I-405 Sepulveda Pass Improvements Project

Similar documents
30-Day Look Ahead Summary August 2011

Click to edit Master text styles

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

I-405 Sepulveda Pass Improvements Project

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

CITY OF BEVERLY HILLS STAFF REPORT

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction

quarterly project status report

Chief Capital Management Officer s Report

Exposition Corridor Transit Project

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

quarterly project status report

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014

NEWS RELEASE November 8, 2017

Mid-Coast Corridor Transit Project

US 67 WIDENING PROJECT

IMPROVEMENT CONCEPTS

AIRPORT HAYVENHURST HAYVENHURST MANDEVILLE CANYON BRENTWOOD SANTA MONICA CARLYLE 20TH 17TH 17TH 14TH MONTANA 11TH LINCOLN 7TH 7TH WILSHIRE

Sherman Oaks Community Traffic Plan

FREQUENTLY ASKED QUESTIONS

Transit Project Delivery Status Report. Significant Issues

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

FREQUENTLY ASKED QUESTIONS

IV. REVISIONS TO THE DRAFT IS/MND

2. PROJECT ALTERNATIVES

Traffic Engineering Study

Purple Line Extension Section 1 Construction Community Meeting January 18, 2018

ODOT District Two Monthly Construction Update

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Janice Fortunato Senior Director Business Partnerships

2.4 Build Alternatives

Sepulveda Pass Corridor Systems Planning Study

4.1 Traffic, Circulation, and Parking

Construction starts this summer on the second and final phase of the Interstate 95 Cottman/

December 12, Dear Secretary Foxx:

Construction Staging Area 4 Avenue Road

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Project Budget and Schedule Status

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018

ODOT District Two Monthly Construction Update

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Purple Line Extension Updates on La Cienega and Rodeo Stations January 10, 2018

Wentzville Parkway South Phase 2 & 2A

Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017

Sepulveda Pass Corridor Systems Planning Study Update

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.

CONFEDERATION LINE EAST SEGMENT

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Lacey Gateway Residential Phase 1

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

V. DEVELOPMENT OF CONCEPTS

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

Exposition Light Rail Transit Project

ROUTE 85 (WASHINGTON STREET) OVER ASSABET RIVER

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Central Park Drives Traffic Management Overview

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

WESTSIDE SUBWAY EXTENSION PROJECT. Construction Traffic Analysis Report

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Capital Improvement Plan Review

Evaluation of Renton Ramp Meters on I-405

Attachment F Transportation Technical Memorandum

Crestmont Development Update 2017 AGM

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

H/Benning Phase 2 Construction. December 17, 2012

Metro Highway Program

I-225 Rail Line Iliff and Florida Stations Information Meeting

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

CTA Capital Construction Update December 12, 2006

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING

Landside Access Modernization Program (LAMP)

PERFORMANCE ACTIVITY 603 SIGNS

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

Brent Spence Bridge Design Exceptions - Alternative I

Technical Feasibility Report

Strategies to keep people and goods moving in and through Seattle

City of Houston Fondren Road Paving and Drainage

Harlem Avenue between 63 rd and 65 th

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

CITY OF STEVENS POINT AGENDA

Buffalo Drive Road Safety Audit

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAPLE STREET UNDERPASS BRIDGE (MM 106.0)

Construction Noise Memorandum

Appendix G Traffic and Parking Report

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Transcription:

I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1

Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half are in the Wilshire segment Of these 12 bridges: Seven are bridge undercrossing locations: Exposition, Pico, Olympic, Santa Monica, Ohio, Wilshire, Constitution Five are ramp locations SB I-405 to EB Wilshire off NB I-405 to EB Wilshire off EB Wilshire to NB I-405 on WB Wilshire to NB I-405 on NB I-405 to WB Wilshire off 2

Wilshire Segment Construction of false work for new southbound flyover ramp 3

Wilshire Segment Construction of false work for new southbound flyover ramp Southbound I-405 to eastbound Wilshire. Scheduled to begin November 27 and continue for approximately two weeks. Requires a full nightly closure of Wilshire Bl from Federal Av to Sepulveda Bl during false work construction over Wilshire Bl Notice of the closure and established detour route will be posted on our project website and sent out via e-mail in advance 4

Wilshire Segment New eastbound Wilshire to northbound I-405 flyover ramps Looking north 5

Wilshire Segment Eastbound Wilshire On-Ramp to Northbound I-405 Erection of this superstructure, extending from the GSA parking lot, over Sepulveda Blvd and hovering above the northbound I-405 off-ramp to westbound Wilshire. When falsework for the bridge deck is extended over Wilshire Blvd, a full closure of Wilshire will be required from Federal Ave to Sepulveda Bl These nightly closures are projected to begin November 19 and to continue for a few days. Advance notice will be posted on our website and sent out via e-mail once the dates are confirmed. 6

Wilshire Segment Northbound I-405 off-ramp to Eastbound Wilshire Falsework for this bridge is visible, extending from the west-side of Sepulveda Bl at Salvation Army, going over Sepulveda Bl, over GSA parking lot to Wilshire Bl. When the deck for this bridge is poured over Sepulveda Bl, a full closure of Sepulveda Bl will be required from Ohio Av to Wilshire Bl. These nightly closures are projected to begin November 26 and to continue for approximately 4 weeks. Advance notice will be posted on our website and sent out via e-mail once the dates are confirmed. 7

Wilshire Segment New Eastbound Wilshire Ramps for Northbound I-405 Looking east Looking north 8

Wilshire Segment Northwest Connector at I-10/Exposition Bl Recent full night closures on Exposition Bl and Pico Bl have been to construct false work for this bridge. When the deck for this bridge is poured over Exposition Bl, a full closure of Exposition will be required from Sawtelle Bl to Sepulveda Bl. These nightly closures are projected to begin within the next two weeks. Advance notice will be posted on our website and sent out via e-mail once the dates are confirmed. 9

Wilshire Segment Upcoming Extended Closures and Dates Ramp Tentative Date Maximum Duration (Days) WB Wilshire on-ramp to NB I-405 June 22 90 NB I-405 off-ramp to WB Wilshire June 22 90 SB I-405 off-ramp to WB Wilshire December 29 14 WB Wilshire on-ramp to SB I-405 TBD 14 EB Wilshire on-ramp to SB I-405 Not Needed 14 SB I-405 to EB Wilshire TBD 90 NB I-405 off-ramp to EB Wilshire TBD 21 EB Wilshire on-ramp to NB I-405 TBD 90 SB I-405 off-ramp to Santa Monica TBD 14 NB I-405 on-ramp from Santa Monica TBD 7 SB I-405 on-ramp from Santa Monica TBD 7 10

Sunset Segment Reconstructed Sunset Bl Bridge reopened September 24, 2012 A second dedicated right turn lane onto the NB onramp will open early 2013. 11

Sunset Segment Sepulveda Bl Repaving Operations Between Montana Av and Church Ln/Ovada Pl New roadway on eastside of street is being repaved now Need to raise street elevation to new, higher elevation Pouring protective concrete around pipe on Sepulveda Bl 12

Sunset Segment Sepulveda Bl Repaving Operations (contd.) Requires a 1 lane northbound and 1 lane southbound configuration Lane reduction in place during 6am to 9pm Full closure of Sepulveda from 9pm to 6am for the week Starts November 26, 2012 thru December 3, 2012 Sepulveda Bl repaved near 1720 Wall. 13

Sunset Segment Church Ln Protection of 12x12 Storm Drain Box On westside of Sepulveda Bl Work will occur in phases Montana Av to Bronwood Av Sepulveda Way to Church Ln/Ovada Pl Storm Drain Line Montana Av 14

Sunset Segment (Contd.) Work is anticipated to start after the Sepulveda Bl roadwork is completed, early December 2012. 15

Sunset Segment (Contd.) Protection of 12x12 Storm Drain Box Requires the installation of approximately 138 piles Pile installation is anticipated to take 6 to 8 months Some piles will go as deep as 130 feet 16

Sunset Segment (Contd.) Protection of 12x12 Storm Drain Box Daytime (7am - 7pm) operations include: Pile driving Pile drilling Excavation Nighttime (7pm - 6am) operations include: Pile drilling Excavation Delivery of supplies Hauling out of material 17

Sunset Segment Freeway Storm Drain NB I-405 Between Getty Center and Getty Ramps Getty Ramps On median of freeway Requires NB freeway lanes be shifted east to create work zone NB Getty on-ramp will be closed to create work zone Anticipated to occur mid-december 2012 Freeway paving will follow Storm Drain Work Zone Getty Center 18

Sunset Segment (Contd.) NB I-405 Roadway Paving Between Moraga Dr and Getty Center ramps Date to be determined Will occur over a weekend Operation is weather permitting 55-hour lane reduction from 5 lanes to 2 lanes MSE walls curve south towards Moraga Dr 19

Sunset Segment NB I-405 Roadway Paving Sepulveda Bl alternative route starting at Wilshire Bl Traffic Control Officers at main intersections along closure Changeable message signs will be utilized to announce closure Montana Av off-ramp will be closed New northbound on-ramp from Sunset Bl, looking northwest 20

Mulholland Bridge Reconstruction Bridge Demolition Closure ended seven hours earlier than planned Significant traffic reduction throughout weekend, 45 55% reduction on I-405 near closure Various work activities completed throughout the weekend closure 21

Mulholland Bridge Reconstruction Work Activities performed during weekend closure Roadway paving Pothole repair Sign structure repairs Barrier rail replacement Wilshire ramp false work Roadway striping Drainage work 22

Mulholland Bridge Reconstruction Reconstruction of the south half of bridge Ongoing nightly closures of Mulholland Dr due to drainage work Bridge abutment construction ongoing Bridge column footing construction ongoing 23

Sherman Oaks Work Activities Retaining wall construction and freeway widening on-going (east side of I-405) Freeway widening and sound wall reconstruction(valley Vista area) anticipated to be begin in early December Sepulveda overpass/bridge widening on-going Sound wall construction and freeway widening (west side of I-405) ongoing 24

Sound/Retaining Wall Construction in Sherman Oaks 259

Sherman Oaks Bridge Widening Traffic Reconfiguration Stage B 26

Skirball Bridge Reconstruction Reconstruction of the south half of bridge Bridge column construction is complete Bridge abutment construction ongoing Ongoing drainage work anticipated to be complete around the end of the 2012 Future bridge abutment at east side of Skirball Bridge, just south of the bridge 27

Relocated Southbound Skirball Ramps New Southbound Skirball on-ramp New Skirball on-ramp anticipated to be in operation in mid-january 2013 (will close existing Skirball on-ramp at the same time) New SB Skirball ramps relocated 2,000 feet south of existing ramps Temporary widening of Sepulveda anticipated to begin in December 2012 On-going utility relocation on Sepulveda Bl New design eliminates the SB acceleration lane on Sepulveda Bl from new SB Skirball ramps 28

Relocated Southbound Skirball Ramps No SB acceleration lane 29

Relocated Southbound Skirball Ramps Temporary configuration of Sepulveda One temporary left-turn lane onto new SB Skirball on-ramp Installation of traffic signal will control traffic at new SB Skirball on-ramp Work to complete the final configuration of Sepulveda anticipated to begin in Spring 2013 30

Relocated Southbound Skirball Ramps Traffic benefits of new SB Skirball ramps design Improved traffic flow, less travel delays and less congestion in the overall area Improved operations of the Skirball/Sepulveda intersection Improved signal timing on Sepulveda Additional capacity and turning lanes will be added to Sepulveda Bl Increased capacity on new southbound Skirball ramps 31

Relocated Southbound Skirball Ramps 32

For More Information Project Hotline: (213) 922-3665 II-405@metro.net www.metro.net/i-i-405 www.facebook.com/i-i-405project Twitter: http://twitter.com/i_i-i-405 Nixle: nixle.com 33