OVERHAULING JOBS (STG) 1 GSEG Ltd. Hazira, STG minor inspection work Model DKY 1- N33 Alstom make 156.1 MW CCPP Phase-1, GSEG Ltd. Hazira. 2010 14 days 14 days 2 NPCIL RAPP -5&6, Kota, Rajasthan Dismantling and Removal of Generator rotor of RAPP, Unit # 6 of 220 MWe at Rajasthan Atomic Power Plant. 2010 15 days 4 days 3 SAS, Capital Overhauling of 210 MW TG set Unit#4 at GSECL,. 2008 35days 35 days 4 Torrent Power Ltd. Ahmedabad 110 MW Turbine jobs of F & D stations at Sabarmati TPS, Ahmedabad. 2006 40 days 40 days 5 GSECL Work of rectification in main steam pipe/ CRH pipe to be carried out during capital O/H of Unit 3 GTPS,. 2006 10 days 10 days 6 Additional works envisaged during medium overhauling of TG Unit 3 of 210 MW at TPS. 2006 20 days 20 days 7 Medium overhauling of Turbine & Generator and Turbine valves at GTPS Unit-3, 210 MW TG set. 2006 35 days 35 days 8 Torrent Power Ltd. Overhauling of 110 MW 'E' station Turbine and Generator at Sabarmati TPS, Ahmedabad,. 2006 42 days 42 days 9 GSEG Ltd. Hazira, STG minor overhaul work Model DKY 1- N33 Alstom make 156.1 MW CCPP Phase-1, Hazira. 2005 12 days 12 days 10 NTPC- Alstom Power Services (NASL), Mathura road, New Delhi- 110 044 Dismantling, unloading, storage, transporting, erection, commissioning and trial run of turbine package required for renovation & modernization of 1X110 MW Station D of Sabarmati TPS of M/s A.E.Co. Ltd., Ahmedabad,. 2003 90 Days 90 Days UEPL/PE/OH/01E15 Page 1 of 5
11 RSC Overhauling of Turbine & Generator of Unit-3 110 MW, TDL TPS, Panipat. 2002 45 days 45 days 12 RSC Balance works of Turbine, Generator and auxiliaries for commissioning of Unit-2, upgrading work of 110 MW to 120MW TDL TPS, Panipat. 2002 90 days 90 days 13 RSC Replacement of HP, IP & LP rotots and overhauling of Turbine & Generator Unit-1, 110MW, Kota TPS. 2002 86 days 86 days 14 (SAS) Capital overhauling of 200 MW TG (LMW) Unit 3 & Extending skilled manpower for rewinding of Gen. & RLA works at Ukai TPS for M/s, Ukai. 2000 75 days 75 days 15 (SAS) W.O. for 2 nos. of HP pipe joints cutting by grinding, SR, TIG & Arc welding & 100% radiography of U-loop piping between IV chest & IP casing for O/H of 120 MW Turbine, Unit #1 at Ukai TPS. 2000 7 days 7 days 16 (SAS) Capital overhauling and retrofitting of steam sealing system in place of water sealing system for 120 MW TG Unit-1 for Ukai TPS, Ukai. 1999 75 days 75 days 17 Overhauling and Inspection of Generator at Thermal Power Station, for Unit 3 & 4 of 210 MW. 1998 30 days 30 days 18 TPS Replacement of generator rotor, exciter rotor, inspection of all bearings of LP turbine and generator rotor coupling, reaming of generator rotor and exciter coupling and alignment work in 120 MW Unit 2 at TPS for 1995 30 days 30 days 19 Capital overhauling of Unit # 1 of 120 MW Turbine Generator Set and Valves with I.P. Rotor and its Peripherals replacement for M/s Electricity Board at Ukai TPS, Ukai, 1994 60 days 60 days UEPL/PE/OH/01E15 Page 2 of 5
20 Siemens Ltd. New Delhi Overhauling & Reblading of Rotor in 3 stages of 62.5 MW TG set at Renusagar Power Co. Ltd., Renusagar 1993 45 days 30 days 21 PS - WR Capital overhauling of 120 MW Turbo- Generator Set ( make) Unit-II including additional work for M/s at TPS, 1993 120 days 120 days 22 Capital overhauling of 120 MW TG Set Unit-I for at TPS, 1990 70 days 70 days 23 Capital Overhauling of 210 MW TG set Unit- 1&2 for M/s at Wanakbori TPS, 1989 75 days 75 days 24 Replacement of Generator Rotor of 210 MW TG Unit 2&3 at M/s Wanakbori TPS, 1988 75 days 74 days 25 Removal & reinsertion of generator rotor of 210 MW TG for Unit 5 & 6 at M/s Wanakbori TPS, 1988 30 days 30 days 26 Overhauling of 200 MW TG Unit 4 for, Ukai TPS, 1986 90 days 90 days UEPL/PE/OH/01E15 Page 3 of 5
OVERHAULING JOBS (GTG) No Period of 1 GSECL CCPP, Dhuvaran TPS, Dhuvaran Combustion Inspection & Major Inspection of Gas Turbines of CCPP in Unit #1 and Unit #2 at GSECL Dhuvaran TPS. 2008 CI 9 days MI 29 days CI - 8 days MI 27 days 2 Damage Rectification work of GT 12 (GT8C2 Model) at GSEG Ltd., Hazira, Dist.,. 2003 35 days 180 days Completed on 05/5/2004 in overstay period 3. Inspection (Major Overhaul) of Gas Turbine and Compressor 12 (GT8C2) at State Energy Generation Ltd., Hazira 2003 35 days 65 days (Rectification/ modification in GT and Compressor 4 Inspection (Major Overhaul) of Gas Turbine 11 (GT8C2) at State Energy Generation Ltd., Hazira. 2003 29 days 25 days 5 Reliance Industries Limited () Unit 1. 6 Complete Major overhauling for frame - VI Gas Turbine at Reliance Industries Ltd., Hazira for Unit 2. 2002 10 days 10 days 7 Unit 3. 8 Unit 4. UEPL/PE/OH/01E15 Page 4 of 5
No Period of 9 Unit 5. 10 Hazira for Unit 6. 11 Complete Major overhauling for frame - VI Gas Turbine at Hazira for Unit 7. 2002 10 days 10 days 12 Complete Major overhauling of Gas Turbine, accessories and load gear box inspection at IPCL, Dahej. 2002 15 days 12 days 13 ONGC Uran, IEC Complete refurbishing for frame - V Gas Turbine at ONGC, Uran, Mumbai. 2002 20 days 20 days 14, U.P Overhauling and Inspection of V94.2 Gas Turbine Generator at Gas power plant for Unit 2 of 143 MW at NTPC 2001 18 days 18 days 15, U.P. Overhauling and Inspection of V94.2 Gas Turbine Generator at Gas power plant for Unit 1 of 143 MW at NTPC 2001 22 days 15 days 16 Fr9A Gas turbine and Generator overhauling at NTPC,. 2000 30 days 25 days UEPL/PE/OH/01E15 Page 5 of 5