Energy 4.0, R&D & Smart Grid Mr. Cherid Kalayanamitr September 12 th 2018
Agenda I. Introduction of EGAT II. Energy Policy (Energy 4.0)-Electricity-EGAT III. EGAT R&D IV. Smart Grid V. Conclusion - Electricity Innovation 2
I. Introduction State-owned Enterprise under Ministry of Energy Responsible for electric power generation and transmission for the whole country as well as bulk electric energy sales Responsible for Thailand s power system for 50 years, since 1968. Reliability and security of the country s power system 3
Vision Innovate Power Solutions for a Better Life Mission - To generate, acquire, transmit, and sell electricity - To conduct electricity-related businesses including production and sale of lignite. 4
- Thailand 1.0 = Agriculture - Thailand 2.0 = Light Industry - Thailand 3.0 = Advance Industry - Thailand 4.0 is an economic model aims into innovation II. Energy Policy (Energy 4.0) Electricity
Thailand Integrated Energy Blueprint 6
Before Energy Policy (Energy 4.0) Electricity 7
The Principles of Smart Grid by MOE - Demand Response - RE Forecast - Micro Grid EGAT main tasks focused 8
EGAT R&D Direction EGAT R&D Direction 9
III. EGAT R&D :Electric Vehicle (EV) EV Conversion Remote Terminal Unit (RTU) Welding Robot EGAT R&D Projects 10
Research Project Roadmap EGAT EV move forward (3 Phase of Development) Phase I (2010-2016) Phase II (2017-2018) Phase III (2019-later) To study the possibility of converting a car with ICE into EV 2 Modified EVs : Honda Jazz and Toyota Vios that have 120 km percharge range Develop lowcost and universal EV conversion kit Prototype of universal EV conversion kit, including installation fee that cost less than 200,000 baht exclude battery and per-charge range not less than 200 km Widespread introduction and Consumer reassurance Cooperate with private industrial sector for transferring knowhow and also establish Modified-EV service and learning center. 4. Modified-EV service and learning center 3.Service manual 5. Entrepreneur training 1. EV kit Manufacturer 11 11
EGAT R&D projects EGAT Smart Grid Pilot Project Mae Hong Son Province Smart Grid Pilot Project in northern Thailand: As the problem of power failure frequently, and located closed to the conserved forest area, limited criteria for transmission system development. EGAT R&D Projects 12
Project Information Mae Hongson Smart Grid Pilot Project is located at Maung District, Mae Hongson Province, 15 km far from Mae Hongson airport. 13
Project Perspective 14
Smart Grid Mae Hong Son Pilot Project Electricity Generation Hydropower-Mae Sa nga (2x2.5 MW+2x2.65 MW) Hydropower Pha Bong (0.85 MW) Solar power Pha Bong (0.5 MW) Smart grid 15
EGAT Smart Grid Pilot Project 1. Smart Energy 2. Smart System 4. Smart Learning 3.Smart City 16
Project Elements 17
IV. Smart Grid and Energy Storage 18
Renewable Energy: RE-SPP: Small Power Producer Hybrid Hydro-Floating Solar Hybrid System 19
Hydro-Floating Solar Hybrid System Concept Price System Environment Low Price o Optimized Land Use Economy of Scale Maximized Existing Facilityzzzz System o Hybrid เช น Hydro Floating Solar Hybrid Energy Storage System o Micro Grid Solution Operation Phase No Environmental Impacts Public Participation Environmental friendly Environmental monitoring System 1 Collaboration with Strategic Partner (2018) Small Scale at Tha Tung Na Dam 500kW 2 Pilot Project (2020) Pilot Project at Sirindhorn Dam 445MW 3 Commercial Project (2022-2031) Large Scale at 11 EGAT dams Potential more than 1,000 MW 2020
Tha Tung Na Dam Kanchanaburi Westhern Thailand Sirindhorn Dam Ubol Ratchathani N/E Thailand 21
22
V. Conclusion Electricity Innovation Innovation Power Plant for Security Power Plant for competition Grid Management - Grid RE Integration - Flexibility Tools - TPA & Regional Grid Manager by The 3 rd Party Access - Regional Grid Infrastructure New Opportunity - Explore New Energy (Innovation) - FSRU & LNG Procurement - Hydro Floating Solar Hybrid Firm - Load Aggregator(Smart Grid and City) Cost & Loss Control
Innovate Power Solutions for a Better Life T h a n k Y o u 24