DRAFT TANKER TRAFFIC STREAM ANALYSIS USING AIS CROSSING LINE COUNTS. Dr. J. Rene van Dorp and Dr. Jason R.W Merrick April 2016

Similar documents
VTRA 2010 TRAFFIC DENSITIES BY CARGO FV and TANK- FV. Presentation by: J. Rene van Dorp. Draft. CASE S: Delta Port Bunkering Operations

Updated: Analysis of Crude Oil Tanker Ballast Water Data for Valdez & Prince William Sound, Alaska. Final Report

Technical Report TR-22. Appendix Q

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range JUAN DE FUCA STRAIT

Schedule A. Payment-In Lieu By-laws. Lots 19, 20 and 21, Blk. 68, D.L. 541, Plan Lot B, Blk. 68, D.L. 541, Plan VAP23202

53, ,750 SF INDUSTRIAL STEELE CREEK ROAD CHARLOTTE, NORTH CAROLINA

Sample size determination and estimation of ships traffic stream parameters

Regional General Permit 6

CDMS - Crash Data Management System. Crash Data Report. Report Memo: RESERVE FOR MAP SCREENSHOT

Michigan. Traffic. Profile

Statistical Data 2012

HIGHWAY 28 FUNCTIONAL DESIGN

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

U.S. Army Corps of Engineers, Detroit District 2018 PHOTO CONTEST CALENDAR

Level Measurement Products Installation Considerations-Ultrasonic

SHORE CENTRE AND SHORE SIDE POSSIBILITIES. Fredrik Karlsson Swedish Maritime Administration Coordinator Innovation & Development

SYSTEM 001 INFO PACK 2018

Section Operations Section Organizational Guidance

CONSULTMARINE SA cc CK # 2000/015744/23 CONSULTING MARINE ENGINEERS AND SHIP SURVEYORS

PROPOSAL FOR A LIMOUSINE MINIMUM RATES PILOT PROJECT FEBRUARY 2011

Proposed Commercial Service at Paine Field Traffic Impact Analysis

Daily Pipeline Status As of 23:

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range HARO STRAIT

TRAVEL DEMAND FORECASTS

SmartSensor HD Performance Test Results

The Belt Railway Company of Chicago CORA Guide Revision

Neighborhood Traffic Calming Options

Collision Analysis Safety Tables

SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame

Spain s exports by oil product group and country of destination

Marine Fuel Prices on the Economics Data Program Website

INVESTMENT OFFERING. OFFERING PRICE $1,346,000 (7.25% Cap Rate)

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

Edmonton Region Commodity Flow Study

The Run Ozaukee 2018

SILVER SPRUCE EXPLORATION. Canada/Mexico. Annual General Meeting April 18, 2008 Northwest River, NL

Spain s exports by oil product group and country of destination. Year Corporación de Reservas Estratégicas de Productos Petrolíferos

BUTTE COUNTY DEPARTMENT OF PUBLIC WORKS

Livingston County Hazardous Material Flow Study August 2018

AIR BAGS SUSPENSION. Quality Tested Replacement Components

UPPER GREEN RIVER OZONE INVESTIGATION (O3i) LUMAN AND PARADISE ROAD TRAFFIC COUNT STUDY 03/05/2009 AND 06/09/2009. Study Summary.

APPENDIX H. Transportation Impact Study

ExxonMobil SYU LFC Interim Trucking Industrial Risk Analysis

RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION

THE ST. LAWRENCE SEAWAY TRAFFIC REPORT

Driving directions to Malcolm X Blvd. 1 Malcolm X Blvd Brooklyn, NY Malcolm X Blvd

Vessels of 24 metres in length overall or more are obliged to participate in the vessel traffic services.

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

External Costs of Maritime Shipping in Europe

GUIDE TO TRAFFIC MARSHALLING AT ExCeL LONDON

Michigan. Traffic. Profile

FOR SALE OR FOR LEASE SALE PRICE: $2,000, & 2950 Garnet Avenue

SOUTHERN STRAIT OF GEORGIA

Daily Pipeline Status As of 23:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Fresno Yosemite International Airport to 2233 Ventura St, Fresno, CA Google Maps

Revision Tailings Management Plan Minto Mine, YT

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

ABBREVIATIONS. Port of Majuro Pre-Final Master Plan February 2014 ABB-1

4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES

ORDINANCE NO. 15,658

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

increase of over four per cent compared to the average of $409,058 reported in January 2010.

Morocco Ports description Contacts

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

APPENDIX L Table 1. Storage and Distribution Study Petroleum Product Storage Facilities - Newfoundland and Labrador

STRAIT OF BELLE ISLE

Port Botany Trade Statistics Bulletin. 1 July April 2017

PAME Working Group. Emission reductions in shipping. Soffia Gudmundsdottir, PAME Executive Secretary

URBAN COMMUNITY AL FAYHAA. RESULTS of the MOBILITY PLAN

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

CreekSide XVI & XVIII

Alaska Deep-draft Arctic Ports Planning Charrette

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project

Price Category Breakdown - February 2010

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

PROCEDURE FOR THE HANDLING OF FUEL ON CONSTRUCTION SITES. Civil Engineering Sector Labour-Management Health and Safety Committee

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Off-Street Parking Information

East Stockton Boulevard (South Sacramento) Costco Gasoline Expansion Fuel Station Expansion Trip Generation Estimate

Monthly Biodiesel Production Report

Alpine Highway to North County Boulevard Connector Study

CastleGlenn Consultants Inc.

Kent County Traffic Crash Data & Year Trends. Reporting Criteria

Jersey R & O Road Traffic (Jersey) Law 1956 ROAD TRAFFIC (SAINT PETER) (JERSEY) ORDER 1992


Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

Pressure Vessel Assessment Report

January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division

ORDINANCE NO. 13,785

Lacey Gateway Residential Phase 1

Automotive Gas Oil (Diesel) Price Watch

APPENDIX 30-A. Marine Vessel Incidence Prediction Inputs to the Quantitative Risk Assessment

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Michigan State Police (MSP) Traffic Safety Network Traverse Bay Area

APPENDIX A. OC Transpo Maps & Route Information

USE OF AIS-DATA TO ACHIEVE EFFICIENT SHIPPING SIRI STRANDENES, PROFESSOR NORWEGIAN SCHOOL OF ECONOMICS, BERGEN

Transcription:

RISK ASSESSMENT (VTRA 205) TANKER TRAFFIC STREAM ANALYSIS USING AIS 200-205 CROSSING LINE COUNTS Dr. J. Rene van Dorp and Dr. Jason R.W Merrick April 206 4/5/206 GW-VCU

RISK ASSESSMENT (VTRA 205) Georgia Strait 5 Cherry Point Buoy J 6 Vendovi 4 March Point Six Departure/ Destination Zones:. Buoy J 2. Puget Sound. Georgia Strait 4. March Point 5. Cherry Point 6. Vendovi Ten AIS Count lines:. Neah Bay 2. Point Roberts. Admiralty Inlet 4. Haro-Strait 5. Boundary Pass 6. Rosario South 7. Rosario North 8. Saddle Bag North 9. Saddle Bag South 0. Bellingham Channel 4/5/206 2 2 Puget Sound

Neah Bay Georgia Strait VTRA 205 Waterway Schematic + AIS s Haro Rosario Point Roberts Bellingham Channel 5 Cherry Point Saddle Bag s 6 Vendovi 4 March Point Buoy J AVERAGE VESSEL COUNT ERROR ATB Cargo Tanker 5 99 2 Admiralty Inlet 4/5/206 2 Puget Sound

RISK ASSESSMENT (VTRA 205) 4/5/206 ã GW-VCU 4

RISK ASSESSMENT (VTRA 205)

RISK ASSESSMENT (VTRA 205) # VESSELS CHANGE FROM 200 80 60 40 20 0-20 -40-60 -80-00 TANKER - DEPARTING FROM LOCATION ZONES 200 20 202 20 204 205 BOUY J PUGET SOUND GEORGIA STRAIT MARCH POINT CHERRY POINT VENDOVI FROM 200 20 202 20 204 205 BOUY J 0 5-7 - -54-78 PUGET SOUND 0-8 -4-54 -4 GEORGIA STRAIT 0-46 -4-40 - -25 MARCH POINT 0 65 2 48 7 2 CHERRY POINT 0 4-2 8 6-7 VENDOVI 0 46 6 57 8 0 Change Threshold From Zone Variable 200 20 202 20 204 205 2 x2 0-6 -7-0 -48-42 x 0-28 -28-25 -25-22 x4 0 4-0 x5r 0 2 5 8-6 -9 x5h 0-5 -6 0-7 -7 0 x6b 0 2 0 7 0 0 0 x6s 0 9 8 27 9 5 x2 0 - - -5 0 x2h 0-8 -9-9 -7-2 0 x2r 0 2 - - - - 0 x24 0 5 6-7 -4-7 0 x25 0 4 - - - - 0 x26b 0-4 -5-5 -4-5 0 x26s 0 0-6 - -2 0 x 0-47 -45-49 -49-46 x2h 0 - - - 0 4 0 x2r 0 0 0 0 0 0 0 x4s 0 4 0 8 2 0 0 X4R 0 0 0 0 5 0 x5 0-4 - 9 6 x6 0 0 0 4 0 0 0 x4 0 20 7 6 - -9 0 x42 0 7 0 - - - 0 x4s 0 0 0 7 5 0 x4r 0 - - 0 - - 0 x45s 0 2 5 2 6 0 x45r 0 9-8 6-5 - x46s 0 9 2 0 0 x46r 0 8 4 24 7 9 x5h 0 - -5 0-0 x5r 0 27 0 4 2-9 x52 0 4 0 0 0 0 0 x5 0-2 - 2 6 0 x54s 0 6-8 5 0 x54r 0 7-7 7-0 0 x56 0-6 -6 - -4 0 x6b 0 4 0 x6r 0 6 6 0 x62b 0-2 0-2 -2-0 x62r 0 2 4 0 0 0 0 x6 0 0 0 5 2 0 x64s 0 2 4 8 6 0 x64r 0-2 4 8 5 x65 0 4-7 5 0 0 Vendovi Cherry Point March Point Georgia Strait Puget Sound Buoy J

RISK ASSESSMENT (VTRA 205) TANKERS TRAFFIC STREAM ANALYSIS USING AIS 200 CROSSING LINE DATA Dr. J. Rene van Dorp and Dr. Jason R.W Merrick April 206 4/5/206 GW-VCU 7

Neah Bay Georgia Strait VTRA 205 Waterway Schematic + AIS s Haro Rosario Point Roberts Bellingham Channel 5 Cherry Point Saddle Bag s 6 Vendovi 4 March Point Buoy J Admiralty Inlet 4/5/206 8 2 Puget Sound

East West Difference Grand Total MAX ATB 72 66 6 8 72 Cargo 204 2996 208 6200 204 Passenger 265 229 6 494 265 Tanker 599 557 42 56 599 Grand Total 440 848 292 7988 440 X X 5H X 5R X 6S X 6B X 4 X 2 Neah Bay Buoy J Georgia Strait 200 TANKER TRAFFIC FROM Buoy J 600 Total 22 Haro Rosario Point Roberts 6 82 42 Admiralty Inlet 5 Cherry Point Bellingham Channel 52 8 6 Vendovi 4 Saddle Bag s March Point 69 4/5/206 9 2 Puget Sound

North South Difference Grand Total MAX ATB 2 20 4 2 Cargo 696 627 69 2 696 Passenger 852 849 70 852 Tanker 75 7 2 48 75 Grand Total 2646 2569 77 525 2646 Neah Bay Georgia Strait 200 TANKER TRAFFIC FROM Puget Sound 9 Haro Rosario Line Point Roberts 5 Cherry Point Bellingham Channel 2 5 6 Vendovi 7 Saddle Bag s 4 March Point Admiralty Inlet Buoy J 4/5/206 X 2 X 2H X 2R X 25 X 24 76 total X 26B X 26S 2 Puget Sound 0

East West Difference Grand Total MAX ATB 29 2 6 2 Cargo 222 227 59 448 227 Passenger 00 29 29 229 29 Tanker 244 24 487 244 Grand Total 2585 2675 90 5260 2675 Neah Bay Georgia Strait 200 TANKER TRAFFIC FROM Georgia Strait 242 Haro 244 total X 4S X X X 5 2H X 2R X 4R X 6 Rosario Point Roberts 5 Cherry Point Bellingham Channel 0 0 0 6 Vendovi Saddle Bag s 4 March Point Buoy J Admiralty Inlet 4/5/206 0 2 Puget Sound

RISK ASSESSMENT (VTRA 205) Other 200 AIS Data BOUNDARY PASS North South Grand Total Grand Total Average ATB 6 6 28 Cargo 242 245 4498 4487 984 Passenger 99 76 205 75 49 Tanker 265 252 520 57 60 Grand Total 2709 2476 5229 585 266 ROSARIO SOUTH North South Difference Grand Total Average ATB 79 78 57 78.5 Cargo 66 7 5 7 68.5 Passenger 45 56 0 50.5 Tanker 20 9 6 5.5 Grand Total 50 525 24 026 5 HARO STRAIT North South Grand Total Grand Total Average ATB 6 6 0 Cargo 280 20 4522 4490 228 Passenger 7 8 288 255 0 Tanker 246 27 57 57 202 Grand Total 2566 2702 5 5268 2668 BELLINGHAM CHANNEL North South Difference Grand Total Average ATB 0 4 6 4 7 Cargo 22 48 26 70 5 Passenger 4 47 4 90 45 Tanker 2 20 26 Grand Total 98 02 4 200 00 ROSARIO NORTH North South Difference Grand Total Average ATB 75 8 6 56 78 Cargo 5 57 4 0 55 Passenger 57 64 7 2 60.5 Tanker 252 270 8 522 26 Grand Total 47 472 5 909 454.5 SADDLEBAGS NORTH North South Difference Grand Total Average ATB 46 5 77 8.5 Cargo 20 4 6 24 2 Passenger 52 79 27 65.5 Tanker 90 6 29 5 75.5 Grand Total 9 90 8 9.5 SADDLEBAGS SOUTH North South Difference Grand Total Average ATB 8 6 2 74 7 Cargo 2 5 27.5 Passenger 2 4 2 Tanker 5 55 50 60 0 Grand Total 56 09 5 65 82.5 4/5/206 GW-VCU 2

Georgia Strait 200 TANKER TRAFFIC FROM March Point Point Roberts 5 Cherry Point Bellingham Channel 5 Neah Bay 0 4 0 Rosario X 42 X 4 X 4R 6 5 X 45R X 46R X 46S X 45S X 4S 7 total 6 Vendovi Saddle Bag s 4 March Point Buoy J Admiralty Inlet 4/5/206 2 Puget Sound

Georgia Strait 200 TANKER TRAFFIC FROM Cherry Point Point Roberts X 5 X 5H X 5R X 52 X 54R 284 total 5 Cherry Point Bellingham Channel 20 242 Neah Bay X 54S X 56 Haro Rosario 0 5 6 6 Vendovi Saddle Bag s 4 March Point Buoy J Admiralty Inlet 4/5/206 2 Puget Sound 4

Neah Bay Georgia Strait 200 TANKER TRAFFIC FROM Vendovi Haro Rosario Point Roberts 44 50 X 65 X 6 X6R X 64R X 62R X 6B X 62B X 64S 5 Cherry Point Bellingham Channel total 6 Vendovi Saddle Bag s 4 March Point Buoy J Admiralty Inlet 4/5/206 5 2 0 2 Puget Sound

RISK ASSESSMENT (VTRA 205)

RISK ASSESSMENT (VTRA 205)

RISK ASSESSMENT (VTRA 205)