STAY SAFE NEAR ELECTRICITY

Similar documents
Electrical Safety Slide Show Presenter s Notes

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Presenter s Notes SLIDE 1

Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Work safely around power lines.

Guidelines when working near TasNetworks electrical assets

Close Approach to Power Lines. Close Approach to Power Lines v

Avoidance of Danger from Electricity Overhead Lines and Underground Cables

Private Overhead Electric Lines. Safety and Responsibility

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

ELECTRICAL SAFET Y FOR CONTRACTORS

Water leaks. What you need to do. dwrcymru.com PAB 0093

Network Safeworking Rules and Procedures

Electrical safety and you

GUIDELINE FOR DELIVERING TO CONCRETE PUMPS

SAFE WORK METHOD STATEMENT OVERHEAD AND UNDERGROUND ELECTRICAL CABLES

FATAL AND SEVERE RISK PROGRAM

Technical Guidance Note 287. Third-party guidance for working near National Grid Electricity Transmission equipment

For your SAFETY. Click Before You Dig, Drill or Excavate. Plan ahead. Dangers of hitting underground lines. May/June 2018

Customer Charter. 1 July 2017

HOUGHTON COUNTY ROAD COMMISSION GUIDELINES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

WORKING IN THE VICINITY OF OVERHEAD AND UNDERGROUND ELECTRIC LINES

Key Issues and Considerations when for. Working around Concrete Pumps, Concrete Pump Trucks, and Crane Lift Buckets

Remove the 3-11mm nuts holding mirror on. Don t drop the nuts!

Position Paper. Telehandler Use: Lifting Suspended Loads

They form part of the Agreement by which homeowners occupy their pitch in accordance with the Mobile Homes Act 1983, as amended.

COUNTY ROAD COMMISSION RULES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

Electrical Awareness for Construction Activities. Overhead Power Lines & Underground Cables

East Lake Tarpon Special Fire Control District

Safe use of quad bikes

Sectional and Tilting Door Opener

Basic Connection Services Application and Price Guide

HEARING STATEMENT - PALMERSTON NORTH CITY COUNCIL PLAN CHANGE 15A - RURAL ZONE (GENERAL ISSUES)

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Guidance on safe procedures for staff and students in respect of road traffic incidents and breakdowns

SECTIONAL AND TILTING DOOR OPENER INSTALLATION INSTRUCTIONS AND USER GUIDE. Comfort 800E/1000E

WATCH OUT LIVE LINES AND YOUR SAFETY

PRIVATELYOWNED POWER POLES AND POWERLINES

Code of Practice on Leakage for Domestic Customers

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

EARTHING YOUR QUESTIONS ANSWERED

Code of Practice. For works on, near or adjacent to the Luas Tramway

Monitor and Review. Electrical Safety. Causeway Coast and Glens Borough Council HSPD 009

AVOIDING ELECTROCUTION HAZARDS

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

LIFT TRUCK SAFETY OPERATOR TRAINING

R O A D S A F E T Y E D U C A T I O N

Monthly promotions. October 2018 Puget Sound Energy bill inserts and information. Download inserts

Electrical Safety Part I

SAFETY FACT SHEETS. Electrical Hazards Safety Non Negotiable. G-HS-ST Electrical Hazards. G-HS-FS Version:1

MQ4C-24/6485 WIRELESS INDOOR/OUTDOOR QUAD-COPTER

Electricity Entity Requirements: Working Near Overhead and Underground Electric Lines

The Management of Electrical Safety in Quarries, Associated Plant and Equipment

Sectional and Tilting Door Opener Installation Instructions and User Guide

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

Aerial Lifts. Man-lifts are electric or air-powered compact lifts that allow units access through standard doorways and operation in narrow corridors.

Charges Scheme 2017/18

Electrical Safety in the Workplace

Power cut We can offer you extra support during a power cut

Stay Safe Around Electricity Teacher s Guide

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

Our Mobility Scooter Policy: A guide to taking mobility scooters on our trains

Safe Driving Standards & Procedures

R3 Roller Garage Door Opener

EZ Hauler 2500 Training & Procedure Manual

Northeast Ohio AWWA October 26, 2017

Beckley Village Hall BVH DN9. HSE Risk Assessment

Advice and safety instructions. for Trafikverket track areas

Summary of Hanover College Vehicle and Parking Regulations

Electrical safety on small construction sites

WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR)

SAFETY BULLETIN ELECTRICITY THE RULES HOW TO STAY SAFE WHEN WORKING AROUND POWER LINES AMERICAN CONCRETE PUMPING ASSOCIATION

EEI Occupational Safety & Health Committee Conference Public Safety Issues and Trends

Work safely. Stowing The Digger. Digging

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

Operator Manual. The most important component is you. This operator manual. has information for. all models of series. B plus some options and

Engineering Considerations. Glenn Stapleton - Senior Electrical Design Engineer Lines

Electrical Safety. Electricity. Safety. Division of Workers Compensation HS01-013B(02-14)

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells

Working in Proximity to Overhead Power Lines

Excavator 360 above 10 Tonnes A59

Pipeline Safety Information. for public officials

MODEL 540 USER MANUAL INCORPORATING MODEL 530 TEMPERATURE CONTROLLER

2-Pack Indoor Simulated Dome Security Cameras

Battery System User Manual for Panasonic LJ-SK56A BATTERY SYSTEM USER MANUAL FOR PANASONIC LJ-SK56A

WASHINGTON UNIVERSITY IN ST. LOUIS DEPARTMENT OF FACILITIES PLANNING & MANAGEMENT ACCESS CONTROL & ELECTRONIC SECURITY OFFICE

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

Managing Electrical Safety on Boats

Instruction Manual MB4 Rolling garage door opener

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines

Presenter s Notes SLIDE 1

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Mobility Vehicle Policy

AURELIA LTD A59 EXCAVATOR 360 ABOVE 10 TONNES INC LIFTING TECHNICAL TEST THEORY CPCS Issue 09-Jul-2012

Life-Saving Rules. Re- Energising Life Saving Rules. You may think that these are only for manufacturing or plant workers Are they?

Complete Pond Kit REMINDER CALL BEFORE RETURNING TO STORE. PLEASE CALL BEFORE RETURNING TO THE STORE.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

Transcription:

IMPORTANT SAFETY INFORMATION STAY SAFE NEAR ELECTRICITY Your guide to working safely around Aurora Energy s electricity and communications networks Keep safe around electricity

At Aurora Energy we want to keep all contractors, customers and the public safe. Aurora Energy Limited owns and operates the electricity distribution network and high speed fibre-optic networks in Dunedin, Central Otago and Queenstown Lakes. Whenever you are digging on private or public property, or working near overhead lines there is a serious risk to life and property. This booklet is a guide to safe working practices when working near our electricity and communications networks in Dunedin, Central Otago and Queenstown Lakes, and provides information about the services we have to help you. For more information about Aurora Energy visit www.auroraenergy.co.nz GLENORCHY ARROWTOWN QUEENSTOWN WANAKA CROMWELL ALEXANDRA ROXBURGH DUNEDIN

1 CONTENTS Before you start work 3 Our Safety Rules 4 What to do in an emergency 6 Planning your work 8 Your legal requirements 9 Working safely the dangers 10 Look Up. Look Out when working near overhead lines 12 Temporary electricity disconnection service 15 Check before you dig working near underground cables 16 Mark out services 20 Close approach approvals 22 Disconnect before you remove or demolish a building 25 Travelling with high loads 26 Building near overhead lines 28 Electricity Communications

2 DISCLAIMER Aurora Energy Limited does not accept any liability for any information contained in this document. None of Aurora Energy Limited or its related companies: Accept liability for any loss or damage suffered or incurred by the recipient of this document, or any other person or entity however caused (including negligence) relating in any way to this document including, without limitation, the information contained in it or any errors in or omissions from it, or the recipient, or any other person or entity, placing any reliance on this document, its accuracy, completeness, currency or reliability. Accept any responsibility, arising in any way, for any errors in or omissions from this document, or for any lack of accuracy, completeness, currency or reliability of this document. Accept any responsibility to inform the recipient of any matter arising or coming to their notice that may affect any matter referred to in this document.

3 BEFORE YOU START WORK CALL US ON 0800 22 00 05 This number is a quick and easy way to use all the services we provide: Reference maps which show the location of our underground electricity and communications cables. On-site advice, mark outs and close approach approvals for work near strategic electricity and communications cables and pipes. High load approvals we will check your route to make sure it s safe. Close approach approvals for excavation work near power poles and operating machinery near overhead lines.

4 OUR SAFETY RULES Safe behaviour is a requirement of working on or near the Aurora Energy network. Our Safety Rules are in place to keep us and others safe and must never be broken. Each of us will personally intervene anytime we feel a situation or behaviour might be unsafe. We will always comply with the Safety Rules, and investigate any breaches. Electrical safety Always follow all electrical isolation and operating instructions Working at heights Always protect yourself against a fall when working at height Lifting operations Never work or walk under a suspended load

5 Vehicles, plant and equipment Always use equipment that is fit for its intended purpose and wear personal protective equipment Always keep a minimum safe distance from moving vehicles, live equipment or working machinery Driving Always wear your seat belt while driving Never use a handheld device while driving Public safety Always protect the public from the work site Never leave electrical equipment unsecured Remote and isolated work Always tell someone where you are when working or travelling alone Emergency response Always know the emergency response plan

6 WHAT TO DO IN AN EMERGENCY IF YOU HIT AN ELECTRICITY CABLE OR OVERHEAD LINE: Treat the cable or overhead line as live get back at least 10 metres. Evacuate the immediate area. If you are in a machine, stay in the machine. If you are at serious risk from another hazard, such as fire, and must leave the machine, jump well clear. Do not touch the machine and ground at the same time. Do not cover up a broken cable or try to fix it yourself. Call us immediately on: 0800 22 00 05 IF YOU HIT A COMMUNICATIONS CABLE: DO NOT look directly at the cable as laser light may damage eyesight. DO NOT attempt to repair the cable. Call us immediately on: 0800 22 00 05

7 Stay back at least 10 metres. Call us immediately. 10 METRES Stay inside the machine. Call us immediately.

8 PLANNING YOUR WORK It takes time to arrange these services, so plan your work carefully and call us in advance. Allow: Up to four working days for on-site advice, mark outs, close approach and high load approvals (less than 5.4 metres). Reference Maps can generally be provided by emailing the AssetSystemsInfoTeam@ auroraenergy.co.nz. Up to two working days may be required to process the request. If any work requires the power to be disconnected, 12 working days notice will be required to plan the shutdown with electricity retailers.

9 YOUR LEGAL REQUIREMENTS WorkSafe has set down minimum safe work practices for carrying out any work near electricity and communications networks. See Worksafe s Guide for Safety with Underground Services (www.worksafe.govt.nz). There are also laws and regulations that specify safe working practices which must be followed: Electricity Act 1992 and amendments Electricity (Safety) Regulations 2010 and amendments Health and Safety at Work Act 2015 NZECP 34:2001 Electrical Safe Distances Health and Safety in Employment (Pipeline) Regulations 1999. Aurora Energy stringently enforces health and safety across its networks and if a third party is found breaching any of the above laws and regulations we will refer the matter to WorkSafe for investigation. We may also take legal action to recover both the cost of repairs and the cost of lost business from any party or parties responsible for damaging our network infrastructure.

10 WORKING SAFELY There s one golden rule safety first, for yourself, your co-workers and the public. Everyone on a worksite is responsible for safety.

11 THE DANGERS If you hit an electricity cable or overhead line there is a risk of: Electrocution Flash over Explosion Fire. It s not always necessary to touch a live cable or overhead line to be electrocuted. At the moment of contact, a machine, tool, or person is live at the same voltage as the cable. If an electricity cable is cut by an excavator, or contact is made with an overhead line, anyone touching the machine is likely to be electrocuted. Electricity can also travel through the ground, causing the ground to become live. If you hit a fibre-optic cable, there is a risk of: Eye damage, possibly blindness.

12 LOOK UP LOOK OUT WHEN WORKING NEAR OVERHEAD LINES Keep a careful watch and make sure that you maintain a safe working distance from overhead lines at all times: at least four metres when operating machinery, such as a digger or crane, near lines and do not excavate within five metres of a power pole (see page 23). Before you start work find out where network cables are, and note the position of overhead lines.

13 WORKING SAFELY NEAR OVERHEAD LINES When you plan to work near overhead lines or power poles it is a legal requirement that you follow the minimum safe distances as set down by New Zealand Electrical Code of Practice NZECP 34:2001 Electrical Safe Distances. Follow the four metre rule: All work activity must be kept at least four metres from Aurora Energy s overhead lines. If you need to work closer to our overhead lines you must get a close approach approval. It takes two working days to process this approval. This includes trimming trees by hand. Close approach approval is required for work within 4 metres of overhead lines. Stay 4m from overhead lines. 4 METRES This w

14 SAFE WORKING NEAR OVERHEAD LINES REMEMBER Note the position of all overhead lines and power poles on a worksite and in the area. Follow the four metre rule: All work activity must be kept at least four metres from overhead lines get a close approach approval if you need to work closer. Do not excavate within five metres of one of our power poles get a close approach approval if you need to dig closer. Close approach approvals take four working days to process. Follow the NZECP 34:2001 Electrical Safe Distances when building near overhead lines. Contact Energy Safety for more information (www.energysafety.govt.nz). If you are working near overhead electricity service lines or a service connection have the power disconnected before you start work.

15 TEMPORARY ELECTRICITY DISCONNECTION SERVICE Repairs to roofing, spouting, painting, waterblasting, tree trimming and scaffolding can be dangerous if carried out close to overhead service lines (the lines connecting a home or business to the lines and poles in the street). Call 0800 22 00 05 to have the power temporarily disconnected when working near overhead service lines. Allow five working days to process the request. This service is free on private properties and available between 8am and 5pm, Monday to Friday. Disconnection services outside these hours will incur a charge.

16 SAFE CHECK WORKING NEAR OVERHEAD BEFORE YOU LINES DIG WORKING NEAR REMEMBER UNDERGROUND CABLES Note the position of all overhead lines and BEFORE power poles YOU on BEGIN a worksite and in the area. Find Follow out where the four our metre electricity rule: All and work activity communications must be kept at cables least four are. Just metres because from there are overhead lines in get the a close area doesn t approach mean approval there won t if you be need underground to work closer. cables as well. Do not excavate within five metres of one STEP 1: of our power poles get a close approach GET REFERENCE MAPS approval if you need to dig closer. Call us at least two days before you begin Close approach approvals take four working work on 0800 22 00 05 and we ll provide free days to process. reference maps showing underground cable locations. Follow the We NZECP may be 34:2001 able to provide Electrical these Safe maps in Distances less than two when days building to meet near an overhead urgent request, lines. but Contact a charge Energy will apply. Safety for more information (www.energysafety.govt.nz). Reference maps are valid for 28 days from If date you of are issue. working After near 28 days overhead you must electricity request service new maps. lines or a service connection have the power The accuracy disconnected of our maps before cannot you start always work. be guaranteed. Road realignment, reconstruction, alterations to ground cover and property boundaries can all affect accuracy. You must hand dig to confirm the location of our cables within your worksite before you start work.

17 STEP 2: MARK OUT THE LOCATIONS. Use the reference maps to mark out the location of all cables on the worksite before you break ground. Maps are a guide only. Use appropriate location technology. Aurora Energy will provide a free mark out service for strategic assets only. A cost may apply for other cables. See page 20 for details. NOTE: The same precautions may be required for other work, such as driving metal stakes or posts into the ground, particularly in verges. A metal post or stake that contacts a live cable is likely to electrocute anyone who touches it. Mark out all cable locations before you start work.

18 STEP 3: HAND DIG TO EXPOSE CABLES. Why hand dig? Hand digging is less likely to cause serious damage to cables. You must dig with caution for your own safety. Any damage to a cable should be reported to Aurora Energy immediately on 0800 22 00 05. And remember to watch out for services coming off a main distribution cable. Hand dig pot holes to locate cables.

19 CABLE DEPTHS Our cables are laid at different depths in the ground, varying from 400mm to over 1200mm. Alterations to the ground cover may reduce or increase the depths. We cannot guarantee the depth of any cable. Expect a cable to be at any depth. Don t rely on finding buried marker tape when you dig as this may have shifted over time and depending on the age of the asset, tape may never have been laid (note warning tape is not a legal requirement). If you expose a cable during excavation, you must ensure that the cable is adequately supported and protected. Any exposed cable must not be moved under any circumstances. If the surrounding material is removed, the cable must be supported at intervals of not more than one metre to prevent any movement. When reinstating excavations, cables must be backfilled with at least 200mm of sand that has been compacted by hand.

20 MARK OUT SERVICES We provide free electricity and communications cable mark outs for strategic assets only (66kV, 33kV and fibre-optic cables). A cost may apply for other cables. One of our representatives will indicate the location of cables by marking the ground to provide a digging guide. Please note: Mark outs are a guide only. It is your responsibility to identify hazards within your worksite. You must hand dig to confirm the location of all cables before you start work. Please allow up to four working days for contractors to arrange mark outs of strategic assets. All other mark outs are your responsibility. Electricity cables mark outs will have a letter beside them look like this. A single orange line shows an individual cable, and you must hand dig to positively locate the cable (and all other services) before using mechanical excavators.

21 A double orange line (corridor marking) shows a raft of cables between the lines. You must hand dig between the two lines. Communications cable mark outs will have the letters F beside them. A single purple line shows that there is a Aurora Energy communications cable. One of our representatives may provide on-site advice if you re working near any strategic assets.

22 CLOSE APPROACH APPROVALS For safety reasons close approach approvals are required for all works near any cables or excavating within five metres of a power pole. We will contact you if any strategic assets are shown on the maps you have requested, arrange for the appropriate close approach approval to be issued and advise whether on-site advice is required or mark out provided. You must not use any mechanical excavation within two metres of strategic cables you must hand dig. Close approach approvals are only valid for the dates applied for and the location and type of works as agreed on the approval.

23 EXCAVATING NEAR POWER POLES Do not dig within five metres of one of our power poles without a close approach approval. Digging is anything that disturbs or penetrates the ground including shovels, excavators, hammer drills, directional drillers and hydro excavators. Excavations within five metres could cause the pole to collapse. We will provide guidance and in some instances, on-site advice. Do not dig within 5 metres of a power pole. Close approach approval required for all digging closer than 5 metres. 5 METRES

24 SAFE DIGGING REMEMBER Get reference maps before you start work. If our maps show electricity or communications cables, you must locate them before you start work. The actual location and depth of cables can differ from what s on our maps because other earth works can change these. Watch out for customer services coming off main cables. You will be advised it you need a close approach approval, mark out or on-site advice. You must obtain a close approach approval for all excavations within five metres of a power pole. Follow WorkSafe s Guide for Safety with Underground Services www.worksafe.govt.nz

25 DISCONNECT BEFORE YOU REMOVE OR DEMOLISH A BUILDING For your own safety, you must have the electricity and communications services disconnected before you demolish or remove a building. Contact your electricity retailer to have all services disconnected.

26 TRAVELLING WITH HIGH LOADS You must apply for a high load approval if you plan to move any tall structure such as a house or a boat. Call 0800 22 00 05 and allow up to five working days to process the approval. Loads between 4.25 and 5.4 metres high: We will check the proposed route If the route is clear to the height required, an approval will be issued If there are low lines we will arrange to escort the load at no cost. Loads 5.4 metres high and over: We will check the proposed route If the route is clear to the height required, an approval will be issued If the route is not clear we will arrange an escort. A charge will apply If disconnection is necessary, a 12 working day notice period is required so we can inform customers who will be affected.

27 High load approval required for loads above 4.25 metres. 4.25 METRES FINE APPROVAL REQUIRED

28 BUILDING NEAR OVERHEAD LINES You must ensure that structures such as garages and extensions to houses remain well clear of overhead lines. The NZECP 34:2001 has set down minimum distances allowed between any new buildings and overhead lines. The minimum safe distances differ depending on the voltage of the overhead lines. If you need to build closer to overhead lines on a private property they may need to be placed underground. A specialist contractor can do this call us for advice on 0800 22 00 05. Call 0800 22 00 05 for more information and to find out the voltage of the lines that you plan to build near.

29 All buildings must be at minimum safe distances, well clear of overhead lines. DEC 2018

FOR ANY QUESTIONS GET IN TOuCH 0800 22 00 05 info@auroraenergy.co.nz www.auroraenergy.co.nz