Residential Photovoltaic (PV) Packet

Similar documents
Non-Residential Solar Energy Photovoltaic (PV) Packet

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

2016 Photovoltaic Solar System Plan Review List

STREAMLINED SOLAR CHECKLIST Owner Name:

Photovoltaic Solar Plan Review

City of Manhattan Beach Community Development

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

City of Manhattan Beach Community Development

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

ENGINEERING SPECIFICATION

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Solar PV Standard Electrical Plan

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

PHOTOVOLTAIC SYSTEMS

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

Solar PV Standard Electric Plan

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

Green Building Technology

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Applicant and Site Information Job Address: Permit #:

SOLAR PV INSTALLATIONS

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

CHAPTER 10 ELECTRICAL. Notes:

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

CITY OF SONOMA - TOOLKIT DOCUMENT #1

Temporarily Approved Solar Photovoltaic System Electrical Schematics

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Job Address: Permit #:

Solar Power Installation Application

CPS 3Phs String Inverters NEC 2014 Compliance

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings

Application Note Three Phase String Inverters NEC 2014 Compliance

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

Load Side PV Connections

CHAPTER 10 ELECTRICAL

City of Daly City Department of Economic and Community Development Building Division th Street, Daly City. CA

Definitions. Scope. Customer Generation Interconnection Requirements

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

DIRECTORY, IDENTIFICATION, LABEL, MARKING, PLAQUE, AND SIGN REQUIREMENTS FOR SOLAR PV SYSTEMS

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Net Metering Service. Customer Information Package

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

Know the Code: PV and NEC

Grounding Systems. Equipment Grounding & Grounded Conductors

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

RGS PV-000. Sheet List

Technical Summary of Battery Energy Storage Systems

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

Bulletin Interconnection of electric power production sources Rules 2-010, , , , , , and

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Questions from the AHJ To Fuse or Not to Fuse?

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

Georgia Tech Bunger Henry Solar Roof Array ENGINEERING PACKAGE

Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller)

CHAPTER V RESIDENTIAL WIRING

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Solar PV General Introduction Guide for Electricians

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support

Renewable sources of electricity a brief overview

Shining a Light On Commercial Building Solar Ready Requirements

Washoe County PLAN SUBMITTAL

March Commercial Distributed Generation with Optional Energy Storage Systems

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

This Process Chart assumes that the system has been inspected and the proper signage has been installed.

BESS Labelling Location Sign Source Notes

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

Supply-Side PV Connections

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Photovoltaic Installations

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Electrical Guidelines for Inverter-Based Micro-Generating Facility

Solar Electric Installation Requirements

Transcription:

Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Residential Photovoltaic (PV) Packet The Roseville Municipal Code and Roseville Electric require all PV systems to comply with the requirements of: City of Roseville Permit PERMIT SUBMITTAL REQUIRED Roseville Electric Residential Renewable Energy Program SYSTEM INTERCONNECTION APPLICATION REQUIRED https://roseville.ca.us/cms/one.aspx?portalid=7964922&pageid=8893146 Design & Construction to comply with Roseville Electric Specifications for Residential Construction Section 8.2 (and) Rule 21-(both located in above link). Net-metering upgrade charges will apply. Systems may not offset more than 100% of the customer s historical annual load. Contents of Packet: Residential Photovoltaic Requirements Sample One-Line Diagram for PV System Sample Site Diagram CEC Table 310.15(B)(16) (included for reference) Roseville Electric Solar Signage Requirements (3 pages) PV Roof Clearance Drawing If you have any questions regarding your PV system permit, please call the building department at (916) 774-5332. If you have any questions regarding the Roseville Electric Residential Renewable Energy program, please call Roseville Electric at (916) 79-POWER. Residential Photovoltaic (PV) Packet Revised 04/07/2017 Page 1 of 10

Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Residential Photovoltaic Requirements Based on the 2016 California Residential Code (CRC) and the 2016 California Electrical Code (CEC) Article 690, Roseville Electric, and Roseville Fire Departments Residential PV system shall be installed in accordance with the current adopted edition of the (CRC) and CEC Article 690 and any other applicable articles or codes adopted by the jurisdiction. Simple plot plan showing: Lot lines Structure locations Main service panel location PV module array configuration shown on a roof layout (or lot if ground mounted system) % of coverage of roof area (If more than 50% a review by the fire department is required) Distance from ridge to array(s) - (minimum of 3 required by CRC) Distance from valley/ hip to array(s) - (minimum of 1.5 by CRC) PV equipment locations, Solar arrays, DC combiner boxes, conduit and conductor location, Inverter, AC combiner box. Roof Information (for roof mounted systems): Type of roof structure and slope. If rafters, provide size and spacing of existing roof framing members. Existing roofing material PV Equipment Manufacturer s Specifications: Provide cut sheets on all components including but not limited to those shown below; including make, model, listing, size, weight, etc. Highlight project specific information on the cut sheets. Inverter: PV modules UL 1703 listed (R907.5) Inverter with GFCI & AFCI protection Mounting System (if using substitution parts to any listed/certified system, or mixing components of different mounting systems, additional engineering shall be required addressing the withdrawal and lateral capacities). Disconnects Combiner Box (if used) AC and DC Combiner boxes. Model number Integrated disconnect Equipped with rapid shutdown. Roseville Electric requires a visible external A/C disconnect within 5 of the main service panel. Mounting System for Panel Installation: Highlight project specific information on the cut sheets Indicate the style, diameter, length of embedment of bolts into framing members and location of attachments. Indicate number of bolts per panel. Provide mounting details and certified engineering or listed mounting installation. Complete Solar Panel Dead Weight Loading Calculation form. Residential Photovoltaic (PV) Packet Revised 04/07/2017 Page 2 of 10

Photovoltaic Modules: Electrical Schematic: If ground mounted, provide details for the foundation. Open-circuit voltage (Voc) from listed cut sheet Maximum system voltage from listed cut sheet Short-circuit current (Isc) from listed cut sheet Maximum fuse rating from listed cut sheet Maximum power- panel wattage from listed cut sheet System inter-tie with utility company or stand alone Indicate the system KW rating Indicate if the system has battery backup Single line drawing of electrical installation which includes: Array PV power source short circuit rating Conductor size and type Conductor locations and runs Equipment bonding points and sizes Per *CEC 250.122 Inverter location AC & DC disconnect locations Per *CEC 690.13 & Roseville Electric Batteries; number, size and locations (if applicable) Point of connect to existing main electrical service panel Size and number of electrical service meters Per *CEC 705.12 (D)(2) exception Location of required signage (Per Roseville Electric specifications) Complete attached verification of wire sizes sheet Provide Rapid Shutdown of PV per 690.12 Proper Signage and Labeling: Signage required per Roseville Electric handout (see attached) Indicate system type below and show location of each required sign on one line diagram (see electrical): SINGLE PV ARRAY SYSTEM PV ARRAY SYSTEM W/ BATTERY BACKUP MULTIPLE PV ARRAY SYSTEMS Please contact City of Roseville for current fees. *CEC 690.17 - Switch or Circuit Breaker. The disconnecting means for ungrounded conductors shall consist of a manually operable switch (es) or circuit breaker(s) complying with all of the following requirements: (1) Located where readily accessible (2) Externally operable without exposing the operator to contact with live parts (3) Plainly indicating whether in the open or closed position (4) Having an interrupting rating sufficient for the nominal circuit voltage and the current that is available at the line terminals of the equipment. *CEC 250.122 Size of Equipment Grounding Conductors. Copper, aluminum, or copper-clad aluminum equipment grounding conductors of the wire type shall not be smaller than shown in Table 250.122 but shall not be required to be larger than the circuit conductors supplying the equipment. *CEC 690.46 Grounding for AC/DC Systems. #6, in conduit or protected from damage *CEC 690.13 (E) Grouping. The photovoltaic system disconnecting means shall be grouped with other disconnecting means for the system to comply with 690.14(C)(4). A Photovoltaic disconnecting means shall not be required at the photovoltaic module or array location. *CEC 705.12 (D)(2)exception - Load Side. A photovoltaic power source shall be permitted to be connected to the load side of the service disconnecting means of the other source(s) at any distribution equipment on the premises, provided that (exception) the sum of the ampere ratings of the overcurrent devices shall not exceed 120% of the rating of the busbar or conductor. Residential Photovoltaic (PV) Packet Revised 04/07/2017 Page 3 of 10

Revised 04/07/2017 Page 4 of 10

Revised 04/07/2017 Page 5 of 10

Revised 04/07/2017 Page 6 of 10

Revised 04/07/2017 Page 7 of 10

Revised 04/07/2017 Page 8 of 10

Revised 04/07/2017 Page 9 of 10

Revised 04/07/2017 Page 10 of 10