3SB Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Similar documents
SEC Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

MS & MS XT/XC Connections

Blue Quick Seal Connection

22. TenarisHydril Blue Thermal Liner Connection

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

ER Connection. . Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Equipment, Material & Documents

Wedge TenarisHydril Running Manual.. Premium connection approved thread compounds TSH-MD

Wedge 533 / 503 / 553

2. The power tong snub line should be attached to a back up post, leveled and positioned at a 90 angle to the power tongs.

Blue Series and Legacy Series Make up Acceptance

1. Use slip type elevators for flush, near flush, integral, special clearance and special bevel coupled connections.

Initial Running Guidelines

Handling / Lift Plugs

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: May 1, 2013

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

Benoit Premium Threading, LLC Recommended Practice. Approved By: Benoit Quality Assurance Department Date: January 6, 2017

OCTG Mill RUNNING AND PULLING PROCEDURE FOR TPS-MULTISEAL (ALL TYPES & GRADES) QP 05-16E Revision No. 7 Page 1 of 11

SEAL-LOCK APEX ANCILLARY

Running Procedure. VAsuperior. Rev.:2.

Running Procedure. Rev.:2 VAGT.

JFEBEAR RUNNING MANUAL

RECOMMENDED PRACTICE TKC FJ-150

Drill Pipe Connection Care and Handling

RECOMMENDED PRACTICE SEAL-LOCK FLUSH/SEMI FLUSH CONNECTIONS

RECOMMENDED PRACTICE SEAL-LOCK HT

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

TKC CONVERTIBLE: 8 RD / NUE / EUE / BUTTRESS 4040 / 4040 HO / 4040 HO-B FS-150 ANCILLARY SPECIFICATION

Running Procedure. VAroughneck. voestalpine Tubulars GmbH & Co KG Rev.: 0

Running Procedure. VAxplorer. Rev.:1.

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

SEAL-LOCK HT ANCILLARY SPECIFICATION

SEAL-LOCK HT-S (TIMED) ANCILLARY SPECIFICATION

Running Procedure for Casing with GB Drilling with Casing Connections

Wedge /8" TO 13 5/8"

U. S. STEEL TUBULAR PRODUCTS PROPRIETARY THREAD CONNECTION MANUAL

Blue 2 3/8" TO 13 5/8"

Blue 2 3/8" TO 13 5/8"

Fishing Bumper Sub. Manual D450

TenarisXP Buttress 4 1/2" TO 16"

VAGT STill GoinG STronG. voestalpine Tubulars GmbH & Co KG

GB Connection Performance Properties Sheet Rev. 3 (10/07/2015) E N G I N E E R I N G T H E R I G H T C O N N E C T I O N S TM

Amerigear SL Spindle

OIL COUNTRYTUBULAR GOODS

Small Block Chevy. S-Drive Pulley Kit INSTALLATION INSTRUCTIONS

Contents. RE PS Revision 5

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

FIELD INSPECTION OF JFETIGER THREAD. Downloaded From JFETC.COM Fri, 16 Nov :49: * valid at time of download * JFETIGER.

Belt Drive Preventive Maintenance Manual

XP-320 and XP-360 Engines Using Superior Original Style Non-Removable Roller Lifters

Lubrication. Extend the life of Circuit breakers and Switches. Presented by Phillip Serna

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Agility. Introducing the First Class Finish...

JUL 17 Rev M

I-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

PONTIAC Late Model (with 11 Bolt Water Pump)

Sport Model with an easy-lube spindle

Pressure Relief Valve Maintenance Manual

CHAPTER 9 : TYPE II TEST ON SI ENGINES (VERIFYING CARBON MONOXIDE EMISSION AT IDLING)

HYDRAULIC PUMP. INSTALLATION, OPERATION, & MAINTENANCE MANUAL MAINTENANCE MANUAL #: MM-HP Rev. A Page 1 of 12

SLIDING SLEEVE. BSS-S Profile BSS-H Profile

Сontents. RE PS Revision 5

QUALITY CONTROL PROCEDURES

Stainless Steel Pipe System. System No. Submitted By Spec Sect Para Location Date Approved Date TEMPERATURE ( F/ C)

MGM Brakes Service Manual

Turning Point Pin Box. by Trailair OWNER'S MANUAL

Owner s Manual Electric Swivel

Application Tooling Specification Sheet

DA Series Diaphragm Valve

For further information please visit our website at TenarisHydril. Aberdeen. Esbjerg. Copenhagen Nisku Red Deer Prudential.

Product Engineering Bulletin

Statoil Multi Dope Yellow

Integrated Process Solutions. Series 88. CF Component Ultra high vacuum fittings Sizes 1 1/3'' to 4 5/8''

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Hub Installation and Bearing Adjustment. Hub Installation and Bearing Adjustment. Hub Preparation Prior to Installation

Explanatory Information (NOT PART OF ANSI STANDARD)

Amsted Rail POCKET INSPECTION GUIDE. Freight Railcars

Amerigear SF Spindle

LS200, LS200N, LS200NDVOR Series and L1100 Liquid Level Switches

no adhesion effect on sliding surface, even after a long standstill superior performance over a wide range of temperatures and hydraulic fluids

G-SERIES PAPER ROLL CLAMP. Rugged. Reliable. Ready when you are.

A system of lubricant dispensing devices (oil or grease) connected by piping to a central pumping unit that is operated automatically or manually.

MODEL 5800 CONTENTS. Installation, Operation, and Maintenance Instructions 1.0 GENERAL

Application Tooling Specification Sheet

JCM 101 Universal Clamp Couplings

Fontaine Fifth Wheel Instructions. Armor Yard Truck

BAMBI BUCKET (ALL MODELS) QUICK REPAIR GUIDE 2014 VERSION B

Dodge Torque-Arm II The Legacy Continues

OPERATING INSTRUCTIONS AND TROUBLE SHOOTING GUIDE

Guide for the use of HANS in motor sport

Installation Instructions

Application Tooling Specification Sheet

GENUINE REAR SPOILER

AEROSWEEP SPEED SWEEPING SYSTEMS OPERATORS MANUAL

PARALLEL STAY. Parallel Opening Hinge for Commercial Applications

Rugby Manufacturing Hoist Cylinder Bulletin. Preface Technical Service Bulletin

SHACKLE INSTALLATION INSTRUCTIONS

Transcription:

IDM Code GDL23374/1 / March 2018 TenarisHydril 3SB Connection Scope These guidelines apply specifically to the use of TenarisHydril 3SB connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable to the running of all TenarisHydril premium connections. References. TenarisHydril Running Manual.. Premium Connection Approved Thread Compounds TSH-MD-00.0002.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG 13-005. Equipment, Material & Documents 1. Verify the appropriate thread compound is available. 2. Refer to document TSH-MD-00.0002 for a list of compounds approved by Tenaris. 3. Latest version of the specific Product Data Sheet can be obtained from Tenaris web site. In case this is unavailable, request the data sheet from the local Technical Sales representative or contact-tenarishydril@tenaris.com. TenarisHydril RUNNING MANUAL 1

TenarisHydril RUNNING MANUAL Pre-Running 1. Never move or handle pipe without the correct thread protectors securely in place. 2. Ensure connections are clean and free of all debris and / or contaminants, cleaning methods employed should conform to the recommendations contained within the TenarisHydril Running Manual. 3. Verify all pipe and accessories have genuine TenarisHydril manufactured connections. 4. Visually inspect thread and seal areas prior to running, ensuring no damage is evident. 5. Verify the compatibility of the 3SB pipe with accessories such as cement heads, safety valves, cross overs, etc. 6. Verify material grade of all accessories ensuring compatibility with main string. 7. Verify connection type:. 4 ½" 3SB 13.5# and 21.6# have casing (5TPI) and Tubing (8TPI) variants, which are incompatible. 8. TenarisHydril 3SB is interchangeable with:. TenarisHydril 3SB / A. TenarisHydril 3SB ST. NK3SB / TS3SB 9. TenarisHydril 3SB is not interchangeable with:. TenarisHydril New 3SB. TenarisHydril 3SB SL 2

IDM Code GDL23374/1 / March 2018 Inspection 1. Inspection criteria for all TenarisHydril connections is as outlined in the Field Service Operative Guideline FSOG 13-005. 2. Pay particular attention to seal areas. 3. Ensure the pin nose has no tears, gouges or raised metal. 4. Ensure the pin and box torque shoulders have no dents, tears or raised material which would interfere with correct assembly. TenarisHydril RUNNING MANUAL 3

TenarisHydril RUNNING MANUAL 3SB Configuration Tubing 8 TPI 4 ½" 13.5# Casing 5 TPI 4 ½" 13.5# SEAL torque shoulder 4

IDM Code GDL23374/1 / March 2018 Thread Compound Application 1. Apply a thin coating of thread compound on the pin and box connections, fully covering all threads, seals, pin nose and box torque shoulder, the thread form should be fully visible. 2. Use approximately 50% of the quantity applied to the pin when doping the box. 3. For Tenaris approved thread compounds, apply the friction factor indicated in TSH-MD-00.0002. For thread compounds other than those listed, apply the thread compound manufacturers indicated friction factor. TenarisHydril RUNNING MANUAL 5

TenarisHydril RUNNING MANUAL Thread Lock Application Connections must be clean and dry when applying thread lock 1. Apply a thin coating of thread lock on 50% of the pin threads furthest from the pipe body. 2. Do not apply thread lock on the seal or torque shoulder. 3. Apply thread compound to the box seal and torque shoulder. 4. Apply the thread lock manufacturers indicated friction factor. 6

IDM Code GDL23374/1 / March 2018 Torque Application 1. The use of computer make up analysis equipment is strongly recommended when assembling 3SB connections. 2. Shoulder points for 3SB.. Minimum 5% of optimum.. Maximum 80% of optimum. 3. Reference torque should initially be set at 5% of optimum. 4. The dump valve should be set at optimum, verify correct operation on the pipe body prior to first make up. 5. Set the computer turns to 2 initially then adjust as necessary to attain good graph depiction. 6. Refer to the TenarisHydril Running Manual make up acceptance section for further explanation. 7. 3SB connections of the same weight and grade are fully interchangeable. See Pre-Running Section for exceptions. TenarisHydril RUNNING MANUAL 8. If different weight or grade of connections are to be mixed apply the lower of the indicated make up torques. 9. The computer make up profile for 3SB should be similar to the ones below. 7

TenarisHydril RUNNING MANUAL TORQUE * 1000 ft-lbs TORQUE * 1000 ft-lbs 6.8 5.1 3.4 1.7 0 0 6.8 5.1 3.4 1.7 0 0 OPT 6400 MAX. SHL 5120 MIN. SHL 320 OPT 6400 MAX. SHL 5120 MIN. SHL 320 MAX. 7040 MIN. 5120 0.16 0.32 0.48 0.65 TURNS MAX. 7040 MIN. 5120 0.23 0.47 0.70 0.93 TURNS 10. If 3SB is to be mixed with 3SB-ST the lower variant torque should be applied. 11. Special clearance couplings require an adjustment to regular coupling torque, this should be available as an option when downloading the latest data sheet. 12. If the special clearance data sheet is unavailable adjust regular coupling torques as below:. Special Clearance Casing = 0.95 of regular torque.. Special Clearance Tubing = 0.90 of regular torque. 8

IDM Code GDL23374/1 / March 2018 Running 1. The use of a stabbing guide is strongly recommended. 2. The use of a weight compensator is strongly recommended for chrome, large OD or heavy pipe. 3. To avoid cross threading stab pipe in a smooth controlled fashion ensuring the pipe is vertical when doing so, continue to support and stabilise the pipe throughout the stabbing and make up operation. 4. Upon commencement of initial rotation use low RPM (5 RPM or below) in order to ensure the pipe has not cross threaded during stabbing. 5. If cross threading is evident, immediately reverse rotate the pipe, completely disassemble, clean and inspect both connections. 6. Maximum spin in speed should not exceed 15 RPM. 7. Apply power tong at low rpm (do not exceed 5 rpm), for final make up. TenarisHydril RUNNING MANUAL 8. Walk chrome pipe all the way in to hand tight, then apply tong only for final make up. 9

TenarisHydril RUNNING MANUAL Pulling 1. Automatic stabbing system or stabber is highly recommended to maintain the pipe in a vertical position. 2. The use of a stabbing guide is recommended to prevent hang up. 3. A weight compensator is strongly recommended for chrome, large OD or heavy pipe. 4. Apply the back up tong jaw on the lower part, over the mill end of the coupling. 5. Apply power tong in low rpm (3-5 rpm) to break the connection, ensuring the pipe is stabilised during the break and spin out process. 6. Do not exceed 15 RPM during spin out. 7. Walk chrome pipe all the way out after initial break. 8. Visual inspection is recommended to classify the thread condition. Any rejected connections should be clearly marked and segregated for further investigation. 9. Apply clean, dry thread protectors after applying storage compound on clean, dry connections. 10. Storage / thread compound should always be applied to connections post job, even rejects. 10