Backup Generation Application

Similar documents
3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

.3 Section Waste Management and Disposal.

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Standby Power Systems

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

CPS 3Phs String Inverters NEC 2014 Compliance

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Definitions. Scope. Customer Generation Interconnection Requirements

Low Voltage Automatic Transfer Switch Systems

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

ECET 211 Electric Machines & Controls Lecture 1-3 (Part 2) Electrical Safety in the Workplace Electrical Safety in the Workplace

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Basics of Paralleling

Users Manual. Cobra Plus Stand-By Emergency Lighting Inverter. Technical Manual # Revision B

2016 Photovoltaic Solar System Plan Review List

NEC REQUIREMENTS FOR GENERATORS

ASCO Low Voltage Automatic Transfer Switch Systems

Photovoltaic Solar Plan Review

MP7650 CONTROLLER. Lake-Shore-Electric.com MP7650 Controller STANDARD FEATURES 1.0 INTRODUCTION

design prefix 50 Hanover Road, Florham Park, New Jersey USA (ASCO), for service call (ASCO)

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Application Note RESIDUAL BUS MAIN-TIE-MAIN AUTOMATIC TRANSFER SCHEME USING THREE GE 850 RELAYS

Pretest Module 24 Three-phase Service Entrance

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Optimizing Emergency Power Systems for Health Care Applications

Owner s Manual. Series 165 Automatic Transfer Switches rated 100 and 200 amps, single phase, 240 V ac for automatic 2 wire start generators

OTPC-SE Service entrance transfer switch open transition

Cutler-Hammer. Installation Instructions for the Digitrip OPTIM Pole Trip Unit Installation and Operation with L-Frame Series C Circuit Breakers

Paralleling Equipment

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

OCEAN COUNTY ARES EMERGENCY GENERATOR USE By WX2NJ. The following was taken from September and October Ocean County ARES Newsletters in 2012:

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

2009 North American Power Quality Interest Group Workshop Title: Power Quality of Emergency Stand-by Systems

Summary of Revision, IEEE C , Guide for Breaker Failure Protection of Power Circuit Breakers

UNIT 6: BATTERIES, UPS AND CABLES

Form C Renewable Energy Micro-Generation Connection Application Distribution System

NET METERING APPLICATION

Experience, innovation and reliability

BTPC Bypass isolation transfer switch open or closed transition

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

Bulletin Interconnection of electric power production sources Rules 2-010, , , , , , and

OpenEVSE - 40A Charging Station

Breaker failure protection function block description

EON Model EL3 Three Phase Centralized Emergency Lighting Inverter. General Specification 10KW 33KW Systems

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

ATyS d M Remotely operated Transfer Switching Equipment from 40 to 160 A

User Manual. 3/1 10K~30K Online UPS

Product Specifications

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

EON Model EL3 Three Phase Centralized Emergency Lighting Inverter. General Specification 40KW 55KW Systems

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

Operator s Series 300 Generator Paralleling System

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

CHPC Transfer switch closed transition

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

OTEC Transfer switch open transition

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

Illuminator Series CR NEMA 3R

Section 6. Generation Interconnection

DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

Transfer switch OTEC and OTECSE open transition

Transfer switch OTPC open, closed, or delayed transition

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

Interconnection Requirements for Generation Systems

Alternator protection, part 1: Understanding code requirements

E-15 Uninterruptible Power Systems (UPS)

TECHNICAL SPECIFICATION FOR A 10 TO 50 KVA THREE PHASE, UNINTERRUPTIBLE POWER SYSTEM WaveRider III

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Rental Power QSL9 series engine

Diesel generator set QST30 series engine

GUIDE SPECIFICATIONS 15-45kVA and 15-90kVA Scalable Three-Phase Uninterruptible Power System 1.0 GENERAL

Transfer switch OTEC open or delayed transition

SmartBoost 50 INSTALLATION INSTRUCTIONS & OWNER S MANUAL LT93 SMTBST50 1. Issue 1 Print 2 AUTOMATIC SHORELINE TRANSFORMER

AP1000 European 7. Instrumentation and Controls Design Control Document

ENGINEERING SPECIFICATION

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

TS880 AUTOMATIC TRANSFER SWITCHES

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Liebert GXT & 10000VA RT208 Rack-Tower models, Dual Inverter GUIDE SPECIFICATIONS 1.0 GENERAL

S&C PureWave UPS System Outdoor Distribution (2.5 to 20 MVA, 5 to 25 kv)

NFPA World Safety Congress & Exposition 2005 NEC Proposals Report of CMP-12

Solar PV Standard Electrical Plan

Transfer switch OHPC open or delayed transition

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Design considerations for generator set mounted paralleling breakers

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

DGC-2020 DIGITAL GENSET CONTROLLER

PowerCommand 3300 Control Panel. Our Energy Is Working For You.

User Manual Solar Charge Controller 3KW

Transcription:

Backup Generation Application For connection of non-parallel generation between Menard Electric Cooperative s Electric system and standby generation that will operate with a manual or automatic transfer switch schemes. Please mail the completed application to: Menard Electric Cooperative P.O. Box 200 Petersburg, IL 62675 Last Revised 9/28/11

Customer Information: Name: Mailing Address: City: State: Zip Code: Service Address if different from above: City: State: Zip Code: Home Phone: Cell Phone: Email: Fax: Account No. : Installation Information: Person or Company Installing: License No. if Applicable: Approximate Installation Date: Mailing Address: City: State: Zip Code: Email: Fax:

Transfer Switch and Generator Information: Transfer Switch Manufacturer: Transfer Switch Model No.: Generator Nameplate Power Rating: kw Voltage: V Generator Phase(s): Single Phase Three Phase Existing Electrical Service: Single Phase Three Phase 120/240V 120/208V 240/480V 277/480V Please attach any specifications, drawings, and plans. Terms and Conditions: 1. All NEC, NESC, UL code, and NFPA requirements shall be followed. 2. Owner/operator must agree not to operate the generator in parallel with Menard Electric Cooperative s system other than as indicated. 3. An inspection and test may be requested by Menard Electric Cooperative. The member and Menard Electric Cooperative shall agree on the inspection/test date. Systems may be inspected periodically to ensure proper operating condition. 4. Menard Electric Cooperative does not require the transfer equipment to be capable of switching the neutral conductor. 5. A one line diagram may be requested by Menard Electric Cooperative, showing the location and wiring of the existing service, transfer switch, disconnects, and generator.

6. An open transition transfer can be achieved with a manual transfer switch or an automatic transfer switch. If an automatic transfer switch is used it is required to have voltage-sensing capability or other means for detecting the loss and restoration of the Menard Electric Cooperative s source. 7. If a closed transition transfer scheme is used synchronizing capability shall be required. Article 705 of the NEC must be followed. This is required in order to tie the two sources together. The duration of the synchronized closed transition shall be less than 100 ms during startup and shutdown of the backup unit. An undervoltage protection scheme shall be required which prevents a closed transition transfer in the event that Menard Electric Cooperative s source is not present. It is required to have a transfer failure scheme, that will cause the opening of one of the sources within two (2) seconds of the start of the paralleling condition. 8. Programmable logic controller (PLC) shall have a backup control scheme independent of the PLC that shall prevent extended paralleling operation. The PLC and backup control logic shall be enabled when the transfer scheme is placed into automatic operation and disabled when the transfer scheme is placed in manual operation. The PLC shall not lose power at any time as a direct result of automatic transfer switching. The automatic transfer switch shall be supervised by the status of a bypass switch, disconnect switch, or breaker. This is so that if any of these switches is manually tripped the PLC control will disable automatic transfer. 9. Two permanent weatherproof signs approx. 5 X7 shall be installed. One sign shall be placed at the metering location indicating that Backup Generation Present. The other sign shall also be placed at the main generator disconnect indicating Main Service Disconnect for Isolation from Generator. If removal of a grounding or bonding connection in normal power source equipment interrupts the grounding electrode conductor connection to the alternate power source grounding conductor, a warning sign shall also be installed at the normal metering location per NEC.

Definitions: Open transition transfer switch is also called a break before make transfer switch. A break before make transfer switch breaks contact with one source of power before it makes contact with another. It prevents back feeding from a backup generator back into the utility line. This is Menard Electric Cooperative s preferred method. Closed transition transfer switch is also called a make before break transfer switch. A make before break transfer switch keeps contact with one source of power while switching to another then breaking contact with the first source. It requires the backup generator to be able to synchronize with the service source. This method requires more sophisticated controls and backup protection. Examples of Common Installations: