Underground Storage Tank Annual Compliance Inspection (Revised 1/2015)

Similar documents
ANNUAL UST SYSTEM INSPECTION CHECKLIST

Understanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety

North Carolina Department of Environment and Natural Resources Division of Waste Management Underground Storage Tank Section

PEI/RP Recommended Practices for the Inspection and Maintenance of UST Systems

(Please type or use black ink)

Underground Oil Storage Tanks Annual Inspection Report

6. Tanks - Leak Detection. NCDENR Division of Waste Management Underground Storage Tank Section

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

New UST Installation Inspection Checklist

Monthly Walkthrough Inspections

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

FINAL UNDERGROUND STORAGE TANK RULE CHANGES. Heather Peters UST Compliance and Technology Unit

Overview of an Underground Storage Tank Inspection

Frequent Mishaps and Solutions with Regulated Underground Storage Tanks in Pennsylvania

BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION

Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00

General information about underground storage tank (UST) fueling systems in every day language.

County of Yolo UNDERGROUND STORAGE TANK PROGRAM INSTALLATION/MODIFICATION/REPAIR APPLICATION

CONTRACTOR S SELF-INSPECTION CHECKLIST for UST INSTALLATION REPLACEMENT UPGRADE RETROFIT REPAIR

This handbook is provided as a general guide. assistance/content/storage-tank-compliance

UST Compliance Assistance Handbook

NCDEQ Underground Storage Tank Section

Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities

UNDERGROUND STORAGE TANK INSPECTION CHECKLIST

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS

UST General Requirements Inspection Checklist

UST Inspector Reference Handbook

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

P.O. Box 435 Saratoga Springs, NY 12866

NYSDEC PBS REGULATIONS Heating Oil Tanks

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA

Operating And Maintaining Underground Storage Tank Systems UPDATED Practical Help And Checklists. Printed on Recycled Paper

Notification for Underground Storage Tanks

Management of Underground Storage Tanks

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Mark S. Morgan, Regulatory Counsel

Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017

Questions And Answers About The 2015 Underground Storage Tank Regulation As Of May 2017

Underground Storage Tank. City of Burbank UST Owners & Operators

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF UST S AN OVERVIEW OF UNDERGROUND STORAGE TANK REQUIREMENTS

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

Compliance Strategies and Benefits. Brian Derge Tanknology Inc. December 6, 2012

Pennsylvania DEP: Maintaining UST Compliance and Regulation Updates. NISTM 8 th Annual Pennsylvania Storage Tank Conference May 18, 2017

Compliance Strategies and Benefits

Operating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper

Operating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper

Test Date: 3/30/2018 Order Number: Dear Regulator, Enclosed are the results of recent testing performed at the following facility:

FACTS ABOUT: MARYLAND CONTAINMENT SUMP TESTING PROTOCOL WHO CAN PERFORM THE TEST

How a UST Site May Become Contaminated -- Even When The Leak Detection is Passing

EPA UST Regulations Update May 22, 2018

New UST Regulations. What follows are the changes to EPA s regulations that TMS believes impacts you, the owner/operator, the most.

UNDERGROUND STORAGE TANK (UST) INSTALLATION & MAINTENANCE

1) Activity Description: Management of Petroleum Storage Tanks and Containers

401 KAR 42:020. UST systems: design, construction, installation, and registration.

YOUR PETROLEUM STORAGE TANK FACILITY INSPECTION GUIDE

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

9.21 Tank Program Guide NYS Office of Mental Health Tank System Installation Guide

Environmental Regulations and Codes For Underground Tank Storage of Flammable & Combustible Liquids

Semiannual Report Of UST Performance Measures End Of Fiscal Year 2018 (October 1, 2017 September 30, 2018)

Massachusetts Department of Environmental Protection Underground Storage Tank Program

New Regs Get Ready for Containment Testing if You Haven t Done So Already!

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY STATISTICAL INVENTORY RECONCILIATION (SIR) GUIDANCE DOCUMENT

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

Syracuse University Petroleum Bulk Storage Tank Program Manual

New Tank Installations. Peter Rollo

UNDERGROUND STORAGE TANK FACILITY OPERATIONS INSPECTION REPORT FORM INSTRUCTIONS

2018 UST Regulation Revision Comment Worksheet

Leak Detection for Petroleum UST and Piping

Petroleum Storage Tank Release Detection and Inventory Control

NYSDEC CBS Compliance Requirements

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION

Grant Guidelines To States For Implementing The Secondary Containment Provision Of The Energy Policy Act Of 2005

Overview of Revisions to the Federal Underground Storage Tank (UST) Regulations. Storage Tank Advisory Committee Harrisburg, PA September 1, 2015

Release Detection Challenges for High Throughput Facilities

Preventing Leaks and Spills at Service Stations. A Guide for Facilities

DEFENDER SERIES. 5 Gallon, Double Walled, Field Replaceable Spill Container Model Series INSTALLATION, OPERATION, & MAINTENANCE

ADDENDUM NO. #1 ITB # FLORIDA A&M UNIVERSITY (FAMU) FUEL STORAGE TANK INSPECTIONS December 8, 2017

Fire & Rescue District

CONTENTS. Foreword...iii. 1. Introduction...1

Environment Canada (EC) Storage Tank System Identification Form

YOUR PETROLEUM STORAGE TANK FACILITY INSPECTION GUIDE

ES Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

ECM environmental compliance monitoring, inc. 1

PETROLEUM PRODUCT STORAGE TANK REGULATION SAFETY AND BUILDINGS DIVISION BUREAU OF PETROLEUM INSPECTION AND FIRE PROTECTION

REVISOR CKIWru. t.tz 42, section 692L et seq.; or. A. system holding: (! a mixture of such hazardous waste and other regulated substances; {!

Why Are You Here? Why Are You Here? The DENR Mission. South Dakota UST Operator Instructional Course Class A/B Operator. EPA/DENR Goals: Your Goals:

TITLE 165. CORPORATION COMMISSION CHAPTER 15. FUEL INSPECTION EFFECTIVE OCTOBER 1, 2018

EQUIPMENT PERFORMANCE SPILL PREVENTION AND PIPING KEVIN HENDERSON

Storage Tank Facility Registration Form

Aboveground Tank Equipment. Presenter: Steven Allwein Northeast Regional Sales Manager Morrison Bros. Co.

Management of Underground Storage Tanks

Code Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations

40 CFR 63, Subpart CCCCCC

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

Date. Director c/o Petroleum Storage Program Manitoba Conservation and Water Stewardship 1007 Century Street Winnipeg, MB R3H 0W4

STP-MLD. Installation and Owner s Manual

Transcription:

Colorado Department of Labor and Employment Division of Oil and Public Safety Compliance Section 633 17 th Street, Suite 500 Denver, CO 80202-3610 Phone: 303-318-8525 Fax: 303-318-8518 Email: cdle_oil_inspection@state.co.us Web: www.colorado.gov/ops Underground Storage Tank Annual Compliance Inspection (Revised 1/2015) Pursuant to 7 C.C.R. 1101-14 2-3-5-2, the designated Class A or B Operator for each underground storage tank (UST) facility must conduct an annual compliance inspection of the facility. This inspection must be completed using this form which includes two components: Facility and Tank Information (page 1) and the Compliance Inspection Checklist (pages 2 through 5). The Class A or B Operator must first complete each field in the Facility and Tank Information form with facility-specific information using the codes listed on page ii, when appropriate. It is important for this form to be completed with information gathered during a site walk-through and owner facility records review in lieu of copying information from the Division of Oil and Public Safety (OPS) database, unless otherwise directed on the form. The information will be used to verify information in the OPS database or make changes in order that the tank owner is accurately notified of documents to be submitted to OPS. Following the completion of the Facility and Tank Information form, the Class A or B Operator must then complete an inspection of the UST system using the Compliance Inspection Checklist form. During the inspection of each facility, the Class A or B Operator must complete the form by answering the questions. If the equipment checks (i.e., ATG) are outsourced to a contractor, the equipment check results must be reviewed by the Class A or B Operator prior to answering the questions on this form that are associated with the equipment. If the facility contains more than 5 tanks, additional copies of this form must be completed. Questions are designated as either a mandatory compliance item () or a recommended practice item ( ). If an item is identified as mandatory and recommended, further information is provided in a note following the question. If "No" is the answer for any mandatory compliance item () question, an associated entry must be made in the Return to Compliance Plan, located at the end of the checklist, with documentation of the date when the issue was brought back into compliance or scheduled to be brought back into compliance. OPS must approve all schedules for repairs to bring the facility back into compliance. If No is the answer for a recommended practice item ( ) question, OPS strongly suggests that the deficiency be corrected. i

Codes Needed for Completing Facility and Tank Information Form Product Names Tank Status Codes Piping Corrosion Protection Codes Reg UL IU In Use FRP Fiberglass Reinforced Plastic Piping Mid UL TC Temporarily Closed FLX Flexible Plastic Piping Prem UL Tank Corrosion Protection Codes GV Metallic Piping w/ Galvanic Anodes E-85 FRP Fiberglass Reinforced Plastic Tank IC Metallic Piping w/ Impressed Current Racing Fuel JKT Jacketed Steel Tank (has interstice) NO Buried Metallic Piping w/ No Additional Corrosion AvGas CMP Composite (Clad) Steel Tank AG Aboveground Piping (NO portion of piping Is buried) Jet Fuel GV Steel Tank w/ Galvanic Anodes NA No piping 1 DSL (clear) IC Steel Tank w/ Impressed Current Piping Flexible Connector Corrosion Protection Codes 1 DSL (red) LN Internally Lined Tank GV Galvanic Anodes 2 DSL (clear) LN+ Internally Lined Tank + Corrosion Protection IC Impressed Current 2 DSL (red) NO Bare Metal Tank w/ No Additional Corrosion Protection NC No Soil Contact (NO portion is buried / in UDC sump) Kerosene Tank/Piping/Spill Bucket/Sump Wall Type Codes BT Plastic Boot B20 (biodiesel) S Single Wall NO Buried Connector w/ No Additional Corrosion B100 (biodiesel) D Double Wall NA No Flexible Connectors New Oil (lube oil) Overfill Protection Codes Piping Delivery System Codes Used Oil (waste oil) FV Fill Valve PR Pressurized Hydraulic Oil BF Ball Float SU Suction (American foot valve in tank) Transmission Fluid AL Exterior Audible/Visual Alarm SS Safe Suction (European NO foot valve in tank) Solvent NA Not Applicable (receives deliveries of 25 gal or less) GRV Gravity Feed Glycol/Antifreeze Tank Release Detection Method Codes NO No Delivery Piping Methanol T1 ATG.2/.1 gph Monthly Monitoring MAN Manifolded Tank (no delivery piping) Not Listed T2 Interstitial Monitoring w/ Sensor Line Leak Detector (LLD) Codes T3 Interstitial Monitoring w/out Sensor E Electronic T4 SIR (Statistical Inventory Reconciliation) M Mechanical T5 Inventory Control + Tank Tightness Testing NA Not Required (SU/SS/GRV/NO/MAN systems ONLY) T6 Other Approved Method (i.e. Tracer Testing) Piping Release Detection Method Codes T7 Manual Tank Gauging L1 ATG.2/.1 gph Monthly Monitoring T8 Manual Tank Gauging + Tank Tightness Testing L2 Double-wall & Sumps w/ Sensor GW Groundwater Monitoring L3 Double-wall & Sumps w/out Sensor VAP Vapor Monitoring L4 SIR (Statistical Inventory Reconciliation) T10 Deferred (Emergency Generator Tanks ONLY) L5 Annual Line Tightness Testing L6 Other Approved Method (i.e. Tracer Testing) L7 Not Required (SS/GRAV) L8 3-yr Line Tightness Testing GW Groundwater Monitoring VAP Vapor Monitoring L10 Deferred (Emergency Generator Tanks ONLY) ii

Colorado Department of Labor and Employment Division of Oil and Public Safety Compliance Section 633 17 th Street, Suite 500 Denver, CO 80202-3610 Phone: 303-318-8525 Fax: 303-318-8518 Email: cdle_oil_inspection@state.co.us Web: www.colorado.gov/ops UST Annual Compliance Inspection Facility and Tank Information Facility Information OPS Facility ID : Facility Name: Facility Address: City/State/ZIP: Facility Phone Number: Form Completed by: Date: Tank Information Tank (change s ONLY if add l pages are required) OPS Tank Tag (from OPS database or registration invoice) Facility Tank or ID (designation used by facility) Tank Capacity gal gal gal gal gal Product Name (describe in comments if not listed) Compartment Only (mark only if NOT the entire tank) Manifolded Tank (mark for true siphon manifold ONLY) Tank Status* If Tank Status = TC: Date in TC (assessment & OPS extension required >1yr) Emptied to 1 or less? (release detection required if not) Date emptied to 1 or less Tank Release Detection Method* Tank Corrosion Protection* Tank Wall Type* Tank receives > 25 gallons at a time? Spill Bucket? (required where UST receives > 25 gallons at a time) Spill Bucket Size gal gal gal gal gal Spill Bucket Wall Type* Overfill Protection? (required where UST receives > 25 gallons at a time) Overfill Protection Type* Piping Corrosion Protection* Flexible Connection Tank* Flexible Connection Dispenser* Piping Wall Type* Piping Delivery System* Line Leak Detector Type (required for PR system)* Piping Release Detection Method* STP (Turbine Pump) Containment Sump? STP Containment Sump Wall Type* UDC (Under-dispenser) Containment Sump? UDC Containment Sump Wall Type* Piping Transition Sumps? Transition Sump Wall Type* Comments *Use codes on page ii for these items. Colorado Division of Oil and Public Safety UST Annual Compliance Inspection Form Page 1 of 5

UST Annual Compliance Inspection Inspection Checklist Facility Information OPS Facility ID : Facility Name: Facility Address: City/State/ZIP: Inspection Completed by: Inspection Date: For each facility, complete the Annual Compliance Inspection Checklist below by answering the questions. If the facility contains more than 5 tanks or 8 dispensers, additional copies of this form must be completed. Questions are designated as either a mandatory compliance item () or a recommended practice item ( ). If an item is identified as mandatory and recommended, further information is provided in a note following the question. If "No" is the answer for any mandatory compliance item () question, an associated entry must be made in the Return to Compliance Plan with documentation of the date when the issue was brought back into compliance or scheduled to be brought back into compliance. OPS must approve all schedules for repairs to bring the facility back into compliance. OPS must approve all compliance plan schedules. If No is the answer for a recommended practice item ( ) question, OPS strongly suggests that the deficiency be corrected. Tank Information Tank Inspection Is there a product tag on the fill riser pipe or are the lids 1 painted in accordance with a posted product code color chart? Is the fill cap on the fill pipe and is the fill adaptor tight on 2 the fill riser pipe? 3 Does the fill cap have adequate clearance between the cap and the manhole cover? Does the tank have a drop tube that extends to within 6 4 inches of the bottom (if no diffuser is present)? Is each UST that receives more than 25 gallons of product 5 at any one time equipped with spill and overfill prevention? 6 Is the spill bucket free of fuel, water or debris? 7 Is the spill bucket in good condition and free of damage? 8 Does the drain assembly work? Is the tank(s) equipped with an overfill device (e.g. overfill alarm, automatic shut-off device or ball-float valve) and is 9 the device installed according to manufacturer s specifications to allow proper functionality? Is the tank overfill alarm mounted near the fill port where 10 it can be seen or heard by the delivery person? If the tank is in temporary closure and contains greater than 1 inch of product, is approved release detection 11 performed and maintained? NOTE: OPS recommends that a tank in temporary closure be emptied (contains 1 inch of fluids). If the tank is in temporary closure, is corrosion protection 12 maintained? If the tank has been in temporary closure for greater than 3 months, is the vent line open and has the piping, 13 pumps, manways, and ancillary equipment been capped and secured? Fill Equipment Spill and Overfill Protection Tanks in Temporary Closure Vapor Recovery (if required) Are the vapor recovery adaptor and cap present and free 14 of damage? 15 Does the vapor cap have adequate clearance between the cap and the manhole cover to enable hook-up? 16 Is the vapor cap in good condition with a gasket? 17 Is the vapor recovery lid painted orange? Colorado Division of Oil and Public Safety UST Annual Compliance Inspection Form Page 2 of 5

OPS Facility ID : Inspected by: Inspection Date: Tank Inspection 18 Are the external and/or internal lids easily removed for inspection? 19 Are the sump lid, gasket and seals present and in good condition? 20 Is the sump free of fuel, water or debris? Is the sump free of cracks, holes, bulges, or other 21 defects? If the system contains secondarily contained piping with 22 release detection consisting of sump sensors installed in the sump, is the interstice open to the sump? Is the sump sensor properly mounted at the bottom of 23 the sump and operating according to the manufacturer s specifications? Are penetration fittings and entry boots intact, secure and free of damage? 24 NOTE: If the sump was installed prior to 8-1-08 and is not used for interstitial monitoring, this is a recommended item. 25 Are junction boxes sealed and free of corrosion? Are the STP components, piping and flex connectors free 26 of leaks or seeps? If no sump is present, are metal components that are in 27 contact with the soil cathodically protected? Are piping and flexible connectors installed according to 28 the manufacturer s specifications (not kinked or twisted)? Did the mechanical and/or electronic line-leak detector 29 pass its annual functionality test which includes a leak simulated in the line as part of the functionality test? 30 Is the mechanical leak detector properly vented? (vent tube not kinked or twisted) Is the manhole cover in good condition and is there 31 adequate clearance between the ATG probe cap and the manhole cover? 32 Is the cap in good condition and does it seal tightly? 33 Are the probe wiring hole, electrical junction box and conduit sealed and in good condition? Are the probe, floats, and water/product warning alarms 34 operating according to the manufacturer s specifications? 35 Does the ATG console have power? 36 Have all ATG leak alarms been properly addressed? Is the console programmed correctly for the tanks found 37 at the site (e.g. product, capacity, points, overfill alarm, intank test, line-leak detector test, etc.)? Is the sump sensor properly mounted at the bottom of 38 the sump? Are the sensors functioning according to the 39 manufacturer s specifications? Submersible Turbine Pump (STP) Sump ATG Port ATG Console Tank Interstice 40 Are the interstitial sensors placed correctly in the tanks? 41 Are the interstitial sensors functioning according to the manufacturer s specifications? Colorado Division of Oil and Public Safety UST Annual Compliance Inspection Form Page 3 of 5

OPS Facility ID : Inspected by: Inspection Date: Tank Inspection Are all system components that routinely contain product 42 (tanks, lines, and other metal components) and that are in contact with the soil properly cathodically protected? Has your cathodic protection system (galvanic anodes or 43 impressed current) been tested within 6 months of installation/repair, and every 3 years thereafter? Has the impressed current system (rectifier) been 44 inspected for proper operation at least every 60 days? If you have an internally-lined tank without additional cathodic protection, has it passed an internal inspection 45 within 10 years after installation of the lining and every 5 years thereafter? 46 If the system is equipped with impressed current, are any wires exposed? 47 Is the vent cap present and is it the correct type? Cathodic Protection Vent Piping Unattended Fueling Is the vent piping of correct height and above 48 obstructions? 49 Are diesel and gasoline tanks vented with separate piping? Is one or more clearly identified emergency shutoff devices 50 located not less than 20 ft. or more than 100 ft. from the dispensing devices, readily accessible to patrons? Is a working telephone or other approved, clearly identified 51 means to notify the fire department provided on the site, and readily accessible to patrons? Is a fire extinguisher with a minimum rating of 40-B, a maintenance inspection not older than 1 year, and located 52 no more than a 30 ft. travel distance from the dispensing devices, readily accessible to patrons? Are the required additional operating and emergency 53 instructions posted and clearly readable in the dispensing area? Monthly Inspections 54 Have all Monthly Inspections been performed and documented, and have all deficiencies noted during the inspections been corrected? 55 56 57 58 59 Inspection Dispenser Information Is hanging hardware free of visible signs of leakage or damage? Are all components of hanging hardware of the proper type and size? If applicable, is fuel product, safety, octane, diesel sulfur, ethanol, signage present and correct? Is the under-dispenser containment (UDC) sump free of fuel, water or debris? Is the UDC sump free of cracks, holes, bulges, or other defects? Dispenser Colorado Division of Oil and Public Safety UST Annual Compliance Inspection Form Page 4 of 5

OPS Facility ID : Inspected by: Inspection Date: Dispenser Inspection Are penetration fittings and entry boots intact, secure and free of damage? 60 NOTE: If the sump was installed prior to 8-1-2008 and is not used for interstitial monitoring, this is a recommended item. If the system contains secondarily contained piping with release detection 61 consisting of sump sensors installed in the sump, is the interstice open to the sump? Is the sump sensor properly mounted at 62 the bottom of the sump? 63 Are junction boxes sealed and free of corrosion? Are meters, piping and flexible 64 connectors free of leaks or seeps? Are piping and flexible connectors installed according to the 65 manufacturer s specifications? (not kinked or twisted) If no UDC, are any metal piping 66 components in contact with the soil properly cathodically protected? Are the shear valves operating 67 according to the manufacturer s specifications? Is at least one fire extinguisher with a minimum rating of 40-B, and a 68 maintenance inspection not older than 1 year, located within 100 feet of each dispenser and tank fill opening? Is an emergency stop button present 69 and operable? Return to Compliance Plan Tank Compliance Issue/Repair Scheduled Date Actual Date Operator Certification By signing below, the operator certifies that the answers above are accurate and based upon performance of associated inspection activities, and that the facility owner has received a copy of this inspection form. A or B Operator Printed Name: A or B Operator Signature: Certification Number: Date: Colorado Division of Oil and Public Safety UST Annual Compliance Inspection Form Page 5 of 5