City of Houston Fondren Road Paving and Drainage

Similar documents
FY 2013 Candidate Projects ($ Thousands) Street & Traffic Control Program - Thoroughfares

Rolling Road (Route 638) Widening Project

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

STANDARD DRAWING INDEX

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

COST ESTIMATES: Curb-Running

PUBLIC INFRASTRUCTURE PROJECTS

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

IMPROVEMENT CONCEPTS

Traffic Engineering Study

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

IH 35 FEASIBILITY STUDY

EXCEPTION TO STANDARDS REPORT

Received June 2, 2017 PLN-PUDC

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Public Information Workshop

DESIGN STANDARDS SECTION DS 3 STREETS

Construction Realty Co.

FIRE DEPARTMENT ACCESS Based on the 2012 edition of the International Fire Code

Capital Improvement Plan Review

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Lacey Gateway Residential Phase 1

2.0 Development Driveways. Movin Out June 2017

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities

South Lexington Transportation Study Lexington, Massachusetts

Construction Staging Area 4 Avenue Road

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

II. PROJECT DESCRIPTION

FREQUENTLY ASKED QUESTIONS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

STAFF REPORT # CHANGE OF ZONING

ACTION TRANSMITTAL No

Subchapter 20 Transportation

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

Construction Noise Memorandum

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Traffic Impact Study Speedway Gas Station Redevelopment

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

FREQUENTLY ASKED QUESTIONS

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

GATTIS SCHOOL RD / SH 130 SUBDIVISION

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

SECTION 9 STORM SEWER INLETS

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

800 Access Control, R/W Use Permits and Drive Design

APPENDIX E. Traffic Analysis Report

Access Management Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

DESCRIPTION QUANTITY PRICE TOTAL

11 October 12, 2011 Public Hearing APPLICANT:

Wentzville Parkway South Phase 2 & 2A

Steese Rd - Curb & Sidewalk Improvement

TRANSPORTATION REVIEW

Traffic Impact Statement (TIS)

2011 LOCAL STREET IMPROVEMENTS

Oaks Commerce Center

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

Plan Check Policies and Guidelines

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.

Letter of Transmittal

ANDERSON PROPERTY SITE ANALYSIS

Brent Spence Bridge Design Exceptions - Alternative I

Plan Check Policies and Guidelines

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

I-405 Sepulveda Pass Improvements Project

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Purpose: General Provisions:

IV. REVISIONS TO THE DRAFT IS/MND

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

The Design-Builder shall meet local road criteria provided by the local governing agencies.

SCHEDULE OF CAPITAL PROJECTS BY FUND

Temporary Sales Trailer Application

Traffic Impact Analysis Update

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS

DIVISION 4: STREET. Improvement Design Standards City of Dundee Oregon. Division 4 : Street Page 1

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

CENTENNIAL PARK EXPANSION

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

Stormwater and sanitary sewer lines 8 inches in diameter or greater

Exposition Corridor Transit Project

Dixie Transportation Planning Office

HIGHWAY 28 FUNCTIONAL DESIGN

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Chapter 7: Infrastructure

SPEED HUMP POLICY. It is the policy of Hamilton Township to consider requests for speed humps as outlined below:

MOTOR VEHICLE ORIENTED BUSINESSES.

Transcription:

City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016

Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y

Land Use Commercial Multi-Residential

METRO Routes Route 68 along Braeswood Route 63 along Fondren Route 10 along Willowbend/Fondren/Dumfries CREEKBEND FONDREN BRAESWOOD DUMFRIES WILLOWBEND

Roadway

Roadway Existing Typical Section

Roadway Existing Sidewalks Substandard

Roadway Existing Non ADA Compliant Ramps

Roadway Existing concrete pavement in poor condition

Roadway Existing concrete pavement in poor condition

Roadway Signal equipment conflicts with sidewalk / ramps

Roadway Proposed Typical Section 12-inch Concrete Pavement 5-foot Sidewalk (minimum)

Roadway Traffic: 2013 ADT: 25,177; Overall LOS: D (for Current Geometry) 2035 ADT: 34,402; Overall LOS: C (for Complete Geometric Improvements) Heavy Truck Traffic < 5% of Total Volume (based on 2016 Traffic Count Data obtained at the Dumfries Intersection)

Roadway Proposed Creekbend Intersection and Willowbend Intersection Improvements CREEKBEND FONDREN WILLOWBEND

Roadway Proposed Creekbend Intersection Improvements CREEKBEND FONDREN Proposed Adding Dual Left-Turns WILLOWBEND

Roadway Proposed Creekbend Intersection Improvements CREEKBEND UPGRADE AND RELOCATE EXISTING TRAFFIC SIGNALS FONDREN WILLOWBEND

Roadway Proposed Creekbend Intersection Improvements CREEKBEND UPGRADE AND RELOCATE EXISTING TRAFFIC SIGNALS FONDREN WILLOWBEND PROPOSED EASEMENT FOR SIDEWALK AND/OR SIGNAL RELOCATIONS

Roadway Proposed Creekbend Intersection Improvements CREEKBEND UPGRADE AND RELOCATE EXISTING TRAFFIC SIGNALS FONDREN WILLOWBEND

Roadway Proposed Willowbend Intersection Improvements CREEKBEND Maintain Dual Left-Turns FONDREN WILLOWBEND

Roadway Proposed Willowbend Intersection Improvements CREEKBEND FONDREN WILLOWBEND REPLACE EXISTING TRAFFIC SIGNALS

Roadway Recommended Creekbend & Willowbend Intersection Improvements CREEKBEND PROPOSED ROW CLIPS UPGRADE AND RELOCATE EXISTING TRAFFIC SIGNALS REPLACE EXISTING TRAFFIC SIGNALS FONDREN PROPOSED ROW CLIPS WILLOWBEND PROPOSED EASEMENT FOR SIDEWALK AND/OR SIGNAL RELOCATIONS

Roadway Dumfries Intersection Improvements ONGOING TRAFFIC SIGNAL STUDY (RESULTS PENDING) FONDREN DUMFRIES DUMFRIES

Roadway Dumfries Intersection Improvements ONGOING TRAFFIC SIGNAL STUDY (RESULTS PENDING) FONDREN DUMFRIES

Roadway Dumfries Intersection Improvements ONGOING TRAFFIC SIGNAL STUDY (RESULTS PENDING) FONDREN DUMFRIES PROPOSED ROW CLIPS

Roadway Proposed Braeswood Intersection Improvements PROPOSED: - Dual WB Left-Turn lanes - Dual NB Thru-lanes FONDREN BRAESWOOD

Roadway Proposed Braeswood Intersection Improvements REPLACE EXISTING (SW) TRAFFIC SIGNAL POLE & EQIPMENT FONDREN BRAESWOOD

Roadway Proposed Braeswood Intersection Improvements FONDREN BRAESWOOD REPLACE EXISTING (SE) TRAFFIC SIGNAL POLE & EQIPMENT

Roadway Proposed Braeswood Intersection Improvements RECONSTRUCT MEDIAN NOSE / CROSSWALK FONDREN BRAESWOOD RECONSTRUCT MEDIAN / CROSSWALK

Roadway Proposed Braeswood Intersection Improvements PROP ROW CORNER CLIP RECONSTRUCT MEDIAN NOSE / CROSSWALK REPLACE EXISTING (SW) TRAFFIC SIGNAL POLE & EQIPMENT EXISTING TRAFFIC SIGNALS NORTH OF INTERSECTION (TO REMAIN IN-PACE) FONDREN PROP ROW CORNER CLIP BRAESWOOD REPLACE EXISTING (SE) TRAFFIC SIGNAL POLE & EQIPMENT RECONSTRUCT MEDIAN / CROSSWALK

Roadway Proposed Roadway Plan Layout: 100 ROW along Fondren, 60 ROW (Creekbend, Willowbend & Dumfries), 120 ROW (Braeswood) Close 4 existing median openings for 660 minimum length (per IDM guidelines) CREEKBEND Signal upgrade Close Existing Median Opening Replace signal WILLOWBEND BRAESWOOD ASSEMBLY CHURCH OF GOD PUBLIC UTILITY POWER STATION CLINIC CLINIC FONDREN BRAESWOOD OAKS APARTMENTS

Roadway Proposed Roadway Plan Layout (Continued ) WESTBURY CHRISTIAN SCHOOL SPORT COMPLEX Close Existing Median Opening FONDREN BRAYS OAKS TOWERS DUMFRIES MORRIS FRANK LIBRARY Ongoing traffic signal WEST HOLLOW APARTMENTS

Roadway Proposed Roadway Plan Layout (Continued ) WASHATERIA Consolidation of Driveway FONDRENWOOD SHOPPING CENTER Close Existing Median Opening New signal FONDREN WEST HALLOW APARTMENTS FOODTOWN SUPERMARKET CITGO GAS STATION BRAESWOOD Close Existing Median Opening

Roadway Summary of Roadway Recommendations 12-inch Concrete Pavement 11-11 -11 lanes with 15 median and 9.5 pedestrian realm 5-feet minimum Sidewalk 11 Left-Turn lanes with 4 minimum median Corner Clips at all intersection 660 minimum median length (except from Creekbend to Willowbend) Full pavement reconstruction to extend 100-ft south of Creekbend Full pavement reconstruction at Braeswood southern curb-returns Signal Upgrades at Creekbend, Willowbend, Braeswood Possible Signal at Dumfries (Pending results from Warrant Study)

Drainage

Drainage - Existing Conditions Northern section located in 100-year Floodplain (Zone AE) Existing Parallel Systems has one independent Drainage Area (81.4 acres) with 3 Outfalls: 24-inch trunk (10 East Esmnt); Outfalls into D140-00-00 @ Willowbend 24- to 42-inch trunk (10 East Esmnt); Outfalls into D140-00-00 @Dumfries 30- to 60-inch trunk (under SB Pvmnt); Outfalls into D100-00-00 @ Braeswood 30 to 60 trunk (along SB Pavement) Outfall @ Braeswood 24 trunk (10 East Esmnt) 24 to 42 trunk (10 East Esmnt) Outfall @ Willowbend Outfall @ Dumfries

Drainage - Existing Conditions 2-yr HGL below gutter 100-yr WSE above MPE Existing BB Inlets - Insufficient Capacity 100-yr MPE EXCEEDED 100-yr MPE EXCEEDED 100-yr MPE EXCEEDED 100-yr MPE EXCEEDED

Drainage Analysis: Analysis based on latest IDM Chapter 9; TP 100 & TP-101 Criteria Existing drainage areas delineated using LiDAR data & record drawings Reviewed existing hydraulic models for 2- & 100-year events using XP-SWMM Identified flooding areas based on ponding data and flooding complaints Proposed drainage areas delineated based on full topographic survey and proposed roadway profile and inlet locations Optimized proposed pipes and inlet sizes for in-line detention to lower the 100-yr WSE below MPE

Drainage Proposed Conditions 30 to 36 RCP Laterals 24 to 42 RCP Laterals 24 RCP Laterals 30 RCP Laterals 36 RCP Laterals 24 RCP Lateral 700-LF 24 RCP parallel trunk 500-LF 30 RCP parallel trunk 400-LF 36 RCP parallel trunk

Results of Hydraulic Models 2-year HGL below the gutter line 100-year WSE are below the MPE

Results of Hydraulic Models: Existing outfall (peak flows) have been retained and increase in flows mitigated within the proposed system

Summary of Recommended Storm Sewer Improvements: Utilize existing 2 parallel storm sewer trunk lines, as possible Add 3rd storm sewer system ranging from 24- to 42-inch diameter (located along the northbound proposed pavement) Replacing all existing BB-Inlets / C-inlets to C-1 inlets Replace Existing leads / laterals with sizes ranging from 24- to 36-inch diameter

Utilities

Utility Existing Public Utilities: 20 water line along the entire project median Serves as distribution to 6, 8 and 16 water lines 42 sanitary sewer main with 8, 14 and 15 service lines 20 Waterline 42 Sanitary line

Roadway Existing Private Utilities: CenterPoint Energy electric, street lights CenterPoint Gas Teppco Crude Pipeline Underground Comcast Cable, fiber optic, Level 3, Phonoscope AT&T/SWBT 21-4 MCD Duct Bank (along the East ROW) CenterPoint Gas CenterPoint Electric Crude Pipeline AT&T Duct Bank

Proposed Utilities 8 sanitary sewer line to be replaced at Fondren & Willowbend CREEKBEND 8 Sanitary Lead WILLOWBEND FONDREN

Proposed Utilities New 24-inch Water line (along median) CREEKBEND 24 Waterline FONDREN DUMFRIES WILLOW BEND FONDREN BRAESWOOD 24 Waterline

Construction Traffic Control

Construction Traffic Control 3 Phase Construction Sequence Phase 1 Temporary Pavement Phase 2 Water / Storm /Sanitary NB Pavement Pedestrian realm Phase 3 Storm SB Pavement Median / landscape Pedestrian realm

Construction Traffic Control Typical Cross-over Detail

Trees and Environmental Issues

Trees and Environmental Issues Estimated 30 Trees within Median areas will be displaced Total: 44 Existing Trees Creekbend to Willowbend (Median & East) (6) 12 Crepe Myrtles ; (3) 10 Oak Willowbend to Dumfries (Median) (17) 10 Oak; (1) 10 Palm Dumfries to Braeswood (Median & East) (17) 8 Oak Tree Protection & Replanting Plan in Phase II Design

Trees and Environmental Issues 3 Recognized Environmental Conditions (REC) Phase II ESA Recommended Old A-1 Cleaners Old Exxon Mobile Gas Station Citgo Gas Station

Construction Cost Estimate

Construction Cost Estimate Estimated Opinion of Construction Cost: General Items Paving Items Storm Sewer Items Sanitary Sewer Items Water Items ROW acquisition $ 699,064 $ 5,255,320 $ 565,401 $ 40,190 $ 1,670,695 $ 100,000 Total Items Contingencies (10%) $ 8,330,670 $ 823,067 TOTAL CONSTRUCTION COST $ 9,053,737

Questions and Comments