AD45 Front Strut Handling Tool George Fisher Mine, Mount Isa Mines, a Glencore Company

Similar documents
Mine Safety 101. A Complete Solution to Lost Persons Detection (LPD) in Underground Mining

ABB life cycle services Uninterruptible power supplies

Asian paper mill increases control system utilization with ABB Advanced Services

FATAL AND SEVERE RISK PROGRAM

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

Powering Sydney s Future

Work at height: Elevated risk

DP-5 Machine Operation and Controls:

The Dangers of Equipment & Vehicle Interaction (are we gambling with the risk?) Presented by Cres Bulger (Inspector Of Mines - DNRM)

PROJECT IDEA SUBMISSION

UNITED KINGDOM RESCUE ORGANISATION. Advancing professional rescue. Lifting Plans. Fire Service College Heavy Rescue Workshop

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site

Guidelines for Battery Electric Vehicles in the Underground - Mine Design

Heavy Duty Vehicles - Land

New Flyer of America Inc. The State of Charging Standards and Deployment. David Warren Director of Sustainable Transportation

Abstract. General N BANDA

City of Palo Alto (ID # 6416) City Council Staff Report

Case Study Quick Change Retractable Idler Frames for Conveyors Improving Safety & Efficiency in Plant Maintenance

Contact: New Technology for the Concrete Jungle

Maintaining frictional resistance on mine road surfaces. Presented by Cres Bulger Inspector Of Mines (Qld)

Modern Maintenance for London s Elizabeth line

MacKellar EPSA Capability Statement

Continuous Miner Dust Suppression. Anglo American Coal. The Problem

Electronic Shifter. Lee Redstone V Lewis Weston V Jason Deglint V Group #5. Supervisor Ashoka K. S. Bhat. Due Oct.

COMPANY PRESENTATION

End Trucks 325 Series

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

Increased Transmission Capacity

Trilift Product Catalogue

dorsavi WORK ACROSS THREE SECTORS

Cluster Knowledge and Skills for Business, Management and Administration Finance Marketing, Sales and Service Aligned with American Careers Business

Development of a Multibody Systems Model for Investigation of the Effects of Hybrid Electric Vehicle Powertrains on Vehicle Dynamics.

Manufacturers of quality Industrial Vacuum & Water Jetting Systems

Ontario Operations MAINTENANCE STANDARD PROCEDURE. Table of Contents. Electrical Electrical Department Energized Electrical Work Procedure

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

ALL TERRAIN TRANSPORTERS WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Rocket Races. Rocket Activity. Objective Students investigate Newton s third law of motion by designing and constructing rocketpowered

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

Commissioning Director for Environment. Officer Contact Details Lisa Wright; Summary

Senior Substation Project Lead Engineer

OVERHEAD CRANE SAFETY:

Railway Technical Web Pages

INDUSTRY REDUCING ACCIDENTS IN THE WASTE

The new light crane system KBK Aluline The new standard for ergonomics

TRANSFORMER SERVICE. ABB Ability inspection for transformers TXplore Oil-filled transformer internal inspection service

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Lessons Learned Communication

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

Improving Roadside Safety by Computer Simulation

The single-hoist crane picks a single 20, 40, or 45 container, or two end-to-end 20 containers (twin-20s), under a single spreader.

CPCS renewal test factsheet

Progress Report. Maseeh College of Engineering & Computer Science Winter Kart 2. Design Team Atom Falcone Austin Greene. Nick Vanklompenberg

Evaluating Stakeholder Engagement

MAC Refrigerant Blend Cooperative Research Program --- Update --- Enrique Peral-AntĂșnez, RENAULT [ Chair person ]

EFFECT OF TRUCK PAYLOAD WEIGHT ON PRODUCTION

Engineers Journal I Volume 60: Issue 10 I December 2006

VTS Wessex Trial Summary. David Burgess Principle Workforce Safety Specialist & Project Lead.

WORKING IN THE VICINITY OF OVERHEAD AND UNDERGROUND ELECTRIC LINES

ELECTRIC ACTUATORS AND CONTROLS. Power Engineering and Manufacturing, Inc. Experts in Electrical and Mechanical Design

HD Truck Fuel Economy Task Group Key Issues for Phase 2 of EPA/NHTSA Rule Bill Van Amburg, CALSTART Leadership Circle Auburn Hills, MI June 5, 2013

Utility and project update 2-3 Project description 4

BRIDGES RAIL WATER WIND BUILDING

LEXUS DESIGN SCHOOL CHALLENGE

Using cloud to develop and deploy advanced fault management strategies

POLLUTION PREVENTION AND RESPONSE (MATTERS EMANATING FROM THE FIFTH SESSION OF THE SUB-COMMITTEE)

Electrical Safety in the Workplace

CNC Storage Equipment

Interim Advice Note 137/10. The use of Stepped Speed Limits at Roadworks. Interim Advice Note 137/10 Stepped Speed Limits

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

Fuel Reliability: Achieving Zero Failures and Minimizing Operational Impacts Rob Schneider, Senior Engineer/Technologist, Global Nuclear Fuel

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS

Guidelines when working near TasNetworks electrical assets

Low and medium voltage service. Power Care Customer Support Agreements

Electric Vehicle Charging Station Installation and Eco-Pass Updates. Report Prepared by: A. Rolston, Parking Operations Coordinator

Bus Stop Optimization Study

Electric. equipment. ICE Level 2. as; cal Installation. qualified. Page 1 of 5

NEW HAVEN HARTFORD SPRINGFIELD RAIL PROGRAM

Dump Point Safety. Vehicle concerns and Additional Points. Jonathan Hall, PE Tech Support, A&CC, M&ESD

Managing Occupational Road Risk. Vehicle Tracking System (VTS) Implementation

JACK RYAN. Short presentation. DrillSafe Forum Presentations - Perth Western Australia 5 th Mar 09

PM/ECCM Course Description and Outline

Haulage Efficiency Improvement Project Report

RAA Member Panel. Older Drivers. Self-regulation by older drivers

NATIONAL CERTIFICATE (VOCATIONAL) NQF LEVEL 3 NOVEMBER

Hendrickson. hendrickson s current leadership still holds true to the principles established by its founder 100 years ago.

Mine Hoist Hazards. The incidents over the past 10 years have been associated with causal factors such as, but not limited to:

CPCS renewal test factsheet

UltraEdge MINING LIP SYSTEM

Demag Service modernises cranes in a hydroelectric power station Investing in cranes for the future Demanding construction site logistics

Appendix A: Authorization to Work around Energized Overhead Conductors Form... 7 Appendix B: Revision Notes & Approvals... 8

CONTACT: Rasto Brezny Executive Director Manufacturers of Emission Controls Association 2200 Wilson Boulevard Suite 310 Arlington, VA Tel.

PROJECT IDEA SUBMISSION STUDENT

White paper: Originally published in ISA InTech Magazine Page 1

OSCE Office in Tajikistan. Case Studies in Cooperation 1: Tajikistan. 7 July 2009

Introduction of tractor based rural road maintenance approaches in Zambia

Eyre Peninsula electricity supply options investigation

Draglines. Product Line

Transcription:

AD45 Front Strut Handling Tool George Fisher Mine, Mount Isa Mines, a Glencore Company The Problem Removal and replacement of the front suspension struts on Caterpillar AD45 underground haulage ejector trucks is a difficult and physically demanding process, exposing maintenance personnel to a combination of hazards. This exposure is due primarily to the weight of the strut (145kg) coupled with the restricted space in and around the front axle area of the truck, which restricts vertical lifts. The strut is currently removed and replaced utilising an eye bolt fitted to the top of the strut body to allow attachment of a soft sling connected to an overhead crane. However, a direct vertical lift of the strut is not possible as it is impeded by other componentry directly above the strut, creating the following hazards through the different phases of the task: Maintenance personnel working in close proximity to suspended loads during the removal and installation of strut pins potentially exposing personnel to the line of fire from the gravitational energy source. Manual handling exposure due to the out of balance force created following the removal of the initial pin during strut removal, and also the physical exertion required to re-align the strut for the installation of the final pin during replacement. The potential for strains and sprains is also coupled with the hazard exposure to pinch points due to the restricted space in the work area. Removal and replacement of a pair of suspension struts usually takes a complete shift due to the difficulty of the task outlined above. George Fisher Mine currently has a fleet of four operational AD45 Trucks each requiring the struts to be changed out on average once per year. The Solution George Fisher Mine s philosophy of leading with safety in recent years has positively impacted the safety culture of the workforce onsite and provided the opportunity to continually improve everyday work practices. This notion was the springboard for members of the Mobile Assets team to have a voice and seek assistance to solve a problem which they believed exposed not only themselves but their co-workers to unnecessary risk during the strut replacement task. Three members of the Mobile Assets team; a diesel fitter, an auto electrician and a boilermaker approached the department Manager outlining the problem but also seeking assistance to further refine a concept (Figure 1) they believed mitigated risk for this task. The team was quickly expanded to four with the inclusion of a structural project engineer to further develop the concept. Together the team determined the requirements for a new tool to remove the risks associated with the task of removal and replacement of the front suspension struts. The

initial concept required three elements; the ability to firmly restrain the strut, functionality to allow a vertical lift, and the ability to rotate the strut allowing it clear access and egress from the underside of the truck. Commercial off the shelf tools were investigated however nothing suitable was available either from the OEM or an aftermarket engineering company to solve this problem. The decision was made to design and build a tool in-house. The following steps formed part of the design development and execution process: Lidar Scanning of an AD45 truck with the front wheels removed to allow the survey data to be imported into a 3D drafting package. Refined concept sketches of the tool prepared by the engineer. Review and design consultation with the maintenance personnel to agree on the concept. Development of 3D model of the tool considering the front axle of the truck. (Figure 2) Additional site measurements of the truck to ensure there were no clashes or interactions during the task. Engagement with local hydraulics company to confirm design for the actuation of the tool to complete the task. Issuing of shop detail drawings to allow fabrication of the tool. Fabrication of strut handling tool by boilermaker. Trial field test of the tool by the team prior to fitment of the hydraulics. This was carried out to ensure there were no clashes with truck components and to determine if any other modifications were required. Minor changes were made to the tool at this stage of development to improve operation. Installation of hydraulic componentry by local hydraulics company. Final field test of the tool. (Figures 3, 4 and 5) External personnel engaged during the design development process included a surveyor for lidar scanning of the truck, drafting services for modelling and shop detail drawings, steelwork fabricator for profile cutting and machining of components and a local hydraulic company for supply and installation of the hydraulic componentry. Benefits/Effects The deployment of this tool into the workshop environment is only in its infancy although it has significantly reduced the inherent risk associated with this task. The strut is restrained in the clamp during the critical steps of the task mitigating exposure to suspended loads, manual handling and pinch point hazards. The hydraulic cylinders are also equipped with counterbalance valves which prevent any unplanned movement due to a loss of hydraulic pressure further mitigating exposure to the line of fire. This tool has also provided a productivity improvement by reducing the task duration by approximately 11hrs.

With the successful trial of the A45 Front Strut Handling Tool, the Standard Work Instruction (SWI) is now being updated to include its use. The success of this project has also assisted in further fostering a culture of continuous improvement and leading with safety onsite. The team involved has taken a problem identified from within and developed their idea into working tool which provides a real and meaningful benefit to the broader Mobile Assets department. It is hoped that the success of this project gives other members of the department the confidence to voice their concerns, opinions and ideas, knowing that they will be supported to further improve safety outcomes for the site. The following quotes have been provided in response to the success of the strut handling tool. Jason Haddon, Mobile Asset Maintenance Supervisor, C Crew - This project has really given the guys confidence that they can make a valid contribution to safety onsite Blain McCormack, Mobile Assets Auto Electrician, C Crew - The best way to improve safety is to ELIMINATE a hazard, the strut removal tool does just that Wayne Hilton, Mobile Assets Leading Hand Diesel Fitter, C Crew - I have learnt through this process that it s a good idea to express your opinion and receive the extra help to complete a safety improvement that will make a difference Jason Wernowski, Maintenance Services Boilermaker - I feel proud to have been part of a team that was able to develop a piece of equipment that will make our workplace safer and more productive The AD45 Front Strut Handling Tool is in the early stages of implementation and is currently only suitable for the AD45 Truck. Plans are in place to assess its suitability for other trucks currently used onsite including the Atlas Copco MT65 and MT6020 dump trucks. It is envisaged that this tool will be rolled out to the wider Glencore business in due course. Transferability Currently, the tool is specifically designed for use on a Caterpillar AD45 truck. The strut clamp is sized specifically for the AD45 strut and the range of vertical motion is also specific to that truck. The concept however can easily be applied to other vehicles with a similar suspension arrangement. As a 3D CAD model of the tool already exists, modifications required to apply this concept to other vehicles can easily be determined by combining the tool model with that of a vehicle to ascertain the space restrictions and required range of motion. Approximate Cost Design including Lidar scan modelling and drawings $6,990 Direct Costs including parts and fabrication $9,350 Total $16,340

Figure 1. Concept Sketches Figure 2. Model Development Figure 3. AD45 Front Strut Handling Tool with extracted Strut

Figure 4. AD45 Truck with AD45 Front Strut Handling Tool in place Figure 5. AD45 Front Strut Handling Tool in place