Performance Evaluation of a Side Mounted Shuttle Derived Heavy Lift Launch Vehicle for Lunar Exploration

Similar documents
Architecture Options for Propellant Resupply of Lunar Exploration Elements

Artemis: A Reusable Excursion Vehicle Concept for Lunar Exploration

Fly Me To The Moon On An SLS Block II

Launch Vehicle Engine Selection Using Probabilistic Techniques

IAC-07- A3.I.A.19 A VALUE PROPOSITION FOR LUNAR ARCHITECTURES UTILIZING PROPELLANT RE-SUPPLY CAPABILITIES

Ares V: Supporting Space Exploration from LEO to Beyond

A LEO Propellant Depot System Concept for Outgoing Exploration

Lunar Surface Access from Earth-Moon L1/L2 A novel lander design and study of alternative solutions

Centurion: A Heavy-Lift Launch Vehicle Family for Cis- Lunar Exploration

Massachusetts Space Grant Consortium

CONCEPT STUDY OF AN ARES HYBRID-OS LAUNCH SYSTEM

Suitability of reusability for a Lunar re-supply system

A Model-Based Systems Engineering Approach to the Heavy Lift Launch System Architecture Study

Development of a Lunar Architecture Simulation Environment for Evaluation the use of Propellant Re-supply

Analysis of Launch and Earth Departure Architectures for Near-Term Human Mars Missions

TOWARDS A HEAVY LAUNCHER - PROPULSION SOLUTIONS - A. Souchier - C. Rothmund Snecma Moteurs, Direction Grosse Propulsion à Liquides

Parametric Design MARYLAND

THE BIMESE CONCEPT: A STUDY OF MISSION AND ECONOMIC OPTIONS

lights on, down 2 ½ 40 feet, down 2 ½ Kickin up some dust 30 feet, 2 ½ down faint shadow

NASA Glenn Research Center Intelligent Power System Control Development for Deep Space Exploration

SPACE PROPULSION SIZING PROGRAM (SPSP)

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

ReachMars 2024 A Candidate Large-Scale Technology Demonstration Mission as a Precursor to Human Mars Exploration

Utilizing Lunar Architecture Transportation Elements for Mars Exploration

SPACE LAUNCH SYSTEM. Steve Creech Manager Spacecraft/Payload Integration & Evolution August 29, 2017 A NEW CAPABILITY FOR DISCOVERY

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Aeronautics and Astronautics

AMBR* Engine for Science Missions

Ares I Overview. Phil Sumrall Advanced Planning Manager Ares Projects NASA MSFC. Masters Forum May 14, 2009

Case Study: ParaShield

THE FALCON I LAUNCH VEHICLE Making Access to Space More Affordable, Reliable and Pleasant

How to Assess Heritage Systems in the Early Phases? Andreas M. Hein

MARS-OZ: A Design for a Simulated Mars Base in the Arkaroola Region

Success of the H-IIB Launch Vehicle (Test Flight No. 1)

Future NASA Power Technologies for Space and Aero Propulsion Applications. Presented to. Workshop on Reforming Electrical Energy Systems Curriculum

Loads, Structures, and Mechanisms Design Project ENAE 483 Fall 2012

Ares V Overview. presented at. Ares V Astronomy Workshop 26 April 2008

FACT SHEET SPACE SHUTTLE EXTERNAL TANK. Space Shuttle External Tank

Lunar Cargo Capability with VASIMR Propulsion

Martin J. L. Turner. Expedition Mars. Published in association with. Chichester, UK

Development of a Low Cost Suborbital Rocket for Small Satellite Testing and In-Space Experiments

Notes: GENERAL DYNAMICS EARLY LUNAR ACCESS [1993]

Lessons in Systems Engineering. The SSME Weight Growth History. Richard Ryan Technical Specialist, MSFC Chief Engineers Office

Abstract. 1 American Institute of Aeronautics and Astronautics

EXTENDED GAS GENERATOR CYCLE

A Scalable Orbital Propellant Depot Design

6. The Launch Vehicle

The GHOST of a Chance for SmallSat s (GH2 Orbital Space Transfer) Vehicle

ENERGIA 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : K Series : K-1/SL-17 Version : 4 strap-ons

Comparison of Return to Launch Site Options for a Reusable Booster Stage

Next Steps in Human Exploration: Cislunar Systems and Architectures

SABRE FOR HYPERSONIC & SPACE ACCESS PLATFORMS

Supersonic Combustion Experimental Investigation at T2 Hypersonic Shock Tunnel

Copyright 2016 Boeing. All rights reserved.

USA FALCON 1. Fax: (310) Telephone: (310) Fax: (310) Telephone: (310) Fax: (310)

35 th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit June 1999 Los Angeles, California

Exploration Architecture Update

Mass Estimating Relations

Design Rules and Issues with Respect to Rocket Based Combined Cycles

Adrestia. A mission for humanity, designed in Delft. Challenge the future

Mass Estimating Relations

IAC-15-C4.3.1 JET INDUCER FOR A TURBO PUMP OF A LIQUID ROCKET ENGINE

Vehicle Reusability. e concept e promise e price When does it make sense? MARYLAND U N I V E R S I T Y O F. Vehicle Reusability

NASA s Space Launch System Marks Critical Design Review

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

IAC-05-D A Lunar Architecture Design and Decision Environment

Extending NASA s Exploration Systems Architecture towards Longterm Crewed Moon and Mars Operations

Concept Study of an ARES Hybrid-OS Launch System

Entry, Descent, and Landing Technology Concept Trade Study for Increasing Payload Mass to the Surface of Mars

ECONOMIC ANALYSIS OF A LUNAR IN-SITU RESOURCE UTILIZATION (ISRU) PROPELLANT SERVICES MARKET:

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Station for Exploratory Analysis and Research Center for Humanity (SEARCH)

BIMODAL NUCLEAR THERMAL ROCKET (BNTR) PROPULSION FOR FUTURE HUMAN MARS EXPLORATION MISSIONS

BIMODAL NUCLEAR THERMAL ROCKET (BNTR) PROPULSION FOR FUTURE HUMAN MARS EXPLORATION MISSIONS

Industrial-and-Research Lunar Base

Mass Estimating Relations

An Innovative Two Stage-to-Orbit Launch Vehicle Concept

CONTENTS Duct Jet Propulsion / Rocket Propulsion / Applications of Rocket Propulsion / 15 References / 25

The Intermediate Outpost - An Alternate Concept for Human Lunar Exploration

Aeronautical Engineering Design II Sizing Matrix and Carpet Plots. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering Spring 2014

Affordable Human Moon and Mars Exploration through Hardware Commonality

REPORT DOCUMENTATION PAGE

Taurus II. Development Status of a Medium-Class Launch Vehicle for ISS Cargo and Satellite Delivery

H-IIA Launch Vehicle Upgrade Development

European Lunar Lander: System Engineering Approach

Deployment and Drop Test for Inflatable Aeroshell for Atmospheric Entry Capsule with using Large Scientific Balloon

Media Event Media Briefing Arif Karabeyoglu President & CTO SPG, Inc. June 29, 2012

CHANGING ENTRY, DESCENT, AND LANDING PARADIGMS FOR HUMAN MARS LANDER

Human Exploration of the Lunar Surface

ULA Briefing to National Research Council. In-Space Propulsion Roadmap. March 22, Bernard Kutter. Manager Advanced Programs. File no.

How Does a Rocket Engine Work?

Coupled Aero-Structural Modelling and Optimisation of Deployable Mars Aero-Decelerators

High Power Solar Electric Propulsion for Human Space Exploration Architectures

AIAA Starsaber: A Small Payload-Class TSTO Vehicle Concept Utilizing Rocket-Based Combined Cycle Propulsion

Name: Space Exploration PBL

Appenidix E: Freewing MAE UAV analysis

CHAPTER 1 INTRODUCTION

Unlocking the Future of Hypersonic Flight and Space Access

Georgia Tech NASA Critical Design Review Teleconference Presented By: Georgia Tech Team ARES

Enhanced. Chapter 3. Baseline

Design and Analysis of a Two-Stage Anti-Tank Missile

Transcription:

Performance Evaluation of a Side Mounted Shuttle Derived Heavy Lift Launch Vehicle for Lunar Exploration AE8900 MS Special Problems Report Space Systems Design Lab (SSDL) School of Aerospace Engineering Georgia Institute of Technology Atlanta, GA Author Robert W. Thompson Advisor Dr. Alan Wilhite April 28, 2006

Performance Evaluation of a Side Mounted Shuttle Derived Heavy Lift Launch Vehicle for Lunar Exploration Robert W. Thompson * Space Systems Design Lab School of Aerospace Engineering Georgia Institute of Technology, Atlanta, GA, 30332-0150 The NASA Exploration Systems Architecture Study (ESAS) produced a transportation architecture for returning humans to the moon affordably and safely. ESAS determined that the best lunar exploration strategy was to separate the launch of crew from the launch of cargo, thereby requiring two launches per lunar mission. An alternate concept for the cargo launch vehicle is a side mounted Shuttle-derived heavy lift launch. This configuration is similar to previously studied concepts, except engines and structure have been added to the External Tank (ET), making it a complete first stage. The upper stage is mounted on the side of the first stage, much like the Shuttle orbiter is mounted on the side of the ET. Like the Shuttle, solid rocket boosters (SRBs) are also used. This configuration has several performance and operational benefits over an in-line heavy lift launch vehicle. According to the ESAS report, side mount configurations were not considered to be among the most promising configurations, and were not carried forward for further consideration within architectural options. The performance of this launch vehicle is independently analyzed, using multidisciplinary analysis techniques. Methods and tools used include launch trajectory optimization with POST, vehicle aerodynamic analysis using APAS, and weights and sizing using historically based estimating relationships. Principal trade studies performed include first and second stage propulsion (number of engines and engine type), solid rocket booster size (four versus five segment), and staging V. The vehicle design that best meets the requirements for space exploration (lunar and future missions) is presented. APAS CaLV CEV DSM EDS ESAS ET LSAM MLP NASA POST SM SRB SSME STS TLI VAB Nomenclature = Aerodynamic Preliminary Analysis System = Cargo Launch Vehicle = Crew Exploration Vehicle = Design Structure Matrix = Earth Departure Stage = Exploration Systems Architecture Study = External Tank = Lunar Surface Access Module = Mobile Launch Platform = National Aeronautics and Space Administration = Program to Optimize Simulated Trajectories = Service Module = Solid Rocket Booster = Space Shuttle Main Engine = Shuttle Transportation System = Trans-lunar Injection = Vehicle Assembly Building * Graduate Research Assistant. AIAA Student Member. Bob.Thompson@gatech.edu. 1

I. Introduction The NASA Exploration Systems Architecture Study (ESAS) produced a transportation architecture for returning humans to the moon affordably and safely. ESAS recommends a 1.5 launch architecture in which cargo and crew are launched separately in order to reduce the risk of harm to crew. The baseline launch vehicle for cargo is an inline Shuttle-derived heavy lift launch vehicle, called the Cargo Launch Vehicle (CaLV). The in-line CaLV design, however, presents several challenges. It is more than 350 feet tall, limiting the growth of the system if required to meet increased payload requirements. This especially limits the capability to accommodate large payloads for future exploration, such as missions to Mars. The height of the launch vehicle also makes processing within the Vehicle Assembly Building (VAB) at Kennedy Space Center difficult. The in-line design also requires that the upper stage engines, which double as the propulsion elements for the trans-lunar injection (TLI) burn, be started at altitude and be restartable, modifications that could prove costly and complex in order to utilize existing engines, such as the Space Shuttle Main Engine (SSME). A side mounted Shuttle-derived heavy lift launch vehicle would solve several of these problems. The configuration under consideration is similar to previously studied concepts like the Shuttle-C, except engines and structure have been added to the External Tank (ET), making it a complete first stage booster. This configuration is similar to the current Shuttle configuration; the upper stage is mounted on the side of the booster stage, much like the orbiter is mounted on the side of the ET. Like the Shuttle, solid rocket boosters (SRBs) are also used. Because the side-mounted configuration is more similar in configuration to the current Shuttle, processing difficulties could be lessened. Additionally, the second stage engines could be started on the launch pad, rather than being started at altitude. Finally, the system can gracefully grow to accommodate increased payload requirements for future missions. Figure 1 - Notional Launch Vehicle Configuration. The purpose of this paper is to describe the performance of this launch vehicle, discuss the various disciplinary analyses by which it was modeled, and present recommendations for further study. Methods and tools used include launch trajectory optimization with POST, vehicle aerodynamic analysis using APAS, and weights and sizing using historical and physics based estimating relationships. Principal trade studies performed include first and second stage propulsion (number of engines and engine type), SRB size (four versus five segment), and staging V. The vehicle design that best meets the requirements for space exploration (lunar and future missions) is presented. II. Vehicle Requirements In order to be useful for current human lunar exploration plans, the CaLV must be able to accomplish several important requirements, designed to meet performance and cost constraints on the planned lunar exploration program. The CaLV will be the largest rocket and most expensive rocket developed since the Saturn V; therefore, there is a perceived benefit to utilizing existing technologies and facilities to the maximum extent possible. For the purposes of this study, Shuttle derived technologies and facilities are used as a baseline. As a starting point for this study, vehicle requirements were established that the launch vehicle will need to meet. These requirements were derived from the mission profile described in the ESAS Final Report 1 (Figure 2) and approximate the performance of the heavy lift launch vehicle concept advocated by that study. These requirements are listed below. Note that nominal orbital altitudes were chosen to approximate the ESAS study, and do not represent an optimal solution for this launch vehicle. 1. Use current STS facilities to the maximum extent possible 2. Deliver LSAM a 30 nmi x160 nmi x 28.5 orbit. 3. Circularize to 160 nmi x 160 nmi x 28.5 orbit. 4. Maintain orbit up to 90 days. 5. Rendezvous and dock with CEV/SM. 6. Deliver LSAM and CEV to TLI Figure 2 - ESAS Lunar Sortie 1. 2

It is assumed that at least one of the current Shuttle launch pads will be converted for use in the launch of the new heavy lift launch vehicles. Therefore, the use of launch infrastructure at Kennedy Space Center is also assumed, including the Vehicle Assembly Building, the three Mobile Launch Platforms, and the two Crawler- Transporters. The CaLV must be capable of delivering the LSAM to a 30x160 nmi orbit at 28.5 inclination. This requirement becomes more difficult when coupled with the requirement of delivering the LSAM and the CEV to TLI, which means that the upper stage of the CaLV must remain partially fueled in orbit. Because the LSAM launches unmanned in the ESAS mission profile, the upper stage of the CaLV, called the Earth Departure Stage (EDS), must wait in orbit for the CEV to rendezvous with it. The current requirement is to allow up to a 90 day wait. Thermal insulation was accounted for in the weight estimation of the EDS; however, advanced concepts for zero-boiloff were not considered. The performance impact of 90 days of cryogenic propellant boiloff was also not accounted for, as this issue is being explored by ongoing research programs. Rendezvous and docking is assumed to be passive on the EDS/LSAM side. The EDS must be left with sufficient propellant to deliver the LSAM and CEV to a Trans-Lunar Injection (TLI). A nominal V of 10,242 ft/s was assumed in order to maintain consistency with the ESAS launch vehicle study 1. Table 1 - Assumed Payload Weights. Element LSAM CEV/SM Margin Weight 100,000 lb 45,000 lb 20,000 lb The weights assumed for each element are shown in Table 1. The margin was allocated evenly to the LSAM and CEV. The CaLV is therefore required to send 165,000 lb, or about 75 metric tons to TLI. This compares with approximately 45 metric tons (LM and CM/SM) in the Apollo program. III. Design Methodology A. Trade Space The first step in the analysis of the performance of the side mount heavy lift launch vehicle was establishing the trade space that would be under consideration. This trade space includes the configuration options that will be considered. Because the performance of the launch vehicle is of interest in this study, all of the trade studies performed were propulsion related. The alternative concepts considered are shown in Table 2. Table 2 - Alternative Concepts Considered. Element 1 2 3 # of Alternatives First Stage Propulsion 3 x SSME 4 x SSME 5 x SSME 3 Second Stage Propulsion 1 x J-2S 2 x J-2S 1 x SSME 3 Booster Size 4 Segment 5 Segment 2 Total Alternative Concepts 18 Shuttle derived propulsion elements (the Space Shuttle Main Engine, or SSME, and Solid Rocket Boosters) were chosen because they provide good performance, and have 25 years of operational performance in the Shuttle program. The 5-segment SRB has been proposed as a performance enhancement to the shuttle, but has never been developed or put into operation. The J-2S was considered for the second stage propulsion due to its ability to restart multiple times, a requirement for the upper stage. The SSME was also considered, although it currently has no restart capability. While the J-2S has restart capability, it has not been manufactured in over thirty years. These are challenges that must be addressed in the design of any heavy lift launch vehicle that must be addressed if the SSME and J-2S are to be considered for EDS propulsion. 3

B. Design Structure Matrix Once the alternative concepts have been defined, the Design Structure Matrix (DSM) was used to define the flow of information through the various disciplinary analyses of the design process. The DSM for this study is shown in Figure 3. Configuration Aerodynamics Propulsion Trajectory Weights & Sizing Figure 3 - Design Structure Matrix. C. Configuration The configuration of the vehicle has two parts: the baseline geometric configuration, and the propulsion system configuration. The first was derived from the current Shuttle configuration, and was used in calculating the aerodynamic coefficients and preliminary sizing calculations. The propulsion system configuration was derived from the 18 combinations in the alternative concepts matrix (Table 2). D. Aerodynamics Aerodynamic analysis was performed using APAS 2 for vehicle modeling, and HABP for hypersonic aerodynamic analysis. The launch vehicle was modeled as four parts: The first stage, second stage (EDS), and the two SRBs. The aerodynamics of three configurations were modeled: launch, after SRB separation, and after first stage separation. These configurations are shown in Figure 4. The cross sections and lengths of the final launch vehicle elements varied considerably from the initial APAS model (as will be shown in later sections); however, these changes do not have a significant impact on the aerodynamic coefficients as outputted by APAS into POST, the trajectory code. Instead, the reference areas and stage lengths are updated within the trajectory code, and the coefficients are kept constant. Figure 4 - APAS model of the CaLV in launch, post SRB separation, and post staging configurations 2. 4

E. Propulsion The propulsion subsystems were modeled using both historical data and a conceptual rocket engine sizing tool, REDTOP-2 3. The four propulsion systems modeled were the Space Shuttle Main Engine (SSME), the J-2S, the four-segment SRB, and the five-segment SRB. The SSME (also known as the RS-25) was modeled using historical information. The SSME was considered to be unchanged from its current Block II configuration. The parameters used for the SSME are shown in Table 3. Table 3 - Space Shuttle Main Engine (SSME) Parameters 3 Parameter Value Units Vacuum Thrust 500,000 lb Vacuum Specific Impulse 452 s Exit Area 45 ft 2 Weight 7,000 lb The J-2S is a derivative of the J-2 engine produced by Rocketdyne in the 1960s. The J-2S (the S is for simplified ) is a tap-off cycle variant of the J-2, which was a gas generator cycle 4. The nozzle area ratio has been increased for better specific impulse. This engine was modeled using the REDTOP-2 code with an increased expansion ratio of 101; this improves engine performance, but lengthens the engine to about 16 feet. The parameters used for the J-2S engine are shown in Table 4. Table 4 - J-2S Derived Engine Parameters 3. Parameter Value Units Vacuum Thrust 275,000 lb Vacuum Specific Impulse 451 s Exit Area 80 ft 2 Weight 4800 lb Both 4-segment and 5-segment SRBs were modeled for use in this study. The thrust profile of the 4-segment SRB is the same as that of the current Shuttle SRB. The 5-segment SRB thrust profile is derived from a design intended to increase Shuttle performance. The relevant parameters for each are shown in Table 5 and Figure 5. Table 5 - Four and Five Segment SRB Parameters. Parameter 4-Segment 5-Segment Vacuum Thrust Variable Variable Vacuum Specific Impulse 265 s 265 s Exit Area 130 ft 2 130 ft 2 Burnout Weight 185,000 lb 220,000 lb Gross Weight 1,293,000 lb 1,630,000 lb 5

4500 4000 Vacuum Thrust (klb) 3500 3000 2500 2000 1500 Four Segment SRB Five Segment SRB 1000 500 0 20 40 60 80 100 120 140 160 Time (s) Figure 5 - Four and Five Segment SRB Thrust Profile. F. Trajectory The Program to Optimize Simulated Trajectories (POST) 5 was used to perform the trajectory simulation. Because of the complexity of the flow of information in and out of POST during the sizing process, a simple schematic of this is shown in Figure 6. Information from the aerodynamic and propulsion analyses was brought forward and used as input for the trajectory analysis. An initial guess was made of the stage dry weights; the trajectory was then run using a projected gradient optimization. The outputs to the weights and sizing analysis are the propellant weights of each stage, which returns the stage dry weights to the trajectory analysis. Because of this feedback loop, iteration was required to close the performance of the vehicle. This was done manually, and typically required 5 to 6 iterations to converge to the final solution. A A Feed Forward Inputs: Aerodynamic Coefficients Trajectory B B Feed Forward Outputs: Propulsion Thrust, Isp 1 st and 2 nd Stage Propellant Weight C Feed Back Input: 1 st and 2 nd Stage Dry Weights C Figure 6 - Trajectory Analysis Data Flow. The trajectory optimization was constrained to meet the final conditions specified by the desired orbit at engine cut-off, and the desired mass at the end of the launch trajectory. These constraints are shown in Table 6. Table 6 - Trajectory Optimization Constraints. Constrained Parameter Value Altitude 78 nmi Flight Path Angle 1.0168 Inertial Velocity 25,708 ft/s Final Weight Feedback from Weights 6

The constraints on altitude, flight path angle, and inertial velocity place the EDS and launch payload on a 30 x 160 nmi orbit, inserting at 78 nmi. This initial orbit is the same as that used by the ESAS in-line CaLV; the same orbit was used in order to be able to compare performance numbers between the vehicles. G. Weights and Sizing An important part of the performance sizing loop is the Weights and Sizing analysis. The inputs for this analysis come from the vehicle configuration, propulsion options, and trajectory. As shown in Figure 6, the propellant weights required for launch vehicle are fed into the weights and sizing spreadsheet, which then calculates the dry weight of the vehicle parametrically. This sizing is based on a database of mass estimating relationships from several sources, which have been compared against the Shuttle for verification of their accuracy 6. These mass estimating relationships are typically parametric regressions of historical data. Included in the weight estimation is the estimation of dry weight margin. Each subsystem was assigned a percentage of dry weight margin based on the heritage of the system. Systems that are derived from already designed an operational systems are given less margin than systems that will have to be developed from scratch. The dry weight margin percentages are shown in Table 7. Table 7 - Dry Weight Margin based on Level of Heritage. Level of Heritage Margin Applied New 15% Moderate Modifications 10% Minor Modifications 5% Existing 0% IV. Vehicle Closure Results As a result of the analysis of the propulsion configurations considered (shown in Table 2), certain options were eliminated due to the inability to close a vehicle with those options that met the lunar exploration requirements. The eliminated propulsion options are: 1. 3 x SSME on the first stage. 2. 1 x J-2S on the EDS. 3. 4 segment SRBs. These options were found to provide insufficient thrust when combined with each other and with other options. They are therefore considered to be infeasible for a heavy lift launch vehicle for lunar exploration within the ESAS 1.5 launch architecture. A single J-2S on the upper stage was eliminated because it provides an insufficient T/W at staging to accomplish the mission. Due to the lower thrust level, the burn time must increase, which increases the amount of propellant required. The four segment SRBs and three SSME options are eliminated because they provide insufficient performance for lunar exploration. To verify this, the vehicle in this configuration was compared to the Shuttle, which utilizes these propulsion elements. The Shuttle system places approximately 300,000 lb in LEO (including the ET). The comparable side mounted CaLV has a similar capability to LEO. However, based on the requirements of the TLI burn and the payload requirements, around 380,000 lb are needed in LEO. Therefore, it can be concluded that a vehicle with a Shuttle-like propulsion configuration does not have the performance necessary to act as the heavy lift launch vehicle in the ESAS architecture. The closure results indicate that a four or five SSME first stage propulsion configuration is possible. With a five SSME configuration, first stage engine out capability could be possible. The other configuration options considered for the EDS propulsion (2 x J-2S versus 1 x SSME) were very close in performance. Based on these results, a baseline side mount heavy lift configuration was chosen. A rendition of the closed vehicle is shown in Figure 7. 7

Figure 7 - Closed Launch Vehicle Configuration. The closed configuration utilizes five SSMEs on the first stage, two five segment SRBs, and two J-2S engines on the EDS. The five SSMEs on the first stage were chosen due to the option for engine-out capability, and due to the potential for future growth of the launch vehicle. Because the four segment SRBs did not have the thrust necessary for this vehicle, the five segment SRBs were used in the baseline. Finally, the two J-2S engines on the EDS were picked rather than the SSME because the J-2S has the capability to be restarted multiple times. The weights of the two first stage and EDS are shown in Table 8 and Table 9. The estimated dimensions of the baseline concept are shown in Figure 8 and Figure 9. Table 8- EDS Weights. Element Dry Weight w/ Margin Residuals Launch Payload (LSAM) Rendezvous Payload (CEV) TLI Propellants Circularization Propellant Ascent Propellants Weight 45,000 lb 2,000 lb 110,000 lb 55,000 lb 217,000 lb 6,500 lb 170,000 lb 145 ft 55 ft 37 ft Initial Weight in LEO Total Weight to TLI 374,000 lb 212,000 lb 22 ft Gross Weight at Liftoff 551,000 lb Figure 8 - EDS Dimensions. 8

Table 9 - First Stage Weights. Element Weight Dry Weight w/ Margin 184,000 lb Residuals 19,000 lb Second Stage (EDS) 551,000 lb Ascent Propellants 2,120,000 lb Fuel 305,000 lb Oxidizer 1,815,000 lb Max Liquid Stage Weight 2,875,000 lb Five Segment SRBs 3,300,000 lb 210 ft 60 ft 130 ft Gross Liftoff Weight 6,175,000 lb Figure 9 - First Stage Dimensions. The core stage is approximately sixty feet longer than the Shuttle ET, from which it is derived. A trade study of staging Vs was performed, and it was found that the best staging point is at an ideal V of 23,500 ft/s, after about 311 seconds for this trajectory. Note that this ideal V does not include drag and gravity losses. An altitude versus time plot of the trajectory of the baseline launch vehicle is shown in Figure 10. The axisymmetric acceleration is shown in Figure 11. Plots of vehicle weight versus time and inertial velocity versus time are shown in Figures 12 and 13 respectively. Altitude (ft) 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 0 100 200 300 400 500 Time (s) Figure 10 - Altitude versus Time. Acceleration (g's) 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 0 100 200 300 400 500 Time (s) Figure 11 - Acceleration versus Time. 9

7,000,000 30,000 Weight (lb) 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 Inertial Velocity (ft/s) 25,000 20,000 15,000 10,000 5,000 0 0 100 200 300 400 500 Time (s) Figure 12 - Gross Weight versus Time. 0 0 100 200 300 400 500 Time (s) Figure 13 Inertial Velocity versus Time. The altitude at orbital insertion is approximately 78 nmi. The time to orbit is 451 seconds, and the maximum g s are 4.0 g s at the end of the burn of the first stage. A max-g limit anywhere between 3.0 and 6.0 g s can be accommodated with minimal change in performance; this is accomplished through throttling the main engines, and impacts the total burn time. The stage dry weight and gross weight comparisons to the ESAS in-line CaLV are shown in Table 10. The stage fueled weights do not include payload. The dry weights are similar because, although less propellant is required, there are additional hardware systems (crossover feed lines and side-mounting hardware) that are used on the side mounted configuration. Table 10 - Comparison of stage dry and fueled weights to the ESAS in-line CaLV. Element ESAS In-line 1 Side Mount First Stage Dry Weight 194,997 lb 184,000 lb EDS Dry Weight 44,118 lb 45,000 lb First Stage Fueled Weight 2,409,997 lb 2,320,000 lb EDS Fueled Weight 541,238 lb 440,500 lb Gross Liftoff Weight 6,393,975 lb 6,175,000 lb V. Future Work In order to compare the results of this vehicle study directly to the results of the launch vehicle analysis done by ESAS, many of the same assumptions were used, such as propulsion choices, trajectory parameters, orbits, as well as dry weight margins and tank assumptions (reserves, residuals, ullage, etc.). The validity of these assumptions should be investigated, documented as to their basis in previous vehicles and missions, and the sensitivities to changes in these assumptions on vehicle performance should be noted. There are also other propulsion options that could be investigated. The performance of other LOX/Hydrogen engines, such as the RS-68 and RL-10 should be investigated. While only liquid oxygen and hydrogen propulsion systems were considered in this study because they have the greatest heritage from the Space Shuttle program, there is Apollo heritage for using Kerosene/RP-1 as a fuel. 10

In order to confirm the feasibility of this launch vehicle configuration concept, a detailed structural analysis of this launch vehicle should be performed. It is possible that the dry mass weights of the stages (especially the first stage) will increase when the structural analysis is incorporated into the performance DSM. A sensitivity study to stage dry weight margin will be performed to quantify the degree of dry weight growth that can be accepted by this configuration. In addition to researching the propulsion options, some attention should be paid to engine-out options. The baseline configuration presented in this study can deliver its payload into orbit after losing one main engine, but the upper stage requires a longer circularization burn. Whether or not this is possible depends on how margin is allocated in the vehicle, which should be a topic of further study. In examining engine-out, the reliability of the launch vehicle should be estimated, in order to assess the potential pay-off in developing that capability. Finally, cost estimation and a more detailed analysis of the operations of this vehicle should be completed. VI. Conclusions The side mount CaLV concept is one that shows promise for lunar exploration. It is capable of accomplishing all of the goals for lunar exploration required by the currently baselined 1.5 launch architecture for returning humans to the moon. This launch vehicle concept shows advantages over the in-line concept. The side mount concept shows a small performance improvement due to the additional engines that are burning through the whole trajectory. It shows potential for growth in future missions and, like the in-line CaLV, has a payload capacity to LEO of over 150 metric tons. Its shorter length and Shuttle-like configuration will ease the transition from current Shuttle operations. In the case of a failure of an engine on the EDS, the launch can be aborted. If such an EDS engine failure occurred on the in-line launch vehicle, the mission would fail. There are, however, some disadvantages to the side mount configuration. The cross-feeding of propellants adds complexity to the design. The upper stage engines also have a significantly longer burn time, increasing their probability of failure. Those same engines have nozzles that are optimized for in-space operation, so there are thrust losses until atmospheric pressure lessens, approximately 90 seconds into the launch trajectory. The impacts of these disadvantages on life cycle cost and vehicle reliability should be studied as future work progresses on this concept. As exploration systems studies continue, this concept should be considered as an alternative to the in-line launch vehicle concept. References 1 Exploration Systems Architecture Study Final Report. NASA-TM-2005-214062. November, 2005. www.sti.nasa.gov. 2 Sova, G., and P. Divan. Aerodynamic Preliminary Analysis System I - User s Manual. NASA CR 182077. April, 1991. 3 Rocket Engine Design Tool for Optimal Performance 2 (REDTOP-2). Academic Version. SpaceWorks Engineering, Inc. 2005. 4 Wade, Mark. J-2S. Encyclopedia Astronautica. http://www.astronautix.com/engines/j2s.htm. Accessed April, 2006. 5 Powell, R.W., et. al. Program to Optimize Simulated Trajectories (POST) Utilization Manual, Volume II, Version 5.2. NASA Langley Research Center, Hampton, Va.; Martin Marietta Corporation, Denver, Co. October 1997. 6 Rohrschneider, R. Development of a Mass Estimating Relationship Database for Launch Vehicle Conceptual Design. MS Special Project. School of Aerospace Engineering, Georgia Institute of Technology. April, 2002. 11