RSA5UP Option 53 RSA5100A Series Real-Time Signal Analyzers Memory Extension, 4 GB Acquisition Memory Total Upgrade Instructions

Similar documents
Electrically Held to Mechanically Latched Contactor

Installing and Removing Power Supplies

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

Deans Switch Microfluidics

Installation Note. Agilent Technologies E4440A Spectrum Analyzer Option BAB, APC 3.5 Input Connector Retrofit Kit

FLEX-6000 GPSDO Installation Guide

Rackmount Installation

Installing an Auxiliary Pressure Control Module

Installing the CO 2 Cryogenic Oven Cooling Kit

PowerFlex 700H and 700S AC Drives Frame 9 Main Fan Capacitor Replacement Kit

Introduction. Pressed Shaft Flowmeter. Flowmeter Service Kits. Disassembly. Idler Shaft Removal

Complimentary Reference Material

INSTALLATION INSTRUCTIONS Product Revision Form Rev. C INST-439 CRADLE, DELL E-6510/6500

Installing a PTV Inlet

DP Series Diaphragm Valve Installation and Maintenance Instructions

M Valve Actuator Weather Shield Kit

Inverted High Pressure Fluid Filters

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

Model Fixed Rack-Mount Kit

XChange Seat Service and Maintenance Guide

Exchange of rollers from the XTS-Mover

Switching DC Power Supply

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED TO ACTIVATE YOUR WARRANTY GO TO: CORSAPERFORMANCE.COM/WARRANTY STOP

NorthStar. brand. Instruction Manual. SLIM Tach SL Thru-Shaft Diameter. Magnetoresistive Encoder Designed for GE Wind Energy

Encore and Spectrum (Global) Powder Feed Center Clamping Cylinder

TOYOTA TUNDRA TVIP V5

Paraffin Block Trimmer Quick Trim UPBT 1011

155 CARTRIDGE SINGLE SEAL

350Z / G35 Brake Master Cylinder Brace

RANGER 900 POWER STEERING KIT

Installing a PTV Inlet

DART-AB Sciex Interface Manual

PowerFlex DC Drive - Frame A Pulse Transformer Circuit Board

Dionex AS-DV Autosampler Preventive Maintenance Procedure

Intel Server Chassis and Platform Bracket Kit Installation Guide

3-Phase, Dual-Input, 12.5kW Power Supply System USER GUIDE

Installation Instructions 300 A Current Sensor Kit for D1h/D3h/D5h/D6h Enclosure Sizes VLT Series FC 102, FC 103, FC 202, and FC 302

It is strongly recommended that this kit be installed by an authorized Polaris dealer.

TOYOTA TUNDRA TVIP V4 REMOTE ENGINE STARTER (RES)

850 TETHER SWITCH KIT

Installation Instructions BLTR and 2BLTR Relight Assembly

S4M Pulley and Gears Maintenance Kit

AUSTRALIAN DISPENSER UPGRADE

Firehawk Second Stage Regulator Fire Service

Installing a Purged Packed (PP) Inlet

Battery Replacement. Installation Instructions. Summary of Changes. Catalog Number 2711P-RY2032. Original Instructions

How to Replace the Main Axle Gear on the Bachmann Spectrum GScale using the NWSL # upgrade gear.

Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Installation & Programming Manual. Quick Reference

Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Galaxy Receiving and Unpacking 09/

FLEX-6000 Rack Mounting Bracket Installation Guide

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

COBB Tuning Catback Exhaust System MAZDASPEED3

Installing the Dionex ICS-1100/1600/2100 Auxiliary Valve

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

160S Rewind Option Kit Installation Instructions

harley davidson motorcycle equipment installation manual

Installation and Service Instructions for 87,000 & 87,100 Series Self-Adjust Brakes (rev. B)

TOYOTA PRIUS 2010 TVIP V4 PREPARATION

TCU Static Mixer Installation

SCOPELITE TIMING LIGHT OPERATING MANUAL

E E VDC COOLEDGE TILE INTERIOR INSTALLATION INSTRUCTIONS. Caution: Observe precautions for handling electrostatic sensitive devices.

AGCO. Corn Header Manual d HEADSIGHT.COM

Figure 35: Assembling a KARA-MINIBU/KARAMINIBUEX stacking platform

Rimac Spring Tester Retro-Fit Kit

SPARKSCAN1 HIGH VOLTAGE CLAMP OPERATING MANUAL

VECTRIX VX-2 SERVICE MANUAL. Version 1.0/May 2011 VECTRIX, LLC

INSTALLATION INSTRUCTIONS

DVM36/42 SERIES LOG SET/BURNER MODULES INSTALLATION INSTRUCTIONS

BMW R nine T Tail Tidy Install Guide

Assembling the Front Panel

Electric Vehicle Charging Station

3-Phase 10-Slot Power Supply System USER GUIDE

Mazda North American Operations Irvine, CA

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Please complete customer details above so that we can ensure all customers can be given prior notification of future upgrades and product status.

Rear Vision System Tailgate Emblem Camera Aftermarket Display 2009-Current Ford F-150 and 2010-Current Super Duty (Kit part number )

Read these instructions thoroughly before attempting to install this option.

Simscape Getting Started Guide. R2014a

TOYOTA PRIUS 2004 TVIP V2 (GBS ADD ON) Section I Installation Preparation

Huron Speed Products Twin Turbo Install Gen 2 CTS-V (09-15)

Read this document carefully before implementing the upgrade!

KIT INSTALLATION INSTRUCTION

WARNING Mercedes Smart for two CDI Installation Instructions BX1990. Serial Number

EFX Integrated LCD Screen Option. Cardio Theater Integrated Bracket Assembly Instructions

TOYOTA TUNDRA TVIP V4 Preparation

QBMATE UPPER BODY.

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Installation Instructions for Series 3100V Low Level Indicator

Please read thoroughly before starting installation and check that kit contents are complete.

Double Pole Circuit Breaker Kit for Non-Regenerative MinPak Plus DC Drives

STEERING COLUMN - TILT

DODGE RAM 1500 UNDER-FRAME MOUNT INSTALLATION INSTRUCTIONS

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly

Service manual. English. F5 Corpus

2-Post Rack Mount Kit Installation Instructions

TABLE OF CONTENTS I. SERVICE & MAINTENANCE PROCEDURES. 1) Opening and closing of door latch. 2) Latch assembly and adjustment

M-9603-FST FOCUS ST COLD AIR INTAKE KIT INSTALLATION INSTRUCTIONS

Transcription:

xx ZZZ RSA5UP Option 53 RSA5100A Series Real-Time Signal Analyzers Memory Extension, 4 GB Acquisition Memory Total Upgrade Instructions www.tektronix.com *P071287900* 071-2879-00

Copyright Tektronix. All rights reserved. Licensed software products are owned by Tektronix or its subsidiaries or suppliers, and are protected by national copyright laws and international treaty provisions. Tektronix products are covered by U.S. and foreign patents, issued and pending. Information in this publication supersedes that in all previously published material. Specifications and price change privileges reserved. TEKTRONIX and TEK are registered trademarks of Tektronix, Inc. Contacting Tektronix Tektronix, Inc. 14150 SW Karl Braun Drive P.O. Box 500 Beaverton, OR 97077 USA For product information, sales, service, and technical support: In North America, call 1-800-833-9200. Worldwide, visit www.tektronix.com to find contacts in your area.

Table of Contents Service Safety Summary... 1 Kit Description... 2 Products... 2 Kit Parts List... 2... 3 Minimum Tool and Equipment List... 3 Remove Cosmetic Top Cover... 3 Replace the Existing Acquisition Memory... 5 Reinstall Cosmetic Top Cover... 7 Option Key Installation... 7 RSA5100A Series RSA5UP Option 53 Upgrade i

Table of Contents ii RSA5100A Series RSA5UP Option 53 Upgrade

Service Safety Summary Only qualified personnel should perform service procedures. Read this Service Safety Summary and the General Safety Summary located in the RSA5100A Service manual (Tektronix part number 077-0522-XX) before performing any service procedures. Do Not Service Alone. Do not perform internal service or adjustments of this product unless another person capable of rendering first aid and resuscitation is present. Disconnect Power. To avoid electric shock, switch off the instrument power, then disconnect the power cord from the mains power. UseCareWhenServicingWithPowerOn. Dangerousvoltagesorcurrentsmay exist in this product. Disconnect power, remove battery (if applicable), and disconnect test leads before removing protective panels, soldering, or replacing components. To avoid electric shock, do not touch exposed connections. RSA5100A Series RSA5UP Option 53 Upgrade 1

Kit Description Kit Description This kit describes the installation of the Option 53 Memory Extension in an RSA5100A Series Real-Time Signal Analyzer. Products RSA5100A Series. All instruments Kit Parts List Quantity Part number Description 1 ea 071-2879-00 RSA5UP OPTION 53 UPGRADE INSTRUCTIONS 1 ea 167 1473-XX IC, MEMORY, DRAM; 512MX64, DDR2, 667MHZ, MT16HTS51264HY-667A1, SODIMM 200 1ea NS 1 DATA SHEET; SOFTWARE OPTION KEY AUTHORIZATION CERTIFICATE, UPGRADE KITS 1ea NS 1 LABEL, MANUFACTURED; OPTION KEY UPGRADE LABEL 2.100 X 2.700, SAFETY CONTROLLED 1 NS Not saleable 2 RSA5100A Series RSA5UP Option 53 Upgrade

This section contains all procedures needed to install Option 53 Memory Extension (4 GB Acquisition Memory Total) in RSA5100A Series instruments. Minimum Tool and Equipment List The following tools are required to install the Option 53 upgrade. All tools are standard tools that should be readily available. Table 1: Tools required for installation Item no. Name Description 1 Screwdriver handle (magnetic) Torque driver handle. Accepts 1/4-in. hex-head driver tips 2 T15 TORX tip 4 T20 TORX tip TORX-driver tip for T15 size screws on the instrument covers TORX driver tip for T20 size screw heads Optional: A torque wrench helps to ensure reliable connections to meet the nominal torque values that may be listed in these instructions. These instructions are for qualified service personnel who are familiar with servicing the product. If you need further details for disassembling or reassembling the product, refer to the product service manual, RSA5100A Series Real-Time Signal Analyzers Service Manual, Tektronix part number 077-0522-XX. Remove Cosmetic Top Cover NOTE. Right-side or left-side references in these instructions assume you are viewing the instrument from the front panel. WARNING. To avoid electric shock which may result in injury or loss of life, switch off the instrument power, then disconnect the power cord from the mains power. 1. Remove the power cord. 2. If it is installed, pull the front protective cover off the instrument. RSA5100A Series RSA5UP Option 53 Upgrade 3

3. Remove the two T15 TORX-driver screws that secure the plastic carrying handle to the side of the instrument. (It is not necessary to remove the black metal handles.) (See Figure 1.) 4. Remove four T15 screws along each side that secure the top and bottom covers to the instrument, and remove two T20 screws near the front edge of the top cover (next to the folding handles). 5. Remove the top cover (leave the bottom cover in place). Remove the top cover by pulling straight back about 1 inch. Then pull the sides of the top cover outward, flexing them slightly to clear the instrument chassis, and pull it away from the instrument. 6. Remove the 18 T15 screws that secure the top internal cover to the chassis, and then remove the top internal cover from the instrument. Figure 1: Removing the cosmetic top cover 4 RSA5100A Series RSA5UP Option 53 Upgrade

Replace the Existing Acquisition Memory The acquisition memory is located near the rear panel, on the left side. RSA5100A Series RSA5UP Option 53 Upgrade 5

1. Use the ejector latches to release the existing 1 GB acquisition memory module. Place the memory module into a static-shielded bag. 2. Insert the new memory module at an approximately 45 angle, making sure the gold fingers are fully seated. Then rotate the module down toward the board until the latches click into place. 3. Reinstall the top internal cover. (See Figure 1 on page 4.) Place the top internal cover onto the instrument, aligning the two protrusions on the cover with the two slots in the chassis. Replace the 18 T15 screws that secure the top internal cover to the chassis. Torque these screws to 8.0 in/lb. 6 RSA5100A Series RSA5UP Option 53 Upgrade

Reinstall Cosmetic Top Cover Reinstall the top and bottom covers. (See Figure 1 on page 4.) 1. Place the instrument on the rear feet, so the front panel is facing up and the topistowardyou. 2. Place the top cover over the top of the instrument and slide it toward the front panel. Make sure that the top cover wraps around the flanges on the rear panel on all three sides. 3. ReinstallthefourT20Torxheadscrews(twooneachside)nearthefront edge of the top cover (next to the folding handles) that secure the top cover to the instrument. Torque these screws to 8.0 in/lb. 4. Align the four screw holes on each side in the top and bottom covers with the holes in the chassis, and install eight T15 screws, four on each side. Torque these screws to 8.0 in/lb. 5. Position the plastic carrying handle and its bracket on the right side of the instrument, and install the two T15 screws that secure it in place. Torque these screws to 8.0 in/lb. Option Key Installation To enter the new option key: 1. In the signal analyzer application, select Tools > Install Upgrades. The Install Upgrade wizard starts. (See Figure 2.) Click Continue. Figure 2: Starting the option upgrade 2. The Install Upgrade Enter Key screen appears as shown. RSA5100A Series RSA5UP Option 53 Upgrade 7

Figure 3: Entering the option installation key 3. Type the option installation key into the empty text box and click Continue. An Installation Success dialog box appears after you click Continue. 4. Click Close. Exit and restart the RSA5100A application to enable the new feature. 5. Select Help > About Tektronix Real Time Signal Analyzer. 6. In the installed Options window, verify that Option 53 is listed. 7. Click OK. Installing the Option Key Label Place the new option key label over the existing label on the instrument rear panel. This completes the installation of the Option 53 Memory Extension, 4 GB Acquisition Memory Total Upgrade kit. End of Document 8 RSA5100A Series RSA5UP Option 53 Upgrade