Metro Gold Line Eastside Extension Review Advisory Committee March 12, 2009

Similar documents
EASTSIDE PHASE 2 - PART 1 GREENWOOD AVE. STATION LOCATION PLAN PNR + TOD TOD BY OTHERS WASHINGTON BLVD. STATION FACILITIES + TOD

3.0 TRANSPORTATION ISSUES AND ANALYSIS

Exposition Light Rail Transit Project

Pomona Rotary December 19, 2017

PASADENA. Altadena Dr. Allen Av. Lake Av. Hill Av. Mountain St. Orange Grove Bl. Villa St LAKE ALLEN SIERRA MADRE VILLA Walnut St.

Conceptual renderings subject to change

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

Delta Kappa Gamma January 22, 2018

Hennepin County Transit Oriented Development Program. The Ellipse, St. Louis Park, 2009

Presentation of the Baltimore Metro System

engineering phase and during the procurement of design build contracts.

Balancing the Transportation Needs of a Growing City

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

JOINT FACILITIES ADVISORY COMMISSION. ART and APS Bus Parking Informational Session July 27, :30 pm

Chief Capital Management Officer s Report

D. Motor vehicle parking, bicycle parking, and loading areas shall be separated from one another.

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

ANDERSON PROPERTY SITE ANALYSIS

MOTOR VEHICLE PARKING AREA STANDARDS

metro.net/ridesafely TRANSIT SAFETY PROGRAMS

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

METRO Orange Line BRT American Boulevard Station Options

Tempe Streetcar. March 2, 2016

Project Status Update January 2017

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

OFFICE/R&D CAMPUS REPRESENTING ±395,335 SQUARE FEET FOR LEASE

Update on Transportation Activities in Fairfax County

Blue Ribbon Committee

Mobility Corridor Updates. Transit & Active Transportation Projects

Welcome to Open House #5 Scarborough Rapid Transit

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Mobility Corridor Updates. Transit & Active Transportation Projects

Agenda. Transbay Program. Brief History. Benefits of Transbay Ridership Financial Program Project Risks

APTA RAIL CONFERENCE June 20, 2016

RTD Commuter Rail System APTA Rail Conference June 23, 2015

Study of Infill Development Potential in the Unincorporated Areas of Los Angeles County

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

El Metro Operations Proposed FY Budget

Metro Strategic Plan: Changing our relationship with the customer May 17, 2018

Plan Check Policies and Guidelines

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

Dulles Corridor Air Rights Study Investigation

Peninsula Corridor Electrification Project (PCEP)

Committee Report. Transportation Committee. Business Item No

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update

The Millenia Town Center consists of a ±12.58 acre portion of the ±210 acre. The Millenia Town Center is currently planned to include two projects

congestion management program

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

Parking and Loading. Page 1 of 7

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

TransNet Dollars Keep San Diego Moving

Space holder to add drone footage/movie

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 PURCHASE OF HYBRID SEDANS APPROVE CONTRACT AWARD ACTION: RECOMMENDATION

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

Rapid Transit and Land-Use Integration a Reality

To: Operations & Scheduling Committee Date: 09/21/2017. From: Ruby Horta, Director of Planning & Marketing Reviewed by:

Phase 2 Exposition Metro Line Project

LADOT Enhancing Transit Services through Competitive Bidding

Plan Check Policies and Guidelines

City of El Paso: Sun Metro Legislative Agenda Briefing

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

F A C I L I T I E S M A S T E R P L A N

17.8 acres site 4.6 acres in floodplain & wetlands 3.5 acres of surface parking 9 acres of open space

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

The Capital Grid Project:

Proposed Program of Interrelated Projects

Develop ground transportation improvements to make the Airport a multi-modal regional

Article 10 Parking and Loading Standards

ORDINANCE NO. 176,558 RESEDA CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLY PERMANENT [Q] CONDITIONS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CHAPTER 5 CAPITAL ASSETS

Federal Way Link Extension

Letter EL652 City of Mercer Island. Page 1. No comments n/a

SANDAG 3D Visualization Howard Blackson 6:15. Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30

Chapter 4 : THEME 2. Transportation

±25,934 SF C-3 ZONED PAD

Sequence, Synergy, and Subsidy

car2go Toronto Proposal for on-street parking pilot project

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS

3.14 Parks and Community Facilities

4 Circulation & Transportation

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

Westside Issues Major generators: employment centers, retail, residential, recreational, UCLA, LAX Rising jobs-housing imbalance Transportation improv

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Chapter 9.28 Parking, Loading, and Circulation

FSITE. November 3, Hillsborough County Aviation Authority

Electric Scooter Sharing Program Community Meeting Feedback

Purpose: General Provisions:

Transcription:

Review Advisory Committee March 12, 2009 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground) Park & Ride Facility Direct Connection to the Pasadena Metro $898.8 million On-Time/Within Budget Opens in Mid-2009 1

Overall Construction Progress Construction began in July 2004. As of mid-march 2009, the Project is over 95% complete. The Contractor has worked over 3.8 million hours without a lost-time accident. Construction of the two underground stations at 1st/Boyle and 1st/Soto is 94% complete. Construction of the six at-grade stations is 90% complete. Systems installation is 97% complete. 2

Overall Construction Progress Remaining Work ACTIVITY 2008 2009 2010 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J Station Architecture & Site Finishes 1st/Boyle & 1st/Soto 1st/Alameda 1st/Utah Indiana 3rd/Ford 3rd/Mednik Pomona/Atlantic Boyle Heights/Mariachi Plaza & Soto Stations Little Tokyo/Arts District Station Pico/Aliso Station Indiana Station Maravilla Station East LA Civic Station Atlantic Station Pomona/Atlantic Parking Structure Third Party Interfaces 1st Street Bridge Widening LAUSD Re-Build Ramona Opportunity High School Systems Installation & Testing/ Pre-Revenue Systems Installation & Integration Testing (Phases I & II) Pre-Revenue Operations Planned Revenue Operations Date 3

Light Rail Transit Stations LittleTokyo/ Arts District Pico/Aliso Boyle Heights/ Mariachi Plaza 1st/Soto Maravilla Indiana Station East Los Angeles Civic Center Pomona/Atlantic 4

Underground Station Construction 1 st /Boyle and 1 st /Soto Boyle Heights/Mariachi Plaza Station Soto Station Station finishes are being installed on the station mezzanines and the platforms. Finish work in the station entrances and on the plazas are the last areas to be completed after the access to underground equipment areas for installation becomes less needed. 5

At-Grade Station Construction 1 st /Alameda and 1 st /Utah Little Tokyo/Arts District Station Pico/Aliso Station Canopy construction is nearing completion at both the Little Tokyo/Arts District and Pico/Aliso Stations. Installation of lighting and communications equipment is underway. 6

At-Grade Station Construction Indiana Street and 3 rd /Ford Indiana Station Maravilla Station Canopy construction is at various stages of completion at the Indiana and Maravilla Stations. Architectural finishes including platform paving is well underway. 7

At-Grade Station Construction 3 rd /Mednik and Pomona/Atlantic East Los Angeles Civic Center Station Pomona/Atlantic Station Canopy construction is underway at the East Los Angeles Civic Center and Pomona/Atlantic Stations. Station artwork and architectural finishes along the platform are being installed. 8

Powered-Light Rail Vehicle Test The first powered-light Rail Vehicle test occurred on March 11, 2009 when the new 2550 Ansaldobreda Vehicle received power from the Overhead Contract System catenary wires along the east portion of the alignment from 1 st /Lorena to Pomona/Atlantic. The Traction Power Sub-Stations for the remaining portion of the alignment to the west are in the process of being energized. However, vehicle power will not be provided until work in the underground portion is further along. 9

Transit Oriented Developments 10

1st + Boyle Site: Metro-owned property, private property and a street closing totaling +3.5 acres and lying on the SWC and the NEC of 1 st and Boyle. Situated at The Mariachi Plaza Station. 11

1st + Boyle Proposed Development SWC of 1 st + Boyle: +100 affordable, residential rentals (mix of single story flats and two-story townhomes) +6,500 sq. ft. of communityserving retail space 4 story project and with one level of below grade parking Design cues to be taken from Boyle Hotel across First (renderings pending) 12

1st + Boyle Proposed Development NEC of 1 st + Boyle: +125,000 sq. ft. of retail/community space (including a +45,000 sq. ft. market/drug store) +35,000 sq. ft. of medical office space Expansion of Mariachi Plaza with direct connection to the portal 13

Chavez + Soto Site: Four separate Metro-owned parcels totaling +3.5 acres and lying south of Cesar Chavez between Soto and Fickett. Situated approximately one quarter mile from the Soto Station. 14

Chavez + Soto Proposed Developments Phase I (east of Matthews): 73 affordable, residential rentals +3,250 sq. ft. of ground floor, community-serving retail space +1,400 sq. ft. of ground floor, community space Phase II (west of Matthews): 90 affordable, residential rentals +7,600 sq. ft. of ground floor, community-serving retail space +2,500 sq. ft. of podium level community space 15

Chavez + Soto Residential Features: Mix of single-story flats and two-story townhomes 15 foot setbacks and front porches along Fickett, Matthews and Soto 3.5 story project with level of semi-subterranean parking Alley access to parking Street scene along Fickett 16

1st + Soto Site: Metro-owned property totaling +0.75 acres and lying on the SWC and the SEC of 1 st and Soto. Situated at the Soto Station. 17

1st + Soto Proposed Development: SWC of 1 st + Soto +50 affordable, residential rentals Ground floor, retail space (total of +14,500 sq. ft. in the project) Community Space Preschool facility SEC of 1 st + Soto +11,500 sq. ft. of office space Ground floor, retail space (total of +14,500 sq. ft. in the project) 18

1st + Lorena Site: Metro-owned property totaling +0.8 acres and lying on the NWC of 1 st and Lorena. A short walk to/from the Indiana Station. 19

1st + Lorena Proposed Development: +52 affordable, residential rentals +10,000 sq. ft. of ground floor, retail space Community space 20

Community Relations 21

Final Street Restoration & Sidewalk Improvements Metro s Contractor is completing the new street and sidewalk improvements including the front portion of new driveways along 1 st Street between Lorena Street and Indiana Street. 22

Final Street Restoration & Striping Metro s Contractor will begin the grind and overlay new street paving work during the week of March 23, 2009 at limited areas along Alameda Street and 1 st Street. 23

Safety Outreach & Education School Safety Presentations: 60 schools, 58,915 students within 1.5 miles complete 23,400 students within.5 miles, second training complete All senior centers have been trained: 2,300 senior citizens Safety training to over 300 staff at Kaiser and White Memorial Medical Center 85,000 safety door hangers distributed. 10 Safety Presentations Underway Rail Ambassadors @ 6 strategic locations: 1 st /Alameda, 1 st /Utah, 1 st /Lorena, 1 st /Indiana, 3 rd /Indiana and 3 rd /Mednik Safety Tips advertisements in 10 publications: circulation 563,681 Safety Fair planned for May 2009 24

Coupon Book & Fun Map 25