ATLAS: The road to Baseline3. Fernández Suárez, Enrique Rodríguez, Antonio

Similar documents
ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments

Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation)

KEYNOTE Michel Ruesen Jaime Tamarit Abstract

ERTMS Level 2 Trackside

Annex A. to Technical Specification "Operations and traffic management" adopted by

UNISIG * EEIG ERTMS USERS GROUP * UNIFE

Rail Interoperability in Spain. ERTMS real deployment

Need, Strategy and Implementation of ERTMS

UIC- ERTMS Conference 2004

Hybrid ERTMS/ETCS Level 3

Notified National Technical Rules (NNTRs)

ERTMS Platform Steering # 15 Brussels, 2 Dec Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base)

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

Der ERTMS-Markt außerhalb Europas

ETCS in Switzerland Views and Learning from an early Investor

siemens.com/mobility Trainguard Full interoperability for rail traffic

Hybrid ERTMS/ETCS Level 3

AŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha

SUPERVISION FUNCTIONS Page 1 (175)

Leading the way to the future. Peter Elestedt

2014 ERA FOLLOW UP OF ERTMS EU FUNDED PROJECTS ERA Follow Up of ERTMS EU- funded projects FINAL REPORT /9

SUPERVISION FUNCTIONS Page 1 (184)

High speed innovation in Adif. Antonio Berrios Villalba ADIF (Spain)

POSITION PAPER Version 3.0

Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania

Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them

New generation of gauge changeover Facilities: The UNICHANGER Project

ERTMS/ETCS National Values

Industry experience with ERTMS projects in Switzerland

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013

Power Supply Systems in Spain

Rail Interoperability in Europe

This document is a preview generated by EVS

Using ERTMSFormalSpecs to model ERTMS braking curves

Technological systems for High Speed lines, ERTMS, security, power systems. Renato Casale Italferr (FS Group), Italy

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

In the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s:

Please find enclosed a letter from François Bellot, Minister for Mobility, regarding the above matter. [complimentary close]

The New Development of CTCS in the Intercity Railway SUMMARY 1 INTRODUCTION 2 CTCS OVERVIEW. 2.1 CTCS Levels

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT

Signalling Programme. Presentation of Banedanmarks ERTMS programme Programme Diretor Morten Søndergaard

The Signalling Programme

Double gauge High-Speed. interoperability and scope

AUXILIARY FUNCTIONS Page 1 (43)

Application and Development of CTCS

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes

ERTMS/ETCS braking curves Robert Dijkman EEIG ERTMS Users Group

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

Italian standards. Andrea Nardinocchi Scientific Director Italferr, Rome, Italy

Guide for the application of the CR ENE TSI

DRAFT RECOMMENDATION N. 006REC1072

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV)

TPWS in action. Decisive steps towards main line ATP on IR. Akhilesh Yadav, Director/ Signal/ RDSO

AUTOCITS. Regulation Study for Interoperability in the Adoption the Autonomous Driving in European Urban Nodes. LISBON Pilot

AUXILIARY FUNCTIONS Page 1 (45)

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

(Non-legislative acts) DECISIONS

Increase of recovery in ERTMS lines with new ATO

National technical rules for vehicles Related Control Command and Signalling Requirements

CEDEX Rail interoperability Lab (RIL) Main activities and tests performed

The Swiss approach based on B3

C-ITS status in Europe and Outlook

Development of a Train Control System by Using the On-board Interlocking

INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016

System. Antenna JRU. Mobile Gateway EVC STM. Cold Movement Detection. Pulse Generator. Safety ETCS

UIC WORKSHOP ON ENERGY EFFICIENCY OF FUTURE TRAINS

Council of the European Union Brussels, 18 July 2014 (OR. en)

Simplified rail vehicle authorization in EU through x-acceptance of requirements. Stefan Sollander, Transportstyrelsen (National Safety Authority)

Date of occurrence Location name Near Santiago de Compostela Local time 20:41

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

How GSM-R serves railways globally. Norman FRISCH Business Development Railway Solutions

GRS. STM General Technical Requirements Specification E 004 SPECIFIC TRANSMISSION MODULE (STM) EBICAB GENERAL TECHNICAL REQUIREMENTS

Building a single European market for railway rolling stock

(Non-legislative acts) DECISIONS

Enhanced ETCS_L2/L3 train control system

Preliminary market consultation session

News from Spain ERESS FORUM Madrid, May 25

Eurailspeed Parallel Session D.3. Julen Barrutia Commercial Director for Europe, CAF

Professor Roderick A Smith. Future Rail Research Centre Imperial College London

Intermediate results

Railway noise control in urban areas. Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups

Faculty of Engineering Technology

QUESTION / CLARIFICATION QC-ENE-001

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS

Overview of Railway Noise Control in Europe

SNCF ERTMS RETURN ON EXPERIENCE THOMAS JOINDOT RAILWAY STRATEGY AND REGULATION DEPARTMENT UIC ERTMS CONFERENCE STOCKHOLM

Energy in evolution looking beyond smart metering Oliver Iltisberger Senior Vice President, Landis+Gyr EMEA, Switzerland. 4 6 May, 2009 Dubai, UAE

The criteria of choice for new High Speed fleet

Precision Station Stopping Progress Update

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY

Design and evaluate vehicle architectures to reach the best trade-off between performance, range and comfort. Unrestricted.

Eress Forum 2016 Highlights

ELECTRANS Level Crossing Protection System

Manufacturing operating and maintaining different rolling stock

Hanzelijn A new ERTMS-ATB 200 km/h rail track in the Netherlands

Eurailspeed Parallel Session E.1

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

NATIONAL REPORT: SPAIN. At 31/12/2015

Railway Obsolescence Management Contract

Transcription:

25 número 5 - junio - 2018. Pág 105-115 ATLAS: The road to Baseline3 Fernández Suárez, Enrique Rodríguez, Antonio Abstract European Rail Traffic Management System (ERTMS) development started several years ago, with some rail manufacturers, infrastructure managers and trains operators, and the European Union. Alstom was present from the beginning in this process, being the first to put in service the ATLAS solution for ERTMS in a High Speed Line (HSL) in Italy, the first freight line in The Netherlands, and the first high-density line with short headway in Switzerland. The first set of ERTMS specification, stable and complete, is based in subset 026 with version called 2.3.0 D, also known as Baseline 2. This Baseline 2 was used in most of the European projects today in commercial operation, and in Spain in all the Adif (Administrador de Infraestructuras Ferroviarias), and Renfe (Public train operator) projects. About Spain, there are several Adif lines in operation (Madrid-Barcelona, Madrid- Valencia, Madrid-Valladolid, etc ), and also Albacete-Alicante, the first to enter in commercial operation with ERTMS level 2, without fall back of level 1, in May 2014. Also Renfe has installed in some of their trains the ERTMS baseline 2, in High Speed, regional and commuter train types. Alstom has installed its ATLAS solution in Renfe S-100, S-104, S-114 and different type of CIVIA trains for commuter lines. Asltom has demonstrated experience in the ERTMS onboard equipment, with more than 5450 trainsets of 115 different types running with ATLAS solution. Keywords: atlas, ERTMS, infraestructures,lines 105

Fernández Suárez, Enrique. Rodríguez, Antonio. 1. ATLAS: The road to Baseline3 - (artículo de 10 páginas versión 170913a) European Rail Traffic Management System (ERTMS) development started several years ago, with some rail manufacturers, infrastructure managers and trains operators, and the European Union. From that time, several projects have been deployed across Europe, and there are several high speed, regional, and freight traffic lines in operation, and hundreds of trains running with ERTMS in commercial operation. Alstom was present from the beginning in this process. Alstom was the first to put in service the ATLAS solution for ERTMS in a High Speed Line (HSL) in Italy. After Alstom did it again for the first freight line in The Netherlands, and the first highdensity line with short headway in Switzerland: Date Country Line Operational Speed ERTMS Baseline Line (km) 2005 Italy Roma-Napoli 300 km/h 2.3.0D 220 D 2006 Switzerland Maastesten Rothrist 200 km/h 2.2.2+ 40 D + 10 S 2007 The Netherlands Betuwe Route (Freight only) 120 km/h 2.3.0D 90 D (S: single line; D: Double line) The first set of ERTMS specification, stable and complete, is based in subset 026 with version called 2.3.0 D, and it is also known as Baseline 2. The complete list of documents and applicable versions can be found at: http://www.era.europa.eu/core-activities/ertms/pages/set-of-specifications1.aspx This Baseline 2 was used in most of the European projects today in commercial operation, and in Spain in all the Adif (Administrador de Infraestructuras Ferroviaras, Infraestructure manager), and Renfe (Public train operator) projects. Here is the list of the most relevant European projects with ERTMS level 2, in commercial operation (in bold what is ATLAS solution from Alstom): Date Country Line Operational Speed 2005 Italy Roma-Napoli 300 km/h 2006 Italy Torino-Milano 300 km/h 2008 Italy Milano-Bologna 300 km/h 2009 Italy Bologna-Firenze 300 km/h 2007 Belgium L3 260 km/h 2009 Belgium L4 300 km/h 2011 Spain Madrid Lleida 350 km/h 2012 Spain Madrid Valencia 350 km/h 2014 Spain Albacete Alicante 300 km/h 2009 The Netherlands HSL Zuid 300 km/h 2012 The Netherlands Hanzelijn 200 km/h 2006 Switzerland Maastesten Rothrist 200 km/h 2007 Switzerland Loetschberg tunnel 250 km/h 106 360.revista de alta velocidad

ATLAS: The road to Baseline3 About Spain, there are several Adif lines in operation, some included in the table above, but I would like to highlight Albacete-Alicante, the first to enter in commercial operation with ERTMS level 2, without fall back of level 1. Línea de Alta Velocidad Albacete-Alicante Albacete Alicante line belongs to Madrid Levante HSL, and it is in commercial operation since May 2014. The most relevant characteristics of the line are: 160 km length with double track, from KP. 326,261 to KP 486,123 at Alicante terminal station. Maximum operational speed, tested with commercial trains is 300 km/h, even if the line is designed for 350km/h. With ASFA the maximum speed is only 200km/h. There are 22 technical buildings along the line to locate three main electronic interlockings Smartlock, in Bonete, La Oliva and Monforte del Cid, and two Radio Block Center (RBC), located at Bonete and Monforte del Cid. Renfe installed in some of their trains the ERTMS baseline 2, in High Speed trains, but also in regional and commuter trains. Renfe has also ERTMS installed in all the HS trains they have: S-102, S-103, S120, S-121, S-130 and S-730. Alstom has installed its ATLAS solution in Renfe S-100, S-104, S-114 and different type of CIVIA trains for commuter lines. 107

Fernández Suárez, Enrique. Rodríguez, Antonio. ERTMS on board of CIVIA Renfe trains Project includes the installation and commissioning of 123 trains to be used in Cercanías Madrid commuter lines. First train is in operation with ERTMS level 1 since Feb 2012. The trains to be equipped were: 8 CIVIA I (in commercial operation), 34 CIVIA II (in commercial operation), 40 CIVIA III (in commercial operation), and 11 CIVIA III and 30 CIVIA IV under manufacturing at the time of the project. Central car with new rack installed, cabling between cars, cabin and driver desks were modified: Today, all units are ready for ERTMS commercial operation. At the end, Alstom has demonstrated a big experience in the ERTMS onboard equipment, the integration in several train types, and the management of other national ATPs when required. In total there are more than 5450 trainsets of 115 different types running with an Alstom ERTMS onboard. In the first implementations, Adif, Renfe and the Ministerio de Fomento created some functions (called National Functions) to cover Spanish specificities not included in the ERTMS standard. I mean, new functions not against the standard, but needed considering operational rules. This was a must because Spain was (and is) one of the European countries with more km of line and trains in commercial operation with ERTMS. A short list of these National Functions is (first version of this specification was created in 2003): Función 20: Gestión separada de limitaciones temporales de velocidad según el nivel Función 24: Gestión del mensaje por defecto de eurobaliza 108 360.revista de alta velocidad

ATLAS: The road to Baseline3 Función 27: Gestión ERTMS del equipamiento ASFA independiente Función 77: Transición degradada desde nivel 2 a nivel 1 por pérdida de comunicación. Función 121: Inhibición de niveles disponibles (via external switch) Función 124: Gestión de la reacción de enlace Función 125: Operación en áreas ERTMS fuera de servicio From those first implementations, the ERTMS specification has evolved to improve defects or misunderstandings found, and to implement new functionalities requested by Infrastructure Managers and Train Operators. The release 2.3.0 D evolved to version 3.0.0, 3.1.0, 3.2.0 and 3.3.0, and after: The Baseline 3 compared with version 2.3.0 D includes: 22 new functions and 32 Errors Change Requests (CRs) in SRS 3.0.0 (due to finalisation of Subset 108) 46 Errors CRs with SRS 3.1.0 73 CRs with SRS 3.2.0 30 CRs added and 2 removed with SRS 3.3.0 The major evolutions are the system version management, harmonised braking curves, the Limited Supervision, and the Level crossings management. But other functions have been also included like: Speed restriction to ensure a given permitted braking distance Inhibition of revocable TSRs from balises in Level 2 or 3 Redefinition of international train categories 109

Fernández Suárez, Enrique. Rodríguez, Antonio. Shunting in level NTC areas Supervision of the safe radio connection Non-Leading input signal Cold movement detection Door control supervision Inhibition of the BG message consistency reaction Passive Shunting mode Lines under construction (Virtual Balise Cover) Changing Train Data from sources different from the driver Etc From release 3.3.0, the specifications evolved to 3.4.0 in 2015, also called Baseline 3 Maintenance Release 1 (MR1). This MR1 includes: 28 CRs, with 21 error corrections and 7 enhancements 25 subsets of specifications affected Key changes on: L1 Limited Supervision (CR 1223) with toggle function to Select Swiss / Other countries; Increased SIL requirements on some DMI features The changes implemented consider the following CRs: Id number 0944 Data unit/resolution/size 1088 Subset-039 upgrade to Baseline 3 1104 Subset-094 upgrade to baseline 3 1109 error non-stopping areas (Follow-up CR 1015) Headline 1124 Findings on SRS section 3.13 Speed and distance monitoring 1127 Non convergence of the release speed calculated on-board 1147 DMI text message handling 1148 Trigger of specific NTC data entry 1149 Alignment of PBD SR requirements with the new braking curve model 1150 Incomplete V_MRSP definition vs train position 1151 Error in Subset-037 Table 11 1153 Train interface passive shunting input simplification 1154 Train interface - clarification of isolation output 1155 CR712 follow-up: packets sent as non-infill information from infill device 1157 SUBSET-076 upgrade to Baseline 3 1158 SUBSET-074 upgrade to Baseline 3 1159 Missing train-to-track message specification for RBC X=1 1168 Unspecified ACC RBC behavior when receiving new pre-announcement messages in ongoing transaction 1173 Miscellaneous problems with STM specifications 110 360.revista de alta velocidad

ATLAS: The road to Baseline3 1176 Feedback on SRS chapter 6 from Baselines compatibility assessment 1183 Unclear use of telegram header info when a balise telegram or BG message is ignored/rejected 1185 Miscellaneous editorial findings in SRS&DMI spec 3.3.0 1223 Display in Limited Supervision 1231 Miscellaneous editorial findings in SUBSET-027 v3.0.0 A year after, in 2016, the specifications evolved to 3.6.0, also called Baseline 3 Release 2 (R2). This R2 includes: 55 CRs, with 39 error corrections and 16 enhancements 25 subsets of specifications affected Key changes on: GPRS; Key management; ATO (finally postponed ), and Low adhesion factor. The changes implemented consider the following CRs: ID number 0239 Train data on TIU 0299 Version compatibility check 0539 Set speed indication for driver Headline 0740 Unclear requirements concerning functions active in L2/L3 only 0741 Packet data transmission for ETCS 0852 Definition of level 2/3 area and level transition border 0933 Storing of RBC contact information 1014 Duplicated balises ambiguities 1033 Disable Start in SR if no safe connection 1084 Target speed masking 1086 Unknown L1 LRBG reported to RBC 1087 Manual network selection 1089 Ack for text messages in NL mode 1091 Insufficient driver information in OS 1094 Unclear stop conditions for display of some DMI objects 1107 Status planning information on the DMI in FS mode 1117 Reception of an order to terminate a communication session while session is being established 1122 Communication session establishment to report change to SL mode 1125 Clarification of human role in ETCS safety analysis 1129 DMI indication of level announcement in SB 1152 Avoid increase of permitted speed and target distance 1163 Train interface Track conditions related outputs to be harmonized 1164 Ambiguity in assignment of coordinate system 1167 Juridical data for the equivalent brake build-up time 1169 Ambiguity about the variable L_STMPACKET in juridical data STM INFORMATION 111

Fernández Suárez, Enrique. Rodríguez, Antonio. 1172 Problems related to level crossing supervision 1180 Guard rails and cables in the vicinity of balises 1184 Missing requirement for the number of communication sessions an OBU must be capable to handle simultaneously 1187 Indication marker inconsistency 1188 Balises in Multi-Rail Track 1190 UES text message end condition 1197 Ambiguity regarding the temporary EOAs and SvLs 1213 SUBSET-091 upgrade to Baseline 3 Release 2 (B3R2) 1221 Availability of Override and Start buttons 1222 Inconsistency regarding list of BGs for SH area 1229 Age requirement for estimated speed 1236 Criteria for Levels in train unclear 1237 KMS evolution 1242 Several problems with STM specifications 1245 Display of ETCS override in level NTC 1249 Problems with pre-indication 1250 Incorrect description in gradient profile 1254 Session establishment attempts to report mode change 1255 Impossibility to transmit unknown values in the message Additional data 1260 Inconsistent set of clauses regarding the service brake interface in SH mode 1262 Issues related to the initiation of a communication session by an RBC 1265 Miscellaneous editorial findings in B3 MR1 1266 Classification of SRS clauses 1273 Impact of UIC 544-1 new version 1275 Eurobalise transmission susceptibility requirements not linked to interoperability 1277 D7 of SoM procedure is reached while no Mobile Terminal is registered yet 1278 SUBSET-074 upgrade to Baseline 3 Release 2 (B3R2) 1280 System version number increment for B3R2 1283 Inconsistent use of the terms EOA and LOA 1284 SUBSET-092 upgrade to Baseline 3 Release 2 (B3R2) The complete list of documents and versions can be found at http://www.era.europa.eu/core-activities/ertms/pages/set-of-specifications3.aspx Going back to Spanish National functions, some of them have been include in the standard, or can be managed through standard functions and interfaces: 112 360.revista de alta velocidad

ATLAS: The road to Baseline3 Función 20: Gestión separada de limitaciones temporales de velocidad según el nivel Función 24: Gestión del mensaje por defecto de eurobaliza Función 125: Operación en áreas ERTMS fuera de servicio This three are already included in the Baseline 3 specifications. Función 27: Gestión ERTMS del equipamiento ASFA independiente Función 121: Inhibición de niveles disponibles (via external switch) This two can me managed with Train interface functions integrated in the ERTMS onboard equipment. And with new Baseline 3 legaly in force, what happen with existing trains /lines in Baseline 2? The Baseline 3 specifications includes the System version management, to ensure all Baseline 3 trains can operate on lines with at least 2 different versions: 113

Fernández Suárez, Enrique. Rodríguez, Antonio. The full picture about compatibility is: As a summary, Baseline 3: offers backward compatibility for baseline 3 trains on baseline 2 infrastructure. offers the possibility to upgrade a baseline 2 trackside while keeping most of the existing balises untouched. offers the possibility for additional trackside functionalities without losing compatibility with baseline 2 on boards (additional baseline 3 information will be ignored by a baseline 2 train but taken into account by a baseline 3 train) A detailed document has been released by the European Railway Agency (ERA) together with the Infrastructure Managers and Trains Operators, to identify all the potential interoperability problems between Baseline 2 and 3 subsystems, called Baseline Compatibility Assessment. The document about Baseline 3 MR1 compatibility can be found in: The conclusion, for the evolution from version 2.3.0 D to Baseline 3 MR1, is vast majority of the 436 analysed Change Requests, the analysis demonstrated that the compatibility objectives for Baseline 3 [ ]have been achieved and no potential compatibility problems were identified. Besides, some other potential compatibility issues were identified, due to shortcomings or grey areas in Baseline 2, for which mitigation measures could be needed to ensure interoperability. *(extracts from Baseline Compatibility Assessment - Final Report, Reference EUG_UNISIG_BCA, version 1.0.0) This document about Baseline 3 R2 compatibility can be found in: http://www.era.europa.eu/document-register/pages/baseline-compatibility-assessment-b3-mr1.aspx http://www.era.europa.eu/document-register/pages/baseline-compatibility-assessment-for-b3-r2.aspx The conclusion is for 50 out of the 55 CRs added in MR2, the compatibility between the baselines has been achieved and no potential compatibility problems were identified. For other 5 CRs (CR 933, 1089, 1184, 1249 and 1262) have been identified mitigation measures. All these analysis have been performed to facilitate migrations to Baseline 3, and coexistence of both Baselines from a legal but also real point of view. And together with specifications evolution, the products also evolve. New generation of ERTMS onboard equipments have: - reduced HW, with less components and less power consumption - more functions integrated in the European Vital Computer - more processing capacities - and open to other standards /equipments used in other sectors. 114 360.revista de alta velocidad

ATLAS: The road to Baseline3 New EVC included in the Alstom ATLAS solution, includes: - 19, 6U rack with all functions integrated (Radio and Balise Transmission Modules integrated, Juridical Recording function, Diagnostic, ) - Additional communication modules to integrate EVC in central diagnostic systems. - Capability to use other communication than GSM-R and Profibus. - ATO and Eco driving - Etc 115