The Federal Aviation Administration (FAA) will require review of the new height of towers; much crop dusting occurs in the Central Valley. The FAA may take ten years to approve new airspace altitude restrictions. The high voltage utilities could be buried, but that usually costs three times as much as standard HVTL towers and would require an underground cooling system. For each location throughout the state where the High Voltage Transmission lines are impacted by the HSR alignment, each re-build will cost an estimated one hundred million dollars ($100,000,000) which includes the above mentioned costs plus contractor overhead. Estimated cost missing from budget for the relocation of the high voltage towers: fifty (locations) times estimated one hundred million dollars per location ($100,000,000) equals five billion dollars ($5,000,000,000). Item 3.) Clearances The CPUC does not currently have clearance regulations specifically addressing high speed rail. The clearances in General Order (GO) 95 have not been updated since the use of trolley car lines. See General Order 95, Case 2, Figure 6, page G-6 for clearance diagram: ftp://ftp.cpuc.ca.gov/gopher-data/go/go-95.pdf The crossing of the HVT and the HSR catenary has only recently begun to elicit conversation between the CPUC and other agencies. This topic may take years to resolve. 5

From the report mentioned in Item 1. "The HSRA recently petitioned the CPUC to adopt rules regarding electric safety for high- speed electric trains using 25 kv power. The HSRA drafted a set of proposed rules, to which utilities objected. The CPUC has opened a rulemaking (R.13-03-009) regarding such rules. Here is the referenced CPUC Rulemaking 13-03-009, dated August 1, 2013. https://www.pge.com/regulation/high- SpeedRailElectricSafetyOIR/Rulings/CPUC/2013/High- SpeedRailElectricSafetyOIR_Ruling_CPUC_20130801_282902.pdf "Order Regarding Whether to Adopt, amend, or Repeal Regulations Governing Safety Standards for the use of 25 kv Electric Lines to Power High Speed Trains." HSR poses a host of technical issues regarding electrical supply. The list is exhaustive and will be time consuming. These issues need to be resolved. The discussion had only just begun. Missing from that list is the clearance distance required between the bottom wires of the HVTL and the HSR catenary when trains travel at 220 mph. Only when that distance is stated in a CPUC General Order can the new height of the HVTL be determined throughout the state of California. Thank you for taking the time to read my letter. Hopefully this explanation of the missing costs from the HSR budget will be of some use in your investigation. There are other monetary funding issues of concern involving HSR, HSPIR, FTA, Metrolink, Los Angeles Union Station and the LA Regional Connector that I will address in three individual letters to follow. Sincerely, Susan MacAdams Track and Alignment Specialist Coordination of Transit Projects 269 S. Beverly Drive, Unit 1187 Beverly Hills, CA 90212 323-352-3313 310-994-8407 cell susan.macadams@gmail.com 6