PO W ERCO N H A N D LIN G SYST EM S (PT Y) LT D.

Similar documents
INSTRUCTION MANUAL FOR MODEL TAC - TRAY ACCUMULATOR CONVEYOR SYSTEM MONORAIL STYLE

Signature Overhead System INSTALLATION MANUAL

TABLE OF CONTENTS Section Page 12 Benefits of Rapid Overhead Conveyors Glossary 4-6 Track and Accessories 7-9 Trolleys and Chain Attachments

B.I. Brooks and Sons Inc. Overhead Conveyor

Tel: (905) Fax: (905) BELT ON ROLLER CONVEYOR OWNERS MANUAL

Installation and Main te nance Manual. Model RB190, SB350, RBI190, & SBI350 Effective June, 2005

750 Series Press Conveyor Installation and Maintenance Manual

3.25, 4.5, 7.5 Tabletop Conveyor Specifications

5683EN. Conveyor system WL. Conveyor assembly manual. Created by EBCCW 00:06

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

DynaCon Instruction Manual

INSTALLATION AND MAINTENANCE MANUAL DRAG CHAIN CONVEYOR MODEL DC-60

ROSTA MOTORBASES ROSTA. Self-Tensioning Motor Mount for Belt Drives. without slippage self-adjusting maintenance-free

B DUAL DRUM SANDER

RolsplicerTM. Maintenance Manual And Illustrated Parts List

Index. 1. Important safety instructions Overview of the lift Installation instructions Operation instructions 8-9

Marine Engineering Exam Resource Review of Couplings

MAINTENANCE - LPX PORTABLE TREATER

Conveyors 12. slide strips roller Conveyors roller elements Conveyor rollers Chain Transfer

Timing Belt Installation

Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

LUBRICATION, INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR STAINLESS STEEL CONE DRIVE SPEED REDUCERS

4", 8", 12", 18", 24" Belt Conveyor Specifications

TABLE OF CONTENTS PART 7 - MACHINERY AND MACHINERY GUARDING

MECHANICAL OVERLOAD CLUTCHES SECTION CONTENTS

Installation and Maintenance Instructions JSE2-0241MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

OPERATION SERVICE PARTS TUGIT2. Manually Operated Short Handle Lever Hoist A3140-XXX

Installation and Maintenance Instructions JSE MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

Randy Recommends... If your bike has chain drive, here are some things you should know.

HQZ & RBM MODEL LIFT & TRANSFERS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT & DIRECT DRIVE XB, HV, HVA, ADD, DDS, DDP

The gear boxes can be run at the same speeds as the actuator models. Do not exceed torque ratings.

I-BEAM 348 and 458 Overhead Heavy Duty Monorail Conveyor

701 & 801 Series Belt Conveyor Installation and Maintenance Manual

INSTALLATION AND MAINTENANCE MANUAL TROUGH BELT CONVEYOR MODEL TBOH

ZRF-P 2040 TIMING BELT CONVEYOR

BX7322 Adventurer Tow Bar Operator Manual & Installation Instructions. (5,000 lb) 2 Inch Coupler

Mechanical Equipment - Course 230.1

INSTALLATION AND MAINTENANCE MANUAL BELT DRIVEN LIVE ROLLER CONVEYOR

Tel: (905) Fax: (905) CDLR CONVEYOR OWNERS MANUAL

Gantry System for both Floor and Roof Truss Lines SQ-1 INTELLIGENT GANTRY. Operators Manual

Maintenance and Repair

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

INSTALLATION AND MAINTENANCE MANUAL BELT CONVEYOR MODEL BS100B

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

KFM-P 2040 INCLINE BELT CONVEYOR

MANUAL TRANSAXLE Return to Main Table of Contents

GUF-P MINI BELT CONVEYOR

Modular belt conveyor WL678X

MBF-P 2040 PLASTIC MODULAR BELT CONVEYOR

GatesFacts Technical Information Library Gates Compass Power Transmission CD-ROM version 1.2 The Gates Rubber Company Denver, Colorado USA

Belt Conveyor Systems

Modular belt conveyor WL526X

7400 Series End Drive Conveyors

Webb Chain Conveyors. Technical Selection Guide for Conveyor Components. Power Only Overhead and Inverted Conveyors. Hand Pushed Trolleys

Installation and Operation Manual. Manufacturers of Innovative Materials Handling Equipment since 1957.

Modular belt conveyor WL374X

Tech Note Truck 14 & 15.5 Twin Plate Cast Iron Type Installation Guidelines

MicroSpan. Transfers. Transfers. 1 revised SpanTech LLC

Instruction Manual For Auto Shift Hydraulic Lift Table

OWNER S MANUAL EPT-55 ! WARNING! HAND PALLET TRUCK

tRIPr Chief Grain Cart. Operator s Manual. Operator s Manual

ROLLER CHAIN SPROCKETS INDEX...E-1 E-2 MADE-TO-ORDER CAPABILITIES...E-3

The Importance Of Proper. Maintenance Inspections On Belt Conveyors

Aerowerks Toll Free :

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

LESSON Transmission of Power Introduction

Serial N... MX1 Chain Driven Pipe Cutting and Bevelling Machine Parts and Operating Manual

DIAMOND ROLLER CHAIN. For Agricultural and Construction Equipment

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

Please contact us today and allow us to show you how we can help you with your material handling.

Installation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA

Bellows. GT Exhaust Accessories Installation and Operation Manual. Rev. B. (c) Copyright 2012, GT Exhaust, Inc. All Rights Reserved

Webb-Stiles Enclosed Track

WARNING DO NOT USE THE PRODUCTS IN THIS GUIDE IN AIRCRAFT APPLICATIONS. THE PRODUCTS IN THIS GUIDE ARE NOT INTENDED FOR USE IN AIRCRAFT APPLICATIONS.

Felco Industries, Ltd Grant Creek Road P O Box Missoula, Montana (406) Fax (406)

Ford Full-Size Rack & Pinion Kit Instructions #

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A

401, 430 & 460 Series Belt Driven Live Roller Conveyor Installation and Maintenance Manual

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

443 / M440 Series Lineshaft Driven Live Roller Conveyor Installation and Maintenance Manual

SLIDE DOOR OPERATOR ADDENDUM

Features / Benefits... PT5-2

Wye Connector. GT Exhaust Accessories Installation and Operation Manual. Rev. A. (c) Copyright 2012, GT Exhaust, Inc. All Rights Reserved

STRUT SPRING COMPRESSOR

BX7322 Adventurer Tow Bar Operator Manual & Installation Instructions

COOKSON OWNER'S MANUAL

Dupont Circle Station - Escalator A03S01 (South Entrance) Assessment Checklist

OPERATOR MANUAL Combo Belt Conveyor

BX7322 Adventurer Tow Bar Operator Manual & Installation Instructions

Assortment 2013_FPT BOOK.indb /02/13 6:57 PM

Felco Industries, Ltd Grant Creek Road P.O. Box Missoula, Montana (406) Fax (406)

Maintenance manual XT modules

Conveyor Layouts 1-1 SECTION 1 OVERVIEW 1-1. Conveyor Manuals 1-1 Using this Manual 1-2. New Construction 1-1 Extensions or Modifications 1-1

Belt Conveyor Systems

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

Power Transmission Belt Drive System Installation, Maintenance and Troubleshooting Guide

Sisu S-Cam Drum Brakes

Timing Belt Design Hints A guide to Timing Belt drives

Transcription:

POWERCON CR MONORAIL SYSTEM GUIDE About us: POWERCON HANDLING SYSTEMS specialises in complete overhead monorail conveyors as well as complete Turnkey Operation and Factory Automation projects. Established in 1982, our track record speaks for itself. We believe in building long-term relationships with our customers by continuously designing and manufacturing the highest quality products while continuously exceeding our customer s expectations in material handling solutions. Our work ethics and dedication make us the leaders in our field. Our factory incorporates the following facilities: In-House CAD drawing / design office Our own sheet metal works with bending breaks, punching and guillotine Our own fully equipped machine shop In-house roller manufacturing with high speed presses / swages Laser cutting large format laser cutter Electrical workshop (Robotics engineering level) We are one of the largest supplier of components to the industry This means we manufacture all our own conveyors and stock components in-house so that we have complete control over delivery lead times, quality of workmanship and the ability to assemble and test every part of a system before dispatching. We can dispatch spares immediately if required. Even replacement conveyor frames are manufactured from scratch and can be dispatched within 24 hours if necessary. Why use a Powercon CR 45 and CR60 series Monorail system: 1. Keep valuable floor space clear. Many factories have unused space in the air or rafters that is not utilised. 2. High temperature applications for powder coating systems 3. Doubles as storage and buffering of product Page 1 of 18

4. Cost effective option to alternative options 5. High efficiency with low power consumption 6. Easy installation 7. Low maintenance costs 8. Safe 9. Clean 10. Versatile 11. Easily re-routed or modified 12. Robust drop forged construction 13. Close pitch on pendants (150mm) means by moving the removable pendant the life span can be significantly extended further 14. Bi-planer chain allows for multi direction options 15. Excellent after sales support Options: CR45 CR60 Riveted wheel arrangements for both vertical and horizontal wheels Solid machine wheels for both vertical and horizontal wheels, suitable for heavier loads and longer systems with a large number of bends. Powercon Monorail conveyor (CR 45 or CR60) This system is utilising the conveyor to store components for the duration of the curing time. Once the components paint is dry, it can be removed and packed. Page 2 of 18

Here a monorail conveyor is used to provide elevated storage while avoiding manufacturing and other critical manufacturing equipment, then lowering at various loading and off-loading stations. This ensures valuable floor space is maximized. Monorail for moving boxes or crates Page 3 of 18

Guidelines for POWERCON OVERHEAD MONORAIL At POWERCON, we offer complete turnkey solutions including the design, drawings, specifications and installation as required. However, should you wish to install your own unit, here are a few guide lines to consider when designing your conveyor. 1. Locate a convenient conveyor path. Consider keeping lines parallel and close to simplify support structures and eliminate wasted space. 2. Establish where suitable loading and offloading areas should be. Take into consideration situations such cooling may be required after an oven or drying time for paint. 3. Consider the material to be handled per minute or hour, spacing and clearances required between the products. Longer items may require larger turning spaces. 4. Determine number of carriers per minute or hour. 5. Consider whether supports require being floor mounted and/or roof mounted. There are many options available and in some cases we can use a variety of options simultaneously. 6. Verify all clearances, both horizontal and vertical taking walls, columns etc into consideration. 7. Consider the environment; ovens require expansion joints and track should be run outside of wash tunnels. 8. A layout drawing with elevations will assist us in advising best position for drive, take-up, service unit and expansion joint placement. Show loading and off loading positions as well as much information regardless of whether or not it seems significant. 9. Allow a minimum of 300mm between directional vertical / horizontal changes. 10. Calculate total chain length of the chain. Add all straight sections, the drive, take-up, inspection units, expansion joints and bends into account. 11. If possible, always position your drive at the highest elevation. 12. Always position the take-up at a low point directly after the drive, without horizontal bends in between the drive and bend if possible. The best position for the take up is always directly after the drive. 13. Longer systems may use multiple drives, but these need to be electrically synchronised. Although in some cases it is possible to use a single 3 phase Variable speed drive, this is only possible if the load can be accurately shared between each unit. Other methods include using Tachometers or any other method with individual variable speed drives and a PLC to monitor each units speed and correct them continuously. It is advisable that an electrical engineer designs a suitable solution. Page 4 of 18

Parallel lines share support structures, simplifying supports while reducing costs. CHAIN PULL CALCULATIONS The chain pull calculations are to be used conservatively and are to be used as a guide line only. There are many factors to take into account including system age and condition, loading, ambient temperatures, number of bends etc. Here is an example of a typical system chain pull calculation. Please consider that in vertical inclines and declines, the loads cancel each other. However, if the full load in exists on inclined bends but not on declines, you need to factor these loads into the equation. Conveyor load capacity: Recommended load: CR45-45kg maximum per pendant CR60-60kg maximum per pendant (A 30% safety factor should be considered in the load capacity) Example (basic chain pull calculation): Conveyor chain length: 120m Weight of chain: 5kg per meter Weight of product: 40 kg Product spacing: 1,2m (100 pendants used in total) Carrier bar weight: 3kg Number of 90 bends: 12 Speed: 10m/min Therefore: Total load = (120X5kg) + (100X40) + (100X3) = 4,900kg total load. Rolling friction = 5% (4%-8% depending on system layout use chart below) 4,900 X 5% = 245kg = 540Lb Page 5 of 18

The total permissible chain pull is 10, 000Lb, therefore this is a safe load situation. Should the loading exceed 10, 000Lb, 2 drives or more may be required. Drive units should be evenly spaced, evenly loaded throughout the system and they should be electrically synchronized. Rolling friction chart: Take all horizontal and vertical bends into consideration. Conveyor with 0-10 X 90 bends 4% Conveyor with 11-20 X 90 bends 5% Conveyor with 21-40 X 90 bends 6% Conveyor with 41-60 X 90 bends 8% It is recommended that an engineers safety factor of 30% be factored in. DETERMINING THE CONVEYOR LINE SPEED Conveyor speed is determined by a combination of carrier capacity and spacing as shown below: V = Q x P V = Conveyor speed (meter/min) Q = Quantity of carriers to be handled (no/min) P = Carrier spacing (meter) COMPONENT IDENTIFICATION: Caterpillar Drive unit (Basic unit, without drive motor) Page 6 of 18

CR45 Chain (1) and CR60 Chain (2) Both chains have 10,000Lb breaking strain but the wheel design determines the load capacity. The HD CR 60 is also recommended for longer systems with a large number of bends. Other models of this is chain is also available on request. 1. 2. CR single pendant are standard and double pendants are available on request: CR Track is supplied as follows: Straight sections 3m long lengths 57mm X67mm Horizontal bends are supplied in Radius 600mm Vertical up / down bends are supplied in Radius 750mm All sections can be supplied with or without joining flanges Page 7 of 18

Hanger (optional rotating fork and drip tray) There are many options available here, either off the shelf or as special design. Allow Powercon Handling Systems to design an attachment to suit your unique application. CR Take-up unit Take-up units are offered in 1,2m CRS or 2,5m CRS with duel tension spring arrangement. The standard unit uses duel spring tensioners to maintain constant line tension while remove chain slack created by the drive in some cases. Optional pneumatic take up units are also available on request. 1,2m CRS take-up Page 8 of 18

DRAWINGS: CHAIN / TRACK DIMENSIONS: TAKE UP (1200MM SHOWN) Page 9 of 18

EXPANSION JOINT TRACK FLANGES Page 10 of 18

DRIVE UNIT OVERALL DIMENSIONS HORIZONTAL BENDS SUPPLIED IN ANY ANGLE REQUIRED Page 11 of 18

VERTICAL UP AND DOWN BENDS SERVICE UNIT (LUBRICATOR AND INSPECTION SECTION) Page 12 of 18

TRACK CLAMPING SYSTEM SINGLE SCISSOR PENDANT Page 13 of 18

JOINING CLAMPS FOR BUTT WELDING TRACK VARIABLE SPEED PANEL: Page 14 of 18

ANCILLARY COMPONENTS Page 15 of 18

Daily: MAINTENANCE SCHEDULE Before start up the following inspection needs to be carried out: 1. Check for loose components or damage 2. Ensure no obstructions with chain and or hangers 3. Check there is sufficient tension on take-up springs 4. In the event you have multiple drives, ensure the take-up units are evenly tensioned 5. Check for oil leaks 6. Ensure chain is lubricated 7. Check for abnormal wear 8. Ensure chain is sufficiently lubricated (should appear moist) Weekly: 1. Open inspection section and inspect chain for lubrication and damage 2. Check drive unit pressure bar, drive chain and bottom plates for wear 3. Check primary drive chain and sprockets for wear and correct tension 4. Check chain tension on conveyor If pendants are held between the two fingers and pushed upwards, it should move upwards by approximately 30-40 millimetres. (Do this at the inspection section with the lid removed) 5. Check free movement of the tensioner / take-up unit. 6. Check correct operation and cleanliness of the torque limiter if fitted. To adjust it - Loosen the three adjusting bolts until the clutch slips under full load. Tighten each adjusting bolt by approximately onequarter revolution at a time until the chain moves without any slippage. Finally tighten one-quarter turn each. Torque limiter will now slip if the chain jams, but will not slip under the load. Lubrication: Lubricate chain weekly for at least 3-4 circulations on the circuit until the chain is visibly wet. Only use Omega 613 High temperature oil or equivalent SAE 10 suitable for high temperatures and micro fog applications. N.B. We recommend Omega 613 for all high temperature applications. Failure to use this oil may result in your guarantee being void. Lubrication method: This method is for a line running at approximately 2-3m/min (most common speed for powder coating conveyors). Should you be running your line faster or slower, you may want to vary step 2 accordingly. 1. Set air pressure on regulator 2-3 bars. 2. Open oil regulator to at least 1 drop of oil per second. 3. Check physically if lubrication reaches the chain and bearings. 4. Use only OMEGA 613 molybdenum based lubricant. 5. Over-lubrication can cause dripping on products without serving any real purpose. Page 16 of 18

Monthly: 1. Check gearbox oil level and check for any leaks 2. Apply, if necessary, appropriate grease to the transmission chain, taking care not to allow any grease to drip onto the torque limiter. 3. Check for any excess wear on bearings. 4. Check for any wear on track and bends. 5. If V- belt driven, check for V-belt wear, as well as free operation of springloaded variable speed pulley. 6. Lubricate chain monthly or as required as per schedule above Low temperature application Chain: Besides lubrication, chain tension is important. A general rule is the springs should be tensioned to approximately 180% of their original length. Wear Patterns: Wear grooves may appear on the friction surfaces over an extended period of time. This is a normal wear condition, and does not impair functioning of the unit. Never machine the friction surface to remove grooves or score marks resulting from normal wear. Motors and Gearboxes (Reducers): Except for keeping the units clean and checking the level of oil in the gearboxes maintenance of these units is minimal. Oil levels in gearboxes should be checked when unit is warm, but not running. If either unit fails, replace it with the same unit. Send the failed unit to the nearest service representative for repairs. Sprockets: Sprockets should be checked for proper alignment, that they are securely fastened to shafts and that they are wearing in a normal fashion. If sprockets show signs of wearing on the sides of their teeth, this is an indication of miss-alignment. If the tips of their teeth are wearing off this is a sign of an elongated chain or a loose chain. Note: When replacing sprockets, or chains it is advisable that they both be changed. Taper Lock Hubs/Bushings (when used): The proper installation of taper lock bushing is critical. If not installed properly, the bushings can break loose, with the potential of damage to equipment and a safety hazard for personnel. Please follow the following instructions for installation of taper lock bushings: Refer to supplier for torque setting of bushes. TROUBLE SHOOTING Premature wear: - Lack of lubrication - Exposure to abrasives - Corrosion - Conveyor over-loaded Page 17 of 18

Slipping clutch / tripping System surges: Oil dripping on parts Drive jumping - Conveyor Overloaded - Excessive chain stretch - Slack Conveyor Chain Backing into the Drive Unit - Pinched Track - Caterpillar Chain Damaged - Clutch Friction Liners Worn Out - Worn bends - Pendant, Hook, or Load Hang-ups - Slack Chain - Excessive Chain Pull - Pinched Track - Excessive Chain Length - Defective Drive - Common with extremely slow moving conveyor lines - Over lubricated, reduce the lubrication rate and monitor - Chain needs to be services / cleaned - Slack Chain - Misaligned Track Joints - Take-up not set up properly or ineffective - Drive chain worn needs replacing It is not always possible to diagnose every issue, therefore we recommend calling out a Powercon trained technician. Notes: Page 18 of 18