Safe, fast HV circuit breaker testing with DualGround technology

Similar documents
Chapter 21 Practical Electricity

Ensuring the Safety Of Medical Electronics

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

A Practical Guide to Free Energy Devices

MEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

How supercapacitors can extend alkaline battery life in portable electronics

Breaking new ground. A circuit breaker with the capacity to switch 15 large power plants

EMPAC Metal enclosed capacitor bank for wind applications

A 500kV AIS Switchyard Rejuvenation in British Columbia using Hybrids

Dual Power. Protection. Protection

Substation Concepts for the Future

BellMega BM-510. Operation Manual Ver: 1.0 Rev: 1

Power System Stability Analysis on System Connected to Wind Power Generation with Solid State Fault Current Limiter

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Grounding Of Standby & Emergency Power Systems

MOM2 Handheld High Current Micro-ohmmeter

CALTRAP INSTALLATION AND OPERATIONS MANUAL

Power Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com

123/145kV SF6 Gas-Insulated Switchgear incorporating VCB. 145kV-1250~2000A-31.5kA

MOM2 Micro-ohmmeter APPLICATIONS DESCRIPTION. MOM2 Micro-ohmmeter. Up to 220 A. Battery supplied. Lightweight 1 kg. Safe test DualGround

Circuit Breaker and Transducer: Where do I connect? Robert Foster Application Engineer Megger Paradise, CA 95969

Guidelines IDRANet Wiring Structure & Testing

MOM2 Micro-ohmmeter. MOM2 Micro-ohmmeter. Up to 220 A. Battery supplied. Lightweight 1 kg. Safe test DualGround. Auto range: 1 µω to 1000 mω

Dynamic Resistance Measurement for Circuit Breakers Applying high DC current

3AP1 DTC for 145 and 245 kv

K25000 & KD25000 Series

MOM2 Micro-ohmmeter. MOM2 Micro-ohmmeter. Up to 220 A. Battery supplied. Lightweight 1 kg. Safe test DualGround. Auto range: 1 µω to 1000 mω

Chapter 27. Circuits

Modular Standardized Electrical and Control Solutions for Fast Track Projects

V=I R P=V I P=I 2 R. E=P t V 2 R

High voltage products PASS M0S 252 kv Innovative solution for transmission substation up to 252 kv

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

BM kv Digital Insulation Tester USER MANUAL

Electrical Energy and Power Ratings

TECHNICAL GUIDE FOR PROXIMITY SENSORS DEFINITIONS YAMATAKE PROXIMITY SENSOR CATEGORIES

DLRO-H200 Microhmmeter

3.2. Current Limiting Fuses. Contents

BASIC ELECTRICAL MEASUREMENTS By David Navone

DYNAMIC BEHAVIOUR OF SINGLE-PHASE INDUCTION GENERATORS DURING DISCONNECTION AND RECONNECTION TO THE GRID

Arc flash solutions catalogue Australia. Safety solutions - Protecting employees and the enterprise

Unit Protection System for Pumped-Storage Power Stations

Independent Testing Laboratory for High Voltage Equipment

Grounding systems for power supply facilities

DESIGN AND ANALYSIS OF PRE- INSERTION RESISTOR MECHANISM

A low loss mechanical HVDC breaker for HVDC Grid applications THOMAS ERIKSSON, MAGNUS BACKMAN, STEFAN HALÉN ABB AB, CORPORATE RESEARCH SWEDEN

SF 6 Gas Insulated Switchgear Type SDH314 / SDHa314 for 72.5 to 145 kv

Chapter Assessment Use with Chapter 22.

Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2

MOM2 Microhmmeter. MOM2 Microhmmeter. Up to 220 A. Battery supplied. Lightweight 1 kg. Safe test DualGround. Auto range: 1 µω to 1000 mω

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Improving predictive maintenance with oil condition monitoring.

& HIGH CURRENT DC POWER SUPPLIES INSTRUCTION MANUAL

Working Principle of Earth Leakage Circuit Breaker (ELCB) and Residual Current Device (RCD)

Battery Monitoring Why Technology Matters. Mats Karlstrom V.P. Sales & Marketing, Alber

Tolerance-Based Time-Current Coordination

AUTOMOTIVE EMC TEST HARNESSES: STANDARD LENGTHS AND THEIR EFFECT ON RADIATED EMISSIONS

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Experience on Deterioration Survey of Aged 550 kv GIS and Optimized Evaluation Model in Thailand

B kv Gas-insulated Substations

Reverse power relay and protection assemblies

Class X Chapter 09 Electrical Power and Household circuits Physics

Examples of Electric Drive Solutions and Applied Technologies

Armature Reaction and Saturation Effect

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava ELECTRICAL ENGINEERING AND ELECTRONICS.

Air-insulated switchgear UniGear type ZS1

Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A

UNIT 2. INTRODUCTION TO DC GENERATOR (Part 1) OBJECTIVES. General Objective

RESIDUAL CURRENT CIRCUIT BREAKER

1.0 Installation Wiring

DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN)

Overcurrent protection

Electromagnetic Coordination Study Objectives for Railroad and Electric Utility Shared Corridors

PASS M00. Multifunctional modules for high voltage substations kv; A;... 31,5 ka

Advanced Test Equipment Rentals ATEC (2832)

MJÖLNER 200 Microhmmeter

Power systems Protection course

Technical information No. 01. IT systems. The basis for reliable power supply

KD LV Motor Protection Relay

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications

POWER FACTOR CORRECTION OF FAST DYNAMICS INDUSTRIAL LOADS

Alvin Xu & Johnny Wang, ABB Xiamen Switchgear Co,. Ltd., November, 2016 ABB lead the intelligent revolution Intelligent technology (Part 2)

NEXT STEP B) SAFETY :

FACT SHEET Standard: Electrical Safety

Accurate and available today: a ready-made implementation of a battery management system for the new 48V automotive power bus

EXPERIMENTAL VERIFICATION OF INDUCED VOLTAGE SELF- EXCITATION OF A SWITCHED RELUCTANCE GENERATOR

VIII. Three-phase Induction Machines (Asynchronous Machines) Induction Machines

B kv T&D GAS INSULATED SWITCHGEAR

Range 16A to 63A. Sensitivity 30mA, 100mA, 300mA, 500mA. Execution Double Pole, Four Pole. Specification IEC / IS : 2000

Fault Finding. Standard/Fundamental Faults

ECET Distribution System Protection. Overcurrent Protection

Outdoor vacuum breaker for railway applications - FSK II

Concepts And Application Of Flexible Alternating Current Transmission System (FACTS) In Electric Power Network

Service and Rehabilitation Electrical Power Systems

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.

EXPERIMENT CALIBRATION OF 1PHASE ENERGY METER

Arc flash hazard mitigation

INTRODUCTION. I.1 - Historical review.

Brochure. Arc Guard System TVOC-2 A protection device for reliable safety

Ignition Coil Current Waveforms 2007 Honda Accord SE 4CYL

Transcription:

Safe, fast HV circuit breaker testing with DualGround technology Substation personnel safety From the earliest days of circuit breaker testing, safety of personnel has been the highest priority. The best way of enhancing safety is undoubtedly to increase the distance between personnel and devices carrying high voltages. Even when an object has been taken out of service however, there are three main ways it can remain or become dangerous through energisation by high voltage. The first is if a fault occurs and unwanted electrical potential reaches the object. The second is lightning affecting the power lines related to the object. The third and most common is capacitive coupling from a nearby live conductor producing a dangerous voltage on the object. These voltages can cause a current of 20 ma or even more through a human body and, according to IEC EN 61010, currents above 3.5 ma are dangerous. The only way to make an object safe for all the cases mentioned is to ground the object at all conductive points that would otherwise be free floating, and also where it is in contact with the surrounding system. In this way a safe zone is created and any current due to voltage on the object will take the shortest path to earth through the grounding cable, which is typically a 120 mm2 conductor. An object grounded in this way cannot become dangerous. Regulations and laws require all objects to be grounded on both sides before any maintenance work is performed on them. There are, however, approved exceptions because it is not possible to do all types of maintenance work with both sides grounded. For example, main contact Safe, fast circuit breaker testing Pg1

timing of circuit breakers is usually performed with only single side grounding (Fig 1). Another aspect of substation test equipment that is important for safety is the user interface. Operating the equipment must be straightforward, fast and easy. Field engineers need to spend their time and energy on the job in hand, not working out how the equipment works. This aspect is hard to quantify and is not covered in standards and regulations. Conventional timing method The conventional approach for main contact timing in circuit breakers is to use Ohm s law with a DC test voltage over the circuit breaker to distinguish the moment when the circuit breaker state changes from open to closed. This method is not based on a standard and there is, therefore, Pg2

no absolute reference point. However, at the present time, this is the technique that it most widely used. With both sides of the circuit breaker connected to ground, this method does not work. Since the circuit breaker contact is short-circuited by the ground loop the DC test current will continuously flow regardless of the contact state, thus, this method will indicate that the breaker is continuously closed. One way of overcoming this safety drawback has been adopted by EDF, the state-owned electricity company in France, which uses an automatic grounding device. A voltage sensor automatically closes a ground connection if there is a voltage potential between the object and ground. This device is used on one side while the other is grounded with a cable. With this technique, however, the timing test is more complicated and takes longer and the grounding device itself introduces another asset that might fail and therefore needs to be maintained. Both sides grounded, DRM timing method The DRM timing method was invented in 1993 by Programma Electric, which is now part of Megger. It was the first solution for measuring CB timing with both sides grounded (Fig 2). This method works by injecting a high current of around 100 amps while opening or closing the CB, monitoring the voltage and recording the dynamic resistance graph. This method was developed principally for outdoor HV breakers. Since contact resistance of the breaker is smaller than the ground loop, when the CB opens or closes the resistance graph will change and from this, the instant of closing and opening can be determined. To put this into perspective, the resistance range of the ground loop is typically around a couple of milliohms while the contact resistance of the breaker when firmly closed is around 50 microohms. This means during Pg3

an open operation, the resistance level will increase from around 50 microohms to 2 or 3 milliohms. This large change can be used to determined closing and opening time while the ground loop is in place. This method provides a safe way of testing SF6 outdoor HV breakers. It does, however, have limitations. The first difficulty is that since this method uses high current, it requires thick cables that make the instrument heavy to transport. For a twobreaks-per-phase breaker, it requires no less than nine 100 A cables! Fig. 3 In this open test, arcing contact only takes about 4 ms to open while having the higher level of resistance. Secondly, in many cases, ground loop resistance is around 2 to 3 milliohms, which is comparable with the arcing contact resistance of the breaker. During open or close operations, the difference between arcing contact and main contact to close or open is in the range of 2 to 7 milliseconds. Since the arcing contact resistance and ground loop resistance in outdoor SF6 breakers are comparable, the thresholds are difficult to determine accurately, and the timing result could be off by 2 to 7 milliseconds if the instant of main contact operation is detected instead of the instant of arcing contact operation. According to both IEC and IEEE standards it is the first touch of the arcing contact that is considered Pg4

as the closing time and the last separation of the arcing contact that is considered as the opening time. DRM on SF AIS CB Dynamic resistance during a close operation with duel ground Fig. 4 Dynamic resistance graph showing various levels during close operation; When breaker is open with ground loop in place, when only arcing contact is closed and when breaker is fully closed. However, according to IEC62271-100, the inter-phase synchronization maximum limit is 1/8 cycle which is 2.1 to 2.5 milliseconds maximum depending on whether it is a 50Hz or 60Hz system. An error of 2 to 7 milliseconds is therefore not acceptable. Fig 3 and Fig 4 show the arcing versus main contact resistance. Fig 5 illustrates the inside of the arcing contact versus main contact of the circuit breaker. In some circuit breaker designs, a pre-insertion (PIR) or a post-insertion (breaking) resistor is connected in parallel with the main contact. PIRs have their own switches and are switched in a few milliseconds prior to or Pg5

after the main contact closes or opens, respectively. These resistors are shown in Fig 6 and Fig 7. Diagnosis of a circuit breaker with PIRs includes timing measurement of the PIR contact. This presents a third difficulty with the DRM method. With PIR and post-insertion resistor values from hundreds of ohms up to several kilohms, the resistance change with the parallel grounding line of milliohms will hardly be noticeable. To put some figures to this with a ground loop of 2 milliohms and a PIR of 200 ohms the two resistances in parallel would have a total value of 1.99998 milliohm. Open or closed PIR would make a difference of a 1/1000 of a per cent, which is not measurable with field equipment. Fig. 6 Equivalent circuit of the circuit breaker phase with two contact pairs in series, each with a parallel contact pair with Pre- Insertion Resistor (PIR) and both sides of the breaker grounded. The grading capacitors are excluded. The fourth and biggest challenge is when the DRM method is used on a GIS breaker. Unlike an outdoor SF6 breaker, a GIS breaker has very low resistance in the ground loop, down to as low as around 75 microohms, which is about the same level of resistance as the main contact, and only a fraction of the arcing contact resistance. This makes determining the open and close level using DRM method impossible (Fig 8). Hence, for GIS breakers, one side of ground has to be opened, which presents the additional time-consuming challenge of finding connection points and it also exposes test engineers to risks of personal injury. DRM was undoubtedly a good start to saving time and enhancing safety in some instances, but the method has several limitations. To address these, the DCM method was developed and patented in 2007 by Megger and, during 2017, an improved third generation of DCM will be released. Pg6

Fig. 7 Schematic illustration of a high voltage circuit breaker (one phase) with two contacts in series, each with parallel contact with PIR and both sides grounded and optional added inductance in the grounding wires The third generation DCM for DualGround timing The first generations of DCM used the fact that there is a change in capacitance when a circuit breaker is in the closed versus the open position. The third generation of DCM modifies this method slightly so that not just the capacitance but also the total impedance is analysed, using a high frequency signal. When a circuit breaker operates from closed to open position it changes its properties from being almost purely resistive to almost purely capacitive. In a test situation with both sides of the circuit breaker grounded, the circuit will have resistive and inductive components through the ground loop, even though the breaker is open see the equivalent circuit in Fig 6. The circuit might also contain pre-insertion resistor (PIR) contacts (see Fig 6 and Fig 7), which also will affect the total impedance in the test circuit but less significantly than the main contact. The advantage of the new DCM techniques that analyse the total impedance change rather than just the capacitance or the resistive change, is that it is possible to detect both the main contact and the PIR contact with both sides of the circuit breaker grounded. Pg7

The ground connection has a very limited influence on the resonant circuit for high frequency signals because the impedance in the ground cables is relatively high. In special situations, like applications involving GIS, the grounding connection requires an increase of inductive reactance on the ground connection. This is achieved by putting a ferrite clamp around the ground connector. The ferrite clamp is either two halfdonuts that are easy to attach around a cable or a U-shape that is easy to attach around a bar. Fig. 8: 150 // 75 => 50 µ Ω Thus, CB in Closed position=50 µ Ω. CB in Open position=75 µ Ω. CB in arcing contact position:2 m Ω // 75 µω = 72 µω Measurement principle The test circuit is tuned with the breaker in both the closed and opened positions. During tuning the impedance level of the test circuit is measured with a high frequency signal. The frequency is swept to find the optimal frequency to maximize the measurement range and automatically set the threshold levels. After this tuning procedure has been performed, the test system will automatically detect if the main contact and the PIR contact are opened or closed. Pg8

The result is interpreted in the same way as conventional timing, and all results are in accordance with the relevant IEC and IEEE/ANSI standards. Testing GIS circuit breakers with DCM DualGround The major advantage with GIS is the reduction of space required compared with air-insulated substations. Also, the maintenance and test interval for circuit breakers installed in GIS is longer than in air-insulated installations. GIS has been installed since the 1980s and much of it is reaching the age when maintenance is needed. The most important diagnostic tool for GIS circuit breakers is the main contact timing described previously. Conventional timing requires that the ground be removed from at least one side of the circuit breaker. An isolated ground switch has a built-in feature that permits access to the primary circuit without grounding it. An isolated ground switch is, therefore, required on at least one side for a conventional timing without fully dismantling the GIS. This feature allows testing of CB timing using the normal single ground method, but it is necessary to remove the ground switch jumper, which as discussed earlier, subjects the testing personnel to high safety risks. In practice, capacitive coupled voltages of up to 4 kv have been reported, which is extremely dangerous. Early GIS installations rarely have insulated ground switches installed. Their use has increased over the decades, but it is still common to find new installations without them. In such cases, the dismantling required for conventional timing is time consuming and expensive. Also, if the bolts are not properly drawn, there will be leakage of SF6. The DCM dual ground method is, under specific conditions, capable of performing timing measurements on a GIS circuit breaker even when Pg9

there is no isolated ground switch available, whereas all other methods, including DRM, will fail to measure timing with both sides of the breaker grounded. These conditions include, for example, there being an access point to the primary circuit outside the gas insulated part, e.g. a bushing connected to an open air line. Generator circuit breakers The power outlet from a turbine in a power plant has a high current capacity; the short circuit current can be around 900 ka at 11 to 33 kv. The high current requires very thick conductors to avoid overheating. The bus bars and couplings are enormous, with hundreds of screws that must be tightened to a precise torque (Fig 9). Disconnection of the bus bar takes more than a day. If even one screw is tightened to the wrong torque, it will result in a point of increased resistance and heating. If the heating is serious, the power plant will need to be shut down for the loose bolt to be properly tightened. Knowing this, it is easy to understand why power plant owners are reluctant to allow the disconnection of bolted bus bars for timing measurements. All service work in power plants is scheduled around planned overhaul events. At this time, there are all manner of personnel working on the turbine and power line. Safety demands that the generator circuit breakers be grounded at both ends during these planned service events. Pg10

Timing of the main contacts with conventional methods using a DC voltage is now only possible if one bus bar is disconnected. The DCM method, however, allows timing with both sides grounded. The time-consuming work to disconnect the bus bar is eliminated along with the risk of loose bolts causing resistive overheating. Pre-insertion resistor (PIR) With a PIR in the circuit breaker and while it is switched on, the impedance for the test circuit is changed. With the third generation of DCM it is possible to detect the PIR impedance level and thereby present the PIR timing at the same time as the main contact timing is measured. This is a huge benefit since PIRs are used most frequently at high voltage levels where the likelihood of hazardous induced currents is high. The DCM technique allows the measurement of PIR contacts, which is impossible using DRM dual ground. Conclusion The additional safety and the principle of different methods for measuring timing on a circuit breaker with both sides grounded has been discussed and the superiority of the DCM DualGround method has been explained. Furthermore, time saving features and benefits of DCM have been shown. Examples include GCB, GIS CBs and CBs with PIRs. DCM DualGround saves up to one working day, reducing shut down and commissioning time. This is true in every case where the ground system cannot be removed or is not accessible. Pg11