MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Similar documents
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

St. Cloud State University St. Cloud, MN

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Highway and Heavy Master Job Classifications OLD versus NEW

ATTACHMENT A. Construction Project Safety Checklist

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

Hennepin County Transportation Department ADDENDUM

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

T.A.T Minimum Wage Scale

Hennepin County Transportation Department ADDENDUM

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

Hennepin County Transportation Department ADDENDUM

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP

Modification Number Publication Date 0 04/01/ /23/2016 * SUMN /01/2014

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

All Users of the City of Denver Prevailing Wage Schedules

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

FEMA's Schedule of Equipment Rates

GREASE TIME RATE SINGULARLY OPERATED MACHINES

FEMA's Schedule of Equipment Rates

BIDDING REQUIREMENTS Addendum No. 2. June 21, Southern Illinois University School of Medicine Springfield, IL PROSPECTIVE BIDDERS

On-the-Job Training Program. Overview of Training Programs

Meredith Creme, Associate Human Resource Professional

CITY OF MONTICELLO PIATT COUNTY, ILLINOIS AN ORDINANCE ENACTING THE ILLINOIS PREVAILING RATE OF WAGES FOR PUBLIC WORKS NO

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

Kansas Department of Transportation

State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone PO Box 44540, Olympia, WA

Auction Ring 1 -Ramp - North Auction Theatre

SEWER AND WATERMAIN CONSTRUCTION

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Schedule of Equipment Rates

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF EAST PEORIA, TAZEWELL COUNTY, ILLINOIS, THAT:

CERTIFICATE. I, Marilyn L. Banks, DO HEREBY CERTIFY THAT I am the Town. of the City of Champaign Township Clerk in and for the Town of the City of

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

SEWER AND WATERMAIN CONSTRUCTION

ADDENDUM NUMBER ONE PART ONE, VOL. 1 CONTRACT DOCUMENTS

County Trade Job Classification Wage Holiday Overtime Notes

KENDALL COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, Base Wage

FAIR WAGE SCHEDULE Sewer and Watermain

Auction Ring 1 -Ramp - North Auction Theatre

CONSTRUCTION and OFF ROAD EQUIPMENT

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

LABOR COMMISSIONER'S EXHIBITS

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

MERCER COUNTY PREVAILING WAGE ORDINANCE FOR

FAIR WAGE SCHEDULE Road Building

Appendix H: Construction Impacts H-3 Air Quality

Prevailing Wage Rates for Will County effective August 15, 2018

General Decision Number: OR /06/2013 OR17. Superseded General Decision Number: OR State: Oregon. Construction Type: Residential

RESOLUTION OF THE BOARD OF EDUCATION OF. for said CONSOLIDATED SCHOOL DISTRICT 158. PREVAILING WAGE

Why? Faster To reduce the duration of the process

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

STATE OF MICHIGAN Prevailing Wages PO Box Lansing, MI Informational Sheet: Prevailing Wages on State Projects

U.S. Department of Labor Wage Determinations

ESSEX COUNTY OFFICE OF THE MANAGER

Kane County Prevailing Wage for July 2015 (See explanation of column headings at bottom of wages)

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Equipment Rental Costs

Manhole Rehabilitation - Landside CONTRACT NO ADDENDUM NUMBER TWO

Bulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010

Bev Quinn. Govemor. Acting Director. August 31,2017. Bruce Rauner


ILLINOIS DEPARTMENT OF LABOR

Transcription:

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS THIS NOTICE MUST BE POSTED ON THE JOBSITE IN A CONSPICUOUS PLACE Construction Type: Commercial County Number: 03 County Name: BECKER Effective: 2014-12-08 Revised: 2015-06-19 This project is covered by Minnesota prevailing wage statutes. Wage rates listed below are the minimum hourly rates to be paid on this project. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at a rate of one and one half (1 1/2) times the basic hourly rate. Violations should be reported to: Department of Labor and Industry Prevailing Wage Section 443 Lafayette Road N St Paul, MN 55155 (651) 284-5091 DLI.PrevWage@state.mn.us * Indicates that adjacent county rates were used for the labor class listed. County: BECKER (03) LABOR CODE AND CLASS EFFECT DATE BASIC RATE FRINGE RATE TOTAL RATE LABORERS (101-112) (SPECIAL CRAFTS 701-730) 101 LABORER, COMMON (GENERAL LABOR WORK) 2014-12-08 21.00 2.95 23.95 102 LABORER, SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) 2014-12-08 12.00 0.00 12.00 06/23/2015 1

103* LABORER, LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR) 2014-12-08 18.75 13.24 31.99 2015-05-01 19.96 13.59 33.55 104* FLAG PERSON 2014-12-08 11.70 6.07 17.77 105 WATCH PERSON 2014-12-08 15.00 1.11 16.11 106 BLASTER 2014-12-08 17.50 1.85 19.35 107* PIPELAYER (WATER, SEWER AND GAS) 2014-12-08 22.50 13.88 36.38 2015-05-01 23.31 14.25 37.56 108 TUNNEL MINER FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US 109* UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) 2014-12-08 20.70 13.88 34.58 2015-05-01 21.51 14.25 35.76 110* SURVEY FIELD TECHNICIAN (OPERATE TOTAL STATION, GPS RECEIVER, LEVEL, ROD OR RANGE POLES, STEEL TAPE MEASUREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS). THIS CLASSIFICATION DOES NOT APPLY TO THE WORK PERFORMED ON A PREVAILING WAGE PROJECT BY A LAND SURVEYOR WHO IS LICENSED PURSUANT TO MINNESOTA STATUTES, SECTIONS 326.02 TO 326.15. +950,000 2014-12-08 23.30 15.77 39.07 2015-05-01 24.21 16.14 40.35-950,000 2014-12-08 21.55 15.77 37.32 2015-05-01 22.46 16.14 38.60 06/23/2015 2

111 TRAFFIC CONTROL PERSON (TEMPORARY SIGNAGE) +950,000 2014-12-08 23.30 15.77 39.07 2015-05-01 24.21 16.14 40.35-950,000 2014-12-08 21.55 15.77 37.32 2015-05-01 22.46 16.14 38.60 SPECIAL EQUIPMENT (201-204) 201* ARTICULATED HAULER FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US 202* BOOM TRUCK 2014-12-08 20.00 0.91 20.91 203* LANDSCAPING EQUIPMENT, INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS 2014-12-08 15.00 0.00 15.00 204* OFF-ROAD TRUCK FOR RATE CALL 651-284-5091 OR EMAIL DLI.PREVWAGE@STATE.MN.US 205 PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (ONE OR TWO PERSON OPERATORS); SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS. 2014-12-08 25.08 14.09 39.17 HIGHWAY/HEAVY POWER EQUIPMENT OPERATOR GROUP 2 * 2014-12-08 28.00 0.00 28.00 306 GRADER OR MOTOR PATROL 308 TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED (HIGHWAY AND HEAVY ONLY) 06/23/2015 3

GROUP 3 * 2014-12-08 24.22 17.20 41.42 309 ASPHALT BITUMINOUS STABILIZER PLANT 310 CABLEWAY 2015-05-01 24.92 17.90 42.82 312 DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY) (HIGHWAY AND HEAVY ONLY) 314 DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER 316 LOCOMOTIVE CRANE OPERATOR 320 TANDEM SCRAPER 322 TUGBOAT 100 H.P AND OVER (HIGHWAY AND HEAVY ONLY) GROUP 4 * 2014-12-08 29.00 0.00 29.00 323 AIR TRACK ROCK DRILL 324 AUTOMATIC ROAD MACHINE (CMI OR SIMILAR) (HIGHWAY AND HEAVY ONLY) 325 BACKFILLER OPERATOR 327 BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER) 328 BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIMILAR TYPES (OPERATOR AND SCREED PERSON) 329 BROKK OR R.T.C. REMOTE CONTROL OR SIMILAR TYPE WITH ALL ATTACHMENTS 330 CAT CHALLENGER TRACTORS OR SIMILAR TYPES PULLING ROCK WAGONS, BULLDOZERS AND SCRAPERS 331 CHIP HARVESTER AND TREE CUTTER 332 CONCRETE DISTRIBUTOR AND SPREADER FINISHING MACHINE, LONGITUDINAL FLOAT, JOINT MACHINE, AND SPRAY MACHINE 334 CONCRETE MOBIL (HIGHWAY AND HEAVY ONLY) 335 CRUSHING PLANT (GRAVEL AND STONE) OR GRAVEL WASHING, CRUSHING AND SCREENING PLANT 336 CURB MACHINE 337 DIRECTIONAL BORING MACHINE 338 DOPE MACHINE (PIPELINE) 340 DUAL TRACTOR 341 ELEVATING GRADER 345 GPS REMOTE OPERATING OF EQUIPMENT 347 HYDRAULIC TREE PLANTER 348 LAUNCHER PERSON (TANKER PERSON OR PILOT LICENSE) 349 LOCOMOTIVE (HIGHWAY AND HEAVY ONLY) 350 MILLING, GRINDING, PLANNING, FINE GRADE, OR TRIMMER MACHINE 06/23/2015 4

352 PAVEMENT BREAKER OR TAMPING MACHINE (POWER DRIVEN) MIGHTY MITE OR SIMILAR TYPE 354 PIPELINE WRAPPING, CLEANING OR BENDING MACHINE 356 POWER ACTUATED HORIZONTAL BORING MACHINE, OVER SIX INCHES 357 PUGMILL 359 RUBBER-TIRED FARM TRACTOR WITH BACKHOE INCLUDING ATTACHMENTS (HIGHWAY AND HEAVY ONLY) 360 SCRAPER 361 SELF-PROPELLED SOIL STABILIZER 362 SLIP FORM (POWER DRIVEN) (PAVING) 363 TIE TAMPER AND BALLAST MACHINE 365 TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH PTO UNRELATED TO LANDSCAPING (HIGHWAY AND HEAVY ONLY) 367 TUB GRINDER, MORBARK, OR SIMILAR TYPE GROUP 5 * 2014-12-08 22.20 17.20 39.40 370 BITUMINOUS ROLLER (UNDER EIGHT TONS) 371 CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED) 372 FORM TRENCH DIGGER (POWER) 375 HYDRAULIC LOG SPLITTER 376 LOADER (BARBER GREENE OR SIMILAR TYPE) 377 POST HOLE DRIVING MACHINE/POST HOLE AUGER 379 POWER ACTUATED JACK 381 SELF-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR) 382 SHEEP FOOT COMPACTOR WITH BLADE. 200 H.P. AND OVER 2015-05-01 22.90 17.90 40.80 383 SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND AND CHIP SPREADER 384 STUMP CHIPPER AND TREE CHIPPER 385 TREE FARMER (MACHINE) GROUP 6 * 2014-12-08 18.75 0.00 18.75 387 CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER 389 DREDGE DECK HAND 391 GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING) 393 LEVER PERSON 395 POWER SWEEPER 06/23/2015 5

396 SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS 397 TRACTOR, WHEEL TYPE, OVER 50 H.P., UNRELATED TO LANDSCAPING COMMERCIAL POWER EQUIPMENT OPERATOR GROUP 1 * 2014-12-08 35.05 16.45 51.50 501 HELICOPTER PILOT (COMMERCIAL CONSTRUCTION ONLY) 2015-05-01 35.85 17.15 53.00 502 TOWER CRANE 250 FEET AND OVER (COMMERCIAL CONSTRUCTION ONLY) 503 TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 2 * 2014-12-08 34.73 16.45 51.18 2015-05-01 35.53 17.15 52.68 504 CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER (COMMERCIAL CONSTRUCTION ONLY) 505 PILE DRIVING WHEN THREE DRUMS IN USE (COMMERCIAL CONSTRUCTION ONLY) 506 TOWER CRANE 200 FEET AND OVER (COMMERCIAL CONSTRUCTION ONLY) 507 TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 3 * 2014-12-08 33.40 16.45 49.85 508 ALL-TERRAIN VEHICLE CRANES (COMMERCIAL CONSTRUCTION ONLY) 2015-05-01 34.20 17.15 51.35 509 CONCRETE PUMP 32-49 METERS/102-164 FEET (COMMERCIAL CONSTRUCTION ONLY) 510 DERRICK (GUY & STIFFLEG) (COMMERCIAL CONSTRUCTION ONLY) 511 STATIONARY TOWER CRANE UP TO 200 FEET 512 SELF-ERECTING TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN (COMMERCIAL CONSTRUCTION ONLY) 513 TRAVELING TOWER CRANE (COMMERCIAL CONSTRUCTION ONLY) 514 TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLUDING JIB (COMMERCIAL CONSTRUCTION ONLY) GROUP 4 * 2014-12-08 33.08 16.45 49.53 2015-05-01 33.88 17.15 51.03 515 CRAWLER BACKHOE INCLUDING ATTACHMENTS (COMMERCIAL CONSTRUCTION ONLY) 06/23/2015 6

516 FIREPERSON, CHIEF BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 517 HOIST ENGINEER (THREE DRUMS OR MORE) (COMMERCIAL CONSTRUCTION ONLY) 518 LOCOMOTIVE (COMMERCIAL CONSTRUCTION ONLY) 519 OVERHEAD CRANE ( INSIDE BUILDING PERIMETER) (COMMERCIAL CONSTRUCTION ONLY) 520 TRACTOR. BOOM TYPE (COMMERCIAL CONSTRUCTION ONLY) GROUP 5 * 2014-12-08 32.92 16.45 49.37 2015-05-01 33.72 17.15 50.87 521 AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION ONLY) 522 CONCRETE MIXER (COMMERCIAL CONSTRUCTION ONLY) 523 CONCRETE PUMP UP TO 31 METERS/101 FEET OF BOOM 524 DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL WHEN USED FOR CAISSON FOR ELEVATOR OR BUILDING CONSTRUCTION (COMMERCIAL CONSTRUCTION ONLY) 525 FORKLIFT (COMMERCIAL CONSTRUCTION ONLY) 526 FRONT END, SKID STEER 1 C YD AND OVER 527 HOIST ENGINEER ( ONE OR TWO DRUMS) (COMMERCIAL CONSTRUCTION ONLY) 528 MECHANIC-WELDER (ON POWER EQUIPMENT) (COMMERCIAL CONSTRUCTION ONLY) 529 POWER PLANT (100 KW AND OVER OR MULTIPLES EQUAL TO 100KW AND OVER) (COMMERCIAL CONSTRUCTION ONLY) 530 PUMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION ONLY) 531 SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN (COMMERCIAL CONSTRUCTION ONLY) 532 STRADDLE CARRIER (COMMERCIAL CONSTRUCTION ONLY) 533 TRACTOR OVER D2 (COMMERCIAL CONSTRUCTION ONLY) 534 WELL POINT PUMP (COMMERCIAL CONSTRUCTION ONLY) GROUP 6 * 2014-12-08 31.50 16.45 47.95 2015-05-01 32.30 17.15 49.45 535 CONCRETE BATCH PLANT (COMMERCIAL CONSTRUCTION ONLY) 536 FIREPERSON, FIRST CLASS BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 537 FRONT END, SKID STEER UP TO 1 C YD 538 GUNITE MACHINE (COMMERCIAL CONSTRUCTION ONLY) 539 TRACTOR OPERATOR D2 OR SIMILAR SIZE (COMMERCIAL CONSTRUCTION ONLY) 540 TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER 06/23/2015 7

GROUP 7 * 2014-12-08 19.90 15.25 35.15 541 AIR COMPRESSOR 600 CFM OR OVER (COMMERCIAL CONSTRUCTION ONLY) 542 BRAKEPERSON (COMMERCIAL CONSTRUCTION ONLY) 543 CONCRETE PUMP/PUMPCRETE OR COMPLACO TYPE (COMMERCIAL CONSTRUCTION ONLY) 544 FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY) 545 OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT) (COMMERCIAL CONSTRUCTION ONLY) 546 PICK UP SWEEPER (ONE CUBIC YARD HOPPER CAPACITY) (COMMERCIAL CONSTRUCTION ONLY) 547 PUMP AND/OR CONVEYOR (COMMERCIAL CONSTRUCTION ONLY) GROUP 8 * 2014-12-08 28.55 16.45 45.00 548 ELEVATOR OPERATOR (COMMERCIAL CONSTRUCTION ONLY) 549 GREASER (COMMERCIAL CONSTRUCTION ONLY) 2015-05-01 29.35 17.15 46.50 550 MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED) (COMMERCIAL CONSTRUCTION ONLY) TRUCK DRIVERS GROUP 1 * 2014-12-08 20.50 0.00 20.50 601 MECHANIC. WELDER 602 TRACTOR TRAILER DRIVER 603 TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) GROUP 2 * 2014-12-08 15.50 0.47 15.97 604 FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK GROUP 3 * 2014-12-08 16.00 0.00 16.00 605 BITUMINOUS DISTRIBUTOR DRIVER 606 BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION) 607 THREE AXLE UNITS GROUP 4 * 2014-12-08 14.55 6.07 20.62 608 BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER) 06/23/2015 8

609 DUMP PERSON 610 GREASER 611 PILOT CAR DRIVER 612 RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS 613 TWO AXLE UNIT 614 SLURRY OPERATOR 615 TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER) 616 TRACTOR OPERATOR, UNDER 50 H.P. SPECIAL CRAFTS 701 HEATING AND FROST INSULATORS 2014-12-08 21.73 13.54 35.27 702* BOILERMAKERS 2014-12-08 32.70 26.42 59.12 2015-01-01 34.10 26.42 60.52 703 BRICKLAYERS 2014-12-08 29.63 18.50 48.13 704 CARPENTERS 2014-12-08 22.36 14.03 36.39 705* CARPET LAYERS (LINOLEUM) 2014-12-08 22.36 14.03 36.39 2015-05-01 23.81 14.03 37.84 706 CEMENT MASONS 2014-12-08 20.00 0.00 20.00 707 ELECTRICIANS 2014-12-08 17.00 3.66 20.66 708 ELEVATOR CONSTRUCTORS 2014-12-08 44.21 31.69 75.90 2015-01-01 44.93 33.66 78.59 709 GLAZIERS 2014-12-08 27.86 13.08 40.94 710 LATHERS 2014-12-08 22.36 14.03 36.39 712* IRONWORKERS 2014-12-08 29.94 22.85 52.79 2015-05-04 31.59 22.85 54.44 06/23/2015 9

714* MILLWRIGHT 2014-12-08 31.57 14.08 45.65 2015-05-01 32.97 14.08 47.05 715* PAINTERS (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) 2014-12-08 25.08 14.09 39.17 716* PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) 2014-12-08 26.15 14.92 41.07 2015-05-01 27.38 14.92 42.30 717 PIPEFITTERS. STEAMFITTERS 2014-12-08 31.96 13.82 45.78 2015-05-01 33.51 13.82 47.33 718 PLASTERERS 2014-12-08 23.72 12.53 36.25 2015-05-01 24.22 12.53 36.75 719* PLUMBERS 2014-12-08 31.96 13.82 45.78 2015-05-01 33.51 13.82 47.33 720* ROOFER 2014-12-08 29.41 12.05 41.46 721 SHEET METAL WORKERS 2014-12-08 33.85 20.12 53.97 2015-05-01 35.10 20.12 55.22 722 SPRINKLER FITTERS 2014-12-08 33.17 17.22 50.39 723* TERRAZZO WORKERS 2014-12-08 30.44 18.77 49.21 724* TILE SETTERS 2014-12-08 29.10 9.35 38.45 725* TILE FINISHERS 2014-12-08 21.26 4.79 26.05 726 DRYWALL TAPER 2014-12-08 23.77 14.26 38.03 2015-06-01 24.57 14.26 38.83 06/23/2015 10

727 WIRING SYSTEM TECHNICIAN 2014-12-08 35.24 14.03 49.27 728 WIRING SYSTEMS INSTALLER 2014-12-08 24.67 11.78 36.45 729 ASBESTOS ABATEMENT WORKER 2014-12-08 28.12 15.59 43.71 2015-01-01 29.13 15.96 45.09 730* SIGN ERECTOR 2014-12-08 26.34 11.28 37.62 2015-05-01 27.44 11.28 38.72 06/23/2015 11