INSTRUCTION MANUAL G-550

Similar documents
INSTRUCTION MANUAL G 2000RC. \Jï::) YAESU MUSEN CO., LTD. \ "I// C.P.O. BOX vv TOKYO, JAPAN

G-450A G-650A. Antenna Rotator & Controller. User Manual

FP-30. Power Supply. Technical Supplement. Contents. Introduction

ASSEMBLY AND INSTALLATION INSTRUCTIONS 738XB 70 CM OSCAR BOOMER MHz COMMUNICATIONS ANTENNAS (7/94)

Nanometrics Solar Power System

888 SMITH SYSTEM USER S GUIDE WARNING: Read and follow all directions for each step to insure proper assembly of this product.

AT120A-E; AT140A-E; AT150A,B,D-F; AT160B; AT175A-D,F Transformers

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

hy-gain INSTRUCTION MANUAL CD-4511 / CD-4511X Antenna Rotator CD-451I has 110 VAC Controller CD- 45IIX has 220 VAC Controller

SNP-8 Series Single mode FC CONNECTOR PLUG - for Angled-PC, Conical Shape -

MODEL SCA Installation and Operation Manual Important:

C2200 and C2200G Conversion Instructions For Country Groups and 10

PORTABLE POWER SUPPLY MODEL NUMBER VMS-1 VERSION 1.0

Series BFM Bulk Flow Monitor 1A FUSE RED LED RELAY. Part Number BFM-1 BFM-2 BFM-3 BFS-1

From. McCROMETER, INC WEST STETSON AVENUE HEMET, CA Phone (951) Toll Free (800) Fax (951)

SPECIFICATIONS ATTENTION OPERATION DESCRIPTION

M100F Incremental Motor Actuator R81F Interface Board

LTX RF LEVEL SENSOR. Instruction Manual

805 FLAT & INCLINE BENCH SYSTEM

Instruction Manual AVTM for. Strip Chart Recorder Catalog Nos and

Aerial Platform with Spec No.: AT-146-3A-00090

835 HIP SLED SYSTEM USER S GUIDE. WARNING: Read and follow all directions for each step to insure proper assembly of this product.

Easy Weigh ADVANCED COUNTING SCALE MODEL: AC-100 OWNER S MANUAL VER 1.00

COMPASS MODULE INSTALLATION & OPERATION MANUAL RMI ROCKY MOUNTAIN INSTRUMENT PO BOX 683 THERMOPOLIS, WY 82443

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

FR circuit breaker - hydraulic magnetic,

FR circuit breaker - hydraulic magnetic, railway, very high current. Datasheet

RS4000 Setup. Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping.

UL TEST REPORT AND PROCEDURE

3651 N Highway 89 Chino Valley, AZ (928)

PANcharge1k Battery Charger User's Manual

Sunwize Power Ready Express Quick Start

S&C Circuit-Switcher Mark VI Outdoor Transmission (69 kv through 138 kv)

INSTALLATION INSTRUCTIONS CATHEDRAL CHIMES. ATTENTION: Please leave this instruction booklet on the job site for future reference.

MALSR APPROACH LIGHTING. Medium-Intensity Approach Lighting System WITH ELEVATED SEQUENCED FLASHERS AND STEADY BURNING LIGHTS

JEEP WRANGLER JEEP WRANGLER UNLIMITED 2 & 4 DOOR 1 BODY LIFT KIT INSTALLATION INSTRUCTIONS KIT# 991

CHEVY AVALANCHE 1/2-TON ONLY 3 BODY LIFT KIT INSTALLATION INSTRUCTIONS KIT# 10173

DODGE DAKOTA (AUTO TRANS. ONLY) 3 BODY LIFT INSTALLATION INSTRUCTIONS KIT# 60163

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

FBD-NT Press Brake Installation Guide

INSTRUCTION MANUAL. HAM IV / HAM IVX Antenna Rotator HAM IV has 110 VAC Controller HAM IVX has 220

JEEP WRANGLER JEEP WRANGLER UNLIMITED 2 & 4 DOOR 2 BODY LIFT KIT INSTALLATION INSTRUCTIONS KIT# 992

Amateur Radio Station WFØGM Repairing a Yaesu G-1000DXA Rotor

INSTALLATION INSTRUCTIONS

Sivoia QED R Installation Instructions Please Leave for Occupant

Installation & Calibration Manual

Meaning of symbols Warning Caution. Prohibited. Required. Door Height. Door width. ±2 mm

Differential Pressure Sensor

SELF FEEDER. Instruction Manual TABLE OF CONTENTS

FL7M-A Series. Aluminum-chip Immunity DC 2-wire Type Cylindrical Proximity Sensors. Specifications. click FEATURES ORDER GUIDE

OPERATIONS MANUAL LEVER CHAIN HOIST

AR circuit breaker - Hydraulic magnetic,

Circular Connector K Series K-31S K-32S

Declaration of Conformity

NOVALYNX CORPORATION MODEL 200-WS-02F WIND SPEED & DIRECTION SENSOR INSTRUCTION MANUAL

Industrial Valves and Flanges

High Current, High Density, Power Connectors

FEEDER WITH SOLDER CUTTING FUNCTION

MCF3 DC86V11CT Inrush-withstand

TOYOTA TACOMA 2WD & 4WD 3 KIT INSTALLATION INSTRUCTIONS KIT# KIT# 5593

CHEVY/GMC /2-TON PICKUP 3 BODY LIFT INSTALLATION INSTRUCTIONS 2006 KIT# PA10163 MANUAL TRANSMISSION VEHICLES REQUIRE KIT# PA4701

Bubble Machine. User Manual

FG Series, 230V ac Toroidal Single Primary Transformers

CURRENT TRANSFORMER MODEL N. SS BAND SECURES BRACKET (view of screw clamp band omitted for clarity) 0.25 x 0.50 SLOT (2 PLACES)

3. WIRING AND INSTALLATION PROCEDURES 3.1 System wiring diagrams 4.LOCATION SELECTION 5. TOWER 6.1 SINGLE WIND GENERATOR 6.2CONTROLLER WIRING 6.

VOLTAGE CONNECTOR CORCOM S VOLTAGE SELECTING AND FUSED CONNECTOR

American Standard ProAx Triaxial Camera Connectors Installation Instructions

MS Sprayers NT 1000/1250 Installation Manual MS1

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG

TOYOTA TUNDRA 3 BODY LIFT INSTALLATION INSTRUCTIONS 2014 KIT# 5643

High-Temperature Axial Extensometer. Measure Strain With Specimens At Temperatures Up To 1200 C (2200 F)

SUMMERS Pull-Type with Proxy Switch Sense Installation Manual SM2

TOWA SEIDEN INDUSTRIAL CO., LTD.

ELECTRONIC CONTROL ACTUATOR

MCF3 25CT Inrush-withstand

Measurements are expressed in millimeters.

Application Information

N.S1-P relay - Signalling, post

INSTALLATION AND OPERATING INSTRUCTIONS

SWII Users Manual. Intercomp Co County Road 116 Minneapolis, MN (763) Fax

CM 5000D IN A HURRY?

EV Charging and Discharging System Connector KW02 Series

HYDRAULIC TRUCK CRANE

Installation & Calibration

Model UT601: OPERATING MANUAL

User Guide. BreezePro TPW-400DT 12/24V 400W Wind Turbine A. NOTICE. B. SAFETY PRECAUTIONS (Important) C. About BreezePro

INSTALLATION AND OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS FOR. Gold-Place TM. Manual Pick & Place with Dispenser System Model MPP-21

CHAPTER 1C PREPARING FOR INSTALLATION

JMW 10 AND 12 Tonearms

HYDRAULIC TRUCK CRANE

Users Manual. Phase Rotation Indicator

ISIMET/MAPA, LLC, an affiliate of WCM Industries, Inc. 103 CJ Wise Parkway Naples, TX (903) fax (903)

FLEXI-COIL 67 Series (1999+) Installation Manual FC1

Universal Super Shield & Ultimate Aluminum w/electric Drive Conversion Kits , , Installation Instructions

HitchHoist Assembly & Operating Instructions IMPORTANT NOTICE

Inductive Proximity Sensor

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Series 41 and 81 Modutrol IV Motors

Boston Gear Ratiotrol

Transcription:

INSTRUCTION MANUAL G-550 VERTEX STANDARD CO., LTD. 4-8-8 Nakameguro, Meguro-Ku, Tokyo 153-8644, Japan VERTEX STANDARD US Headquarters 17210 Edwards Rd., Cerritos, CA 90703, U.S.A. International Division 8350 N.W. 52nd Terrace, Suite 201, Miami, FL 33166, U.S.A. YAESU EUROPE B.V. P.O. Box 75525, 1118 ZN Schiphol, The Netherlands YAESU UK LTD. Unit 12, Sun Valley Business Park, Winnall Close Winchester, Hampshire, SO23 0LB, U.K. YAESU GERMANY GmbH Am Kronberger Hang 2, D-65824 Schwalbach, Germany VERTEX STANDARD HK LTD. Unit 5, 20/F., Seaview Centre, 139-141 Hoi Bun Road, Kwun Tong, Kowloon, Hong Kong

YAESU G-550 MEDIUM-DUTY ANTENNA ELEVATION ROTATOR & CONTROLLER The Yaesu G-550 provides 180 elevation control of unidirectional satellite antenna arrays under remote control from the station operating position. The factory-lubricated rotator unit is housed in weatherproof melamine resin coated die-cast aluminum, to provide maintenance-free operation under all climatic conditions. The controller unit is a handsomely-styled desktop unit which indicates antenna elevation offset from zenith up to 90 in both directions. Please read this manual carefully before installing the G-550. Voltage requirement: 110-120 or 220-240 VAC Power consumption: 30 VA Motor voltage: 24 VAC 180 rotation time (approx.): 67 seconds @ 60 Hz Rotation torque: 1,400 kgf-cm (101 ft-lbs) Stationary braking torque: 4,000 kgf-cm (289 ft-lbs) SPECIFICATIONS Pointing accuracy: ±3 percent Control cable: 6 conductors (#20 AWG or larger) Mast diameter: 38-63 mm (1-1/2 to 2-1/2 inches) Boom diameter: 32-43 mm (1-1/4 to 1-5/8 inches) Weight: Rotator; 3.6 kg (7.9 lbs), Controller; 1.7 kg (3.7 lbs) Packaged; 5.8 kg (12.7 lbs) PAGE 1

UNPACKING & INSPECTION When unpacking the rotator confirm the presence of the following items; Rotator Unit... 1 Controller Unit... 1 7-pin Metal Connector... 1 Water Resist Cap... 1 Instruction Manual... 1 Plastic Bag containing; 1 8mm Spring washer... 8 2 8mm Nut... 8 3 8mm Flat washer... 8 4 8mm dia Stud bolt... 4 5 Pipe clamp... 6 6 U-Bolt... 2 7 6mm Flat washer... 4 8 6mm Spring washer... 4 9 6mm Nut... 4 10 Spare Fuse (117V;1A, 220V; 0.5A)... 1 If any of these items are missing or appear to be damaged, save the carton and packing material and notify the shipping company (or dealer, if purchased directly at his shop). Before proceeding with installation, confirm that the AC voltage label on the rear of the Controller matches your local line voltage: either 117V for 110 to 120 VAC, 220 for 220 to 240 VAC. If the labeled voltage range does not match, return the controller to the dealer from whom you purchased it (different power transformers are installed for the different voltage ranges). Note that cable is not included with the rotator, as the length must be determined caseby-case. Contact your Yaesu dealer to obtain the length of cable your installation requires. For runs of over 100 feet, use #18 AWG instead of #20 AWG. PAGE 2

CONTROL CABLE PREPARATION & CONNECTION 1. Assemble the cable according to the following diagrams. 2. Connect each wire to the terminal on the rear panel of the controller, making sure to match the numbers on the pins (terminals 7 and 8 are not used), and insert the connector to the Jack on the rotator. 3. On the controller, make sure that the POWER switch is in the OFF position, and connect the line cord to the AC power outlet. 4. Turn on the POWER switch. The meter lamp should light and the meter indicate approximately 90 (center). 5. Press the UP switch. The rotator should turn as the meter indication moves to the right. Release the UP switch and confirm that the rotator slowly stops. 6. Repeat step 5, pressing the DOWN switch instead of the UP switch. The rotator should turn in the opposite direction as the meter indication moves to the left. 7. If operation does not occur as described above, check for a wiring error in the cable connections. When everything checks out in the above steps, slide the water resist cap over the connecter on the rotator. Remove the cable clamps from the controller, clip them over the cables, and screw them back onto the controller. Then replace the terminal cover. Notes on Controller Operation: If both UP and DOWN switches are pressed at the same time, the rotator turns clockwise (up). Remember to turn the controller off when the rotator is not in use. Terminal 7 is not used. Tin the wire with solder. Make sure to insert the Water Resist Cap first. PAGE 3

ELEVATION INDICATOR CALIBRATION Turn the controller off and note the position of the meter needle, which should be precisely at the left edge of the scale. If not, adjust the zero adjust screw beneath the meter face. 0. ADJ Screw Press the UP switch to align the 180 markers on the rotator. The meter should now point precisely to 180 (right edge of scale). If not, adjust the Full Scale ADJ potentiometer on the rear panel so that it does. Full Scale ADJ PAGE 4

ROTATOR INSTALLATION The G-550 is designed to accommodate small- and medium-size antenna arrays. The maximum safe load depends on the physical size of the antenna, method and quality of mechanical installation, and maximum wind velocity at the installation site. The diagrams below show several recommended installations. Notice that the preferred mounting method requires that each antenna be attached to the boom at its center of gravity, with the boom there attached to the rotator at its center of gravity. This minimizes stress on the rotator and supporting structure, especially during strong winds. 1. Referring to Figure 1, screw one 8mm nut over the end of each stud bolt with the shortest thread. Slip a spring washer over the threads, and screw each stud bolt into holes in the side of the rotator. 2. Slip an 8mm flat washer over each installed stud bolt, and then the pipe clamps, as shown in Figure 2. Place another flat washer and then spring washer over the end of each stud bolt, and start a nut on each to hold the hardware in place. 3. Slide the boom through the rotator. 4. Place one U-bolt over each arm of the rotator, and assemble one pipe clamp, flat washers, spring washers and nuts on the U-bolts as shown in Figure 2. Center the boom carefully, and alternately tighten the nuts on each U-bolt 1/2-turn beyond the point where the spring washers are flattened. Figure 1 Figure 2 PAGE 5

Be sure to leave enough slack in both the elevation control cable and the coaxial cable feedline around the azimuth rotator so the antenna can rotate 180 without straining the cable or feedline. For dual parallel arrays, feedlines should be taped to the boom on either side of the rotator, with enough slack left to allow 180 rotation without stressing the feedlines. The rotator motors are rated for five-minutes intermittent duty. However, they be brought to rest for at least 15 minutes afterwards. No 1 2 3 4 5 6 7 8 9 Qty 8 8 8 4 6 2 4 4 4 Description 8φ Spring Washer 8φ Nut 8φ Washer 8φ Stud Bolt Boom/Mast Clamp U Bolt 6φ Washer 6φ Spring Washer 6φ Nut PAGE 6

G-550 Schematic Diagram PAGE 7

Note PAGE 8

Copyright 2001 VERTEX STANDARD CO., LTD. All rights reserved No portion of this manual may be reproduced without the permission of VERTEX STANDARD CO., LTD. Printed in Japan. E 1 2 8 9 1 0 0 1