Installing the 6850 Direct Valve Column Connector Kit

Similar documents
Installing a Purged Packed Inlet

260 Solvent Vapor Exit Accessory

Installing the CO 2 Cryogenic Oven Cooling Kit

Installing a Cool On-Column Inlet

Installing a Purged Packed (PP) Inlet

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

Installing a PTV Inlet

Installing a PTV Inlet

6890 Installing ¼ Glass Columns

Hot Injection Adapter Kit - Installation Guide

Nickel Catalyst Tube Accessory 19205A

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Agilent 6890 Gas Chromatograph

Agilent G1554A On-Column Capillary Inlet with EPC

Agilent G2738A Upstream Capillary Interface

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Installing the Flame Ionization Detector EPC Flow Control Manifold

1310 Inlets. 1 of 36. Jun Illustrated Parts Breakdown Agilent 6890 Gas Chromatograph Service Manual

Installing an Auxiliary Pressure Control Module

Agilent G2855A Deans Switching System

Agilent 490 Micro GC Internal and External Mount Genie Filter Brackets

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Installing an Auxiliary Pressure Control Module

Microsep Low-Bleed PTFE-Lined Septa. XLB Septa

Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

Installation Guide Thermal Conductivity Detector Accessory 19232E

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

Agilent G2647A (Single) and G2648A (Dual) Flame Photometric Detector Update Kits

INSTALLATION OF OPTIC 3 INJECTOR SYSTEM ONTO AN SHIMADZU GC-2010 GAS CHROMATOGRAPH.

Agilent 6850 Series II Network GC System G2630A Performance Specifications

Agilent SD-1 Purification System ml/min

Agilent G3510A/G3511A Multimode Inlet

Agilent 7697A Headspace Sampler

Achieving Higher Sensitivities Using GC-FID with the Agilent Multimode Inlet (MMI)

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

Setting up SilFlow for BackFlush in your GC

AZ Chrom s.r.o.

Agilent 210/218 - Isocratic Pump

Agilent 7820A Gas Chromatograph

Installation Note for Solvent Selection Valve Upgrade Kit (G1360A)

Using a New Gas Phase Micro-Fluidic Deans Switch for the 2-D GC Analysis of Trace Methanol in Crude Oil by ASTM Method D7059 Application

DETECTORS Photo Ionization Detector - PID. Overview

Agilent G3348B Flame Photometric Detector

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

Maintenance of the Electronic ( EPC ) Pressure Controllers on SRI GCs

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Calibration and Performance Check: Agilent Dual Plasma Controller

Practical Steps in GC Troubleshooting

Optimizing Ultra Fast Simulated Distillation with a Low Thermal Mass (LTM) GC System. Jim McCurry Roger Firor Agilent Technologies Wilmington, DE

Using the PSD for Backflushing on the Agilent 8890 GC System

Choose for Your Instrument. GC Supplies - Agilent Instrument Quick Pick Guide

Agilent 210/218 - Binary Pump

GC Inlets. An Overview. Simon Jones GC Applications Engineer

RIVA 2014 COMPLETE YOUR AGILENT TOUR. Better Connections with Agilent. Ken Lynam CSD R&D/Applications Chemist, Wilmington, DE USA.

Phenomenex Exclusive! Inlet Base Seals. Agilent 5000, 6000 and. Guaranteed fit for Series GCs. Easy Seals

*Order ferrules separately. Outlet Splitter. Outlet Splitter 14898

GC Best Practices & Troubleshooting. Group/Presentation Title Agilent Restricted Month ##, 200X

Copyright 2004 Alltech Associates, Inc.UNP. brochure #487K. accessories

Troubleshooting Tips & Tricks for your GC Analyzer & CFT Application

Agilent InfinityLab LC Series 1260 Infinity II Fraction Collectors

Genuine Restek Replacement Parts For Agilent 5890 GCs

Agilent 1200 Series Valves

Page 1. Alternate Carrier Gas Considerations and Faster GC Analysis

For more information about Agilent Technologies services please visit our web site using the following URL

Technical Procedure for Gas Chromatography (GC-FID)

Typical Gas Chromatographic System

Agilent and ASTM. Update on Recent Activities. Page 1

Agilent Valve Kit G4231A/B/C and G4232B/C/D

Proof of Long-Term, Leak-Free Performance for a Novel Self-tightening GC Column Nut

Increased sensitivity and reproducibility in the analysis of trace fatty acid methyl esters in jet fuel

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

Instrument Accessories & Parts, Tubing & Connections

6890 CHECKOUT PROCEDURE TCD (THERMAL CONDUCTIVITY) DETECTOR

MET-Biodiesel Capillary GC Columns

Agilent G2333B (Single) and G2334B (Dual) Flame Photometric Detectors

Swagelok.

AZ Chrom s.r.o.

Troubleshooting 3Z8 038 Rev B

Installing the G2743A/G2745A Valve Actuator Kits

HP 1946A LC/MSD Replacement Parts

Impact of GC Parameters on The Separation Part 2: Choice of Column Internal Diameter

Agilent Dynamax Analytical HPLC Column Systems 4.6 mm id Data Sheet

Dual-Needle Infinity II Upgrade Kit

Agilent InfinityLab LC Series 1260 Infinity II Delay Coil Organizer

Application Note. Abstract. Authors. Environmental Analysis

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

Method Development for Capillary GC Systems. Slide 1

High Temperature Simulated Distillation Performance Using the Agilent 8890 Gas Chromatograph

Choose for Your Instrument. GC Supplies - Bruker (Varian) Instrument Quick Pick Guide

HPLC Tubing and Fittings Hints & Tips for the Chromatographer

Choose for Your Instrument

Technical Procedure for Pyrolysis-Gas Chromatography/Mass Spectrometry (Py-GC-MS)

Fast GC. Dial for e-seminar Audio. Slide 4 SPEEDY GC

trace samples >2µL 4.0mm 6.5mm x 78.5mm accommodates more polar solvents and lower MW solvents 5.0mm 6.5mm x 78.5mm 2.0mm 6.5mm x 78.

Oxygenates in Fuels Analysis Solutions From Trace Levels to Ethanol Fuels

Application Note. General Use Inlet Solvent Filters. Inlet Solvent Filters. Filters and Degassers. New!

Model 8610C Gas Chromatograph. GC Chassis Types ECD PID FID / DELCD FPD. Mounts up to Six Detectors and Five Injectors

Transcription:

Use this kit to bypass the inlet and connect your 6850 gas or liquid sampling valve directly to a column. To use this kit, your 6850 GC must have a purged packed inlet. This kit contains: Installing the 6850 Direct Valve Column Connector Kit Agilent 6850 Gas Chromotograph Part Number G2630-61710 Description Part Number Quantity Direct tube assembly G2630-61700 1 SS ZDV* union, 1/16-inch to 530 µm column 0100-1515 1 SS ZDV* union, 1/16-inch to 320 µm column 0100-1527 1 SS ZDV* union, 1/16-inch to 1/8-inch column 0100-1542 1 Ferrule, Vespel/graphite, 1/16-inch 0100-1512 4 Liner, polyimide, for 530 µm columns 0100-1513 1 Liner, polyimide, for 320 µm columns 0100-1514 1 SS nut, 1/16-inch, counterbored 0100-1511 2 Liner tool 18900-20850 1 * Zero Dead Volume sa

Direct tube assembly 320 µm column union 530 µm column union 1/16-inch Vespel/ graphite ferrules Liner tool 1/8-inch column union Liner, for 530 µm columns SS nut, 1/16-inch Liner, for 320 µm columns Figure 1. 6850 Direct valve column connector kit Tools required T-10 Torx driver 1/4-inch wrench 5/16-inch wrench 7/16-inch wrench 2

Disconnect the existing inject line WARNING The oven, detector, and inlet heated zones may be very hot. Column fittings and other hardware may remain hot after the oven has cooled. 1. Turn off the GC oven, inlet, and detector heated zones and allow them to cool. 2. Turn off the GC and unplug the power cord. 3. Remove the top cover from the valve box. 4. Remove the screw and washer that hold the inject line onto the valve heated block. Disconnect inject line Remove screw and washer Figure 2. Disconnect the inject line from the valve 5. Disconnect the inject line from the sampling valve. 3

Install the direct tube assembly 1. Open the lid and disconnect the column from the inlet. Plug the inlet column fitting with a no-hole ferrule and column nut. Caution In the next step, do not use the direct tube assembly supplied in this kit to punch the hole through the insulation. Insulation may be trapped in the tubing. 2. Locate the small through hole in the oven lid between the purged packed inlet and the valve box. There is a corresponding hole in the bottom of the oven lid, behind the inlet. Use a spare 1/16-inch tube, a wire or a thin screwdriver to clear the insulation from this hole. See Figure 3. Oven lid through hole (Liquid sampling valve shown) Figure 3. Location of oven lid through hole 4

Caution When pushing the direct tube assembly into the hole, leave the protective cap in place to prevent insulation from clogging the tubing. 3. Push the long end of the direct tube assembly, with the cap in place, through the hole into the oven. 4. Transfer the protective cap from the short (top) end of the direct tube assembly to the open end of the inject line that you disconnected earlier. 5. Connect the short end of the direct tube assembly to the sampling valve at the port where you removed the inject line. Tighten 1/4 turn past finger tight. Install the screw and washer (removed under Disconnect the existing inject line above) through the direct tube assembly coil and secure it to the valve heated block. 6. Inside the oven, clean off any insulation stuck to the tubing or protective cap. Remove the cap from the end of the tube. Caution In the next step, do not use a stainless steel ferrule. Once installed, you will not be able to remove it and will have to cut the direct tube assembly to change to a different diameter column. 7. Install a zero dead volume (ZDV) union onto the end of the direct tube assembly using the 1/16-inch graphite/vespel ferrule supplied in this kit. For 320 µm columns, install part number 0100-1527 For 530 µm columns, install part number 0100-1515 For 1/8-inch packed columns, install part number 0100-1542 5

Figure 4. Union installed onto the direct tube assembly 8. For capillary columns only: a. Select the appropriate polyimide liner for the column diameter (320 or 530 µm). Slide the liner onto the column, large end first. b. Cut off a small amount of the column end to eliminate any particles that might have been scraped from the inside of the liner. c. Slide the column and liner into the counterbored nut. Push the installation tool into the counterbore to force the liner all the way to the bottom of the counterbore. Keep the tool in place until the nut has been tightened. d. Slide the ferrule over the liner. Be sure that the liner is as far into the counterbore as it will go. Pull the column back until the end is flush with the liner. e. Screw the nut into the ZDV union. With a wrench, tighten the nut 10 to 15 past finger tight. 9. For 1/8-inch packed columns only. Connect the column to the ZDV union using the 1/8-inch nut and and appropriate ferrules. 6

10. Clean up any pieces of insulation in the oven. 11. Reinstall the valve box cover. 12. Restore power. Leak test Leak test the system using an electronic leak detector (if available and if helium is used as the carrier gas) or as described below. 1. If using hydrogen as a detector gas, turn it off. 2. Make sure the pressure at the carrier gas supply is at least 35 psi. 3. Disconnect the column at the detector fitting and plug the end. Packed column: cap the end with a clean Swagelok cap. Capillary column: insert the column end into the side of a clean septum. 4. Close the oven and turn on the GC. 5. Use the Control Module or data system to define a capillary column with length 0 m and any diameter. This puts the inlet into pressure control mode. 6. Set the inlet and oven to normal operating temperatures. 7. Set the inlet pressure to 25 psi. If pressure cannot be reached, there is a gross leak. (Check the column cap.) 8. Allow the pressure to stabilize for one minute, then turn the pressure off. Monitor the pressure for 10 minutes. If the pressure drop is < 0.7 psi ( 0.07 psi/min.), the system is leak free. If the pressure drop is much greater, check for leaks at the valve fittings and the column connection to the direct tube assembly. 7

Direct valve to column operation Undefined column If your column is undefined, the flow through the column is equal to the total flow. Defined column Pressure modes Both modes will operate as expected but the readings for column flow will be low by 1 to 2 ml/min, the amount of the septum purge flow. The actual column flow is equal to the total flow. Flow modes The actual column flow will be lower than the setpoint value by 1 to 2 ml/min, the amount of the septum purge flow. Copyright 2000 Agilent Technologies 2850 Centerville Road Wilmington, DE 19808-1610 Printed in USA FEB 2000 G2630-90787