BEFORE START AFTER START

Similar documents
BEFORE START AFTER START

AFTER PF LANDING PARKING PNF SECURING THE A/C A320

Takeoff Flaps UP 2000

A310 MEMORY ITEMS Last Updated: 20th th October 2011

DASSAULT AVIATION Proprietary Data

OVERHEAD PANEL PROCEDURES FLASH CARDS

Cessna Citation XLS - Anti-Ice & De-Ice Systems

ELEC EMER CONFIGPNF FL 260 ALL AC BUSES FAULT ELEC EMER LAND ASAP ECAM ACTIONS DECISION CONFIGURATION LANDING GEAR EXTENSION FINAL APPR

by Greg Whiley Aussie Star Flight Simulation

PRECISION APPROACH PNF

PRECISION APPROACH PNF

Differences Training

B737 NG Anti Ice & Rain

ILS APPROACH PNF. Initial APP Interm. APP Final APP FAF IAF APP PHASE ACTIVATION 15 NM. Common LR. LR - Version 02b L R

AIRCRAFT SYSTEMS PNEUMATIC

Fokker 50 - Ice & Rain Protection. Controls and indicators of the AIRFRAME DE-ICING system are located at the ice protection panel.

A310 AIRCRAFT PREPARATION FOR COLD WEATHER OPERATION FCOM>>Procedure and Techniques >>Inclement Weather Operation

General. APU Control System. APU Door System

King Air B90. Speeds (KIAS)

Cessna Citation XLS - Electrical

DCS L-39 ALBATROS REAL PILOT START-UP, TAXI AND TAKEOFF CHECKLISTS V 1.0 PREPARED BY LINO_GERMANY

CHAPTER ICE AND RAIN PROTECTION SYSTEM

DASSAULT AVIATION Proprietary Data

ATA 49 AUXILIARY POWER UNIT

Boeing /-200/-200A Limitations

Full Authority Digital Electronic Control (FADEC)

AIRPLANE OPERATIONS MANUAL SECTION 2-15

Examen Teórico sobre Habilitación de Tipo B (Última actualización: Septiembre 2016)

David s Flight Simulator Operations Manual

ATR Checklist

AIRBUS A319/320/321 Technical Ground School Study Guide July 1, 2004 (Updated 1/18/05)

Introduction. APU Location

General. Airfoil Anti-Ice System

The Straight Word. Cessna 208 Caravan 208 Caravan I & 208B Grand Caravan Series

Bombardier Global Express - Hydraulics

CAVOK Aviation Training Ltd. Cessna C177

BEFORE START & START (C/R)

Fokker 50 - Limitations GENERAL LIMITATIONS MASS LIMITATIONS. Page 1. Minimum crew. Maximum number of passenger seats.

POWER ON CHECK LIST COCKPIT PREPARATION

EMBRAER 190. Powerplant DO NOT USE FOR FLIGHT

GIV MEMORY FLASH CARDS OCT09

Dash8 - Q400 - Pneumatics

The Straight Word. Beechcraft 90 King Air B90 Series. Condition Lever. Set for Takeoff Cabin Altitude Controller Set Cruise Level + 1

Cessna 172P PPL Checklist Page 1

LAD Inc. Beechcraft King Air 200 Series Technical Ground School Syllabus Material Covered

At all times use approved company publications and aircraft manufacturer manuals as sole reference for procedures and data!

AIRPLANE GENERAL Exterior REV 3, May 03/05

AIRCRAFT SYSTEMS HYDRAULIC

CHAPTER 14 LANDING GEAR

AIRCRAFT SYSTEMS FUEL

N416WM. Maintenance Due List Sort By Earliest Due Date Include only mandatory service information not yet accomplished. Projected Through:

DESCRIPTION AND OPERATION ICE DETECTION SYSTEM

Preservation. A.1. Preservation for a Period of up to 30 Days. Pág. 2. Memoria ** ON A/C , , TASK

REFERENCE: 2861 wings 2044 trunk 4904 total BEW 10,655 BOW 11,185 Max Useful load 5115 MLanding ZFW FUEL BURNS 11min min min

EXAMEN POR MATERIAS PARA USO DE LOS POSTULANTES A LA HABILITACIÓN DE TIPO EN MATERIAL B733. ENERO 2018

CESSNA 182 CHECKLIST. LEFT WING Trailing Edge 1. Aileron CHECK freedom of movement and security

Expanded Flight Checklist Cessna 152

INDEX: Normal Procedures Emergency Procedures Pre Flight Inspection NORMAL PROCEDURES BEFORE STARTING ENGINE

FLIGHT CONTROLS SYSTEM

DASSAULT AVIATION Proprietary Data

DASSAULT AVIATION Proprietary Data

1. Aircraft General (0 Hours 39 minutes) 2. Doors (0 Hours 33 minutes) 3. EFIS (2 Hours 55 minutes) 4. Exterior Lighting (0 Hours 24 minutes)

CESSNA CITATION C750 (CITATION X) PUNTA BRAVA S.A. (Rev Abril 2012)

Section of 14. Ice and Rain Protection

EMERGENCY GEAR DOWN HANDLE CHECK VALVE GEAR DROP TO EXTEND POSITION DOOR SELECTOR DOOR SELECTOR VALVE UPLOCK RELEASE CYLINDER DOOR CYLINDER

T-6B EMERGENCY PROCEDURE CRITICAL ACTION MEMORY ITEMS & OPERATING LIMITATIONS EMERGENCY PROCEDURE CRITICAL ACTION MEMORY ITEMS

Preflight Inspection Cabin EMPENNAGE RIGHT WING Trailing Edge RIGHT WING NOSE

Landing Gear & Brakes

FALCON SERVICE ADVISORY

B777. Electrical DO NOT USE FOR FLIGHT

North American F-86F Sabre USER MANUAL. Virtavia F-86F Sabre DTG Steam Edition Manual Version 1

PA GURW (December 30, 2000) PRE-START. Langley Flying School. Airspeeds (MPH) for Safe Operation. Cockpit Checks

Canadair Regional Jet 100/200 - Auxiliary Power Unit

ATA 36 PNEUMATIC TABLE OF CONTENTS DGT ATA 36 PNEUMATIC TABLE OF CONTENTS GENERAL Introduction Sources

The engines are designed to use 100/130 octane fuel. If not available use next higher grade. - 1

PA34-220T Piper Seneca III

ENGINE GROUND RUNNING

AIRCRAFT SYSTEMS POWER PLANT

NORMAL PROCEDURES. TABLE OF CONTENTS Page

AVANTI P180. Ground Handling

4.1 General Information. 4.2 Turning Radii. 4.3 Clearance Radii. 4.4 Visibility From Cockpit in Static Position. 4.5 Runway and Taxiway Turn Paths

Bombardier Challenger Auxiliary Power Unit

CHAPTER 09 TOWING AND TAXIING LIST OF EFFECTIVE PAGES

DASSAULT AVIATION Proprietary Data

SECTION 2-05 ELECTRICAL

Cessna Citation XLS - Environmental & Temperature Control

Dornier 328Jet - Pneumatic

DASSAULT AVIATION Proprietary Data

SECTION 6-3 POWER PLANT

Jump to Table of Contents

@AIRBUS A318 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING

General. Gear Retraction and Extension

Thrust Reverser System

E4610 (2 8160) Wing Landing Gear Retract Actuator Assy E4620 (2 8189) Wing Landing Gear Unlock Actuator Assy

Compiled by Matt Zagoren

MAJESTIC Q400 SHARED COCKPIT FLOWS CHECKLISTS MULTIPLAYER OPERATIONS.

Automatic Flight Chapter 4

SECTION III HYDRAULICS & LANDING GEAR

CESSNA P 337 H Pressurized Skymaster

Owners Manual. Table of Contents 4.1. INTRODUCTION SPEEDS FOR NORMAL OPERATION CHECKLIST & PROCEDURES 4

Transcription:

BEFORE START ENGINE START AFTER START - Version 03

1.a. BEFORE START LOADSHEET...CHECK TAKEOFF DATA..... ENTER/REVISE TAKEOFF DATA... XCHECK COCKPIT DOOR...CLOSED SEAT BELTS ADJUST MCDU...PERF TO SEAT BELTS.ADJUST MCDU.F-PLN EXT PWR..OFF ORDER. BEFORE START C/L down to the line BEFORE START down to the line.. PERFORM ANNOUNCE.. BEFORE START C/L down to the line COMPLETED Confirm any takeoff weight limitation. Ask for external power disconnection

1.b. BEFORE START NW STRG DISC MEMO.....CHECK WINDOWS and DOORS. CHECK CLOSED THR LEVERS.. IDLE PUSHBACK/START CLEARANCE.OBTAIN WINDOWS.CHECK BEACON ON PARKING BRAKE ACCU PRESS. CHECK PARKING BRAKE. ON ORDER. BEFORE START C/L below the line BEFORE START C/L below the line PERFORM ANNOUNCE.. BEFORE START C/L COMPLETE GROUND CREW COMMUNICATION ESTABLISH CAUTION! DO NOT PERFORM the pushback if NW STRG DISC not displayed on the ECAM MEMO to avoid damages to the nose landing gear. The BRAKE ACCU PRESS must be in the green band When PARKING BRAKE is ON: brake pressure is shown PARK BRK MEMO is displayed

ENG START SEL....IGN/START BLEED PRESSURE CHECK ANNOUNCE... STARTING ENGINE 1 MASTER SW 1.ON START VALVE OPENS N2 INCREASES (N3 for RR) IGNITER FUEL FLOW EGT N1..CHECK OIL PRESS START VALVE CLOSE 50% N2 (GE) Between 43% and 48% N2 (PW) 50% N3 (RR) ENG IDLE PARAMETERS..CHECK NORMAL ANNOUNCE... STARTING ENGINE 2 REPEAT START SEQUENCE FOR ENG 2.. 2. AUTOMATIC ENGINE START SEQUENCE GE RR PW Start ENG 2 ONCE AVAIL is displayed for ENG 1 XX.X Check BLEED PRESSURE on ECAM page. ECAM ENGINE page

ENG START SEL. NORM 3.a. AFTER START End of START sequence : Signal for actions APU BLEED.OFF 1. GND SPLRS ARM 2. RUD TRIM RESET 3. FLAPS SET 4. PITCH TRIM..SET ECAM STATUS. CHECK ECAM DOOR PAGE....CHECK 5. ENG ANTI ICE AS RQRD WING ANTI ICE..AS RQRD ANNOUNCE. CLEAR TO DISCONNECT 6. APU MASTER SW OFF ENG START SEL back to NORM 5 6 Overhead Panel ENGINE WHEEL ECAM 1 4 3 Pedestal 2

3.b. AFTER START AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: engines started 0 2 t (min.) To stabilize engine hot section temperature: 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :

ENG START SEL....IGN/START BLEED PRESSURE CHECK ANNOUNCE... STARTING ENGINE 1 2. AUTOMATIC ENGINE START SEQUENCE MASTER SW 1.ON START VALVE OPENS N2 INCREASES Select IGN(N3 for RR) Set ENG master Wait 3 sec. IGNITERSTART switch to ON FUEL FLOW EGT N1..CHECK ENG 1 is started first because it powers the blue hydraulic system, which pressurizes the parking OIL PRESS START brake. VALVE CLOSE 50% N2 (GE) Between 43% and 48% N2 (PW) DO NOT 50% SET N3 the (RR) MASTER switch ON before all amber crosses and messages have disappeared on ENG engine IDLE parameters PARAMETERS..CHECK (upper ECAM display). NORMAL Start ENG 2 ONCE AVAIL is displayed for ENG 1 ANNOUNCE... STARTING ENGINE 2 REPEAT START SEQUENCE FOR ENG 2.. GE RR PW Check BLEED PRESSURE on ECAM page. ECAM ENGINE page

ENG START SEL....IGN/START BLEED PRESSURE CHECK ANNOUNCE... STARTING ENGINE 1 2. AUTOMATIC ENGINE START SEQUENCE MASTER SW 1.ON DO START NOT SET VALVE the OPENS MASTER switch ON before EGT amber crosses and messages have disappeared on N2 engine INCREASES parameters (N3 for (upper RR) ECAM display). IGNITER FUEL FLOW EGT ENG 1 is started first because it powers the blue hydraulic system, which pressurizes the parking N1..CHECK brake. OIL PRESS START VALVE Starting CLOSE a hot engine 50% N2 (GE) EEC performs a dry crank to Between (1 st start: 43% EGT>100 C and 48% N2 (PW) reduce engine temperature 50% 2 N3 nd start: (RR) EGT>150 C) ENG IDLE PARAMETERS..CHECK NORMAL Start ENG 2 ONCE AVAIL is displayed for ENG 1 ANNOUNCE... STARTING ENGINE 2 REPEAT START SEQUENCE FOR ENG 2.. GE RR PW Check BLEED PRESSURE on ECAM page. ECAM ENGINE page

ENG START SEL....IGN/START BLEED PRESSURE CHECK ANNOUNCE... STARTING ENGINE 1 2. AUTOMATIC ENGINE START SEQUENCE MASTER SW 1.ON START VALVE OPENS N2 INCREASES (N3 for RR) ENG 1 is started first because it powers the blue hydraulic system, which pressurizes the parking IGNITER brake. FUEL FLOW EGT N1 DO NOT SET the MASTER switch ON before..check all amber crosses and messages have disappeared on OIL engine PRESS parameters (upper ECAM display). START VALVE CLOSE 50% N2 (GE) Between 43% and 48% N2 (PW) 50% N3 (RR) ENG IDLE PARAMETERS..CHECK NORMAL Start ENG 2 ONCE AVAIL is displayed ANNOUNCE... STARTING ENGINE 2 REPEAT START SEQUENCE FOR ENG 2.. GE RR for ENG 1 PW Check BLEED PRESSURE on ECAM page. ECAM ENGINE page

NORMAL ENGINE IDLE PARAMETERS AT ISA SEA LEVEL GE: N1 about 23% EGT.about 360 C N2 about 63% FF about 550 kg/h (1210 lb/h) PW: FF about 580 kg/h (1280 lb/h) N2 about 59% EPR about 1.010% EGT about 320 C N1 about 23% RR: FF about 820 kg/h (1800 lb/h) N3 about 63% EPR about 1.015% EGT about 380 C N1 about 22.6% N2 about 47% Upper ECAM Lower ECAM

ENG START SEL. NORM 3.a. AFTER START End of START sequence : Signal for actions APU BLEED.OFF 1. GND SPLRS ARM Turn APU BLEED OFF just after engine start to avoid ingesting engine exhaust gases. 2. RUD TRIM RESET 3. FLAPS SET 4. PITCH TRIM..SET ECAM STATUS. CHECK ECAM DOOR PAGE....CHECK 5. ENG ANTI ICE AS RQRD WING ANTI ICE..AS RQRD ANNOUNCE. CLEAR TO DISCONNECT 6. APU MASTER SW OFF ENG START SEL back to NORM 5 6 Overhead Panel ENGINE WHEEL ECAM 1 4 3 Pedestal 2

PITCH TRIM SET Set Takeoff CG on the pitch trim wheel For this purpose, use the actual CG indicated on the ECAM : 4 The Takeoff CG value must be within the green band limits.

WHEN ARE ENG & WING ANTI ICE REQUIRED? Engine anti-ice OAT or TAT 10 C with visible moisture in the air, standing water, slush, ice or snow on the taxiways or runways ICING CONDITIONS expected ENG ANTI ICE must be ON Wing anti-ice Prevent ice formation OR Ice accumulation on the wing leading edges OR Ice accumulation on the visual ice indicator or on the windshield wipers WING ANTI ICE recommended CAUTION! In icing conditions, minimise flight duration with the slats extended.

FAULT 3.b. AFTER START If nosewheel steering has exceeded 93 AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: FAULT NO GO Maintenance action required engines started 0 2 Illumination of the red oversteer warning light t (min.) To stabilize engine hot section temperature: 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :

3.b. AFTER START AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: NW STRG still disconnected + at least 1 engine running engines started 0 2 t (min.) To stabilize engine hot section temperature: 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :

3.b. AFTER START AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: If icing conditions > 30min OR Significant engine vibration engines started 0 2 On ground, perform an ENGINE RUN-UP (60% N1 minimum) for approximately 30 sec prior to higher thrust in order to centrifuge any ice from the engine s rotating parts t (min.) ENG ANTI ICE ON To stabilize engine hot section temperature: Continuous ignition automatically selected 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :

3.b. AFTER START AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: engines started On ground, perform an ENGINE RUN-UP (50% N1 If icing conditions recommended) for 10 sec prior to take off t (min.) order to 0 & centrifuge any ice from 2the engine s rotating parts OAT 1 C If holding on the ground, perform it once every hour To stabilize engine hot section temperature: 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :

3.b. AFTER START AFTER START C/L NWS TOWING FAULT LT extinguished CHECK Observe the ECAM MEMO: If icing conditions & engines OAT started 3 C On ground, perform PERIODIC ENGINE RUN-UP (50% N1 recommended) to centrifuge any ice from the engine s rotating parts at intervals not greater than 15 min. t (min.) Take off should be preceded by a STATIC RUN-UP (50% N1 0 recommended) with2 observation of all primary parameters ENG ANTI ICE ON To stabilize engine hot section temperature: Continuous ignition automatically selected 3 min (GE) / 5 min (PW & RR) / 3 min (RR if engines have been stopped for 1.5 hr or less) minimum at or near IDLE Engine started High power t If icing conditions : GE : RR : PW :