Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

Similar documents
Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Facility Name: Asama Coldwater Manufacturing Georgia City: Warrenton County: Warren AIRS #: Application #: 23751

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: Application #: 22133

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Part 70 Operating Permit Amendment

Printed: April 13, 2016 Page 1 of 35

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #:

Full Compliance Evaluation Report Off-Site Report

PERMIT APPLICATION REVIEW SUMMARY

STATEMENT OF BASIS. University of Arkansas for Medical Sciences (UAMS) 4301 West Markham St. Little Rock, Arkansas 72205

The following emission units and control devices associated with the friction materials process are currently permitted:

Engineering Summary New NGC, Inc.

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

Regulatory and Permitting Requirements of Stationary Generators In Delaware

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

Note: This rule is effective on July 1, 2018, through June 30, 2019.

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) AIR QUALITY PROGRAM

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6

Permit Holder. Permitted Equipment

STATEMENT OF BASIS. NAICS Description: Other Basic Inorganic Chemical Manufacturing NAICS Code:

STATEMENT OF BASIS. NAICS Description: Motor and Generator Manufacturing NAICS Code:

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

Example Notification of Compliance Status Report a

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

Streamlining Multiple Applicable Requirements

The subject renewal application was received on February 28, 2017 and was determined to be administratively complete on March 9, 2017.

Metro and you, building together.

OUTOKUMPU STAINLESS USA, LLC CALVERT, AL FACILITY NO.: MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302

State of New Jersey. Department of Environmental Protection Division of Air Quality

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Air Permitting: Municipal Facilities with Emergency Generators

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

PERMIT APPLICATION REVIEW SUMMARY

STATEMENT OF BASIS. NAICS Description: Fabricated Pipe and Pipe Fitting Manufacturing NAICS Code:

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

PERMIT TO INSTALL. Table of Contents

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

2017Compliance Table with methods.xlsx

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

Permit Holder. Permitted Equipment

Permit No. NN OP

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

PERMIT APPLICATION REVIEW SUMMARY

MAJOR SOURCE OPERATING PERMIT

Overview of Revisions to the Proposed GP-5A and GP-5 and Emissions Discussion

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

Regulatory Impacts of Biogas-fired Internal Combustion Engines

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Engineering Analysis

FINAL PERMIT APPLICATION REVIEW SUMMARY

SECTION.1400 NITROGEN OXIDES

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

Air Individual Permit Permit Limits to Avoid NSR

Appendix E Worksheets for Major Sources of PM10, NOx and SO2

Fuel Oil Conversions. Association of Energy Engineers (AEE) September 20, 2011

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

Technical Contact. Steven Klafka Environmental Engineer (608) South Paterson Street Madison, WI 53703

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

PERMIT TO INSTALL. Table of Contents

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

City of Fort Worth s Natural Gas Air Quality Study Follow-up on Report Recommendations. August 16, 2011

MassDEP 310 CMR 7.00 Air Repair Air Pollution Control Amendments Effective March 9, 2018

DRAFT AUTHORITY TO CONSTRUCT

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

3. GENERAL CONDITIONS

Part 70 Operating Permit Amendment

New Federal Regulations for Internal Combustion Engines. Doug Parce

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO.

Draft Statement of Basis for Kenworth Truck Company Renton Facility AOP Renewal 2 <TBD>

PERMIT TO INSTALL. Table of Contents

Transcription:

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: 04-13-103-00007 Application #: 40890 Date SIP Application Received: March 7, 2016 Date Title V Application Received: March 7, 2016 Permit No: 2621-103-0007-V-04-5 Program Review Engineers Review Managers SSPP Cassie Smith Dave Matos SSCP N/A N/A ISMU N/A N/A TOXICS N/A N/A Permitting Program Manager Eric Cornwell Introduction This narrative is being provided to assist the reader in understanding the content of the referenced SIP permit to construct and operate and Section 502(b)(10) change to the Part 70 source. Complex issues and unusual items are explained in simpler terms and/or greater detail than is sometimes possible in the actual permit. This permit is being issued pursuant to: (1) Sections 391-3-1-.03(1), 391-3-1-.03(2), and 391-3-1-.03(10) of the Georgia Rules for Air Quality Control, (2) Part 70 of Chapter I of Title 40 of the Code of Federal Regulations, and (3) Title V of the Clean Air Act Amendments of 1990. The following narrative is designed to accompany the permit and is presented in the same general order as the permit amendment. This narrative is intended only as an adjunct for the reviewer and has no legal standing. Georgia-Pacific Consumer Products LP Savannah River Mill, TV-40890 Page 1 of 5

I. Facility Description A. Existing Permits Table 1 below lists the current Title V permit, all administrative amendments and minor and significant modifications to that permit, and any 502(b)(10) changes. Comments are listed in Table 2 below. Table 1: Current Title V Permit and Amendments Comments Permit/Amendment Number Date of Issuance Yes No 2621-103-0007-V-04-0 September 25, 2012 2621-103-0007-V-04-1 August 14, 2013 2621-103-0007-V-04-2 June 27, 2014 2621-103-0007-V-04-3 January 21, 2015 2621-103-0007-V-04-4 July 6, 2015 2621-103-0007-V-04-5 April 20, 2016 Table 2: Comments on Specific Permits Permit Number 2621-103-0007-V-04-1 2621-103-0007-V-04-2 2621-103-0007-V-04-3 2621-103-0007-V-04-4 2621-103-0007-V-04-5 B. Regulatory 1. PSD/NSR/RACT Comments Installation of stationary reciprocating internal combustion engines. Administrative amendment for address change. Installation of a new converting line. Venting of trim removal system to atmosphere. Inclusion of normal operating ranges for pressure drop and scrubbant flow rate of two new scrubbers (SB09 and SB10). The Savannah River Mill is considered a major source under PSD. The facility has accepted the following PSD Limits: a. Emissions of SO 2 from Boiler No. 3 are limited to 491.4 pounds per hour. b. Emissions of NO X from Boiler Nos. 3, 4, and 5 are limited to 0.4 pounds per MMBtu heat input. c. Emissions of SO 2 from Boiler Nos. 4 and 5 are limited to 381.5 pounds per hour each. d. Emissions of NO X from each combined Combustion Turbine / Waste Heat Boiler stack are limited to 105.0 pounds per hour. e. The sulfur content of the no. 2 fuel oil burned at the mill is limited to 0.05 percent, by weight, or less. f. The mill may burn only natural gas in the Paper Machine dryer burners. g. Emissions of VOC from the Paper Machines combined are limited to less than 206.3 tons per year. h. Emissions of VOC from Paper Machine No. 20 are limited to 0.0067 pound per MMBtu heat input. i. The mill was required to install low NO X burners in the dryer hoods for Paper Machine No. 17. j. Emissions from Paper Machine No. 17 are limited to 0.005 pounds per MMBtu heat input of PM/PM 10, 0.0007 pounds per MMBtu heat input of SO 2, 0.036 pounds per MMBtu heat input of NO X, 0.184 pounds per MMBtu heat input of CO, and 0.006 pounds per MMBtu heat input of VOC. k. Emissions of PM/PM 10 from Paper Machine Nos. 16 through 19 are limited to less than 17.9 tpy, 16.8 tpy, 10.7 Georgia-Pacific Consumer Products LP Savannah River Mill, TV-40890 Page 2 of 5

tpy, and 5.6 tpy, respectively. l. Emissions of VOC from the combined Pulp Processing Area and Bleaching Systems are limited to less than 201.3 tpy. m. The mill must comply with a good operating practices plan for the Sodium Bisulfite Tank. The facility has accepted the following limits to avoid PSD: a. The mill must limit the sulfur content of fuel oil burned at the site to 0.05 percent, by weight. b. The mill must limit the size of Compressor Engines operated under Source Code CE01 to less than 750 hp. c. The mill must limit the operation of engines under Source Code CE01 to 12,000,000 hp-hours combined 2. Title V Major Source by Table 3: Title V Major Source Is the Emitted? Major Source PM PM 10 SO 2 VOC NO x CO TRS H 2 S Individual Total HAPs If emitted, what is the facility s Title V status for the? Major Source Requesting SM Non-Major Source II. Proposed Modification A. Description of Modification Application No. 40890 was submitted for the purpose of installing a new dust collection system and wet venturi scrubber on the winder section of Paper Machine 19 (PM04). The dust collection system will consist of an exhaust stack, wet scrubber (SB11), venturi section, fan, motor and hoods, and associated electrical, control, and monitoring equipment. This system will vent outside to the atmosphere and is being installed primarily to enhance worker comfort/health and safety. This project is expected to begin in July 2016, with final the installation expected in September. The wet venturi scrubber is a control device with controlled PM emissions of 3.1 tpy. Based on engineering estimates and design removal efficiency, uncontrolled emission from the paper machine would be more than 100 tpy. Therefore the scrubber is needed to meet the equipment SIP Rule PM allowable emission limit. Since this control device is for an other pollutant-specific emission unit (less than 100% of the major source threshold after control device), the facility will submit a compliance assurance monitoring plan for the new scrubber (SB11) with the next Title V renewal application per 40 CFR 64.5(b), adopted by reference in 391-3-1-.02(11). Georgia-Pacific Consumer Products LP Savannah River Mill, TV-40890 Page 3 of 5

B. Emissions Change The Paper Machine 19 dust collection system will not increase production capability beyond the currently permitted potential rate of 307 air dried tons finished paper per day (ADTFP/day). However, a new dust collection system may increase production on an annual basis by up to 1,243 MDT/yr. This is due to reducing machine downtime to clean dust. The facility assessed PSD applicability by comparing past actual emissions for the April 2012-March 2013 time period to the projected future actual emissions from Paper Machine 19. Projected actual emissions from the paper machine are based on a future actual production rate of 98,550 MDT/yr (104,463 ADT/yr). The PM emissions for the paper machines are calculated using an interim emission factor (1.0 pound/paper machine ton). After having undertaken an extensive paper machine emissions testing program, the facility is currently reviewing test data from these machines. Preliminary results indicate that the total combined roof vent/stack emissions from Paper Machine 19 might be more than the current estimate of 1.0 lb/paper machine ton. Therefore, they utilized a conservative estimate of 1.75 lb/paper machine ton emission factor based on a worst case scenario to calculate potential emissions for this project. A wet venturi scrubber will also be installed. PM emissions from the new scrubber (SB11) were calculated using a 1.0 lb/hr emission factor. This emission factor is based on the scrubber manufacturer vendor guarantee. PM test results on similar scrubbers and paper machines were also used to confirm the reasonableness of the emission factor and determine the PM 10 /PM 2.5 speciation. Potential emissions from the scrubber were calculated based on the vendor guarantee of 8,760 hours of operation. Since the new dust collection system may increase production, other potentially-affected sources (boilers, pulp mill, and converting line) were also included in the emissions calculations that would attribute to increases in NO X, SO 2, VOC, and PM. The table below summarizes the total emissions increases with respect to the PSD significant emission rates (SER). These emissions do not exceed PSD thresholds. Detailed emissions calculations are included in the application. Table 4: Emissions Change Due to Modification C. Title I Modification Emission Increase (tpy) PSD Threshold (tpy) Percent of Threshold (%) PM 12.2 25 49% PM 10 10.7 15 71% PM 2.5 9.1 10 91% PSD/NSR Applicability SO 2 4.6 40 12% SAM 3.36E-02 7 <1% NO x 1.5 40 4% CO 1.3 100 1% VOC 3.7 40 9% Pb 3.71E-05 0.6 <1% CO 2 e 1,990.7 75,000 3% The modification is not subject to PSD or NSR Georgia-Pacific Consumer Products LP Savannah River Mill, TV-40890 Page 4 of 5

III. Facility Wide Requirements IV. Regulated Equipment Requirements The new scrubber will be subject to general state emission requirements for particulate matter per 391-3-1-.02(2)(11)(b) and (e). V. Testing Requirements (with Associated Record Keeping and Reporting) VI. Monitoring Requirements (with Associated Record Keeping and Reporting) Condition 5.2.19 was added to require the facility to monitor the pressure drop and scrubbant flow rate for the new scrubber (Source Code SB11) and to record the data once per operating shift, in accordance with 40 CFR Part 52.21 and Georgia Rules 391-3-1-.02(2)(b) and 391-3-1-.02(2)(e). VII. Other Record Keeping and Reporting Requirements Condition 6.1.9 was added to require the facility to report excursions for the new scrubber (Source Code SB11) in accordance with new Condition 6.2.25. Condition 6.2.25 was added to allow the facility 90 days to establish normal operating ranges for the new scrubber (Source Code SB11). VIII. Specific Requirements Georgia-Pacific Consumer Products LP Savannah River Mill, TV-40890 Page 5 of 5