Soldier Summit + Salt Lake City Route Extension Scenario Pack 01

Similar documents
Realistic Contemporary and Historical Scenarios for Train Simulator. Sherman Hill Scenario Pack 01

The Dash 9 Locomotive Pack

SD70M Southern Pacific Pack

General Motors SD50 locomotives Union Pacific & Southern Pacific

FP7 California Zephyr

David W. Salter Collection

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Train Simulator - Clear Creek Old Timer Rolling Stock Pack. Contents. Copyright 2017 Milepost Simulations and Dovetail Games

Munich - Augsburg Scenario Pack 01

ES44DC BNSF Heritage 2 Locomotive

The Racetrack Aurora to Chicago

PENINSULA CORRIDOR SAN FRANCISCO - GILROY. Copyright Dovetail Games 2016, all rights reserved Release Version 1.1. Page 1

N CB&Q EMD E5A Silver Streak Zephyr 6 Unit Set And Individual EMD E5 un-skirted Locomotives

Miami Commuter Rail F40PHL-2

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

BR Class 105. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0

A route for Train Simulator 2012

GM Aerotrain for Train Simulator 2017 Owner s Manual

London Transport Heritage Collection

ALP-46 New Jersey Transit

Pier B On-Dock Rail Support Facility Project Rail Grade Crossings Analysis

Former Yreka Western No. 19 Arrives at Age of Steam Roundhouse

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

Union Pacific Diesel Painting Guide

Poster book. by Marvin T. Broyhill. Copyright All rights reserved. May not be used in whole or in part without prior written consent.

Port Terminal Railroad Association. Committed to Safety and Service

VNHRR Presents: Baltimore & Ohio KINGWOOD BRANCH Tunnelton, WV Kingwood, WV Train Simulator 2017 Route DLC

Baldwin RF-16 for Train Simulator 2015 Owner s Manual

DR BR86 Locomotive. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0

is being pushed by the locomotive, which reduces the number of seats in that car.

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

SAMPLE PAGE. Trains Express Lapbook. Any Age. A Journey Through Learning

Update of the Midwest Regional Rail Initiative. Tim Hoeffner Michigan Department of Transportation Director, Office of Rail Lansing, MI

We photographed it as well as a UP eastbound doublestack lead by UP #8638 (SD70ACe).

Regional Transportation Plan: APPENDIX P

F40PH-2CAT New Jersey Transit

Westland No. 1 Mine (Bob Ciminel 2012)

CN in Your Community British Columbia Photo: Squamish, 1BC

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

11/4/11. Between 1860 and ,000 patents were issued for new inventions By 1900, Americans standard of living was among the highest in the world

GUIDE TO COAL MINES Mines Served by BNSF Railway

U.S. System Summary: ARIZONA/SOUTHWEST

Northeast Corridor New York to Philadelphia

USER MANUAL. History. Setting

EMD SD45 for Train Simulator 2013 Owner s Manual

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

GE ARROW III NJ TRANSIT

100 YEARS C H I C A G O, M I L W A U K E E, S T. P A U L A N D P A C I F I C R A I L R O A D C O M P A N Y

Layout Track Plans. All Rights Reserved.

EMD SD45 for Train Simulator 2013 Owner s Manual

Corridor Sketch Summary

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Inland Empire Railroad Main Line Study Final Report Contract

GE 44 Tonner for Train Simulator 2012 Owner s Manual

Solar in Utah: Policies, Markets, and Technology Billy Smallen, Utah Clean Energy

North Jersey Coast & Morristown Lines: Hoboken & New York - Bay Head & Dover

Class 24 BR Blue. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0

2017 Railroad Day - Train Line-up

Solar in Utah: Policies, Markets, and Technology Billy Smallen, Utah Clean Energy

Sophisticated Mapping for Increasing Railway Capacity

Amtrak Dash 8-32BWH. Copyright Dovetail Games 2016, all rights reserved Release Version 1.0

American Steam By J.A. Friedland

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

Passenger Rail Solar Electrification: A Primer. Oregon Department of Transportation Rail Division. June 2009

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

BNSF 2185, an END GP 38, was doing flat switching in the Yard during our visit.

Southern Railway s15 Class

Committee Report. Transportation Committee. Business Item No

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

LICENSED DISMANTLERS SALT LAKE COUNTY February 1, 2018

Arriva Trains Wales DMU Pack

Vertical Loads from North American Rolling Stock for Bridge Design and Rating

Canadian National SD40-2 Wide Nose

Canadian Pacific Railway: Addressing Climate Change. UN Conference on Climate Change (COP 11) December 3, 2005

Corris railway. Copyright Dovetail Games 2016, all rights reserved Page 1

List of UPRR Business and Excursion Cars

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

TRAIN SIM WORLD : LONG ISLAND RAIL ROAD OPERATOR MANUAL

This are the pictures from the Stockholders Report

Houston Region Freight Study. July 23, 2007

Harlem Avenue between 63 rd and 65 th

Train Simulator 2015 EMD FL9. New Haven EMD FL9. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0. Page 1

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

the modeling stop More Trackside Built-ups SPEEDER SHED

David W. Salter Collection

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials

Regional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015

4-4-0 TYPE - EIGHT WHEEL - CLASS SYMBOL E

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013

The Great Northern Railway Cascade Division

X EMD F2A & F2A

Traffic Micro-Simulation Assisted Tunnel Ventilation System Design

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

RhB Enhancement Pack 2

Trainini Photo Calendar in exclusive Co-Operation with Ztrack Magazine

Sample Validation of Vehicle Probe Data Using Bluetooth Traffic Monitoring Technology

INSTRUCTOR EMPLOYEE: ID NUMBER: DATE: INSTRUCTOR: SCORE:

Transcription:

Realistic Contemporary and Historical Scenarios for Train Simulator

About High Iron Simulations We began serving the Train Simulator community in October 2012 by developing and publishing free Train Simulator scenarios to Steam Workshop and we're pleased that our series of more than 300 Steam Workshop scenarios have been downloaded by Train Simulator enthusiasts more than 750,000 times. As a Train Simulator Partner Programme member, we collaborate with Dovetail Games to produce a wide variety of realistic scenario packs for Train Simulator routes. The Standing tall along the western rim of the Rocky Mountains is the Wasatch Range, stretching from Utah to Idaho. Rugged, magnificent, and daunting, the Wasatch claims peaks as tall as 11,900 feet. The Wasatch Range is also famous for Soldier Summit, the pass through which the Rio Grande pushed its steel rails west in 1882. Soldier Summit is the fifth highest mountain crossing on a U. S. western transcontinental railroad route. Train Simulator s stretches west from Helper to Salt Lake City, Utah, a distance of 118 route miles along Rio Grande s Utah Division. Helper, so named for its role as the place where Rio Grande added helper locomotives, marks the start of the hard westbound climb over Soldier Summit s east slope. From Helper, which stands at an elevation of 5,830 feet, Rio Grande s Soldier Summit route begins an arduous 2.4 percent gradient east slope climb through famed locations such as Castle Gate and Kyune toward the line s summit at 7,440 feet, then drops down the long west slope (with grades of up to 2 percent), reaching Provo (standing at 4,517 feet elevation). West of Provo, the D&RGW served the sprawling Geneva Steel Works and made its way to Salt Lake City, an important interchange point with both the Union Pacific and Western Pacific. No small part of Soldier Summit s fame over the decades has been due to the hard and unforgiving task that the Rio Grande faced in lifting coal mined in the Wasatch westbound over the Wasatch east slope. But the Soldier Summit route was always bustling with a variety of diverse rail activity. As part of D&RGW s main traffic artery for east-west transcontinental traffic, Soldier Summit was host to priority merchandise freights, intermodal traffic, and, of course, one of America s most famous passenger trains, the California Zephyr. The dome-equipped CZ made its debut in 1949, operating between Chicago and San Francisco s Bay Area until 1970, when Western Pacific was allowed to discontinue the train s western route segment. Rio Grande chose not to join Amtrak in 1971, and instead operated its own Rio Grande Zephyr (using equipment from the CZ) until 1983. Following the discontinuance of the Rio Grande Zephyr, Amtrak s Superliner-equipped version of the California Zephyr began operating over the D&RGW and Soldier Summit, and continues to do so today. Now part of the Union Pacific system, Soldier Summit remains an active line, hosting UP tonnage, Utah Railway coal trains, Amtrak s California Zephyr, and BNSF trackage rights freight movements The Scenarios This pack includes 10 career scenarios based on authentic D&RGW freight and passenger operations on the railroad s Utah Division during the 1980s. Career scenario scoring for all freight (main line, local, and switching) operations in the scenario pack are based upon a starting score of 1,000 with deductions made for operating errors. Passenger-service scenario scoring is based upon points achieved for meeting timetable expectations. All scenarios require Dovetail Games Train Simulator, the, and the GP40-2 Loco Add-On. Select scenarios also require the Western Pacific FP7 California Zephyr Loco Add-On as detailed in the individual scenario descriptions (pages 3-6). Train Simulator and all required products are available at the Steam Store: http://store.steampowered.com Our additional scenario packs are also available at the Steam Store: http://store.steampowered.com For Train Simulator and scenario product support, visit: http://dovetailgames.kayako.com/ For the latest news and information on High Iron Simulations and our scenario products, visit our Facebook page at: https://www.facebook.com/highironsimulations/ 2

[SLC 1.01] D&RGW TRAIN 18, PART 1 Following the discontinuance of the California Zephyr in 1970, the Rio Grande continued the Salt Lake City-Denver leg of the "Silver Lady's" schedule, with the train renamed the Rio Grande Zephyr. Operating triweekly in each direction, the RGZ utilized ex-california Zephyr equipment. On a winter morning, you are the engineer of D&RGW Train 18 the westbound RGZ ready for departure from Salt Lake City's D&RGW station and soon you'll be rolling east into the snowy Rockies. This is the first of a three-part scenario. Featured Equipment: D&RGW EMD F9 and Rio Grande Zephyr. [SLC 1.02] D&RGW TRAIN 18, PART 2 Following the discontinuance of the California Zephyr in 1970, the Rio Grande continued the Salt Lake City-Denver leg of the "Silver Lady's" schedule, with the train renamed the Rio Grande Zephyr. In Part 1 of this three-part scenario, you proceeded with Train 18 the eastbound RGZ from Salt Lake City to Provo, and you are now ready to continue the journey east and ascend snowy Soldier Summit. Featured Equipment: D&RGW EMD F9 and Rio Grande Zephyr. Scenario Duration: Approximately 80 minutes. [SLC 1.03] D&RGW TRAIN 18, PART 3 Following the discontinuance of the California Zephyr in 1970, the Rio Grande continued the Salt Lake City-Denver leg of the "Silver Lady's" schedule, with the train renamed the Rio Grande Zephyr. In Part 2 of this three-part scenario, you proceeded with Train 18 the eastbound RGZ to the summit of the Wasatch, and you are now ready to continue the journey down the east slope of Soldier Summit to the station stop at Helper, Utah. Featured Equipment: D&RGW EMD F9 and Rio Grande Zephyr. 3

[SLC 1.04] D&RGW TRAIN 733, PART 1 D&RGW Train 733 totted coal mined in Carbon County, Utah from Columbia Jct. to the sprawling Geneva Steel Works west of Provo. You are the engineer of Train 733, stopped at the summit of the Wasatch as your helper set has been removed, and you are now ready to begin the challenging descent of Soldier Summit s west slope with D&RGW SD40T-2 power. This is the first installment of a two-part scenario. Featured Equipment: D&RGW EMD SD40T-2. Scenario Duration: Approximately 45 minutes. Extension; GP40-2 [SLC 1.05] D&RGW TRAIN 733, PART 2 D&RGW Train 733 totted coal mined in Carbon County, Utah from Columbia Jct. to the sprawling Geneva Steel Works west of Provo. You are the engineer of Train 733, and in Part 1 of this two-part scenario you proceeded to Narrows. You ll be meeting Amtrak Train 6 the eastbound California Zephyr then proceeding to the great Geneva Works. Featured Equipment: D&RGW EMD SD40T-2. Scenario Duration: Approximately 65 minutes. Extension; GP40-2 [SLC 1.06] D&RGW TRAIN 152 D&RGW Train 152 was a general manifest freight operating from Roper Yard in Salt Lake City to Grand Junction, Colorado. Having been called as engineer for the morning departure, you have just climbed aboard a set of Rio Grande EMD GP40-2s at the Roper engine terminal and, after tying onto your train in the yard, you ll be headed east to Provo where you will stop for a pick up. Featured Equipment: D&RGW EMD GP40-2. Scenario Duration: Approximately 65 minutes. Extension; GP40-2 4

[SLC 1.07] D&RGW SHORT LINE TRANSFER D&RGW's job between its own Roper Yard and the Union Pacific's North Yard in Salt Lake City was called the Short Line Transfer. You are the engineer of the Short Line Transfer and are stopped near Salt Lake City's Grant Tower on the return journey to Roper Yard. But you have more switching work, with a Rio Grande EMD GP9 as power, to perform in rainy Salt Lake City before making the final run to Roper. Featured Equipment: D&RGW EMD GP9. Scenario Duration: Approximately 45 minutes. Extension; GP40-2 [SLC 1.08] D&RGW F9 FINALE After the discontinuance of the Rio Grande Zephyr in April 1983, the D&RGW s remaining F9s were placed in secondary freight service. In July 1983, the veteran F-units were assigned to handle ballast trains, including movements of slag ballast off the Bingham Branch. You are the engineer of D&RGW Extra 5771 East with a load of ballast, ready to come off the Bingham Branch at Midvale and head to Sutro, Utah. Featured Equipment: D&RGW EMD F9. Scenario Duration: Approximately 75 minutes. [SLC 1.09] D&RGW TRAIN 101 Among the hottest freight trains on the Rio Grande were trains 100 and 101 carrying priority traffic between Denver and Ogden. You are the engineer of westbound Train 101 stopped at Helper, Utah while a rear helper has been added and, with a trio of Rio Grande EMD GP40-2s on the point, you are now ready for the climb of Soldier Summit s wintry eastern slope. Featured Equipment: D&RGW EMD GP40-2. Extension; GP40-2 5

[SLC 1.10] D&RGW MIDVALE TRAMP D&RGW's well-known Midvale Tramp was based at Roper Yard and worked the railroad s Bingham and Garfield branches which connected with the main line at Midvale, Utah. You are the engineer of the Midvale Tramp, ready to handle a variety of switching duties around Midvale, then make the westbound run to Roper with a pair of veteran Rio Grande EMD GP9s. Featured Equipment: D&RGW EMD GP9. Extension; GP40-2 Loco Pack Add-On Acknowledgements and Credits For support in developing this pack, our particular thanks are extended to: Simon Sauntson, Third Party Partner Manager, Dovetail Games Edward Gates, Third Party Technical Support, Dovetail Games Stephen Dark, Product Experience Manager, Dovetail Games Members of the Train Simulator beta test team and Dovetail Games QA department Gary Dolzall authored the scenarios included in this pack. 2018 High Iron Simulations, all rights reserved. Realistic Contemporary and Historical Scenarios for Train Simulator 6