Appendix D. List of Existing Structures

Similar documents
South Gloucestershire Challenge Fund and Cycle Ambition Fund

Appendix F-1 Description of the Long-Term Alternatives

Vigaun bridge. Picture credits: Florian Schreiber Fotografie for SSF Ingenieure GmbH

BCA Birmingham A137(1)

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.

B.C. MINISTRY OF TRANSPORTATION. Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE

Chapter 11 Route Window NE10 Gidea Park station. Transport for London

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River.

Chapter 5 Route Window NE4 Ilford station. Transport for London

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Brent Spence Bridge Design Exceptions - Alternative I

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Volume Contents for NRA Manual of Contract Documents for Road Works

South West Wales Best Practice Club with ABC Electrification Swansea 7 th July 2015

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Great Eastern Line. Proposed Service Improvements. Crossrail propose to improve rail services on the Great Eastern Line with:

Hosur Krishnagiri Project Of NH-7

. DEFENCE AREA 59 FRILFORD / FYFIELD

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

First published June 2007 Copyright China Trend Building Press Limited

Safety Barriers (Including Amendment No. 1, dated January 2016)

TRANSPORTATION REVIEW

Cost to extending KC Streetcar north approximately ½ mile

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

California University of Pennsylvania (CALU) Maglev Sky Shuttle

LAL LAL WIND FARM YENDON SECTION. Feasibility of haulage routes. WestWind Energy Pty Ltd. 10/01/2008 Job No. CG107800

Kimberley Route Options

Hosur Krishnagiri Project Of NH-7

Infrastructure & Power. FP M c Cann. Tel: +44(0) Fax: +44(0)

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

Confederation Line West Alignment Improvement. September 21, 2016

Chapter 3 Route Window C2 Paddington station. Transport for London

Wilsons Auctions PROPOSED VEHICLE STORAGE COMPOUND, QUEENSFERRY, FLINTSHIRE. Transport Assessment VN60593

THE FUTURE OF VANCOUVER S VIADUCTS

Sandyford - Brides Glen (Line B1)

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

Forest Hill Street Clutter study

Blue Bridge Lane. Potential connectivity through garages, to be confirmed.

THE FUTURE OF VANCOUVER S VIADUCTS

Behavior & Design. Curved Girder. Curved Steel Girder Bridges. PDF Created with deskpdf PDF Writer - Trial ::

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

IMPROVEMENT CONCEPTS

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting

Table Station Elements

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

RESILIENT INFRASTRUCTURE June 1 4, 2016

APPENDIX C. Existing Utilities

FOOTBRIDGE ELEVATION SCALE 1:100

Mid-Coast Corridor Transit Project

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

Please Read Carefully

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

Baddow Road Bus Gate Frequently Asked Questions May 2018

TRAFFIC POLICE, SIRSA

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

US 191 Load Rating Past and Present. By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

Modernising the Great Western railway

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

Technical Information. 300 Elm Street Rockford, Illinois

This section is illustrated in Figure The length of this section is approximately 24.5 km.

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

The Eastern Connector Study November, 2007 planning for the future

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

Motorcycle route safety review Inner Melbourne. Wendy Taylor. August 30, 2013

Best Practices in Intercity Rail An Infrastructure Manager s Perspective. Nigel Ash Managing Director, Network Rail Consulting TRB January 2014

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

On-the-Job Training Program. Overview of Training Programs

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

MO 370 Interchange Ramp at Salt River Road - Phase 1

VIADUCT LOCATION STUDY. October 19, 2009

New Mexico Transmission Expansion Concepts For Wind Resources

The following section summarises the present conditions related to transportation for the proposed development of the Matimba B Power Station:

CHAPTER 4 PRELIMINARY DESIGN (PHASE 1)

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

A428 Western Corridor Guided Bus Route Options

Appendix G Aquilla Lake Pool Rise Recreational Resources

Transit City Etobicoke - Finch West LRT

APPENDIX 1-2 PRESENTATION MATERIAL(2)

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation 22 nd February 2010.

10/06/ /03/ /06/13 17/06/14. 22/07/13 19/12/14 4 way temporary traffic lights Low 26/07/ /03/2014

Going down and under. underbridge

1 Downtown LRT Connector: Draft Concept

3.14 Parks and Community Facilities

AusRAP assessment of Peak Downs Highway 2013

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

The remainder of this memorandum contains the details of our peer review findings.

The Project North West Electrification Programme

APPENDIX 12.1 ABNORMAL LOADS ASSESSMENT

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Transcription:

A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135

A120 Braintree to A12 - Existing Structures Existing Structure Name Structure Key Scheme Options Affected Approximate Chainage Structure Type Span Arrangements Overall Span Total Width Overall Width of new A12 @ location of the structure Estimated Abutment Type Structure Outcome? Extended Deck Structure Condition Assessed Capacity Area Existing Headroom Galley's Corner Subway 24328 3, 4b & 9 A120 2DAP Pedestrian subway 1000 in situ r.c. box Single span 5.0 34.0 26.1 Approx. 12 m extension to the north pending structural assessment 68 Structure is in a fair condition with no major defects. 32T ALL ~3.90 Strucure may require strengthening. TBC pending results of the assessment. Tilkey Culvert 24406 3 A120 2DAP Robin's Brook 9655 precast r.c. box units Single span 2.5 48.0 26.1 Either steepen existing embankments with good quality fill/strengthened earthworks from ~1:2.5 to ~1:1.5 OR estend structure. (28) Structure is in a good condition with no major defects. 32T ALL ~2.0 (without water) Strucure may require strengthening. TBC pending results of the assessment. Tilkey Subway 24407 3 A120 2DAP Pedestrian subway 9720 precast r.c. box units Single span 2.7 17.0 26.1 Approx. 30 m long extension to the north pending structural assessment. 99 Structure is in good overall condition with some minor nonstructural defects. 32T ALL ~2.55 Strucure may require strengthening. TBC pending results of the assessment. Twain Culvert 24324 1 & 8 A120 2DAP River Brain 900 precast r.c. box units Single span 3.0 46.4 26.1 Possibly slight regrading/steepening of embankments. Structure is in a good condition with no major defects. 32T ALL ~2.5 (without water) Strucure may require strengthening. TBC pending results of the assessment. Blackwater 24329 Existing A120 River Blackwater Steel composite RSJ's with hogging plates and fill 2 span 15.4 11.7 Unaffected by any proposed options. FAIR 17T ALL unknown Not clear whether structure has been strengthened to withstand 40T ALL. Suggest reassessment to determine suitability for retention of structure or whether strengthening is suitable. Railway bridge over Ex. A120 TBC Braintree Branch Railway Existing A120 Steel half-through girder with composite deck 2 span 42 6.0 Unaffected by any proposed options. TBC TBC 5.7 Information on this structure is still to be confirmed pending SMIS database information. Overhead Line Equipment is present. Millenium Way TBC B1018 - Millenium Way Existing A120 Prestressed beams 4 span 70 24 Unaffected by any proposed options. TBC TBC 5.7 Information on this structure is still to be confirmed pending SMIS database information. Mark's Tey Rail Bridge 24331 Existing A120 Railway precast beams with insitu slab Single span 23 10.9 Unaffected by any proposed options. FAIR All traffic lanes 40T ALL + 45HB. AIL's to pass down centre of bridge 1 m from kerb face to avoid weak 7.5T capacity corner slab. 5.90 Structure has had extensive strengthening works carried out recently.

A120 Braintree to A12 Technical Appraisal Report Appendix E. List of Proposed Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 135 of 135

A120 Braintree to A12 - Proposed Bridges - Option 1 / Deck Width Total Length Min. headroom req'd River Viaduct 920 Carriageway River Brain Viaduct Greenfield site. Steel composite is likely form of construction. Piers to have minimal impact on floodplain, likely founded on piles. 27.1 100 2725 5.7 Viaduct crossing the River Brain and associated floodplain Braintree Branch 1150 Carriagway Braintree Branch Line Railway requirements. Would need to conduct NR STAT's survey. Prefabricating entire bridge adjacent to its permanent position will enhance time saving for railway possession. Single span structure. Construction methodology technically challenging. 17 28 500 5.7 Structure carries proposed A120 under the Galley's Corner Dumbell bridge 2230 Grade separated junction 27.1 45 1225 5.7 Junction overbridge for new 'dumb-bell' grade separated junction at Galley's Corner. NMU bridge 2530 Footpath 74/5 To carry pedestrian, cyclists and occassional vehicles. 8 51 425 5.7 over Ashes Road 2800 Ashes Road 27.1 50 1375 5.7 It crosses A120 and connecting Ashes rd with Long Green Lanham Green Rd O/B 3660 Lanham Green Road 17.5 45 800 5.7 It crosses A120, joining Boars Tye rd, Lanham Farm rd and Hollies Rd Links Road 4400 Links Road 12 45 550 5.7 It crosses A120, joining Boars Tye rd with Links rd. FP 108/51 4800 Footpath 108/51 3 span structure with open To carry pedestrian, cyclists and occassional vehicles. 8 40 325 5.7 This NMU bridge allows pedestrains to cross Sheepcotes Lane 5360 Sheepscote Lane 14.1 45 650 5.7 This side road bridge diverges from Sheepcotes Lane and crosses and again merges onto Sheepcotes lane Quarry access rd 6080 side road Greenfield site. Single span structure, likely of construction. 27.1 13 375 5.7 This bridge allows access to the quarry via an underbridge. FP Quarry 7540 Pantlings Lane 15 45 675 5.7 Access to the Quarry and Pantlings Lane over NMU bridge (Bridleway) 9460 Bridleway 1.8 m high parapets required Access to the surrounding area over A120 Coggeshall Rd 10050 Coggeshall Road (B1024) 15 60 900 5.7 Crossing, joining Coggeshall Rd and Kelvedon Rd FP92/4 10350 Footpath 92/4 8 50 400 5.7 Access between Coggeshall and Kelvedon over A120 River Blackwater Viaduct 10925 Carriagway River Blackwater Viaduct Greenfield site. Steel composite is likely form of construction. Piers to have minimal impact on floodplain, likely founded on piles. 27.1 200 5425 5.7 Viaduct crossing River Blackwater and associated floodplain Coggeshall Rd II 11250 Coggeshall Road Old Rd 12295 Old Road Elm Lane 12430 Elm Lane 15 40 600 5.7 15 50 750 5.7 Continues access over A120 on Coggeshall Continues access over A120 on Old 15 40 600 5.7 Continues access over A120 on Elm Lane. Great Eastern Main Line U/B 14210 Carriagway requirements, but likely to be a single span. Would need to conduct NR STAT's survey. Structure carries proposed A120 over the Old A12 14420 Carriagway A12 27.1 50 1375 5.7 existing A12. A12 Dumbell Bridge 14615 A120 Grade separated junction with A12 27.1 50 1375 5.7 Bridge connects A120 to A12 A120 Braintree to A12 - Proposed Culverts - Option 1 Approx. Culvert Size Total Length Ashes Rd Culvert 2520 Ashes Rd Watercourse 1.5 dia. 58 Ralphs Cottages Culvert 5310 Ralphs Cottages Watercourse 1.5 dia. 51 Cogges Hall Culvert 10565 Cogges Hall Watercourse 1.5 dia. 53 Culvert 04 13580 Watercourse 1.5 dia. 50 Additional

A120 Braintree to A12 - Proposed Bridges - Option 3 / Deck Width Total Length Min. headroom req'd NMU bridge over existing A12-80 Accommodation / NMU crossing 8 60 500 5.7 Cressing Road 1300 Cressing Road 14 70 1000 5.7 Continues access over A120 connecting into extended Cressing Galley's Corner Dumbell O/B 1800 Grade separated junction 27.1 45 1225 5.7 Structure needs to be built before proposed A120 carriageway works demolish Galley's R'bout. O/H Power lines in close proximity. Lanham Farm Rd 2055 Lanham Farm Road 8 75 600 5.7 Suggest straigten up realignment to reduce skew and length of proposed structure. Coggeshall Road 3100 Coggeshall Road to traffic. 15.4 60 925 5.7 Continues access of Coggeshall Road over proposed A120. FP 111/23 3670 Footpath 11/23 8 60 500 5.7 River Blackwater Viaduct 4020 Carriagway River Blackwater Viaduct Viaduct to span the River Blackwater and associated floodplain and Water lane at its east end. 27.1 195 5300 5.3 Headroom to viaduct from Water Lane suggested at a reduced 5.3 m for pragmatic purposes. Structure would require extra bracing to cater for impact loading on bottom flange. FP 45 Bradwell 5250 Footpath 45 8 35 300 5.7 Doghouse Road 6060 Carriagway Doghouse Road Off-slip 6060 A120 Westbound Off-slip Doghouse Road Junction Doghouse Road Junction Single span structure on a greenfield site. 27.1 21 575 5.7 Fully integral structure likely. Single span structure on a greenfield site. 10 21 225 5.7 Fully integral structure likely. Hotfield Road 8380 Hotfield Road to traffic. 12 35 425 5.7 Structure connects West Street, Ambridge road and the mainline A120. Ambridge Road 8930 Ambridge Road to traffic. 12 45 550 5.7 connecting Ambridge Rd over Colne Road Junction 10350 Colne Road to traffic. 15 43 650 5.7 Structure continues access of Colne Road over A120 Tey Road 11200 Tey Road & Existing A120 8 40 325 5.7 Structure continues access of realigned Tey Road over A120 Colchester Road 12000 Colchester Rd grade separated Junction Greenfield site. 2 span structure with central pier. 15 75 1125 5.7 allows access to Colchester rd, existing A120 and Proposed A120 FP 72/42 12350 Footpath 72/42 and on & off slip roads Greenfield site. 3 span structure, central span 40 m. 8 90 725 5.7 Old Road overbridge 12850 Old Road Greenfield site. 3 span structure, central span 40 m. Fairly high skew. 15 55 825 5.7 Structure continues access of realigned Old Road over A120 Elm Lane 14160 Elm Lane Recommend Elm Lane realigned furher away from existing alignment to permit simpler and safer construction of proposed bridge. 15 50 750 5.7 Structure continues access of realigned Elm Lane over A120 Great Eastern Main Line U/B 14940 Carriagway requirements, but likely to be a single span. Would need to conduct NR STAT's survey. Old A12 15150 Carriagway A12 to traffic. Central span circa 40 m. Steel composite likely. 27.1 90 2450 5.7 Allows for existing A12 lay-by to continue use. A12 Dumbell Bridge 15250 A120 Grade separated junction with A12 27.1 50 1375 5.7 Bridge connects A120 to A12 A120 Braintree to A12 - Proposed Culverts - Option 3 Approx. Culvert Size Total Length Approx. Deck Area Hanwick's Farm Culvert 2800 Hanwick Farm Watercourse 2.4 x 2.4 90 216 Prior's Wood Culvert 5170 Prior's Wood Watercourse 1.5 dia. 60 Doghouse Road Culvert 6100 Doghouse Road Watercourse 1.5 dia. 150 Woodland Culvert 6660 Woodland Watercourse 1.5 dia. 70 TBC 7050 TBC 1.5 dia. 65 River Blackwater Culvert 7640 River Blackwater diversion 1.5 dia. 65 Robin's Brook Culvert Extension 9650 Robin's Brook 1.5 dia. 70 Tey Road diversion Culvert 11170 Tey Road realigned Tey Road Watercourse diversion 1.5 dia. 60 Tey Road Culvert 11290 Tey Road Watercourse 1.5 dia. 45 Old Road Culvert 12650 Old Road Watercourse 1.5 dia. 50 Doomsey Brook Culvert 14310 Doomsey Brook 1.5 dia. 45 Additional r.c. box

A120 Braintree to A12 - Proposed Bridges - Option 4b / Deck Width Total Length Min. headroom req'd NMU Bridge over Existing A120-90 Accommodation / NMU crossing 8 60 500 5.7 Cressing Road 1300 Long Green 13 50 650 5.7 Continues access over A120 connecting Long Green to Cressing Galley's Corner Dumbell Link 1800 Grade separated junction 27.1 55 1500 5.7 Junction overbridge for new 'dumb-bell' grade separated junction. Lanham Green Farm 2080 Lanham Farm Road 8 70 575 5.7 Continues access over A120 on Lanham Farm Fells Farm Road 2830 Lanham Green Rd 8 65 525 5.7 Continues access over A120 on Lanham Green FP 67/34 3280 Footpath 64/34 8 42 350 5.7 Links Road 3850 Links Road 12 37 450 5.7 Continues access over A120 on Links FP 108/51 4310 Footpath 67/63 8 40 325 5.7 Sheepcotes Lane 5075 Sheepscote Lane 14.1 45 650 5.7 This side road bridge diverges from Sheepcotes Lane and crosses and again merges onto Sheepcotes lane Quarry Access O/B 5540 side road Greenfield site. Single span structure, likely of construction. 27.1 13 375 5.7 This bridge allows access to the quarry via an underbridge. FP Quarry 7000 Pantlings Lane 15 45 675 5.7 Access to the Quarry and Pantlings Lane over NMU bridge (Bridleway) 8920 Bridleway 1.8 m high parapets required Access to the surrounding area over A120 Coggeshall Rd 9510 Coggeshall Road (B1024) 15 60 900 5.7 Crossing, joining Coggeshall Rd and Kelvedon Rd FP92/4 ( NMU Coggeshall to Kelvedon) 9810 Footpath 92/4 8 50 400 5.7 Access between Coggeshall and Kelvedon over A120 River Blackwater Viaduct 10380 Carriagway River Blackwater Viaduct Greenfield site. Steel composite is likely form of construction. Piers to have minimal impact on floodplain, likely founded on piles. 27.1 200 5425 5.7 Viaduct crossing River Blackwater and associated floodplain Coggeshall Rd II 10730 Coggeshall Road 15 40 600 5.7 Continues access over A120 on Coggeshall Old Rd 11750 Old Road Elm Lane 12900 Elm Lane 15 50 750 5.7 Continues access over A120 on Old 15 40 600 5.7 Continues access over A120 on Elm Lane. Great Eastern Main Line U/B 13675 Carriagway requirements, but likely to be a single span. Would need to conduct NR STAT's survey. Old A12 13880 Carriagway A12 to traffic. Central span circa 40 m. Steel composite likely. 27.1 90 2450 5.7 existing A12. A12 Dumbell bridge 14080 A120 Grade separated junction with A12 27.1 50 1375 5.7 Bridge connects A120 to A12 A120 Braintree to A12 - Proposed Culverts - Option 4b Approx. Culvert Size Total Length Approx. Deck Area Additional Lanham Wood Culvert 2400 Lanham Wood watercourse 1.5 dia. 50 Ralphs Cottages Culvert 4760 Ralphs Cottages Watercourse diversion 1.5 dia. 60 Cogges Hall Culvert 10030 Cogges Hall Watercourse 1.5 dia. 35 Doomsey Brook Culvert 13040 Doomsey Brook 1.5 dia. 45

A120 Braintree to A12 - Proposed Bridges - Option 8 / Deck Width Total Length Approx. Deck Area Min. headroom req'd River Viaduct 920 Carriageway River Brain Viaduct Greenfield site. Steel composite is likely form of construction. Piers to have minimal impact on floodplain, likely founded on piles. 27.1 100 2725 5.7 Viaduct crossing the River Brain and associated floodplain Braintree Branch 1150 Carriagway Braintree Branch Line Railway need to take into account NR future development requirements. Would need to conduct NR STAT's survey. Prefabricating entire bridge adjacent to its permanent position will enhance time saving for railway possession. Single span structure. Construction methodology technically challenging. 17 28 500 5.7 Structure carries proposed A120 under the Galley's Corner Dumbell bridge 2230 Grade separated junction 27.1 45 1225 5.7 Junction overbridge for new 'dumb-bell' grade separated junction at Galley's Corner. NMU bridge 2530 Footpath 74/5 To carry pedestrian, cyclists and occassional vehicles. 8 51 425 5.7 over Ashes Road 2800 Ashes Road 27.1 50 1375 5.7 Lanham Green Rd O/B 3660 Lanham Green Road 17.5 45 800 5.7 Links Road 4400 Links Road 12 45 550 5.7 FP 108/51 4800 Footpath 108/51 3 span structure with open To carry pedestrian, cyclists and occassional vehicles. 8 40 325 5.7 It crosses A120 and connecting Ashes rd with Long Green It crosses A120, joining Boars Tye rd, Lanham Farm rd and Hollies Rd It crosses A120, joining Boars Tye rd with Links rd. This NMU bridge allows pedestrains to cross Sheepcotes Lane 5360 Sheepscotes Lane 14.1 45 650 5.7 This side road bridge diverges from Sheepcotes Lane and crosses and again merges onto Sheepcotes lane FP 92-31 5900 Footpath 92/31 FP 108-53 6985 Footpath 108/53 8 50 400 5.7 Park Gate Road 7680 Park Gate Road 15 60 900 5.7 FP 92-33 9510 Footpath 92/33 8 50 400 5.7 FP 92-17 9995 Footpath 92-17 over over Continues access over A120 on Park Gate over over connecting FP 92-17 with Cranes Lane. Great Eastern Main Line U/B 10295 Carriagway Structure to be built online over existing A12 and slip roads. Careful design, planning and sequencing of construction required. Existing A12 10760 Carriagway A12 Structure to be built online over existing A12 and slip roads. Careful design, planning and sequencing of construction required. 27.1 65 1775 5.7 existing A12. Proposed A12 (dumb-bell) bridge 10960 A120 Grade separated junction with A12 Proposed realigned A12 29.1 45 1325 5.7 Bridge connects A120 to A12 A120 Braintree to A12 - Proposed Culverts - Option 8 Total Length Approx. Approx. Culvert Size Deck Area Ashes Road Culvert 2540 Ashes Road Watercourse diversion 1.5 dia. 55 Ralphs Cottages Culvert 5310 Ralphs Cottages Watercourse diversion 1.5 dia. 50 Park Road Culvert 7990 Park Road Watercourse 1.5 dia. 53 TBC 8545 TBC 1.5 dia. 53 TBC 9618 TBC 1.5 dia. 53 River Blackwater Culvert 10200 Tributary of River Blackwater 1.5 dia. 82 Additional

A120 Braintree to A12 - Proposed Bridges - Option 9 / Deck Width Total Length Min. headroom req'd NMU Bridge over Existing A120-90 Accommodation / NMU crossing 8 60 500 5.7 Cressing Road 1300 Long Green 13 50 650 5.7 Continues access over A120 connecting Long Green to Cressing Galley's Corner Dumbell Link 1800 Grade separated junction 27.1 55 1500 5.7 Junction overbridge for new 'dumb-bell' grade separated junction. Lanham Green Farm 2080 Lanham Farm Road 8 70 575 5.7 Continues access over A120 on Lanham Farm Fells Farm Road 2830 Lanham Green Rd 8 65 525 5.7 Continues access over A120 on Lanham Green FP 67/34 3280 Footpath 64/34 Links Road 3850 Links Road 12 37 450 5.7 Continues access over A120 on Links FP 108/51 Essex Way 1 4310 Footpath 67/63 Sheepcotes Lane 4840 Sheepscote Lane 14.1 45 650 5.7 This side road bridge diverges from Sheepcotes Lane and crosses and again merges onto Sheepcotes lane FP 92/31 5350 Footpath 92/31 FP 108/54 6450 Footpath 108/54 8 50 400 5.7 Park Gate Road 7165 Park Gate Road 14 60 850 5.7 Continues access over A120 on Park Gate FP 92/33 9000 Footpath 92/33 8 50 400 5.7 FP 92/17 9480 Footpath 92/17 Great Eastern Main Line U/B 9775 Carriagway requirements, but likely to be a single span. Would need to conduct NR STAT's survey. Existing A12 10525 Carriagway A12 Structure to be built online over existing A12 and slip roads. Careful design, planning and sequencing of construction required. 27.1 65 1775 5.7 existing A12. Proposed A12 (dumb-bell) bridge 10725 A120 Grade separated junction with A12 Proposed realigned A12 29.1 45 1325 5.7 Bridge connects A120 to A12 A120 Braintree to A12 - Proposed Culverts - Option 9 Total Length Approx. Deck Approx. Culvert Size Area Lanham Wood Culvert 2385 Lanham Wood watercourse 1.5 dia. 50 Ralphs Cottages Culvert 4735 Ralphs Cottages Watercourse diversion 1.5 dia. 70 Park Road Culvert 7470 Park Road Watercourse 1.5 dia. 53 TBC 8025 TBC 1.5 dia. 53 TBC 9100 TBC 1.5 dia. 53 River Blackwater Culvert 9680 Tributary of River Blackwater 1.5 dia. 83 Additional