CHAPTER 8 LAUNCH SITE OPERATION

Similar documents
CHAPTER 8 LAUNCH SITE OPERATION

CHAPTER 8 LAUNCH SITE OPERATION

CHAPTER 1 INTRODUCTION

CHAPTER 6 ENVIRONMENTAL CONDITIONS

CHAPTER 2 GENERAL DESCRIPTION TO LM-2E

CHAPTER 2 GENERAL DESCRIPTION TO LM-3C

SpaceLoft XL Sub-Orbital Launch Vehicle

6. The Launch Vehicle

USA FALCON 1. Fax: (310) Telephone: (310) Fax: (310) Telephone: (310) Fax: (310)

Atlas V Launches the Orbital Test Vehicle-1 Mission Overview. Atlas V 501 Cape Canaveral Air Force Station, FL Space Launch Complex 41

Moreno Valley Fire Prevention Bureau. Model Rocket Guideline

Pre-Launch Procedures

SOYUZ-IKAR-FREGAT 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : SOYUZ Series : SOYUZ Version : SOYUZ-IKAR SOYUZ-FREGAT

THE FALCON I LAUNCH VEHICLE Making Access to Space More Affordable, Reliable and Pleasant

CONTENTS Duct Jet Propulsion / Rocket Propulsion / Applications of Rocket Propulsion / 15 References / 25

USA ATHENA 1 (LLV 1)

Jordan High School Rocketry Team. A Roll Stabilized Video Platform and Inflatable Location Device

H-IIA Launch Vehicle Upgrade Development

In-Space Demonstration of HighPerformance Green Propulsion (HPGP) and its Impact on Small Satellites

Deployment and Drop Test for Inflatable Aeroshell for Atmospheric Entry Capsule with using Large Scientific Balloon

Boeing CST-100. Commercial Crew Transportation System. Keith Reiley, The Boeing Company. February, 2011

Y. Lemmens, T. Benoit, J. de Boer, T. Olbrechts LMS, A Siemens Business. Real-time Mechanism and System Simulation To Support Flight Simulators

Success of the H-IIB Launch Vehicle (Test Flight No. 1)

SPACE LAUNCH SYSTEM START 1 USER S HANDBOOK VOLUME II: PRE-LAUNCH PREPARATION, LAUNCH, & COSMODROME OPERATIONS

NanoRacks External Payload Platform

Reentry Demonstration Plan of Flare-type Membrane Aeroshell for Atmospheric Entry Vehicle using a Sounding Rocket

Rocket 101. IPSL Space Policy & Law Course. Andrew Ratcliffe. Head of Launch Systems Chief Engineers Team

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Copyright 2016 Boeing. All rights reserved.

MISSION OVERVIEW SLC-41

Adaptation of Existing Fuze Technology to Increase the Capability of the Navy s 2.75-Inch Rocket System

Taurus II. Development Status of a Medium-Class Launch Vehicle for ISS Cargo and Satellite Delivery

Testing Of Fluid Viscous Damper

Case Study: ParaShield

EXTENDED GAS GENERATOR CYCLE

Georgia Tech NASA Critical Design Review Teleconference Presented By: Georgia Tech Team ARES

Rapid Coupled Loads Analysis and Spacecraft Load Reduction using SoftRide

Star Tower. Why Aerostats Star Tower: Applications Summary. Description Performance Features Payload. Product CARAVAN INTERNATIONAL CORPORATION

Development of a Low Cost Suborbital Rocket for Small Satellite Testing and In-Space Experiments

Auburn University Student Launch. PDR Presentation November 16, 2015

SSC Swedish Space Corporation

Joint Unmanned Aircraft System Mission Environment (JUAS-ME)

DESIGN OF A MODULAR STEERING SYSTEM TEST BENCH FOR DURABILITY, PERFORMANCE AND CHARACTERIZATION TESTS

Lunette: A Global Network of Small Lunar Landers

Cable Dragging Horizontal Takeoff Spacecraft Air Launch System

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

Statement of Work Requirements Verification Table - Addendum

The 22M Class Aerostat: Increased Capabilities for the Small Tethered Aerostat Surveillance System

Antares Rocket Launch recorded on 44 1 Beyond HD DDR recorders Controlled by 61 1 Beyond Systems total

TacSat-4 I&T, Launch Processing, and Early Flight Operations Experience

Keywords: Supersonic Transport, Sonic Boom, Low Boom Demonstration

BY HOEYCOMB AEROSPACE TECHNOLOGIES. HC-330 HYBRID-POWERED ALL- ELECTRICITY DRIVEN four-rotor UAV

ARIANEGROUP ORBITAL PROPULSION ROBERT-KOCH-STRASSE TAUFKIRCHEN GERMANY

KMS MD35 Communication protocol Release 1.02 KMS MD35 ECU.

Modeling, Structural & CFD Analysis and Optimization of UAV

ENERGIA 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : K Series : K-1/SL-17 Version : 4 strap-ons

System Testing by Flight Operators the Rosetta Experience

GK L A U N C H SER VICES MOSCOW 2017

In 2003, A-Level Aerosystems (ZALA AERO) was founded by current company President Alexander Zakharov, since then he has led

APPLICATION NOTE AN-ODP March 2009

Procedure for assessing the performance of Autonomous Emergency Braking (AEB) systems in front-to-rear collisions

AN EXPERIMENTAL STUDY OF THE AERODYNAMICS FORCES ACTING ON A TRUCK

To determine which number of fins will enable the Viking Model Rocket to reach the highest altitude with the largest thrust (or fastest speed.

Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer

IST Sounding Rocket Momo User Guide

B kv T&D GAS INSULATED SWITCHGEAR

High Performance Green Propulsion (HPGP): A Flight-Proven Capability and Cost Game-Changer for Small and Secondary Satellites Aaron Dinardi

Travel: Detailed Flight Plan

Welcome to Vibrationdata

Rocket Activity Advanced High- Power Paper Rockets

MISSION OVERVIEW SLC-41 CCAFS, FL

USA DELTA DELTA Mc DONNELL DOUGLAS SPACE SYSTEMS

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

HYDROS Development of a CubeSat Water Electrolysis Propulsion System

Transport Canada s ecotechnology for Vehicles (etv) Program

Flight and Terminal Ballistic Performance Demonstration of a Gun-Launched Medium Caliber Ramjet Propelled Air Defense Projectile

Validation System (EVS)

APPROVED AROUND THE WORLD BENTEC RIGS

CHAPTER 4 : RESISTANCE TO PROGRESS OF A VEHICLE - MEASUREMENT METHOD ON THE ROAD - SIMULATION ON A CHASSIS DYNAMOMETER

DemoSat-B User s Guide

Development of Internationally Competitive Solid Rocket Booster for H3 Launch Vehicle

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

Installation and Operations Manual

Modeling and Control for Turboelectric Aircraft

Development of Japan s Next Flagship Launch Vehicle

Presentation Outline. # Title # Title

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Explosion Relief Valves

ELECTRIC PROPULSION MISSION TO GEO USING SOYUZ/FREGAT LAUNCH VEHICLE M.S. Konstantinov *, G.G. Fedotov *, V.G. Petukhov ±, G.A.

UNDERGROUND MINING. Mine hoist disc brake systems Improved safety, availability and productivity

Auburn University. Project Wall-Eagle FRR

1.1 REMOTELY PILOTED AIRCRAFTS

1-Remove stock exhaust, Y-Pipe, and silencer (Retain OEM springs and exhaust gaskets for pipe installation).

Introduction...3. System Overview...3. PDC Control Unit Sensors PDC Button Interfaces Activation of the PDC...

The Falcon 1 Flight 3 - Jumpstart Mission Integration Summary and Flight Results. AIAA/USU Conference on Small Satellites, 2008 Paper SSC08-IX-6

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification

1. Abstract. 2. Introduction. 3. Pilferage and adulteration of fuels used in Telecom Sector. 4. Problems due to fuel pilferage and adulteration

Mars Surface Mobility Proposal

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Development Status of H3 Launch Vehicle -To compete and survive in the global commercial market-

The European Lunar Lander Mission

Transcription:

Launch Site Operation mainly includes: LV Checkouts and Processing; SC Checkouts and Processing; SC and LV Combined Operations. LAUNCH SITE OPERATION The typical working flow and requirements of the launch site operation are introduced in this chapter. For different launch missions, the launch site operation will be different, especially for combined operations related to joint efforts from SC and LV sides. Therefore, the combined operations could be performed only if the operation procedures are coordinated and approved by all sides. LM-2C uses JSLC as its main launch site. The launch site operations in JSLC are focused in this Chapter. The operations in XSLC are similar. 8.1 LV Checkouts and Processing Two-stage LM-2C or LM-2C/CTS launch vehicle is transported from CALT facility (Beijing, China) to JSLC (Gansu Province, China) and undergoes various checkouts and processing in the North Technical Center and the South Launch Center. The typical LV working flow in the launch site is shown in Table 8-1. Issue 1999 8-1

Table 8-1 LV Working Flow in Launch Site T E C H. No. Item Working Period Accumulative Period 1 To Unload LV from the Train and Transfer LV to LV Test 1 day 1 day Building (BL). 2 Unit Tests of Electrical System 7 days 8 days 3 LV Status Recovery before Transfer 3 days 11 days L A U N C H C E N T E R 4 To Transfer LV to the Launch Center and Erect LV on the 1 days 12 days Launch Tower 5 Tests to Separate Subsystems 2 days 14 days 6 Matching Test Among Subsystems 2 days 16 days 7 overall checkout on the first and second stages 2 days 18 days 8 To Mate SC/Fairing Stack with LV 1 days 19 days 9 CTS subsystem tests and matching tests 1 days 20 days 10 The First Overall Checkout 1 day 21 days 11 The Second Overall Checkout ( Launch Rehearsal, SC Involved) 1 day 22 days 12 The Third Overall Checkout 1 day 23 days 13 Reviews on Checkout Results 1 days 24 days 14 Functional Check before Fueling, Gas Replacement of Tanks 1 days 25 days 15 N2O4/UDMH Fueling and Launch 2 day 27 days Total 27 days 27 days After SC is transferred to Launch Center, some of SC and LV operations can be performed in parallel under conditions of no interference. Issue 1999 8-2

8.2 Combined Operation Procedures Take LM-2C/CTS launching multiple SCs as an example. 8.2.1 SC/LV Integration and Fairing Encapsulation in North Technical Center In BS2 & BS3, SC team carries out all the SC operations. LV side is responsible for mating SCs with CTS and installing SC/LV separation devices. The following describes the typical working procedure: 1. In BS3, CALT to clean up the fairing halves and install wires and sensors on the inner surface of the fairing, and glue the thermal blanket (cork panel) on the outer surface of the fairing; SC side to prepare and perform SC testing; 2. In the assembly area of BS3, CALT to install the solid rocket motor on the CTS; CALT to move the CTS to the fueling area, to fuel RCS with hydrazine and perform gas-filling for the gas bottles; CALT to move the CTS back to the assembly area; 3. CALT to bolt the CTS with the supporting table through the LV Adapter; 4. SC side to hoist the fueled & weighed SCs overhead the CTS; CALT to mate SCs with CTS one by one; 5. CALT to encapsulate the fairing; 6. CALT to install explosive bolts on the fairing, and finally form a SC/Fairing stack; Refer to Figure 8-1. Issue 1999 8-3

Orbital Maneuver System SRM SC Adapter Launch Vehicle Adapter 1. To clean up the fairing and install sensor inside it. 2. To install SRM on the CTS, and to fuel RCS with hydrazine and perform gas-filling for the gas bottle; 3. To bolt CTS with the supporting table through the LV Adapter; 4. To mate SCs with CTS one by one. 5. To encapsulate the fairing. 6. To install explosive bolts on the fairing, and finally form a SC/Fairing Stack. Figure 8-1 SC/LV Integration and Fairing Encapsulation 8-4 Issue 1999 8-4

8.2.2 SC Transfer and Fairing/Stage-2 Integration CLTC is responsible for transferring the encapsulated fairing from BS3 to the North Launch Center. The following working procedures are performed: 7. CLTC to load the SC/Fairing stack onto the transfer trailer; CLTC to connect the transfer trailer with the tractor, and make the air-conditioning pipe connected to the encapsulated fairing, then get the temperature and humidity monitoring system ready; CLTC to transfer the SC/Fairing stack to the Launch Center; 8. CLTC to move the encapsulated fairing stack under the launch tower, and install hoisting sling; 9. CLTC to lift up the encapsulated fairing stack onto the stage-2 of LM-2C, which is already erected; 10. CALT to mate the encapsulated fairing with stage-2 of LM-2C; Refer to Figure 8-2. 11. CALT to set up an air-conditioned closure for the SC/Fairing stack, and connect the air-conditioning pipes to the encapsulated fairing air-conditioned, then record the environment parameters inside the fairing; 12. CALT to connect the umbilical cable, SC side to monitor SC status and charge SC battery; 13. CALT to perform subsystem tests and matching test for CTS, SC side to perform SC testing; 14. CALT and SC side to conduct launch rehearsal (SC involved). This is the end of combined operations. Issue 1999 8-5

7. To load the encapsulated fairing stack onto the transfer trailer, and to drive the tractor from BS3 to the launch center. 8. To move the encapsulated fairing stack under the launch tower and install hoisting sling. 9. To lift up the encapsulated fairing onto the stage-2 of LM-2C. 10. To mate the encapsulated fairing with stage-2 of LM-2C. Figure 8-2 SC Transfer and Fairing/stage-2 integration 8-6 Issue 1999 8-6

8.3 SC Preparation and Checkouts CALT and CLTC are responsible for checking and verifying the umbilical cables and RF links. If necessary, SC team could witness the operation. LV accessibility and RF silence time restriction must be considered, when SC team performs operation to SCs. 8.4 Launch Limitation 8.4.1 Weather Limitation Ambient temperature: -10 C~+40 C; Relative humidity: 98% (corresponding to 20±5 C) The average ground wind velocity in the launch area is lower than 10m/s The winds aloft limitation: q α 4000N/m 2 rad (q α reflects the aerodynamic loads acting on the LV, whereas, q is the dynamic head, and α is LV angle of attack.) The horizontal visibility in the launch area is farther than 20 km. No thunder and lightning in the range of 40km around the launch area, the atmosphere electrical field strength is weaker than 10kV/m. 8.4.2 "GO" Criteria for Launch The SCs' status is normal, and ready for launch. The launch vehicle is normal, and ready for launch. All the ground support equipment is ready; All the people withdraw to the safe area. 8.5 Pre-launch Countdown Procedure The typical pre-launch countdown procedure in the launch day is listed below: No. Time Event 1-7 hours Launch Status Preparation; 2-5 hours LV Power-on, Functional Checkouts on Each Sub-system 3-4 hours Connecting Plugs for Battery and Pyrotechnics 4-3 hours LV Status Checkouts, Sealing; Issue 1999 8-7

5-2 hours GSE Status Checkouts; 6-90 minutes Final Launch Status Preparation; 7-60 minutes SC side send GO signal; Battery air-conditioning stops; LV tanks are pressurized; Aiming; 8-40 minutes Flight Software Loading; One of Air-conditioning Pipes Drop-off; 9-30 minutes Moveable Platforms on the Umbilical Tower Withdrawal; 10-15 minutes Umbilical Disconnection; 11-7 minutes The Final Air-conditioning Pipe Drop-off; 12-2 minutes LV Power Switch Over, In-Flight-Disconnectors (IFD) Drop-off; 13-1 minute Swinging Arms Withdrawal; 14-40 seconds TT&C Systems Starting; 15-5 seconds Camera On 16 0 Ignition 8.6 Post-launch Activities The orbital parameters of the injected orbit will be provided to Customer in half-hours after SC injection. The launch evaluation report will be provided to the Customer in a month after launch. Issue 1999 8-8