GRID CONNECTION OF POWER GENERATING FACILITIES. FEBEG POSITION Elia WG Belgian Grid ( )

Similar documents
The Role of DSO as Facilitator of the Electricity Markets in Macedonia. Key aspects and considerations

Tendering Public Charging Infrastructure for Electric Vehicles

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach

Good Practices for Grid Connection: European Wind Industry perspective. Iván Pineda EWEA Research Officer Grids and Internal Electricity Market

XIII Seminario Repsol YPF - Harvard

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Position of the European Sea Ports Organisation on the Commission s proposal on Port Reception Facilities (COM 2018/0012)

DG system integration in distribution networks. The transition from passive to active grids

Security of supply II: Electric Transmission System Reliability

Accelerating Electric Recharging Infrastructure Deployment in Europe

New Rules for a Consumer Centered Clean Energy Transition EURELECTRIC views on the Clean Energy Package

The Development of Adequate Energy Infrastructure in Albania and Alternative Resource Options

Demand Charges to Deal With Net Energy Metering: Key Considerations

Japanese version of Connect & Manage for expanded introduction of renewable energies

Global PV Demand Drivers

Automated and Electric Vehicles Bill

INTERNATIONAL GOOD PRACTICES IN ROAD INFRASTRUCTURE SAFETY MANAGEMENT (RISM) & LESSONS FOR ROMANIA

Brookfield Renewable Ireland. Response to Review of Connection and Grid Access Policy: Initial Thinking & Proposed Transitional Arrangements

REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS

Life Needs Power, Hannover Messe, April 24, 2018 The role of smart and strong grids in Europe s energy transition

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens,

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

The Gambia National Forum on

PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

Frequency-Regulation Reserves by DERs: barriers to entry and options for their resolution. Olivier BORNE - Marc PETIT - Yannick PEREZ

UfM Ministerial Declaration on Energy

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016

Towards a sustainable market design

Mutual trading strategy between customers and power generations based on load consuming patterns. Junyong Liu, Youbo Liu Sichuan University

Power distribution: contributing to the European energy transition

CO2 WLTP November 2018

CONSULTATION DOCUMENT

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Click to edit Master title style

Modernising the Great Western railway

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Solar-Wind Specific Request for Proposals

Flexible gas markets for variable renewable generation

Connecting your business diesel generation

Electric energy storage Elia Group Approach

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

SUMMARY OF THE IMPACT ASSESSMENT

Serbia Analytical examination of the acquis

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Non-BM Balancing Services Volumes and Expenditure

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Progress and Challenges in Philippine Energy Sector Reform

Page 1 of 5. 1 The Code Administrator will provide the paper reference following submission to National Grid.

Grid Energy Storage: Policies

Market Models for Rolling-out Electric Vehicle Public Charging Infrastructure. Gunnar Lorenz Head of Unit, Networks EURELECTRIC

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

Opportunities for Export and Trade Development: Electricity Export Expansion to Europe. Joint EFET & DTEK Legal Workshop

Unleashing New York s Energy Efficiency Market Once and for All

Suggested Administrative Procedure to Deliver Supported Program Feature. Community- driven Program

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS

Comhairle Cathrach Chorcaí Cork City Council

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Enova's support to charging infrastructure in Norway

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Transmission System Operators in the Interplay between Physics and Market

Layered Energy System

Power Purchase Agreement for Commercial PV Systems

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

National Agency for Energy Regulation

COUNCIL OF THE EUROPEAN UNION. Brussels, 31 May /13. Interinstitutional File: 2012/0288 (COD)

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status

Spreading Innovation for the Power Sector Transformation Globally. Amsterdam, 3 October 2017

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Decision on Merced Irrigation District Transition Agreement

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Part 3 Agreement Programs for 2017 and Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act

Grid Impacts of Variable Generation at High Penetration Levels

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

SSE Guide to the Energy Industry. Guide

RATE 765 RENEWABLE FEED-IN TARIFF

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Particularities of Investment Projects in the Romanian Biodiesel Industry

Procurement notes for councils (Scotland)

Co-location Informal Guidance Note. March 2018 Version 1.1

THE CHARGING OF THE USE OF ROAD INFRASTRUCTURE

Distribution grid congestion management Remco Verzijlbergh, section Energy and Industry, faculty of Technology, Policy and Management

GC108: EU Code: Emergency & Restoration: Black start testing requirement

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

GAS WORKS THE ROLE OF THE DISTRIBUTION SYSTEM OPERATOR IN THE ELECTRICITY MARKET

JEA Distributed Generation Policy Effective April 1, 2018

(Liability of producers and importer for spent batteries and accumulators etc.)

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

Understanding Impacts of Distributed Solar Generation on Cost Recovery and Rates IAMU Annual Energy Conference Preconference Seminar

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Washington State Road Usage Charge Assessment

Transcription:

GRID CONNECTION OF POWER GENERATING FACILITIES FEBEG POSITION Elia WG Belgian Grid ()

FEBEG 2

CONTENT Current developments General principles Integrating new power plants in the grid Grid connection procedure Firm capacity for injection Congestion management Derogations Conclusions

CURRENT DEVELOPMENTS Proposals Elia (WG Belgian Grid) for new capacity reservation procedure Proposals Elia (WG Belgian Grid) for new connection procedure Proposals in Policy Platforms VREG and CWaPE (REDI) regarding flexible access (= conditional connection)

GENERAL PRINCIPLES (1) Need for transparent and efficient procedures for nondiscriminatory connection of new power plants to the grid (art. 23,1 of EU Electricity market directive) All new generation capacity should be timely connected to the grid (art. 23,2): connection cannot be refused on the grounds of possible future limitations to available network capacities current situation in BE is not compliant connection cannot be refused on the ground that it will lead to additional costs linked with necessary capacity increase of system elements Power generators need firm commitment and predictable conditions at the moment of their investment decision

GENERAL PRINCIPLES (2) Grid operators should employ all reasonable means to timely connect all new generation capacity: at a reasonable cost at the most appropriate connection point (location, voltage, ) without imposing disproportionate or discriminatory technical or operational constraints to power generators Grid operators should proactively invest with a long term vision in order to reach this objective 1 ensure the long-term ability of the system to meet demands for transmission of electricity in a secure, reliable and efficient way contribute to security of supply through adequate transmission capacity and system reliability Solidarity and coordination between TSO and DSOs regarding grid investments and choice of most appropriate connection point for power plants 1 Art. 12 of EU Electricity Market Directive

INTEGRATING NEW POWER PLANTS IN THE GRID Investment decision Power generation development Firm grid capacity available Strategy Project planning Development Phase Specs, Licensing, RFI, RFP, Engineering Build First Firing Consultation Request Request Commitment for firm capacity Connection Agreement Connection Procedure Orienting study Detailed study Engineering Realization Connection (Congestion Management) Grid development TYND Investment planning Engineering Permitting Grid reinforcements Grid reinforcements

CONNECTION PROCURE Capacity reservation TSO should treat all applications for grid connection on a transparent and non-discriminatory manner At the moment of its investment decision (financial closing) the applicant needs firm commitment that grid capacity will be firmly available at the commissioning date Objective is to avoid grid capacity hoarding for non realistic projects and reduce interdependencies and administrative overhead for Elia and applicant: frequent in between checks based on permitting status or confirmations of requests should be avoided ad hoc intervention of Minister in individual procedures is not appropriate

CONNECTION PROCEDURE Principles Connection procedure should be transparent and efficient and based on non-discriminatory criteria: objective criteria to assess request for connection informative orienting study formal request for detailed study (leading to connection options, including conditions, timing and costs) formal & mutual acceptance of one option signing of the connection agreement start realization according to planning and payment scheme Signing of the connection agreement: firmly allocates the capacity to the applicant fixes all terms and conditions between applicant and grid operator, including arrangements if grid operator is unable to timely realize grid connection (reinforcement) or if power plant project is delayed or definitely stopped

CONNECTION PROCEDURE Agreement General terms and conditions Specific terms and conditions In case of timely realization of connection Payment In case of withdrawal connection request Possible compensation depending on phase of realization In case of untimely realization of connection Compensation In case of untimely realization grid reinforcements Congestion management

FIRM CAPACITY FOR INJECTION Flexible connection is unacceptable lack of incentives for grid investments discourages investments in generation capacity discriminatory competition distortion additional uncertainty and missed revenues for power generator NMA1: flexible connections are discriminatory because they make a distinction between existing and new connections If grid infrastructure is not sufficient to guarantee firm connection capacity: market based congestion management as temporary solution pending urgent grid investments 1 NMA decision of the 20th of May, 2009 (102690/87)

CONGESTION MANAGEMENT (1) Objective criteria to measure/predict actual/future congestion proactive investment program Structural congestion is unacceptable Occasional congestion: should also be prevented by timely investments market based congestion management can offer temporary solution Market based congestion management system with fair compensation ensures: grid operators can assess whether they compensate grid users to ramp up/down or invest in grid reinforcements a correct price which reflects scarcity or oversupply of flexibility a fair compensation incentivizes market operators to invest in flexible generation capacity or flexible demand

CONGESTION MANAGEMENT (2) System redispatch with up- and downward regulation can be implemented according to the Dutch Model: clear identification of congested zones on TSO and DSO grid voluntary and, if necessary, mandatory bidding applicable on all grid users (both generators and end users), including already connected parties no discrimination biddings for different categories of units to prioritize renewables and cogeneration fair and market based compensation net cost of congestion management system is socialized in grid fee

DEROGATIONS Derogations of these principles should be avoided: except for system security reasons existing derogations such as mutually agreed upon grid access constraints for specific conections during a limited number of hours for the maintenance of grid components, should not be considered as a precedent

CONCLUSIONS Grid operators should employ all necessary means to timely connect all new generation capacity Complexity and uncertainty in the connection procedure and agreement should be reduced Grid capacity for injection needs to be firm Structural congestion must be avoided by timely investments Occasional congestion should also be prevented by grid reinforcements or managed with a market based congestion management system with fair compensation