Construction Staging Area 4 Avenue Road

Similar documents
THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

IMPROVEMENT CONCEPTS

Public Works and Infrastructure Committee. p:/2015/clusterb/tra/northyork/pw15086

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Traffic Impact Study Speedway Gas Station Redevelopment

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Construction Realty Co.

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Director of Building and Deputy Chief Building Official

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

On-Street Electric Vehicle Charging Stations - Parking Amendments

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

The Re:Queen and Sparks Traffic Brief - Addendum #2

TRANSPORTATION REVIEW

ANDERSON PROPERTY SITE ANALYSIS

Traffic Engineering Study

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Chapter 740, Street Vending One Year Review

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Central Park Drives Traffic Management Overview

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Clean Harbors Canada, Inc.

Public Works and Infrastructure Committee. General Manager, Transportation Services and Treasurer. P:\2015\Internal Services\rev\pw15018rev (AFS20761)

11 October 12, 2011 Public Hearing APPLICANT:

HIGHWAY 28 FUNCTIONAL DESIGN

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Driveway Entrance Policy for Residential Properties - District 3 - All Wards

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

TORONTO TRANSIT COMMISSION REPORT NO.

FREQUENTLY ASKED QUESTIONS

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

Re: Amend Sections and File No ZA Marcus Lotson, Development Services Planner

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

101, 111 and 129 St. Clair Avenue West Part Lot Control Exemption Application Final Report

2.0 Development Driveways. Movin Out June 2017

4 Circulation & Transportation

TRAFFIC PARKING ANALYSIS

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES

West Rosslyn Development

TORONTO MUNICIPAL CODE CHAPTER 910, PARKING MACHINES AND METERS. Chapter 910 PARKING MACHINES AND METERS 1. ARTICLE I Parking Machines

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Chapter 740, Street Vending One Year Bylaw Review

16. SIGN REGULATIONS

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

CORE AREA SPECIFIC PLAN

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

Transit City Etobicoke - Finch West LRT

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

PROPOSED TRAFFIC RESOLUTION

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Traffic Impact Assessment

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

Bi-County Transitway/ Bethesda Station Access Demand Analysis

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

This letter summarizes our observations, anticipated traffic changes, and conclusions.

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

CHAPTER 72: STOPPING, STANDING AND PARKING

Rate Review 2017 Off-Street Municipal Parking Facilities

4.2 Series Station Option Description

Existing Traffic Conditions

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

FREQUENTLY ASKED QUESTIONS

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Re: 233 Armstrong Street Residential Condominium Traffic Brief

886 March Road McDonald's Transportation Study

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

I-405 Sepulveda Pass Improvements Project

4131 Chain Bridge Road

Traffic Feasibility Study

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

Re: Cyrville Road Car Dealership

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

City of Houston Fondren Road Paving and Drainage

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

1133 Melville Street Office Building Development REZONING APPLICATION SUBMISSION

Transcription:

REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 20, Trinity-Spadina SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Avenue Road, City Council approval of this report is required. PCL Constructors Canada Incorporated is redeveloping the existing Park Hyatt hotel at 4 Avenue Road, located in the north-west corner of Avenue Road and Bloor Street West. Transportation Services is requesting approval to close the sidewalk and a portion of the southbound curb lane on the west side of Avenue Road fronting the site for a period of 19 months in order to enable construction of the above mentioned redevelopment. Pedestrian operations will be maintained within the closed portion of the southbound curb lane. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District recommends that: 1. City Council approve the closure of the west sidewalk and a 2.9 metres wide portion of the southbound curb lane on Avenue Road, between a point 52.5 metres north of Bloor Street West and a point 56.4 metres further north and the provision of a sidewalk within the closed lane from January 8, 2018 to January 31, 2019. 2. City Council approve the closure of the west sidewalk and a 2.9 metres wide portion of the southbound curb lane on Avenue Road, between a point 52.5 metres north of Bloor Street West to Prince Arthur Avenue and the provision of a sidewalk within the closed lane from February 1, 2019 to March 31, 2019. 3. City Council approve the closure of the west sidewalk and a 2.9 metres wide portion of the southbound curb lane on Avenue Road, between a point 75.7 metres north of Bloor Street West and Prince Arthur Avenue and the provision of a sidewalk within the closed lane from April 1, 2019 to July 31, 2019. Construction Staging Area - 4 Avenue Road Page 1 of 10

4. City Council prohibit stopping all times on the west side of Avenue Road, between a point 17.5 metres north of Bloor Street West and Prince Arthur Avenue. 5. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 6. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for nighttime illumination, at their sole cost, to the satisfaction of the Ward Councillor. 7. City Council direct that Avenue Road be returned to its pre-construction traffic regulations and lane configurations when the project is completed. FINANCIAL IMPACT There is no financial impact on the City. PCL Constructors Canada Incorporated is responsible for all costs, including payment of fees to the City for the occupancy of the right-of-way. Based on the area enclosed and projected term of the closure, these fees for Phase 1, 2 and 3 will be approximately $210,500.00, $46,800 and $32,500, respectively. DECISION HISTORY This is a new initiative. COMMENTS A redevelopment of the existing Park Hyatt hotel located at 4 Avenue Road will be undertaken by the PCL Constructors Canada Incorporated. The site is bounded by Prince Arthur Avenue to the north, Avenue Road to the east, Bloor Street West to the south and an existing multi-storey building (180 Bloor Street West) and a public laneway to the west. The public laneway provides access to the elevated parking deck at the rear of 180 Bloor Street West development and an at-grade Toronto Parking Authority (TPA) parking lot located to the west of the site. The Park Hyatt hotel in its existing form includes two multi-storey buildings located at the northern and southern ends of the site (hereafter referred to as the North Tower and South Tower, respectively). The 14-storey high North Tower and 18-storey high South Tower are linked by a 2-storey high podium building. Currently, the hotel consists of a mix of hotel (336 hotel rooms), office and retail uses. The central courtyard area for the hotel located on Avenue Road serves as the primary vehicular access point for the hotel patrons. However, an underground parking garage is also provided, which can be accessed from Prince Arthur Avenue. The redevelopment of the hotel will include interior remodelling of the South Tower to provide residential apartment uses (65 dwelling units) and relocation of the existing Construction Staging Area - 4 Avenue Road Page 2 of 10

elevator shaft to the north of the South Tower. The central podium building will be demolished and a new 4-storey building will be constructed to provide new commercial uses. The renovation of the North Tower will include remodelled hotel uses with an addition of a new loading dock to the west of the building. All vehicular access to the development during construction will be from Avenue Road. The redevelopment of the site will be undertaken in three phases. Major construction activities within each phase and associated timeline are described below: Phase 1 (January 08, 2018 to January 31, 2019 - approx. 13 months) Demolition work - South Tower interior, entire central link building and North Tower interior and lower building envelope; Tower crane installation - crane hoisting from Avenue Road; Structural work for the South Tower and central link building - caissons, micro piles, structural steel framing, concrete, façade panels and curtain walls; South Tower - interior framing, roofing ; North Tower - form work, curtain wall and interior framing; Phase 2 (February 01, 2019 to March 31, 2019 - approx. 2 months) South Tower - interior remodelling, millwork, elevator shaft enclosure, elevator work, exterior building envelope, roofing, fireproofing; Central Link Building - interior framing, finishes, flooring; North Tower - interior remodelling, curtain walls, mill work, elevator work; Tower crane removal; Phase 3 (April 01, 2019 to July 31, 2019 - approx. 4 months) South Tower - metal cladding, elevator work, exterior building envelope, fireproofing and interior finishes; Central Link Building - fireproofing, interior finishes, flooring, painting; North Tower - curtain walls, elevator work and interior finishes; Landscaping. A detailed review of the construction schedule was undertaken by the developer to minimize the project duration and impacts of construction on all road users. The existing development extends from property line to property line and the new construction will mainly take place at the central portion between the North and South Towers. The developer has advised that due to limited availability of space, all construction staging operations cannot be undertaken within the site. Alternative options were explored by the developer to setup a construction staging area for the development. The public laneway and elevated parking deck located to the west of the site were considered as potential locations to setup a construction staging area for the development. The elevated parking deck provides a parking facility for the adjacent Construction Staging Area - 4 Avenue Road Page 3 of 10

development (180 Bloor Street West) and any proposal to utilize it for construction staging area over an extended period of time would restrict access to vehicular parking. Also, the elevated parking deck presents structural challenges to support heavy crane and truck loads. The public laneway to the west of the site provides access to the elevated parking deck and TPA parking lot facility and any proposal to utilize it for construction staging area would result in restricting access to these facilities. Additionally, the distance of the laneway from the construction area would present challenges for the crane hoisting operations. Therefore, the public laneway and the elevated parking deck were not considered suitable for construction staging operations. In order to continue with the construction of the development, the developer has proposed a construction staging area within the road right-of-way on the west side of Avenue Road and north side of Bloor Street West fronting the site. Construction staging operations on Bloor Street West will take place within the existing boulevard allowance. Pedestrian operations will be maintained within a 2.1 metres wide covered walkway. With the proposed construction staging area in place, traffic operations on Bloor Street West will remain unchanged. Avenue Road, in the vicinity of the site, is a major arterial roadway and consists of a sixlane (three northbound and three southbound) cross-section. Avenue Road forms signalized intersections with Bloor Street West and Yorkville Avenue and stop-controlled intersections with Prince Arthur Avenue and Cumberland Street. Currently, the northbound curb lane on Avenue Road is closed from Cumberland Street to approximately 20 metres south of Yorkville Avenue to accommodate the construction staging area for the currently under-construction Cumberland Condominium Tower (21 Avenue Road). The Toronto Transit Commission Downtown Express bus route 142 and Avenue Road bus route 5 operate on this portion of Avenue Road. There are southbound near-side and northbound far-side transit stop provided at the intersections of Avenue Road and Bloor Street West. The following regulations are in effect on the subject section of Avenue Road. East Side: "No Parking, Anytime" between Bloor Street West and Cumberland Street; "No Stopping, 7:30 a.m. to 9:30 a.m. and 3:30 p.m. to 6:30 p.m., Monday to Friday except Public holidays" between Bloor Street West and Cumberland Street; "No Stopping, Anytime" between Cumberland Street and Yorkville Avenue. West Side: "No Parking, Anytime except Sundays" between Bloor Street West and Yorkville Avenue; Construction Staging Area - 4 Avenue Road Page 4 of 10

"No Stopping, 7:30 a.m. to 9:30 a.m. and 3:30 p.m. to 6:30 p.m., Monday to Friday except Public holidays" between Bloor Street West and a point 15 metres south of Lowther Avenue. Construction staging operations on Avenue Road will take place within the existing boulevard and southbound curb lane. Subject to approval, a portion of the southbound curb lane and west sidewalk on Avenue Road between Bloor Street West and Prince Arthur Avenue will be closed. The length of lane occupation to accommodate the proposed construction staging area on Avenue Road will vary under each phase of construction. Under Phase 1 of construction, a 2.9 metres wide portion of the southbound curb lane and west sidewalk on Avenue Road between a point 52.5 metres north of Bloor Street West and a point 56.4 metres further north will be closed to accommodate the construction staging operations. Pedestrian movements along Avenue Road fronting the site will be maintained in a protected 1.5 metres covered walkway within the closed portion of the southbound curb lane. Under Phase 2 of construction, a 2.9 metres wide portion of the southbound curb lane and west sidewalk on Avenue Road between a point 52.5 metres north of Bloor Street West and Prince Arthur Avenue will be closed. Pedestrian movements along Avenue Road fronting the site will be maintained in a protected 1.5 metres covered walkway within the closed portion of the southbound curb lane. Under Phase 3 of construction, a 2.9 metres wide portion of the southbound curb lane and west sidewalk on Avenue Road between a point 75.7 metres north of Bloor Street West and Prince Arthur Avenue will be closed. Pedestrian movements along Avenue Road fronting the site will be maintained in a protected 1.5 metres covered walkway along the façade of the building. To enhance traffic flow around the construction zone, stopping will be prohibited during all times on Avenue Road between a point 17.5 metres north of Avenue Bloor Street West and Prince Arthur Avenue during the period of construction. The existing southbound nearside transit stop on Avenue Road will be temporarily relocated to the south of Bloor Street West during the Phase 1 of the construction. However, the existing stop location will be maintained during the remaining phases of the construction. With the proposed closure in place, Avenue Road, in the immediate vicinity of the site, will operate as two southbound and two northbound lanes. However, the existing lane configuration will be maintained at the intersection of Avenue Road and Bloor Street West. Finally, a review of the City's five-year major capital works program was undertaken to identify any conflicts between the proposed construction staging area and planned capital works projects in the area. The review of the Program at the time of this report indicated that in Year 2018, watermain structural relining is planned on Bloor Street West between Bathurst Street and Avenue Road. Also, in Year 2019, major road resurfacing is planned on Bloor Street West between Avenue Road and Bedford Road. Construction Staging Area - 4 Avenue Road Page 5 of 10

The exact dates of the planned capital works projects were not available at the time of the report. In the event of any conflict with the planned capital works project, the developer has been advised that the proposed construction staging areas on Bloor Street West and Avenue Road will need to be modified or removed to accommodate the capital works project activities. Intersection Capacity Analysis The existing and future (under construction) traffic operations were analyzed during the morning and afternoon peak hours at the following signalized and unsignalized boundary road intersections. Signalized intersections: Bloor Street West and Avenue Road; Yorkville Avenue and Avenue Road. Unsignalized intersections: Cumberland Street and Avenue Road; Prince Arthur Avenue and Avenue Road. The existing traffic operations were analyzed using the current lane configurations and vehicular/pedestrian traffic volumes. The future conditions were analyzed using the lane configurations available during construction of the site and projected traffic volumes. Under existing conditions, the signalized intersections operate acceptably with an overall intersection delay of up to 23 seconds during the morning and afternoon peak hours. Additionally, the unsignalized intersections also operate acceptably with an intersection delay up to 16 seconds during the morning and afternoon peak hours. Under future (during construction) conditions, the signalized intersections are expected to continue operating acceptably with an overall delay of up to 27 seconds during the morning and afternoon peak hours. With the proposed closure in place on Avenue Road fronting the site, the southbound through traffic movements are expected to operate with an average delay of 29 seconds and 95th percentile queue length of 131 metres during the morning peak hours. The projected queue length will not block the eastbound turning movements on Prince Arthur Avenue at Avenue Road. Furthermore, the unsignalized intersections are expected to continue operating acceptably. In view of the above, the proposed lane closure on Avenue Road during construction of the site are anticipated to have a manageable impact on traffic operations at the boundary road intersections. It should be noted that some southbound through traffic on Avenue Road may divert to other alternative routes during the proposed road closure and construction of the development. This may result in reduced delay and queue lengths and improved intersection traffic operations. Construction Staging Area - 4 Avenue Road Page 6 of 10

Through ongoing dialogue with the developer, Transportation Services is satisfied that PCL Constructors Canada Incorporated has looked at all options to minimize the duration and impact of the construction staging area on all road users. Councillor Joe Cressy's office has been advised of the recommendations of this staff report. CONTACT Ann S. Khan, P. Eng. Manager, Traffic Operations Toronto and East York District Transportation Services Telephone: (416) 397-5021 Fax: (416) 392-1920 E-mail: Ann.Khan@toronto.ca SIGNATURE Dave Twaddle, C.E.T. Acting Director, Transportation Services Toronto and East York District ATTACHMENTS Drawing No. 421G-2678, dated September, 2017 Drawing No. 421G-2679, dated September, 2017 Drawing No. 421G-2680, dated September, 2017 P:2017\Cluster B\TRA\ts2017196te.top.doc - nb Construction Staging Area - 4 Avenue Road Page 7 of 10

Construction Staging Area (Phase 1) - 4 Avenue Road Construction Staging Area - 4 Avenue Road Page 8 of 10

Construction Staging Area (Phase 2) - 4 Avenue Road Construction Staging Area - 4 Avenue Road Page 9 of 10

Construction Staging Area (Phase 3) - 4 Avenue Road Construction Staging Area - 4 Avenue Road Page 10 of 10