MicroRail Alternate to Light Rail

Similar documents
Why Conventional Hi-Speed Rail Can t Solve Nation s Traffic Problems

MEGARAIL TRANSPORTATION SYSTEMS, Inc.

What is the Connector?

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

FACT SHEET. US 192 Alternatives Analysis Modal Technologies. Alternative Description/Overview

Denver Metro Association of Realtors

SERVICE DESIGN GUIDELINES

Streetcar and Light Rail Design Differences. March 2015

PART TWO. 4. Transporting Passengers Safely. 5. Air Brakes. 6. Combination Vehicles. 7. Doubles and Triples. 8. Tank Vehicles. 9. Hazardous Materials

RUF capacity. RUF International, May 2010, A RUF DualMode system can obtain very high capacity by organizing the vehicles in small trains.

INTELLIGENT URBAN MOBILITY SOLUTIONS MARTIN ERTL CHIEF INNOVATION OFFICER BOMBARDIER TRANSPORTATION BERLIN,

Safer Swifter Better Leadrail Infra Solutions Pvt. Ltd. / INDIA

Bi-County Transitway/ Bethesda Station Access Demand Analysis

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

Table Station Elements

Service Quality: Higher Ridership: Very Affordable: Image:

Personal Rapid Transit as an Alternative to Bus Service in Two Communities

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Public Meeting. June 15, :30 7:30 p.m.

Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

PAWG Meeting #3a Tier 1 Evaluation

Develop ground transportation improvements to make the Airport a multi-modal regional

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

RUF Self Driving Cars

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS


Crenshaw-Prairie Transit Corridor Study Public Meetings

Key Transfer Stations - Technical Memo

Measure R Funded Transit Projects

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016

March Government Center Station

TRANSIT DRIVES PENNSYLVANIA MOBILITY FACT SHEET

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Honolulu Rail Transit Project Light Rail vs. Honolulu Light Metro. Harvey L. Berliner Infraconsult / HDR

West Broadway Reconstruction/LRT Design. March 19, 2015

PUBLIC TRANSPORTATION

5. OPPORTUNITIES AND NEXT STEPS

MPE060 MPE080. Truck shown with optional equipment. Rider/Walkie Pallet Trucks 6,000-8,000 lbs.

vision42

Proposed Program of Interrelated Projects

Community Outreach Meetings

PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA

Transport Modes and Technologies A Walking Tour on Capacity, LOS. Urban Transportation Planning MIT Course 1.252j/11.

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

ANDERSON PROPERTY SITE ANALYSIS

North America s leader in Track, Transit and Systems construction & maintenance services

Quality by Design CAPACITIES FROM 75,000 TO OVER 750,000 BUSHELS VARIETY OF PEAK LOAD RATINGS LARGE ROOF DECKS

City of Storm Lake Fire Department Heavy Rescue Specifications

Transit on the SC Rail Corridor

Metro Green Line to LAX Alternatives Analysis. March 2012

Chapter 4 : THEME 2. Transportation

Business Advisory Committee. July 7, 2015

PUBLIC TRANSPORTATION

DFW HSR Station Plans People Movers Hyperloop

The Implications of Automated Vehicles for the Public Transit Industry

Bus Rapid Transit. Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL

Presentation Overview. Stop, Station, and Terminal Capacity

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

PUBLIC TRANSPORT MODAL CHARACTERISTICS AND ROLES

VAN NESS AVENUE BUS RAPID TRANSIT

3D Shape Files for VS Products

What IS BRT, Really? Not BRT and RNY

Needs and Community Characteristics

Transportation Demand Management Element

Funding Scenario Descriptions & Performance

Executive Summary. Phase 2 Evaluation Report. Introduction

Stittsville OC Transpo Services

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

on the Real Estate Industry Rutt Bridges

CTA Blue Line Study Area

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

North Shore Alternatives Analysis. May 2012

Restoration of Historic Streetcar Services in Downtown Los Angeles

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

The City of Toronto s Transportation Strategy July 2007

Travel Time Savings Memorandum

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Smart transit system and e-mobility technologies for the GCC s railway aspirations

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in

Appendix G: Rapid Transit Technology Backgrounder July 2017

Kenosha-Racine-Milwaukee (KRM)

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

ACCIDENT REVIEW FORM

Landside Access Modernization Program (LAMP)

Patrons will be allowed access into the venue by the Gate Number denoted on their tickets.

4.0 TIER 2 ALTERNATIVES

A New Day for Accessible Commuting

Zone Control Co-Driver e-coaching Actions for Sets 1 to 16

GO Transit s deliverable: the 2020 Service Plan

Transit Fares for Multi-modal Transportation Systems

IMPROVEMENT CONCEPTS

WVU PRT Redefining Mobility

BENEFITS. Robotic Parking Systems offer numerous benefits over conventional ramp style garages or parking lots.

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Planning of electric bus systems

Transcription:

MicroRail Alternate to Light Rail Practical & affordable solutions are now available! MegaRail Transportation Systems, Inc. Fort Worth, Texas U.S. PATS. 6,039,135, 6,401.625, 6,435,100. 6,615,740, 6,742,458, 6,834,595 & 6,837,167 OTHER U.S. & INTERNATIONAL PATENTS PENDING Reg. U.S. Pat. & Tm. Off. 3-17-05

LRT has Serious Guideway Problems Not light weight Must support 149,000-lb cars Heavy-duty bridge structures needed Guideway Railroad-type grade, ballast, rails & cross-ties Right of way Dedicated ROW needed 44-ft for dual track 25-ft on city streets (Typical) Plus side trolley wire posts On-street lines often take two traffic lanes Heavy-duty & costly structures Massive support columns Multiple traffic lanes lost

LRT has Major Station Problems Typical characteristics 200-ft platforms ( Handle 2-car, 200-ft trains) Open platforms ( No passenger protection from trains & guideway ) Need additional right of way Elevated stations Often large and expensive Street stations Take away two to three traffic lanes Large & costly structures Open Passenger Platforms Stations can block traffic lanes

LRT has Critical Cost & Time Problems High initial cost $30 to $60 M / mile Avg. $45 M / mile (US) Now typically 50% Federal 50% local funds High O&M costs 15-25% from fare box - Balance from taxes Large & costly maintenance facility Long wait time Often 6 to 12 years Years of lobbying congress (US) Often greatest time hurdle Long ROW acquisition process Long construction time Major traffic disruptions

LRT has Installation & Traffic Impacts Major light rail system problems Street light rail Serious traffic disruption Streets torn up for months Traffic rerouted Business failures during construction Street blockage impact Long-term traffic disruption Traffic flow impeded by trains Frequent grade crossing accidents cars & pedestrians Dedicated right right-of-way Tearing down homes and businesses Extensive grading & utility relocations Environment damage Noise, visual & drainage impacts

Light Rail has Last Mile Problem Service does not appeal to most people Root cause of low ridership problem ( System unable to provide door to door & 24/7 service ) Light rail stations (one to two mile spacing ) Light rail line Typical max walk distance (1/8 mile) Desired service area (Now served by buses or nothing) Only carless people and limited others ride system

MicroRail Offers Affordable, Low-risk & NOW Alternate to LRT Better mass transport in less time and at less cost!

Superior MicroRail SkyCoach Performance Performance High-speed 65-mph Short trip times! High passenger capacity 26,000 pphpd (Typical light rail 200-ft station length) (36,047 with 300-ft stations) ( Typical max at-grade light rail capacity = 5,220 pphpd ) Short wait times As short as 30 seconds ( Typical time for conventional, at-grade light rail is 6-min ) Grade-separated Small, factory-built stainless-steel guideways No crossing accidents or street traffic delays No pedestrian accidents Go-anywhere ( Including up hills ) Cars use rubber tires Plus Offers Last Mile problem solutions!

MicroRail Transport is Available NOW! Guideway installation Guideway engineering Immediate start First production guideway sections deliver in 12 months Train production Start within 12 months Deliveries within 18 months First service within 30 months ( Manual control ) No waiting for extensive new development!

MicroRail SkyCoach Urban Transport Superior performance to light rail & monorail in small space & at low cost Ultralight MicroRail SkyCoach urban transport train on elevated guideway ( Mechanically-coupled train operated by on-board motorman )

Conventional off-the-shelf Train Control MicroRail Used on light rail systems for over a century Motorman in lead car Manual speed and brake controls Precise in-cab signaling for close train spacing

Signaling & Train Control Systems Signaling system Position & speed read by each train Two-way RF - digital data transfer links in guideway Train position & speed data from each train - Rapid updates Distances to next station & next train sent to each train Train control system Operator in each train Graphical & numeric train operator displays in cab Train Speed & Distances to next train & station Required braking zones Amber bars & max speed Prohibited entry zones Displayed as red bars Train operator controls Simple & easy-to-use Throttle Brakes Left/right Switch Select Doors Integrated part of system Not a separate system

Signaling & Train Control Diagram Guideway Train Position & Speed Monitor Guideway RF Digital Comm. System Manual Throttle, Brake & Switching Control Inside Rail Bar Codes Door Sensors & Controllers Train Position Readers RF- Digital Communication Units Train Control Unit Train Operator Display & Controls Battery Power Backup Unit Train Speed Tire Press & Vib. Sensors Motor & Steering Controllers Passenger Interface Units Motor-wheel Units SIGNALING & TRAIN CONTROLS

Attractive & Low Profile Stainless Guideway Ultralight, stainless-steel structure Long-life, no rusting Guideways elevated above street & pedestrian traffic - MicroRail guideway photo Minimum sky blockage No wide elevated LRT shadows View looking upward through guideway Small, 6.4-ft wide by 34-inch high MicroRail guideway U.S. Patent 6,837,167

Small, low cost, factory-built guideway Fast, bolt in place installation 6.4-ft wide by 34-inch high MicroRail guideway Enclosed Rails Center, Open-mesh Emergency Walkway U.S. Patent 6,837,167 Cross-braces every 5-feet Guideway cross-section System cost 20% of typical LRT system cost Over street rights-of-way No more land or earth moving projects Mass-produced, factory-built sections fast on-site assembly

Factory-built, Modular SkyCoach Stations Platform-edge wall with sliding doors omitted to show train Stations over streets Stairs Elevator Wall with sliding doors for safety MicroRail mass transit train at four-car elevated, over-street SkyCoach station Low-maintenance stainless-steel Low cost Minimum street impact

MicroRail SkyCoach Train Design Trains of small & light-weight, mechanically-coupled cars Ample leg & foot space 42-in doors for fast entry and exit MicroRail Skycoach interior Four seat configuration 8-ft long cars MicroRail coaches carry up to 13 and seat from four to six passengers 2-ft car spacing 20 to 30-car trains Up to 260 to 390 passengers per train

SkyCoach Step in and Sit Entry & Exit No center aisles! Fast entry & exit Short station dwell times Ample leg room Photos are of larger, but similar, MegaRail cabin All cars are wheelchair-compatible

SkyCoach Offers Safe Escape Unaided escape for all (including wheelchairs) without rescue personnel U.S. Patent 6,837,167 Full-height escape doors in ends of cars Open-mesh escape walkway between rails Covered electric rails Upward view through walkway

Electric power to trains 3 phase, 240V, 50 or 60 Hz Low Energy Use Four power rails Located inside rail tubes Power to system 3 phase, 13,000V, 50 or 60 Hz Substations at each 4 miles Distributed internally by system cables inside rail tubes Step-down transformers on guideway support columns Emergency power Generators spaced along guideway Energy use For 10-car train - Stations at 0.5-mi. Peak energy (during acceleration) 0.68 Mw * Average energy use per hour 138 kw - ( 20% of LRT power ) * Loads would be balanced by time-matching accelerating & decelerating trains to reduce total system peak power to approach 160-kw x number of trains.

Low-cost, All-weather, Enclosed Rails Low-cost guideway rails Formed from flat stainless-steel Machine-welded construction Low material & labor costs Bolt-in electric power rails Trucked to installation site Single guideway rail cross-sections All-weather, enclosed rails Wheels & power collectors inside Protected electric power rails Dry & ice-free traction surfaces Safe operation in any weather TIRES & TRACTION SURFACES FULLY PROTECTED RAIN, SLEET, OR SNOW

Technical Summary Unique new combination of off-the-shelf, proven technology Enclosed stainless-steel guideway rails - US Pat. 6,039,135 Simple welded steel factory fabrication Standard electrical power rails Flat-free tires Current car tire technology Permanent-magnet electric motors Electric Motor Poles Axle Assembly Current commercial brushless-motor technology Electric motor wheels current electric car use Car-based steering & switching Automobile-type steering with electronic control Switching No moving rails Used in other people-movers Electric Drum Brake Flat-free Rubber Tire Wheelmotor cross section Only the combination & guideway are new!

SkyCoach Maintenance Daily Cleaning & equipment inspections Accomplished at stations during nightly shutdown times Routine Periodic Actuators, tires, brakes, electronics Accomplished at on line service station on storage rail Car Installation & Removal Accomplished at on line service station on storage rail Lifts move cars between guideway and trucks on street Major Maintenance HVAC service, interiors, doors Accomplished at ground level service center Service center similar to an automobile repair facility No costly guideway to a costly repair center!

MicroRail Last Mile Problem Solutions Driver-controlled, hybrid-electric Skytram service Available - 36 months Dualmode, 52-passenger, 25-mph SkyTram service areas beyond easy walking range Future dualmode electric & hybrid-electric automobiles Available - 48 months Automated personal dualmode automobile service on guideways Dualmode personal automobile service on ordinary streets

Factory-built, Modular SkyTram Stations Dualmode MicroRail SkyTram at station on parking lot Low-maintenance stainless-steel Low cost Minimum ground space

Future Growth Summary Improved service More frequent & personal service On-demand, 24-hour, seven-day service Personal automated transport (PAT) service Short wait time for group automated transport (GAT) service Time to initial automated service 42 months! Only 12 months after start of manual-control train service Added future features Improve Last Mile solution Personal automobile service Electric dualmode car capability Automated cargo container car service MicroRail Available NOW + Exciting Future Growth Options

MicroRail - Low-risk Solution Revolutionary, but entirely upon off-the-shelf, proven technology First systems use manual train control Control proven in transit and railroad systems No exotic new technology All technology proven in transit and auto systems* Guideway is only really new element! ( And it is a simple welded steel structure ) * Future automated systems also employ proven aircraft technology

MicroRail Transport Summary Performance Beats LRT and solves Last Mile problem 26,000 pphpd (200-ft LRT-size stations) Up to 36,947 pphpd with 300-ft stations At-grade LRT capacity = 5,220 pphpd Shorter trip times Bus-type hill capability Dualmode serves more Early service Within 30 months! ( LRT-type manual control ) Much less than typical LRT systems - No funding delays Total system cost 20% to 22% of typical LRT system cost Local funding and control No on-going operation subsidies Environment friendly Noise free operation No construction or operating impacts to business or street traffic No earth moving No added right-of-way Zero emissions MicroRail Available NOW

TRANSPORTATION SYSTEMS, Inc. 401 West Jim Wright Freeway, Suite 113 Mail Address P. O. Box 121728 Fort Worth, Texas 76121 (817) 738-9507 FAX (817) 367-2373 contact@megarail.com www.megarail.com Revolutionary, High-speed, Multi-user! offers - Unprecedented level of service Low transportation user costs Near-term & affordable solution to traffic & air pollution problems