Rule 21 WG #3 Issue #23. V2G Interconnection Issue Proposal Follow-Up January 17, 2019

Similar documents
Rule 21 Working Group 3

R Working Group 3 Issue 23

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Issue 23 draft for Nuvve

IEEE1547 Vs J3072 Vs Rule 21 Comparison

VGI Communications Protocols. April 2018

Battery Interconnection Process

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

The Commonwealth of Massachusetts

24. SOLAR INCENTIVE PROGRAM II

California Vehicle-Grid Integration (VGI) Roadmap: Enabling vehicle-based grid services

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Merger of the generator interconnection processes of Valley Electric and the ISO;

Energy Storage in the Fast Lane

Battery Interconnection Process

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Interconnection and Net Metering Service in Ohio

What, Why, and Where? Brian Lips Senior Project Manager for Policy NC Clean Energy Technology Center

SDG&E Electric Vehicle activities

INTRODUCTION. June 15, Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110

CPUC Transportation Electrification Activities

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

TERMS AND CONDITIONS

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

PROPOSED RULES FOR ENERGY STORAGE RESOURCES IN GENERATOR INTERCONNECTION STUDIES GI Improvement Task Force

Overview of Net Energy Metering (NEM) Successor Tariff (NEM 2.0)

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Overview of S.L Competitive Energy Solutions for North Carolina

Net Metering Policy Framework. July 2015

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

White Paper. P13008 Net-metering concept for Small Scale Embedded Generation in South Africa. prepared for

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

Smart Charging and Vehicle Grid Integration Silicon Valley Leadership Group PEV Forum December 16, 2014

Decision on Merced Irrigation District Transition Agreement

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Electric Vehicle Strategy MPSC Technical Conference February 20, 2018

California Vehicle-Grid Integration (VGI) Roadmap: Enabling vehicle-based grid services

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Freeing The Grid Resource for better solar policy

Rhode Island Net Metering First Bill Walkthrough. Updated September 2017

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) WORKING GROUP ONE FINAL REPORT

Joint EV Charging Parties Comments

Rider 11 Partial Requirements Service (PRS)

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Interconnection Reform Update to New Jersey Board of Public Utilities IX/NEM Working Group

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

GridMotion project. Armand Peugeot Chaire Conference. PSA La Garenne Colombes

Grid Energy Storage: Policies

PREPARED TESTIMONY OF DAVID M. GOLDGRABEN ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY CHAPTER 3

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

Proposed Amendments to the Zero Emission Vehicle Regulation. March 27-28, 2003

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

The Commonwealth of Massachusetts

Update on State Solar Net Metering Activities Lori Bird, NREL RPS Collaborative Summit Washington, DC September 23, 2014

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

USAID Distributed PV Building Blocks

Addressing ambiguity in how electricity industry legislation applies to secondary networks

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Solar Massachusetts Renewable Target (SMART) Program Summary Kaitlin Kelly Renewable Energy Program Coordinator

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Vermont Public Power Supply Authority 2018 Tier 3 Annual Plan

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

Solar Power, NEM and Challenges to the Traditional Utility Model. Carrie Cullen Hitt SVP, State Affairs

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Senate Substitute for HOUSE BILL No. 2101

MA SMART The EDC Perspective. Chris Porter - National Grid Brian Rice - Eversource

DRAFT R E S O L U T I O N

Testimony of Ann Wilson House Energy & Commerce Committee Subcommittee on Commerce, Manufacturing and Trade Self-Driving Cars November 15, 2016

February 13, Docket No. ER ; ER Response to Request for Additional Information

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

Brussels, 14 September ACEA position and recommendations for the standardization of the charging of electrically chargeable vehicles

Grid Interactive Vehicle Integration

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Improving DER Interconnection with Updated Standards and Codes, Smart Inverters, and Distribution System Design

S T A F F R E P O R T

Net Metering & Compensation Seminar

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Electric Vehicles: Opportunities and Challenges

SHENANDOAH VALLEY ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

06/05/2018. COMMUNITY SOLAR OVERVIEW For Generation Owners and Subscribers

SEPA Grid Evolution Summit: Rethinking Rate Design

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Transcription:

Rule 21 WG #3 Issue #23 V2G Interconnection Issue Proposal Follow-Up January 17, 2019 1

Presentation Overview Proposal Concepts: Establish applicability of Rule 21 only when bi-directional capabilities are activated and utilized Authorize V2G DC interconnections and make the appropriate modifications to the Rule 21 tariff and portal Direct a sub-group within Working Group #4 in this proceeding (R.17-07-007) to more deeply address V2G AC interconnection issues Clarify a pathway for parties to interconnect V2G AC systems on a timely basis for experimental and/or temporary use 2

Proposal #1: Applicability CESA recommends that applicability of the Rule 21 tariff specifically call out the nonapplicability of V1G and V2G systems when V2G capabilities are activated CESA proposes the following redline changes: 4. Interaction with Other Tariffs for Storage or Vehicle-to-Grid Charging Load Treatment For retail customers interconnecting energy storage devices pursuant to this Rule, the load aspects of the storage devices will be treated pursuant to Rules 2, 3, 15, and 16 just like other load, using the incremental net load for non-residential customers, if any, of the storage devices. For retail customers activating vehicle-to-grid devices to interconnect to the distribution grid, the load aspects of the vehicle-to-grid devices will be treated pursuant to Rules 15 and 16 just like other load, using the incremental net load for customers, if any, of the vehicle-to-grid devices. This Rule only applies to vehicle-togrid devices that operate as a Generating Facilities for retail customers seeking to activate vehicle-to-grid capabilities. Vehicle-to-grid devices should otherwise not be applicable to this Rule and should be only applicable to Rules 15 and 16. 3

Proposal #1: Applicability CESA raises the possibility of defining vehicle-to-grid and how to define activation of V2G capabilities, as it would clarify applicability questions for V2G systems i.e., when V2G systems should be treated as Load Facilities versus Generating Facilities CESA proposes the following redline changes to Section C: Vehicle-to-grid devices: Electric vehicles or electric vehicle supply equipment that have the capability of bi-directional electrical energy flow between the electric vehicles or electric vehicle supply equipment and the host customer load or grid Activate; activation: The act or condition of Load Facilities modifying inverter or equivalent controls to operate and be treated as Generating Facilities 4

Proposal #2: V2G DC Interconnections Authorize V2G DC interconnections and make the appropriate modifications to the Rule 21 tariff and portal: Modify interconnection portal (Issue #22) to accommodate EVSEs in Rule 21 application This can be addressed in Issue #22 Streamline study processes (Section N expedited process for non-export storage) No major changes needed, including on requiring UL-1741 certified smart inverter in Section N What is the status of continuing Section N processes? Additional policy questions that may not be addressed here but should be considered broadly: Can threshold and multiple generator provision be reassessed given EV fleets? Can we strike the provisions around control systems ensuring that there is no increase in a customer s existing peak load demand? What is the status of continuing Section N processes? 5

Proposal #2: V2G DC Interconnections CESA proposes the following redline modifications to the Rule 21 tariff Section D (General Rules, Rights, and Obligations): 14. Special Provisions Applicable to Non-Export Energy Storage Generating Facilities Applicants with Non-Export Energy Storage Generating Facilities, including direct current vehicle-to-grid energy storage systems, that meet the criteria listed in Section N shall be eligible to elect to have their Interconnection Requests processed in an expedited timeframe, subject to the terms and conditions of Section N. Similarly, the opening applicability paragraph of Section N would need to be modified: Upon implementation by Distribution Provider, Applicants with Interconnection Requests for Non-Export Energy Storage Generating Facilities, including direct current vehicle-to-grid energy storage systems, who meet the requirements outlined below are eligible for expedited interconnection, as provided herein, in accordance with the Fast Track Process technical review requirements of Section F.2. Applicants with Non-Export AC/DC Converters that meet the requirements outlined in Section O below are also eligible. 6

Proposal #2: V2G DC Interconnections Authorize V2G DC interconnections and make the appropriate modifications to the Rule 21 tariff and portal: Create expedited interconnection process similar to NEM generating facilities for the exporting use cases Alternatively, a new sub-section of Section N and Section B.5 could be created for V2G DC systems and broadly for V2G systems in general, thus teeing up future consideration of V2G AC interconnections: As opposed to lumping them in with BTM energy storage 7

Proposal #3: V2G AC Interconnection Discussions Direct a sub-group within Working Group #4 in this proceeding (R.17-07-007) to more deeply address V2G AC interconnection issues: More time is needed Are there ways to break this issue out for more immediate sub-group attention? Do we have to wait until WG #3 report is completed, commented on, and decided? Stakeholders are locked and ready to put in the time to develop proposal How can we initiate more deeper understanding of SAE J3072 (more applicable standard)? Can the definition of smart inverter be broadened to not be limited to a box but allow smart inverter functionalities, including communication capabilities, encompass the combination of the EVSE and EV? 8

Proposal #4: V2G AC Interconnection Pilot Approval Clarify a pathway for parties to interconnect V2G AC systems on a timely basis for experimental and/or temporary use: The IOUs should clarify a path for some temporary allowance for pilots and experimentation and not hinder pilot deployments due to interconnection issues Key learning opportunities would be deterred They may have de minimis impact and are overseen by CPUC/CEC Temporary exemption from Rule 21 smart inverter requirements at limited levels appears to be worthy of consideration at this time while being supplemented by SAE J3072 certification Key learning opportunities would be deterred 9

Key Conclusions V2G has great potential and supports the state s goals but face interconnection barriers and uncertainties Automotive OEMs and EVSE providers need a regulatory signal that applicable V2G systems have a clear path to interconnection Customer experience should be an important factor that should be taken into account in these Rule 21 working group discussions V2G use case applicability should be clarified V2G DC systems should be authorized (not much change needed) and some V2G AC systems should be allowed for learning purposes V2G AC interconnection discussions should continue in a forum that allows for deeper and more technical discussions to work toward longer-term solutions 10

Thank You Jin Noh Policy Manager California Energy Storage Alliance (CESA) jnoh@storagealliance.org 703-507-8809 11