Industrial Steam Turbines. The comprehensive product range from 2 to 250 megawatts. Answers for energy.

STEAM TURBINE MODERNIZATION SOLUTIONS PROVIDE A WIDE SPECTRUM OF OPTIONS TO IMPROVE PERFORMANCE

Industrial RB211 Gzero Gas Turbines

SWT Turning moderate wind into maximum results

The SGT5-8000H proven in commercial operation

Efficient, dependable and off the shelf. Pre-engineered gas-turbine driven pipeline compressor packages. Answers for energy.

Pre-Designed Turbocompressors

Bright outlook for improved profitability. Direct drive wind turbine SWT Answers for energy.

New dimensions. Siemens Wind Turbine SWT Answers for energy.

GRAND RENEWABLE ENERGY PARK PROJECT DESCRIPTION REPORT. Attachment C. Turbine Specifications

SGT5-8000H / Irsching 4 Siemens H class gas turbine Pioneering efficiency with world class flexibility

Meet the SGT-750. Proven technology. Perfected results. 37 MW. Answers for energy. Industrial Gas Turbines

The Smart Way. HVDC PLUS One Step Ahead. Answers for energy.

Siemens G2 platform 2.3-MW geared wind turbines. Exceptional performance, proven reliability. Answers for energy.

Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2

SGT-2000E gas turbine series

POWER-GEN Africa 2012

Technology Application to MHPS Large Frame F series Gas Turbine

Steam Turbines and Gas Expanders. Reliability, Efficiency, Performance

GE Marine. Seaworthy power. GE s new L250 inline diesel engine. imagination at work

Siemens G2 platform 2.3-MW geared wind turbines. Exceptional performance, proven reliability. Answers for energy.

MD High Pressure Stage Casing Pump

Reliable, economical and safe siemens.com/rail-electrification

Latest Developments in Siemens Large Gas Turbine Portfolio. Matthias Fränkle 8000H Product Manager

SKF Explorer angular contact ball bearings. Designed to run faster, cooler, smoother, longer

We just Added Oil. Oil-injected screw compressors

MC High Pressure Stage Casing Pump

SIMINE DRAG. Innovative solutions for maximum productivity and reliability. Mining Technologies

SIGENTICS HV Series S-modyn

Siemens AG SIMOTICS T-1FW3 Torque Motors. The Powerful Torque Motors. Edition February Brochure. siemens.

ME High Pressure Stage Casing Pump

For Sale: Used Steam Turbine Generator Sets. Offer Ref. STG MW Steam Turbine Genset Condensing-Extraction type

Proven to be better. Development trends in industrial rolling bearings

PRODUCTS. Multi-Stage Steam Turbines. Proven reliability and efficiency

SGT-2000E gas turbine series

SGT5-2000E Latest Service Improvements for Optimized Operations, Maintenance and LNG Fuel Conversion Upgrade Grit Hennig

SKF Explorer spherical roller bearings Optimized for superior field performance

ALSTOM WORLD WIDE EXPERIENCE OF STEAM TURBINE RETROFITS ON NUCLEAR POWER PLANTS. May 2015

Global VPI Insulated Indirectly Hydrogen-Cooled Turbine Generator for Single-Shaft Type Combined Cycle Power Generation Facilities

Welcome to the world of electromobility!

High performance S1S hydraulic seals. Providing a longer and more reliable life-cycle for hydraulic cylinders

17-IAGT-104 Siemens introduces the SGT-A45 mobile unit: superior performance with trusted technology

SGT5-8000H/SCC5-8000H 1S. First experience of Commercial Operation at Irsching 4. Russia Power Moscow, March

We power the world with innovative gas turbines

Synchronous condenser solutions siemens.com/energy/facts

GSG Diffuser Style Barrel Pump ISO (API 610) Type BB5

MID TONNAGE. Van Dorn Caliber

RIKT Isothermal Turbocompressors. With integrated cooling

Siemens D3 platform 3.2-MW direct drive wind turbines. Reduced complexity, increased profitability. Answers for energy.

Gas-insulated switchgear from 72.5 to 550 kv. Excellent systems that create lasting value. siemens.com/energy-management

Beyond 60% - Pioneering H-class Efficiency with World Class Flexibility

OHV and OHVL Vertical Inline Pumps ISO (API 610)

B kv Gas-insulated Substations

GTV HVOF K2 Burner OPERATORS MANUAL GTV Verschleißschutz GmbH.

Power Generation Services Solutions for challenging Markets

MARIM Steam Turbines. Engineering the Future - since MAN Diesel & Turbo

Printed on elementary chlorine-free bleached paper.

About us. In this brochure we are pleased to present one of our latest innovations the Becker Mewis Duct.

AGN 076 Alternator Bearings

Strandguide Roller. Preconfigured products for precision applications. Metals Technologies

ABB PSPG-E7 MODAKOND More efficient and dynamic unit control. ABB Group May 8, 2014 Slide 1 ABB

laser shaft alignment

Trackguard Retarder TKG

Engineering Success by Application of STAR-CCM+ for Modern Gas Turbine Design

YOUR PROPULSION EXPERTS

Goulds High Pressure, Multistage Ring Section Pump

Modern Approach to Liquid Rocket Engine Development for Microsatellite Launchers

SION vacuum circuit-breaker.

Siemens Hybrid Power Solutions. Technical and Financial Simulation Tools for High Penetration Hybrid Power Systems, Bangkok June 2015

Fisher TBX Steam Conditioning Valve

High-Voltage Circuit-Breakers 3AP1/ kv up to 550 kv. Power Transmission and Distribution

3AH37 and 3AH38 vacuum generator circuit-breakers for power stations and industry

Power Transmisson Division Erlangen, April 15, Siemens receives major order for BorWin3 North Sea grid connection from TenneT

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER

H Class High Performance Siemens Gas Turbine (SGT-8000H)

Assemblies for Parallel Kinematics. Frank Dürschmied. INA reprint from Werkstatt und Betrieb Vol. No. 5, May 1999 Carl Hanser Verlag, München

Control & monitoring system for Siemens gas engines & gen-sets siemens.com

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

GÝROL FLUID DRIVES GÝROL FLUID DRIVES SAVE ENERGY HOW GÝROL FLUID DRIVES WORK

The Bulk Way. UHV DC the new dimension of efficiency in HVDC transmission. Answers for energy.

MBN Multistage Ring Section Pumps

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants

Development of an innovative diaphragm accumulator design and assembly process

MSD Axially Split Multistage Pump

Chapter 6. Supercharging

MAN 18V48/60TS. Two-stage turbocharged diesel engine

CMG Compact Motor Gear

Faster project implementation. Earlier return on invest. SIMOTICS HV M shaft height 450 to 800: the modular motor concept up to 19 MW

Small step, big impact: Energy efficiency and dynamic performance

M50 L50 Series Multistage Regenerative Turbine Pumps

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

MSD Axially Split Multistage Pump

trak systemizer Turnkey charging & changing stations

EP4-Platform: E-126 EP4 / E-141 EP4. Arno Hildebrand, Programm Manager EP4 ENERCON Research & Development

Novenco axial flow fans. ZerAx - Standard January 2010

View thousands of Crane Specifications on FreeCraneSpecs.com HMK. Higher Performance and Faster Handling Mobile Harbour Crane HMK 300 E

RIKT 71 Isothermal Turbocompressor

Shoreside power supply. Intelligent solutions for berthed ships based on SIHARBOR / SIPLINK medium-voltage systems. Answers for Energy.

M50 L50 Series - 50Hz Metric Edition Multistage Regenerative Turbine Pumps

MAIN SHAFT SUPPORT FOR WIND TURBINE WITH A FIXED AND FLOATING BEARING CONFIGURATION

Transcription:

Power Generation The Enhanced Platform The Next Generation of Industrial Steam Turbines www.siemens.com / energy / steamturbines

Advanced Steam Turbine Design Figure 1: Enhanced Platform Design The Enhanced Platform steam turbine design sets the course for the next generation of Siemens industrial steam turbines. As an innovative technology basis it represents the development of a steam turbine family with a flexible casing concept applied for upgrading several well-known Siemens product lines, such as the SST-300, SST-400, SST-500, SST-600 and SST-800. Harmonization of Product Lines The Enhanced Platform steam turbine design combines the advantages of all the established Siemens industrial steam turbine product lines. Furthermore, it integrates the latest technological developments which form the basis for the modified versions of existing product lines. The Enhanced Platform design combines various turbine model designs to establish a common basis that helps to significantly reduce the maintenance and upgrade efforts required for various steam turbine models. Moreover, the integration of new features and up - grades can be realised quickly. This modu - lar design concept ensures that these features are available simultaneously for all relevant applications providing a significant reduction of time- to-market and enhanced availability. 2

Enhanced Platform Means Innovation The Enhanced Platform is Siemens answer to our customers need for extended operating capabilities and improved economical solutions. It brings the entire Siemens industrial steam turbine product range under one common umbrella and incorporates new state-ofthe-art features. The very best features of the Siemens steam t urbine portfolio have been incorporated in a new series of standardized modular components that can be assembled to meet virtually any customer need. Accordingly, customer solutions benefit from many innovative features, such as improved blading and sealing design, an optimized casing and, last but not least, improved steam paths. Modularization for Maximum Flexibility The Enhanced Platform is a technoloy platform allowing the realization of different product lines such as customized and standardized turbine configurations as single and multi-casing solutions. It uses predefined components to cover different turbine solutions and applications. This concept allows a maximum flexibility due to standardization at the sub-part level. 3

Enhanced Efficiency Compared to previous steam turbine designs, Enhan c ed Platform steam turbines provide a more efficient operation. Due to the improved blade and seal concept, turbines operate with up to 2 % higher efficiency. An additional contribution to higher efficiency is the revised steam path realized by specialized steam inlets which en sure high temperatures (up to 565 C) with short heat-up times, along with competitive solutions for lower parameters. Better Operational Flexibility Moreover, the optimized homogenous geometrical casing design guarantees a reduced start-up time of up to 50 %. Faster load changes and unlimited load changes over the entire life time for small and medium size turbines allow for virtually any load regime. Improved CO2 Footprint A CO2 emission reduction up to 15 % will be achieved over the entire life time applying the benefits provided by the Enhanced Platform. A reduction of CO2 emissions produced based on key influential factors such as material, manufacturing, packaging, service and transport can be achieved thanks to the following points: Long-term experiences in material behavior lead to efficient material inventory for all components and result in a total turbine weight reduction. Applying pre-standardized components leads to reductions in both engineering and manufacturing effort. Less total weight leads to benefits for both packaging and logistics. The carefully designed Enhanced Platform building block system enables Siemens to combine customized design solutions for maximum efficiency and performance with standardization and repeated use for proven high reliabili ty and availability. Higher Reliability and Availability The persistent and long term material behavior ensures a long life cycle of 200,000 operating hours. The application of a proven design, e. g., high and intermediate pressure blades with tried-and-tested root clamping designs, or maintenance-free bolts up to 50,000 operating hours results in a high level of availability. Figure 2: A benchmark of the Enhanced Platform against the existing Siemens Building Block (SBB) solution showed environmental benefits. The produced CO2 emissions were calculated on turbine examples for both designs. 4

Technical Specifications Outer Casing Reduced start-up times due to optimized turbine casing The symmetrical design of the upper and lower halves avoids material concentrations and ensures improved thermal behavior and improved start-up time. The optimized split joint flanges also avoid thermally-induced stress and, furthermore, supports of internal parts allow ther mal expansion. The scaled and homogeneous geometrical casing design over the complete range simplifies the engineering. The design of guide blade carriers is flexible enough to allow optimum usage of space and material. Figure 3: Comparison of admission section of conventional Siemens building block design (upper) and the improved Enhanced Platform design (lower). Steam Guide Ideal steam path for a highly efficient steam turbine The inner casing is designed to realize both front and center steam admission. Front steam admission is an efficient solution here, as it guarantees a short radial bearing distance. Center steam admission leads to increased bearing distance but allows the realization of more efficient turbine solutions because of reduced leakage flow and mechanical losses. Furthermore, center steam admission allows for more applicable sizes. Highly efficient turbine solutions can now be realized even for high live steam para meters and for smaller sizes. Also, the standard inner casing allows a three step elongation according to re quired blade path length. Figure 4: Examples for the pre-defined valve-piping-arrangement. 5

Steam Inlets High temperatures with short heat-up times The Enhanced Platform technology employs a valve piping arrangement for control of live steam. To en sure short turbine design processes a dedicated number of pre-designed arrangements were created covering most applications. Depending on the live steam conditions (pressure, temperature, mass flow), the application and turbine operation, the valve piping arrangement is implemented with one to four control valves in combination with one or two emergency stop valves. Diffuser valves are used for high parameters: Up to four control valves with one or two emergency stop valves Poppet or bell valve design No material concentrations, allowing short heat-up times HP (High Pressure) and LP (Low Pressure) hydraulics possible Internal butterfly valves are used for low parameters: One or two main control valves with one emergency stop valves each, hydraulically operated Up to three internal butterfly valves, electrically or hydraulically operated Blades and Vanes Highest efficiency with improved blade profiles and material know-how The improved cylindrical high pressure blades and conical (twisted) intermediate pressure blades allow longer airfoils and, therefore, contribute to the overall high efficiency. The improved sealing system allows more sealing strips per blade row at both moving and stationary blades. All sub-components are predefined and ensure simple processes in sales, engineering, and production. Optimized seal concept minimizes leakages An improved sealing system allows more sealing strips per blade row for both moving and stationary. The improved sealing concept combined with the improved profiles leads to less profile losses and secondary losses. This results in an increase of efficiency and better per - formance. Low Pressure Blades Optimized blade design Depending on the application, standard stages are available for variable and fix speed, direct drive and geared applications, and normal and high condensing pressure conditions (water and air cooled condenser). The maximum continuous operating speed is 18,000 rpm. The maximum condensing pressure is limited to 0.5 bara for continuous operation. In total, five different standard stage groups are available. Two types of standard stages are available for each variable speed and geared application and one standard stage type for direct drive 50 and 60 Hz. Figure 5: Improved cylindrical high pressure blades and conical (twisted) intermediate pressure blades allow longer airfoils. 6

Extraction Points Additional options for thermal cycles With the Enhanced Platform all well-known and proven extraction systems will now be provided under one common umbrella. Available are: External control valves, applicable for very high steam extraction conditions Internal control valves in combination with and without nozzle group Both profiled and un-profiled grid valves Depending on customer process and application demands, several solutions are possible. This inlcudes up to seven extraction planes for one casing, including up to two controlled solutions. The choice is primarily driven by thermodynamic requirements, but also takes performance and cost into consideration. Our experts will help you to find the optimum balance between highest efficiency and lowest cost. Bearings and Thrust Smaller bearings and lower oil consumption by optimized thrust and bearing system The possibility of applying up to three balancing pistons minimizes thrust and allows smaller axial bearings. Thanks to improved radial bearings less oil and thus a smaller oil tank are needed. Furthermore two bearing housing types that are based on well proven technology cover the full range of applications. Exhaust Casings Larger condensing stages and higher backpressures Axial and radial exhaust solutions ease installation in our customers environment. Typically both solutions are fabricated of sheet metal, radial exhausts up to 0.6 m² are available as casted solution. Radial as well as axial exhaust casings up to 8.7 m² allow for both air and water cooled condensation. 1 3 2 4 Figure 6: Extraction solution available within the Enhanced Platform technology: external valve (1), internal valve with/without nozzle group (2), profiled grid valve (3) and un-profiled grid valve (4). Exhaust casings in different sizes. (right) 7

8

9

Customized Solution Siemens Enhanced Platform: Extensively Tested The Enhanced Platform is an ideal steam turbine technology platform for realizing turbine solutions for power gene ration, steam conditioning and mechanical drive applications for industry, utilities and the oil & gas market. High performance, outstanding reliability and an improved efficiency ensured by the improved blading, sealing and the optimized steam flow path have been verified and approved in extensive tests using a full-scale steam turbine. The symmetrical homogeneous outer casing and the flexible valve piping arrangement combined with unique Siemens know-how for steam path and blading result in shorter start-up times, faster load changes and an increased availability. The new design allows simplified installation and extended maintenance intervals. The Enhanced Platform design 1 Steam Admission Both front and center steam admission applying nozzle casing or inner casing 2 Control Stage Improved flow guidance within the nozzle (meridian profiling) and sealing 3 Vanes / Blades High pressure blading with improved profiles and sealing Intermediate pressure blading with improved profile and sealing, use of twisted blades for both vanes and blades Low pressure blading, several proven technical solutions for fix, geared, and variable speed Grid valve, adaptive stage, A-wheel 4 Bolts 50,000 operating hours maintenance free (formerly 30,000) 5 Bearings The improved bearings have a lower oil consumption allowing a smaller oil system to be used. 6 Exhaust Casing Special solution for backpressure, condensing and district heating 7 Balancing Piston Stepped piston to reach optimal axial thrust compensation 8 Extraction Controlled and uncontrolled extraction up to 7 levels covered in one casing Several technical solutions available depending on steam pressure / temperature 9 Valve Optimized customer solutions according to requirements 10

9 6 8 3 2 7 5 4 1 11

Test Turbine Vision One For the final validation and calibration of the turbine design calculation tool for customer orders an actual turbine equipped with an improved flow path was designed, engineered, manufactured and operated. The turbine was tested as a backpressure extraction steam turbine with 19 stages in total, with cylindrical as well as twist ed blade configurations beeing install ed. The output power was 9 to 10 MW and the maximum continuous operational speed was 9000 rpm. The turbine was operating with live steam of 70 bara / 476 C in maximum. Load control was achieved using a water friction brake. The complete turbine was equipped with extensive measurement techniques for pressure and temperature mea sure ments to obtain a feedback on the thermodynamic expansion through the turbine. In addition, two stages were equipped with strain gauges for blade vibration measurement to ensure the unchanged reliability for the blade row coupling during different operational speeds and loads. Figure 8: Full size test turbine. 12

Key Parameters Topic Power Output Speed Parameter 5 250 MW 3,000 18,000 rpm Live Steam Inlet pressure 165 bar / 2393 psi Inlet temperature 565 C / 1049 F Controlled Extractions (up to 2) Pressure, ext. valve 72 bar / 1044 psi Pressure, int. valve 55 bar / 798 psi Temperature 480 C / 895 F Uncontrolled Extractions (up to 6) 85 bar / 1233 psi Exhaust Conditions Backpressure 80 bar / 1160 psi Condensing District heating 1.0 bar / 15 psi 3.0 bar / 43 psi Figure 9: First Enhanced Platform steam turbine in manufacturing. 13

Summary The Enhanced Platform: Combination of Innovation, Efficiency and Reliability High quality and customized solutions are guaranteed for every Siemens steam turbine. Based on that philosophy, Siemens took the very best features of individual turbine designs and applied them across the entire product range resulting in the Enhanced Platform. This innovative technology basis is the best solution for every application where steam turbines are deployed. Optimized Performance Higher steam parameters 165 bar, 565 C (formerly 140 bar, 540 C) High reliability Bolts are maintenance-free for 50,000 h (formerly 30,000 h) Reduced start-up time Up to 50 % less for turbines of small and medium size Faster load changes For turbines of small and medium size < 63 no limits of load changes Improved CO2 footprint 15 % reduction of CO2 emissions Improved efficiency Up to 2 % Long life cycle increased life time 200,000 h (formerly 100,000 h) Extensively tested and verified initial turbine Full load test in Duisburg Megatest Center 14

15

Published by and copyright 2014 Siemens AG Power Generation Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens Energy, Inc. 10730 Telge Road Houston, Texas 77095, USA For more information, please contact our Customer Support Center. Tel: +49 / (0)180 / 524 70 00 Fax: +49 / (0)180 / 524 24 71 (Charges will depend on local telephone provider) E-mail: support.energy@siemens.com Power Generation Division Order No. E50001-G100-A191-X-7600 Printed in Germany Dispo 34808, BluB 0714 Published by and copyright 2014 Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.