Remote Village Electrification

Similar documents
Anil Agarwal Dialogue 2014



Application is to be sent to the undersigned in two sealed covers on or before 21st July 2018 by 1500 hrs. as under:

Session IV ESMAP Approach and Pilot Overview

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

THE CORE BANKING SOFTWARE. Guide is Under Development. It will be soon available for online references.

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

(URL: F /KV Damoh/ / Date:

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

Solutions for Full Length Test - 4

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power. Central Electricity Authority. New Delhi

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

सम मनत यहद प ई ह त ल हदए गए प र चपक म म ख प रपक च म खत पक त पक अध हस त क ष प भ ज

INDRA MARSHAL POWER TILLER

Private Sector led solar micro-grids in remote and rural Nepal

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

Green Solutions to Power Problems (Solar & Solar-Wind Hybrid Systems )

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Committed to unlocking value

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

INDUSTRY SALES REVIEW. July 2017

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

Government Of India Ministry of Power Central Electricity Authority New Delhi

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

Executive Summary on Power Sector. Jul-18

ब जल स स रक ष ELECTRICAL SAFETY. Dr. H. K. Verma Distinguished Professor (EEE) Sharda University, Greater Noida

/ Telefax : No: 1(2)2015-E/ Battery& Charger TVH/ Dated:

Government Of India Ministry of Power Central Electricity Authority New Delhi

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

ईट ड 11/ ट

REGIONAL MEETING ON SUSTAINABLE ENERGY

NATIONAL INSTITUTE OF WIND ENERGY

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

व द य त स रक ष व द य त स च म डण रचन / आर खड प रम णपत र अभ य सक रम स म न यत द ण य ब बत.

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com

Solar Multi-Utility Centre and Smart Minigrid Experience in implementing and maintaining off-grid projects in rural areas

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम

Hybrid Solar: Mini-Grids and PV Plants

THE ASIAN SCHOOL, BAHRAIN MONTHWISE DISTRIBUTION OF SYLLABUS FOR THE YEAR

Ac Mini-Grid Workshop:

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

ENERGY FOR ALL: An Update. JIWAN ACHARYA Senior Energy Specialist

Promoting Technical Quality Measures for PV Mini-grid Development in Indonesia

Utility Operator Model

Scaling Successful Mini-grid Programs: Experience of Bangladesh

VIJAY VR-15L POWER TILLER

Contents 1. Country Background 2. Lao Power Sector 3. Power Sector Policy 4. Current Electric Power Situation (statistics) 5. Demand Forecasting 6. Ex

How Micro-grids Can Solve Energy Access in Africa while Building the Energy System of the Future

ETD 39 (10038 ) ETD 39 (10039 ) ETD 39 (10040 )

Nehru National Solar Mission, Phase II

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

DOCUMENT DESPATCH ADVICE. Technical Committee: Petroleum and Related Products Sectional Committee, PCD 3

ईट ड 16/ ट

Technical Committee: Petroleum and their Related Products of synthesis or biological origin Sectional Committee, PCD 3

Myanmar: Towards Universal Access to Electricity by Yangon, January 30, 2015

Automotive Vehicles Safety Belts, Restraint Systems and Safety Belt Reminder Installation Requirements

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

Solar PV Projects PPA Model

Solar PV systems Roof Tops, Ground Mounted & Floating Platform, Grid Tied & Standalone. Solar PV Rooftop 140 kwp at BCP Mumbai

Towards 100 GW Solar Capacity in India. Ashok Jhunjhunwala, IIT Madras

म नक भवन, 9 बह द रश ह फर म ग, नई दद ल

Shkel Photovoltaic Parks in Albania. August 2017

स त य; त, प रश सनक क य ष य,

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

STATUS OF RURAL ELECTRIFICATION IN ZAMBIA

Off-grid Commercial Micro-grid System Provides Energy Storage For Resort In India

CONTENT. Background and vision. Power Corner Business Model CHAPTER 2. Case Study of Tanzania. Power Corner Zambia & Scale Up CHAPTER 4

दय अन फ ध क स चन. Tender Ref. No.: SCIC/Tenders/2014/001, Date: 10 th Oct, 2014

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

SOLAR PLANT PERFORMANCE IN INDIA

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

1.2 + Billion people live in Darkness.

RENEWABLE ENERGY SITUATION IN BOTSWANA

MANHARI SOLAR. (Your own renewable energy management experts)

Renewable Energy in Small Island Grids. Design and Case study - Tuvalu

Rural Energy Access: Promoting Solar Home Systems In Rural Areas In Zambia A Case Study. O.S. Kalumiana

Electricity Access in Lao PDR

Power Sector Trends: Focus on States

How to get rid of my diesel generator? Should you really?

य पक प रच लन मस द प स ड 25(2700) तकन क स म त प स ड 25

Success Story Scaling Up Energy Efficiency An Indian Experience

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

INDEPENDENCE. Invest today. Reap benefits for a lifetime.

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

Transcription:

Remote Village Electrification Gram Oorja s Journey August 2013

About Gram Oorja Gram Oorja Solutions Private Limited (www.gramoorja.in) founded in 2008, acts as a catalyst in commercialising on-the-ground viable Renewable Energy solutions with focus on the rural sector. Founded by professionals willing to take a leap of faith in renewable energy solutions with a long term view. Vision: To achieve social good under a commercial framework, delivered with highest levels of ethics, integrity and professionalism Focus Areas for Operations Rural mini grids based on renewable energy sources (solar/biogas/biomass/small wind etc) for off grid villages Act as an energy provider for commercial entities that use diesel gensets for their business (Rural BPOs, Telecom Companies, Bulk mill chillers, etc)

Experience - Microgrids 9.4 Kwp Solar System at Darewadi, a village 140 kms from pune Identified the village through social networks Convinced villagers about the project and monitored formation of trust for project maintenance Negotiated with Bosch Solar AG to have the project installed at the location as part of their Pilot project Designed the system jointly with Bosch and managed the end to end project execution Ongoing operations and maintenance of the plant including monitoring of system performance. Ensuring bill collection and trouble shooting. Consulting assignment for Shakti Foundation Undertaken detailed survey of 85 off-grid villages The states covered are Uttar Pradesh, Madhya Pradesh, Karnataka and Maharashtra. Detailed Project Reports prepared for 10 villages Gram Oorja is in various stages of attempting to execute projects at these 10 villages including Including discussions with villagers for project implementation Approaching potential funders for the project including CSR, Local MLAs/MPs, NABARD, etc.

Experience - Others Renewable Energy Service Company - RESCO 8.1 Kwp plant set up at a Rural BPO in Sonari. This is located about 70 kms from lucknow The plant supplies power for a 40 seat BPO Gram Oorja owns the asset and has a long term power supply contract with the BPO Project operational since mid 2011 and discussions for enhancement of capacity is currently going on Other Projects Biogas based electricity supply for an ashram in Kumbakonam, Tamil Nadu. Gram Oorja was the EPC contractor for this project Small solar projects executed in Mohali, Chandigarh, Naitwar in Uttarakhand Solar water pumping solutions for villages in Jawhar, Thane district

Remote Village Electrification -Problem Statement

Dimensions to the problem Villages located in inaccessible locations Cost of taking grid to these locations are prohibitive OR not allowed by law Population in these villages have little or no access to modern sources of energy India has over 100,000 villages that remain un-electrified Latent demand exists India has a significant electricity deficit

Project Darewadi Why Darewadi Proximity to Gram Oorja operational center Pune No grid at Darewadi - hamlet does not exist on govt. records Initial social interaction showed willingness of villagers to set up a community level project Inhospitable terrain and significantly deprived community

Project Darewadi - Key features Collaboration between Bosch Solar Energy AG and Gram Oorja This is a reference plant to establish a model that works and is sustainable Helped in understanding implementation issues Project success as follows: Moderate if project stabilizes over the longer term High success if project scales up, based on demand

Darewadi

Darewadi Key Factors Identification Sizing Implementation Maintenance Growth

Darewadi Key factors - Identification Population - ~220 Num. households 39 Distance from motorable road 2 km

Darewadi Key factors - Sizing Bosch & Gram Oorja are looking forward to setting up renewable & decentralized power plants in remote villages, so that electricity can be provided for domestic as well as for productive applications. Plan Vision 1. Basic Hygiene Reduction in Kerosene use, hence smoke & carbon 2. Entertainment Reduction in migration 3. Mechanization Reduction in human efforts for basic needs 4. Employment generation Reduction in migration 5. Skill development Upward lift

Darewadi Key factors - Implementation Sr No. Item Description No Model / Make 1 Solar PV Module 240 Wp 39 Monocrystalline Bosch Modules 2 Battery 600 Ah, 48 V - Amaron 3 5 kw 2 SMA, Sunny Island Inverter Si 5048 4 10 kw 1 SMA, Sunny mini central 5 Mini-grid length ~1.5 km - - Entire system has been paid for by Bosch Solar Energy AG Transmission and distribution also defined and specified as per Bosch guidelines

Darewadi Key factors - Implementation

Darewadi Key factors - Implementation

Darewadi - Inauguration!

Darewadi - Inauguration!

Darewadi Key factors - Maintenance Data collection SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH SI5048EH 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 1.26E+09 TimeStamAdr AptPhs AptTmRmgBatChrgOpBatChrgVtBatSoc BatSocErr BatTmp BatVtg CardStt ChpPwrAtChpRmgTmChpStrRmgChpStt EgyCntIn EgyCntOutEgyCntTm Error E-Total E-Total-In hh:mm hhmmss V % % degc V kw hhmmss hhmmss kwh kwh h kwh kwh 0:15 1: Master 2: On 0 3: Float 53.43 99.17 7.6 25.9 53.4 2: Operatio 0 0 0 1: Idle 253.9 169.4 1112 0: ----- 169.4 253.9 0:30 1: Master 2: On 0 3: Float 53.43 99.2 7.6 25.9 53.4 2: Operatio 0 0 0 1: Idle 254 169.4 1112.2 0: ----- 169.4 254 0:45 1: Master 2: On 0 3: Float 53.43 99.3 7.6 25.91 53.42 2: Operatio 0 0 0 1: Idle 254.1 169.4 1112.5 0: ----- 169.4 254.1 1:00 1: Master 2: On 0 3: Float 53.42 99.4 7.7 26 53.4 2: Operatio 0 0 0 1: Idle 254.1 169.4 1112.7 0: ----- 169.4 254.1 1:15 1: Master 2: On 0 3: Float 53.42 99.4 7.7 25.96 53.4 2: Operatio 0 0 0 1: Idle 254.2 169.4 1113 0: ----- 169.4 254.2 3:00 1: Master 1: Off 20000 1: Boost 57.03 96.23 3.5 25.9 52.14 2: Operatio 0 0 0 1: Idle 254.3 169.5 1113.2 0: ----- 169.5 254.3 3:15 1: Master 1: Off 20000 1: Boost 57.03 96.04 3.5 25.9 52 2: Operatio 0 0 0 1: Idle 254.3 169.5 1113.5 0: ----- 169.5 254.3 3:45 1: Master 1: Off 20000 1: Boost 57.04 95.31 3.5 25.76 51.59 2: Operatio 0 0 0 1: Idle 254.3 169.7 1114 0: ----- 169.7 254.3 4:00 1: Master 1: Off 20000 1: Boost 57.06 94.9 3.5 25.61 51.49 2: Operatio 0 0 0 1: Idle 254.3 169.8 1114.2 0: ----- 169.8 254.3 4:15 1: Master 1: Off 20000 1: Boost 57.06 94.45 3.6 25.58 51.4 2: Operatio 0 0 0 1: Idle 254.3 170 1114.5 0: ----- 170 254.3 4:30 1: Master 1: Off 20000 1: Boost 57.07 93.8 3.6 25.5 51.3 2: Operatio 0 0 0 1: Idle 254.3 170.1 1114.7 0: ----- 170.1 254.3 4:45 1: Master 1: Off 20000 1: Boost 57.06 93.32 3.6 25.53 51.2 2: Operatio 0 0 0 1: Idle 254.3 170.2 1115 0: ----- 170.2 254.3 5:00 1: Master 1: Off 20000 1: Boost 57.07 92.77 3.6 25.5 51.16 2: Operatio 0 0 0 1: Idle 254.3 170.4 1115.2 0: ----- 170.4 254.3 5:30 1: Master 1: Off 20000 1: Boost 57.07 91.28 3.7 25.48 51 2: Operatio 0 0 0 1: Idle 254.3 170.8 1115.7 0: ----- 170.8 254.3 5:45 1: Master 1: Off 20000 1: Boost 57.07 90.68 3.7 25.42 50.99 2: Operatio 0 0 0 1: Idle 254.3 171 1116 0: ----- 171 254.3 6:00 1: Master 1: Off 20000 1: Boost 57.08 90.1 3.7 25.33 50.96 2: Operatio 0 0 0 1: Idle 254.3 171.1 1116.2 0: ----- 171.1 254.3 6:15 1: Master 1: Off 20000 1: Boost 57.09 89.4 3.7 25.24 51.02 2: Operatio 0 0 0 1: Idle 254.3 171.3 1116.5 0: ----- 171.3 254.3

Darewadi Key factors - Maintenance Sample Energy usage August 2012 ळनद ळ ग र म द य ग न य स, दर ळ ड, प स ट द ळल, त. ज न नर ग र हक क रम क ग र हक च न ळ ज डण प रक र Meter reading 1.8.2012 31.8.2012 Difference Bill amount १ त क र म ख म ब ऱ ह ड घरग त २ स म आ ब शऴ ग ड घरग त ३ एकन थ द ळर म ब ऱ ह ड घरग त 25 26 1 92 ४ ऱक ष मण द ळर म ब ऱ ह ड घरग त 24 33 9 108 ५ प न ज ऱक ष मण ब ल घरग त 27 27 0 90 ६ न र यण न मद ळ ब ऱ ह ड घरग त 22 31 9 108 ७ स त र म ऱक ष मण ब ल घरग त 20 21 1 92 ८ न र यण ब रक ब ऱ ह ड घरग त 28 43 15 120 ९ ग न अ ब घ ट घरग त 0 90 १० ब ल भ म ब ऱ ह ड घरग त 23 30 7 104 ११ च द रक त गण शऴ द घरग त 26 61 35 160 १२ स द प ऱ म ब ऱ ह ड घरग त 22 26 4 98 १३ ऱह ख ळज ब ऱ ह ड घरग त 30 48 18 126 १४ ख ळज य स ब ऱ ह ड घरग त 26 34 8 106 १५ ह न आन ज ब ऱ ह ड घरग त 24 34 10 110 १६ क शऴन थ चचम ब ऱ ह ड घरग त 22 51 29 148 १७ प र ज प न ज ब ऱ ह ड घरग त 26 46 20 130

Darewadi Key factors - Maintenance Sample Energy Bill

Darewadi Key factors - Growth In last 10 months, there has been an increase in the energy usage every month 7 households have purchased TVs with satellite connections 2 computers and a flour mill are in operation Water pump is in the works

Rural Micro Grids Current Government Programs Government has in the national solar mission modified its approach and is taking the mini grid approach to solve the problem Is targeting 20,000 villages under its Energy Access program. To be achieved till 2017 90% of the capital costs to be provided by central government Collection of tariffs to pay for operations and battery replacement DDG program of RGGVY Allocation of Rs 540 crores under the 11th plan For locations where grid connectivity is either not feasible or not cost effective To be implemented on a Build, Operate, Maintain Transfer Model over 5 years Close to 280 projects covering 680 villages is said to be under implementation but progress is slow First set of villages completed in Andhra Pradesh, in most other states the process is still at the bidding stage The World Bank has separately announced a program along with the MNRE (Ministry of New and Renewable Energy) targeted at specific states. In the first phase program to target Uttar Pradesh and Bihar ADB, IFC etc also are reportedly mulling similar programs

The Way Forward

Darewadi after electricity came in!

Thank you!