The Generator Company 3MVA Bespoke Generator

Similar documents
ors at VE Gener A owerw P

200 kva* Noise level (Generator online) Fuel tank size (approx. 5.5 hours autonomy) 1400 liters 308 gallons /370 US gallons

Performance Through Innovation

Electric Power Marketing Spec Sheet Continuous Power Module CPM250

Performance Through Innovation

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Flexible, Reliable, Connected Power

INTERNATIONAL STANDARD

TECHNICAL SPECIFICATION

Deutz Cummins Kohler IVECO Detroit Diesel MTU Volvo/Penta Perkins John Deere Mitsubishi

POWERING EXCELLENCE. Whatever your industry, whatever your need, we have the solution.

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

Fuji Electric France S.A.S. Instrumentation & measurement solutions

Exceeding the standards with MNS

DESIGN AND RETROFITTING OF LOW VOLTAGE AIR CIRCUIT BREAKERS.

Guidelines for connection of generators:

Lloyd s Register Type Approval System Test Specification Number GT04

Low Voltage Systems. Service and Support Lifecycle. proactive value. innovative value. resourceful value. activate value.

Designed for Today s World

Brochure. Synchronous generators for diesel and gas engines Proven generators reliable power

Power Products Division. Power Services Service underpins everything we do

ABB Low voltage systems MNS Platform

Appendix 11 RETURN TO APPENDICES LIST. High Voltage Power Supply Upgrade (Welcon Technologies Pty Ltd)

petrol filling station consultants

ors at AVE Gener PowerW

Event Power Services Hire Guide 2018

Exhaust Aftertreatment Technology for Emission Control of Diesel Engines

TECHNICAL SPECIFICATION

Lighting upgrade PROPOSAL

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Designed for Today s World

Service and Rehabilitation Electrical Power Systems

Diversifying into Marine Energy. ABB March 2015

HDS is committed to develop its expertise and reputation in a responsible manner for the benefit of both clients and the environment.

FRONTIER PITTS MAINTENANCE CONTRACTS

C A PA B I L I T Y S TAT E M E N T

Features CPM1000. Continuous. Cat CPM1000. Power Module. Voltage Frequency Operating Temperature. 32 to 104 F -13 to 158 F 480 x 96 x 114 in kg

Powering industry since 1947.

Designed for Today s World

YEARS. Alcad Stationary. Ni-Cd batteries ADVANCED SOLUTIONS ENGINEERING EXCELLENCE

Netherlands Russia United Kingdom United Arab Emirates. Gas turbine maintenance improvement GE LM1600 LM2500/+ LM6000

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Rubber-stamp for remanufacture

White Paper Load Banks for Power System Testing

MP Access Charger.

GAS INSULATED VOLTAGE TRANSFORMERS.

GENERATORS - PORTABLE

Western Alberta Transmission Line (WATL) HVDC Project

LWALR LIQUID COOLED LONG RUNNING GENSETS

Expert Design...Trusted Power

Only Emergency Generator Maker

Certification Scheme

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

City of Palo Alto (ID # 6416) City Council Staff Report

A DIVISION OF TGC INTERNATIONAL LTD HIRE EQUIPMENT CATALOGUE

Major milestone accomplished in commercialization of breakthrough process technology

power moving forward KVA RANGE Performance I Durability I Serviceability

EMEX Power Modular AC/AC central power supply system

HIGH SPEED POWER STATIONS

HARAS High Availability Redundant Actuation Systems

Crane and Hoist Solution Guide. The Advantage of Experience

Phone: +44 (0) or

"Group of companies"

CAT CG170 K. Series Gas Generator Sets

TECHNICAL SPECIFICATIONS FOR. 3/5/6/8/10 kva Single phase in/out Single or parallel UNINTERRUPTIBLE POWER SUPPLY SYSTEMS

POWERFUL LINEUP. Paralleling Generator Sets

High Performance Power. For Middle Eastern And African Airports

THRee divisions. ONe FAMIlY COMPANY > SOLAR DIVISION

INTERNATIONAL STANDARD

DIESEL GENERATOR SET MTU 16V2000 DS1100

Road tests and vehicle testing. Our services Experience Competence

GE Marine. Offshore Support Vessels. Dec 2013

Sealed Lead Acid Battery STANDBY APPLICATIONS. Premium Brand of Flying Power Group. Certified by

Low Impact Light Rail Update

Digatron Formation Solutions Integrated Turnkey Engineering from one Source

Unmetered Connections (UMC) Guidance Notes & Price Schedules

DIESEL GENERATOR SET MTU 20V4000 DS3600

The oil & gas industry driven by David Brown.

Power and Distribution Transformers

Alpha SERIES LWA 10(A)*, LWA 15(A), LWA 20(A), LWA 27(A) 50 Hz; 1500 r/min; power outputs: kva 60 Hz; 1800 r/min; power outputs:

VIRTUS Diesel Gensets

OIL FREE SCREW COMPRESSORS XK RANGE

KVA POWERHOUSE RANGE 1250 KVA 1700 KVA

DIESEL GENERATOR SET MTU 12V4000 DS1750

Hydro Power Synchronous Generators. Power range MW

ABB MEASUREMENT & ANALYTICS. Predictive Emission Monitoring Systems The new approach for monitoring emissions from industry

Technical specification

PROJECT CONSULTANT AND MANUFACTURER FOR ELECTRICAL INSTALLATION FOR INDUSTRIAL AND COMMERCIAL APPLICATIONS

UK MANUFACTURED GENERATORS PS9P PS20P PERKINS 400 SERIES TECHNICAL DATA SHEET

DIESEL GENERATOR SET MTU 16V4000 DS2500

DIESEL GENERATOR SET MTU 16V4000 DS2250

Oil Free Compressors for PET Bottle Blowing. The Industry Standard, Trusted Since Exceptional Performance & Low Power Consumption

(1) Prime power: The rating is available for an unlimited of annual operating hours in variable load applications, in accordance with

Centrifugal Cabinet Fans Model BDF. Belt Drive Duct Fan

SPECIALTIES REFINERY. The definitive range in fuel treatment

Microgeneration Installation Standard: MCS

THORNE & DERRICK UK TEL FAX TEL FAX

By installing Riverbed we ve come to understand that the issue isn t always the bandwidth, but actually one of latency.

DIESEL GENERATOR SET MTU 18V2000 DS1400

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E

Transcription:

The Generator Company 3MVA Bespoke Generator System for New UK Distribution Centre Nearing the end of 2016 we were contacted by a regular client to design and install a back-up generator power system to support a new 50 million logistics and distribution centre for one of Europe s leading retailers. The electrical contracting team requiring our services for the most suitable, efficient and cost effective new bespoke system were especially keen for us to become involved on this new build as we had previously worked with them, as well the main contractor undertaking this project. Client Global Retailer Project Specifications Design and install the new back-up generator power system for a new UK distribution centre

This giant new depot commenced construction during the latter part of 2016. The site had already been acquired with planning permission for the 50,000m2 warehouse. The new regional distribution centre is an enormous boost for growth in East Devon and expected to create over 500 jobs when fully erected and operational. The client s presented challenges were; Review existing specifications for international and regional scopes to align our design. Upgrade the design package from 2000kVA to 3100kVA. Comply with Vibration and Emissions requirements. Work within tight space constraints. Design a control system that meets the client s operational and functional requirements and can be integrated seamlessly with their LV switchgear. Meet a tight programme and within budget. In order to provide the necessary back-up power required for the entire building, our proposal for the bespoke design, installation and commissioning of the new generator system comprised: A 3100kVA (400V, 50Hz, 0.8pf ) standby rated open generator sourced from MTU, one of the leading manufacturers of diesel engines and generators, complete with; MTU engine model 20V4000G63. Leroy Somer twin bearing alternator oversized and rated for 3427 kva to aid with ISO8258 G3 performance compliance. Mechanical driven. Dual redundant starter motors and 24vdc lead acid battery starting system. Additional spring AVM s to provide 97% vibration isolation. Engine and exhaust emissions compliance. A free standing breaker panel comprising; 5000A fixed ACB for generator protection and isolation. 5000A fixed ACB for dual purpose connection for either a temporary loadbank or temporary generator. Castell interlocking. Acoustic package designed for 75dBA@1m complete with inlet and discharge attenuators and duct work to turn discharge air 900 at high level. Exhaust system designed for 70dBA@1m comprising; Twin 18 exhaust silencers. Stage II CAT (oxidation catalyst) to reduce CO2 emissions by approximately 60% and HC emissions by 40% and large soot particles in region of 15%. Twin wall stainless steel exhaust flue to atmosphere at high level. Fuel system designed for 65hrs back-up comprising; A separate 5,000ltr fuel tank rated for 8 hours at 100% load. A separate 40,000ltr bulk tank rated for 48 hours at 100%. 20m fuel pipe connecting both fuel tanks on mezzanine level and fill point at ground level..

Control System comprising; A bespoke set mounted control panel. Mains controllers, featuring InteliGenNT and InteliMainsNTC modules and 12 HMI and software, seamlessly integrated into the clients LV panels. G59 Protection. Factory Acceptance Test [FAT]in Rustorf, Germany comprising; Resistive load test 4 hrs @ 100%. Transient recordings to demonstrate ISO8528 P5 and G3 performance compliance. Functional and performance/operational tests. Offload and Positioning comprising; Access via landing platform. Challenged with reducing platform weight expertise, twin cranes. When The Generator Company put together their proposal for the back-up generator power system the site had not even commenced its build phase. Our designs produced by our dedicated Project Team were based on the Consultants initial draft specification and outline project drawings. As the build progressed our Project Team went to site on many occasions to see if there were any implications that would require altering any of the specifications and/or drawings we had put together for the new system.

Once formal orders were placed our team continued to work very closely with the client s team with full transparency and the usual methods of communication including numerous site meetings to develop our design which included various value engineering proposals, including; Relocation of the ground level fuel fill point cabinet to a more strategic access point in conjunction with the bulk tank, day tank and generator that were on the 1st floor mezzanine. Redesign of the size and location of the bulk tank. Design high level ductwork to discharge hot cooling air. Provide design support to integrate our free issue Master Control Module into the client s LV panel. Produce an effective method to deliver heavy equipment into 1st floor level plantrooms whilst maintaining safety in working methods. During the middle of March 2017 our Director, Project Manager, main contractor and electrical contractor all flew to the MTU factory in Rustorf, Germany to witness the FAT test being undertaken on the bespoke built generator. The FAT test for the 3100kVA, 2480kWe engine was carried out to prove its design specification. When all relevant parties arrived at the factory the engine was already assembled and connected up to the necessary exhaust and cooling pipework, cabling and monitoring equipment ready to go in their testing facility. The engine was not run for at least 24 hours prior to the tests to simulate cold start conditions. The first inspection was simply a visual one which was straightforward, the engine was then started by an MTU engineer and everyone else present relocated upstairs into a test cell to watch the testing performed on the monitors. Back-up Generator Power System (45)The load test was completed over a 4 hour period with measurements being taken every 15 minutes followed by a 50% load test for 5 minutes and a 100% load test for 10 minutes, all completed very successfully. All the testing carried out was designed to prove the operational engine met the standards of ISO8528 part 5; G2. The performance of the engine was so good that it outperformed the G2 requirement achieving G3 instead. Following this, additional functional, performance and protection tests were carried out, once again all meeting the required standards and specification! All parties; us, the electrical contractor and the main contractor, as well as the German manufacturers, were incredibly satisfied with the performance of the new engine and hugely confident that once installed the 3100kVA backup generator power system would successfully provide power protection to support the entire power load, if required, of the new 50,000m2 distribution centre. The generator plantroom was on a 1st floor mezzanine and original plans from the client s team were to construct a landing platform to skate the generator into place. However, this would have been a costly exercise and no longer possible due to the weight of the generator itself. We were therefore asked to liaise with the HSE advisor and specialist crane provider for an alternative solution. Following some careful planning we not only solved this problem but also delivered a favourable cost and time saving solution.

With a 100 tonne crane the generator was lifted using front and rear strops to align it into position at mezzanine level. When it arrived at the correct level the front was lowered into the building and gradually skated into position, enabling our installation engineers to lower the back end whilst they removed the rear strops. Once it was skated into the correct place the 40,000ltr bulk tank was the next significant piece of equipment to be craned into position followed by the radiator, day tank, exhaust system and attenuation. The larger elements were craned up as per the generator and through the dedicated openings in the building as left by the main contractor. All components were fully assembled in place by our engineers before all the final connections were carried out and inspected. The generator control panel and the generator circuit breaker were both positioned on a free standing panel within the same room as the generator and the mains controller was located onto the site s LV switchboard in the switchroom. Once all the equipment was in the desired location inside the plantrooms the mechanical and electrical installation was completed. When the entire back-up generator power system was deemed to be fully connected up for operation the electrical cabling was wired up by the electrical contractors ready for the system to be commissioned at the end of May on the completion of the new build. The Generator Company then worked closely with the client s team to produce extensive test documentation. With the assistance of our rental arm, Powerhire, we utilised a 5000kVA inductive loadbank and over 500mtrs of temporary rental cable to meticulously coordinate and execute the commissioning tests as well as carrying out a repeat of the successful off site FAT tests all to the full satisfaction of the client s team. Generator: System Design Supply Install Hire Service Maintenance CS-132-TGC-2886--R0 TGC International Ltd 2016