Enelion Vertica. Installation manual. 22 kw. for the specialists

Similar documents
KeContact P20. User manual

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17.

Technical Manual. DLM Module. This manual should remain with the unit.

Owner's/Installation Manual

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC)

Installation manual wall-mounted distributor

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

Installation and Operation Manual

Installation and Operation Manual. Value Switch Package (VSP and VSP+)

Installation and Operation Manual

WALLBOX EV PORTABLE USER MANUAL INSTALLATION MANUAL

Installation, Operation, and Maintenance Manual

Battery Charger Retrofit Kit Q-DCCHG1 for DC Cabinet Retrofit Manual

Post evolve Series. Installation Manual

CPS Energy Balancer. Version: 1.0

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Siemens Drives & PLCs

RAUTOOL G2 BATTERY HYDRAULIC TOOL KIT PRODUCT INSTRUCTIONS. Construction Automotive Industry

UP WALLBOX USER MANUAL INSTALLATION MANUAL. View this manual online.

Installation and Operation Manual

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM

Post evolve Series. Installation Manual

Installation manual portable distributors

UG-8 Speed Adjusting Devices. Product Manual (Revision NEW) Original Instructions. Pneumatic and Manifold Speed Setting for UG Type Governors

MULTILUBE SYSTEM INSTALLATION AND MAINTENANCE

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

Guidance to Installers of Viridian EV Charging Stations

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION

EVlink Parking EVF1 - EVW1

Assembly instructions

CONTENTS DESCRIPTION UNPACKING DIMENSIONS

Appendix: Safety and application notes for... 15

Allen-Bradley Parts. CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns. Installation Instructions. Catalog Number 2500

Installation, Operation, and Maintenance Manual

Operating Instructions Pedestrian Turnstile Type MPT 33

IVTM Installation Manual

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

T832 T842 ELECTRIC MOTOR OPTION ASSEMBLY MANUAL. Read & understand all instructions pertaining to this option prior to use!

Owners Manual: - Pumps

Installation, Operation, and Maintenance Manual

Removable Applied Panel Mounting System

INSTALLATION MANUAL MODEL #100947, AMP MODEL #100949, AMP RELIANCE CONTROLS ARL SERIES AUTOMATIC TRANSFER SWITCH

Operating Instructions Type MPT 53

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004

Installation and Operating Manual

INSTRUCTION SHEET. Installation Instructions for Mercmaster LED Luminaire. Applications. Agency Ratings. Product Safety

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION

Instruction Manual. Harmonic Filter AHF 005/010. Drives Solutions

Installation Instructions (Translation) Marking. Description. Danger, warning and note symbols. Technical data. ANTARES ExtSet.

Roller Door Operator

Part Number Mini Linear Lift Assembly Installation & Operator s Instruction Manual

HOME CHARGER MODE 2. Series to /32A single phase CONTENTS. Manual IMPORTANT SAFETY INSTRUCTIONS 3 SAFETY INFORMATION 4 INSTALLATION 5

Type 5411, Operating Instructions. Bedienungsanleitung Manuel d utilisation

HOYMILES MICRO-IVERTER MI-250

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

Triple Output Power Supply

UltraSlim Mechanical Install & Owner s Manual

Type 6213 EV, 6281 EV

Instruction Manual. Blink HQ Charger. Charge on. a CarCharging Company

Assembly instruction. Pendant Light Toccata GENERAL REMARKS ON SAFETY: Technical data: BOM

EN/US INSTRUCTIONS FOR USE OF UBEFLEX KD CART - ISO 2. Version 2

9200 Revenue Meter. Model Certification Current Inputs. Complies with the accuracy requirements of the ANSI C Revenue Metering Standard

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

Swing Piston Compressors and Vacuum Pumps

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

Operating instructions

TOD-BCU-PNUS2. Installation Manual. Connection Box for EIBS16GU2 or EIBS16GU2+ (Storage Battery System) For Installation Company Use

General Guidelines. Instructions for Part # SC-SWING-AWAY-V2. Safety

BMW i. Freude am Fahren. BMW i Wallbox Plus. Owner's manual

Illuminator System Series CM

In-Place-Inclinometer Installation Manual

4" ENVIRONMENTAL E-SERIES PUMPS OWNER'S MANUAL. DANGER warns about hazards that will cause. WARNING warns about hazards that can cause

MMA 160S ARC/MMA WELDER OPERATION INSTRUCTIONS

AG PRODUCTS, LTD. YOU RE ALWAYS AHEAD... WITH A MODERN BEHIND.

SLIDING GATE OPENER USER MANUAL

Installation and Operation Manual

Type 3360, Service Manual. Serviceanleitung Service Manuel

Intended Users This manual is meant for Gasboy Authorized Service Contractors (ASCs) who will install this kit on Atlas units.

Mounting and Operating Instructions EB 8111/8112 EN. Series V2001 Valves Type 3321 Globe Valve

Linear Actuator. Installation Manual. warranty installation parts list. Linear Actuator Installation Manual Page 1

Solar PV General Introduction Guide for Electricians

Installing a Purged Packed (PP) Inlet

Pan and Tilt Head CDD2416-T

Product Manual (Revision A) Original Instructions. EG-3P Actuator Installation on Detroit Diesel V-149 Engine. Kit Installation Manual

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

OPERATING AND MAINTENANCE INSTRUCTIONS HYDRAULIC ELECTRICAL PUMPS HAM (Manual control) HAE (Electrical control)

Consists of. Date:17/02/2011 Page 1/8

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

Operating Instructions CYR52

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

Pressure relief valve

Table of Contents. 1.0 INFORMATION 1.1 Introduction. 1.2 Product Information. 2.0 INSTALLATION 2.1 Pre-Installation. 2.2 Component Installation

CONTENTS. VIKING PUMP, INC. A Unit of IDEX Corporation Cedar Falls, IA USA SECTION TSM 710.1

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

14", 18" & 24" Fiberglass Turbo Fans Installation & Operator s Instruction Manual

Safety. Operating instructions Solenoid valve VGP DANGER. Contents WARNING CAUTION. Changes to edition Elster GmbH Edition 10.

Service information. How to avoid equipment failures with preventive maintenance measures. 1. General information 08/2017

PTB 14 ATEX 2023 X, IECEx PTB X. Operating Instructions. Solenoid coil Type AC10 Magnetspule Typ AC10 Bobine magnétique Type AC10

100 Ton Shop Press Operating Instructions

Transcription:

Enelion Vertica kw Installation manual for the specialists ver..6 Enelion 05.07

Enelion VERTICA General notes At various points in this manual you will see notes and precautionary warnings regarding possible hazards. The symbols used have the following meanings: WARNING! Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. CAUTION! Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. ATTENTION! Indicates a situation which, if not avoided could result in property damage. ESD This symbol reminds you of the possible consequences of touching electrostatically sensitive components. Notice Notes on use of equipment and useful practical tips are identified by i. Notices do not contain any information that draws attention to potentially dangerous or harmful functions. Additional important information. Technical Specifications Two charging panels: socket / cable (depends on version), x00v AC ~ 50Hz, kw (A) for one charging panel, P+N+PE, Standby power - W for one charging panel. Installation manual ver..6, Enelion 05.07

Important information Important information. Safety instructions WARNING! Not observing the safety instructions can result in risk of death, injuries and damage to the device! ENELION LTD assumes no liability for claims resulting from this! Do not remove any notices on the device, such as safety symbols, warning notices, rating plates, nameplates or cable markings! Observe the instructions given for selecting the location and the constructional requirements! If the specifications for the location are not observed, this can result in death, serious physical injury or equipment damage if the corresponding precautionary measures are not met! Electrical hazard! The installation, commissioning and maintenance of the charging station may only be performed by correctly trained, qualified and authorized electricians who are fully responsible for the compliance with existing standards and installation regulations. Pull the charging cable only at the plug and not at the cable out of the connector. Ensure that the charging cable is not mechanically damaged (bent, pinched or run over) and the connection area does not come into contact with heat sources, dirt or water. Only supply the terminals from phases 00V with grounded sources! Before commissioning, check all screw and terminal connections for firm seating! The connector panel cover may never be left open unattended. Mount the connector panel cover if you leave the charging station. 5 safety rules: - Shut down all poles and all sides! - Secure against reactivation! - Check that the equipment is voltage-free! - Ground and short-circuit! - Cover adjacent live parts and restrict access to hazardous areas! Use of the charging station with open cable insertion openings is prohibited. Do not carry out any unauthorized conversion work or modifications to the charging station! Repair work to the charging station is not permitted and may only be performed by the manufacturer (replacement of the charging station)! Installation manual ver..6, Enelion 05.07

Enelion VERTICA Important information Risk of damage! ATTENTION! Make sure that the charging station is not damaged by improper handling (anchoring, housing cover, socket, inner parts etc.). Do not open the lid of terminal in the rain! Risk of damage the aluminium and plexi housing! - Use only detergents dedicated for anodised aluminium / plexi, - Do not tighten the mounting screws with force. Electrostatically sensitive components Information for technicians who are permitted to open the device: Risk of damage! Electronic components can be destroyed if touched! Before handling components, make sure you perform an electrical discharge by touching a metallic, grounded object!. Intended use NOTICE Enelion Vertica is a charging terminal for outdoor area at which electrically operated vehicles can be charged. Two vehicles can be charged at the same time, with phases, A and maximum kw power. The charging station is designed for installation on a pavement mounted column. The respective national regulations must be observed with regard to the installation and connection of the charging terminal. The intended use of the device always includes the compliance with the environmental conditions for which this device was developed. The device was developed, manufactured, inspected and documented in compliance with the relevant safety standards. Therefore, the products do not pose any danger to the health of persons or a risk of damage to other property or equipment under normal circumstances, provided that the instructions and safety precautions relating to the intended use are properly observed. The instructions contained in this manual must be followed precisely in all circumstances. Failure to do so could result in the creation of potential sources of danger or the disabling of safety devices. Apart from the safety instructions given in this manual, the safety precautions and accident prevention measures appropriate to the situation in question must also be observed. Only electrical vehicles or their chargers may be connected. A connection of other loads (e.g. electric tools) is not permitted! Installation manual ver..6, Enelion 05.07

6 7 5 0 8 8 7 5 5 0 9 7 PART NO. PART Housing Profile Alu Ground Plate Front Panel Socket Core 5 Socket Cover With Flap 6 B8..M - 6 x.0 x 6 Hex SHCS -- 6SHX 7 Top Cover Plate 8 Upper Structural Rib 9 Structural Rib - Connector 0 0 Wago Connector Male B8.M - Plain washer, 6 mm, regular B8..6M - M5 x 0.8 x 0 Hex Socket Cone Pt. SS --S Center Element 5 B8...M - Hex nut, Style, M6 x --D-S B8...M - Hex nut, Style, M x 0.5 --D-S 6 M5 Security Screw 7 Motherboard 8 LCD 9 RFID 0 Pilot Box Wago Connector Female 6 Distance Screw Hex Mx8 Distance Screw Hex M.5x8 Distance Screw Hex M.5x0 5 Computer with gsm (optional) 6 DIN Rail 7 Connector Mount 8 Lower Alu Plate 9 Lower Panel 0 DIN Rail - Short Pilot RP Mount v 9 8 fig. Top Gasket Wago Connection Terminal Installation manual ver..6, Enelion 05.07

Enelion VERTICA Installation guidelines Installation guidelines. Before Installing This document describes how to install Enelion Vertica charging station. Before any installation work is performed, study all drawings furnished by the supplier for the particular installation.. Safety Requirements Ensure that at all times when working, no power is connected. Eye protection with appropriate glasses (especially when using the electrical drill). In the installation be sure to not connect directly to power distribution network cables without additional protection. fig. Use appropriate tools for each function.. Delivery content packages Charging station is delivered to a client in separate packages containing: Case steel construction with attached aluminium profiles, connection for x00v (P+N+PE) and top cover with two security screws - fig. Two panels with electric elements, electronics and a socket or a charging cable (depends on a charger s version) - fig. fig. Foundation preparation kit (if ordered) - fig. Set of screws for panels installation, a key for security screws, RFID cards, RFID key holders. Upon receipt of shipment, examine the package for damage. If the shipping container must be opened outdoors, take proper precautions to prevent the entrance of moisture. fig. Installation manual ver..6, Enelion 05.07 5

. Installation Overview Before installation check local requirements for -phase electric device contact (terminal) and policy of electric devices installation in public spaces. prepare a foundation for terminal, mount a terminal case to the base, connect terminal to the power grid, install charging panels, close terminal.. PART Basis Plate(bottom)/ Leveling Plate (top) Threaded Rod M Nut M Washer M QUANTITY 6 NO. NO. PART Basis Plate(bottom)/ Plate (top) Leveling Threaded Rod M Nut M Washer M QUANTITY 6 fig.5 Terminal base preparation with Foundation Preparation Kit Installation.5 Terminal installation steps: Ensure that at all times when working, no power is connected. Terminal Foundation Kit (id ordered) contains four threaded rods, 6 M screws, and gaskets and basis plates fig.5. Mount to bottom basket four rods and tight the nuts onto. Repeat steps with top basket. On the top should be left 50mm rods free space fig.6. Insert mounted construction and cable conduit (not included) into concrete. Cable conduit should be guided via one of top basket hole fig.7. fig.6 50 500 PART QUANTITY Basis Plate(bottom)/ Leveling Plate (top) Installation guidelines Threaded Rod M Nut M 6 Washer M 50 O. Level position of top basket with screws under the plate. Screws should touch te concrete. Use M wrench. after concrete solidify, remove top base. fig.7 6 Installation manual ver..6, Enelion 05.07

Enelion VERTICA 50. Installation guidelines Mounting terminal case to the base Before installation pull up plexi panels from both sides of the case bottom, to get access to the inside installation area and to the contact (terminal) Install the terminal case on the prepared foundation fig.8,9 After installing the case, tightly screw the nuts on ø rods fig.0. Do not put the bottom plexi panels yet. fig.8 fig.9 PART Basis Plate(bottom)/ Leveling Plate (top) Threaded Rod M Nut M Washer M QUANTITY 6 500 NO. Installation manual ver..6, Enelion 05.07 fig.0 7

Installation guidelines. Connection to the power grid In the lower (bottom) part of the terminal there is a contact to the powergrid, which divides electric energy to two charging panels at the same time. Pull out black plexi panel to get access to the contact. The installation, commissioning and maintenance of the charging station may only be performed by correctly trained, qualified and authorized electricians who are fully responsible for the compliance with existing standards and installation regulations. Ensure that at all times when working, no power is connected. phase phase phase neutral earth Connect wires from the contact to the socket - fig. fig. Terminal must be earthed. Ensure, that yellow-and-green wire is connected to the working earhting contact! Ensure, that wires to power grid have proper diameter. It must be minimum 6mm. Insert (slide in) black plexi panels on each side of the case.. Charging panels installation Charging panels have a safe connection system with the powegrid through a contact with a socket and a plug. fig. Before installing a charging panel, make sure that a fuse and RCD are turned on (working) Lift the panel and slide it in the rails of an aluminium profile fig.. If there are any difficulties in sliding the panel in, put a drop of a thick grease into each rail. At the end of the sliding in, a plug on the panel will get inside the socket in the case - fig.. On the top, screw two screws to the case - fig.0. Repeat all above with the second charging panel. fig. 8 Installation manual ver..6, Enelion 05.07

Enelion VERTICA Installation guidelines. Connection to internet To connect to the internet, use the GSM SIM card. SIM card must be without PIN number. Card slot is located in hole at back wall of charging panel fig.. Unlock slot fig.5, Open slot fig.6, Insert SIM card with goldenpins faced to pins on GSM module fig.7. Close slot - fig 8. Lock slot - fig 9. fig. fig.5 fig.6 fig.7 fig.8 fig.9 Installation manual ver..6, Enelion 05.07 9

Installation guidelines 5. Closing the terminal Put a lid on the top and screw two security screws to the case - fig.. fig.0 fig. fig. 0 Installation manual ver..6, Enelion 05.07

Enelion VERTICA Installation guidelines.6 First start Turn the power on in the power grid supply. On the screens you will see a welcoming message. After connection with internet, terminal is ready to use. Please note: charger has list of current APN adresses and passwords to connect with mobile Internet Provider. If there is new provider, installer nedds to update memory card inside charger (please contact with Enelion specialist)..7 Online configuration Online charger works with Enelion Administration Software or with third parts software via OCPP.6. In Enelion Admin Software you can: To add to map and remotely manage charger. To add users and assign RFID cards. To make tariff plans to sell energy to users. To configure static and dynamic load balancing. To enable Enelion Admin Software please contact us: info@enelion.com Installation manual ver..6, Enelion 05.07

www.enelion.com