GLOBE FLOWCELL. Operating Manual. Rola-Chem Flowcell PN /01/2013 page: 1 of 8

Similar documents
IMPORTANT SAFETY INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

TABLE OF CONTENTS INTRODUCTION.3 WARRANTY INFORMATION 4 SAFETY INFORMATION 5 PREPARING YOUR WATER BEFORE INSTALLATION 6

IMPORTANT SAFETY INSTRUCTIONS

ChlorSM Series SALINE CHLORINATOR. Installation, Operation, and Maintenance Manual

STOP CITY PRESSURE BOOSTER PUMP INSTRUCTION MANUAL

G1000 Feeder IMPORTANT INFORMATION

Installation, Operation and Maintenance Manual

i n s t r u c t i o n m a n u a l

OPERATING INSTRUCTION MANUAL

SUNC3000 / Item #40885

O WNER S MANUAL. C316 ORP Controller with ph Display, 24 Volt

Model 2008 I Battery Operated Irrigation Timer with 3/4 in. Anti-Siphon Valve

QUICK START GUIDE OWNER S MANUAL AL50 SERIES SAND FILTRATION TECHNOLOGY PLEASE CALL DO NOT RETURN TO STORE

ESE Series Cast Iron Sewage Pumps

OPERATING INSTRUCTION MANUAL

GARDEN HOSE UTILITY PUMP

OWNER S MANUAL D.E. CARTRIDGE. Installation Operation Parts. Models PCDE-30 PCDE-40

SEWAGE PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 14

AEROMOTIVE Part # /2 4.6L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

IntelliChlor Electronic Chlorine Generator Commercial System COMSYS

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

JET METER INSTRUCTIONS

PRE-PLUMBED SEWAGE SYSTEM

HI-FLOW FUEL RAIL. Installation Instructions for Scion tc & xb AEM Fuel Rail AN Hose adaptor

Submersible Pond Pump with UV 800 Gallons Per Hour

Installation, Operation and Maintenance Manual

DEMA MODEL 692T FOAM STATION I INSTALLATION INSTRUCTION

AEROMOTIVE Part # & Generic Fuel System Kit INSTALLATION INSTRUCTIONS

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

GRINDER PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 13

Global Water Instrumentation, Inc.

SUNC1200 / ITEM #40882 SUBMERSIBLE UTILITY PUMP OPERATIONS MANUAL

IMPORTANT SAFETY INSTRUCTIONS

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

DEMA Model 294D Spray Foam INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # / L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE KPF Single Lever Kitchen Faucet With Pull-Out Sprayer

COMPRESSED AIR LOADER MODEL: AL-1

2-DOOR LAUNDRY CABINET KIT

Sand Filtration System

Value Super Filter Max Installation Manual

SUBMERSIBLE SUMP PUMPS

Techcon Systems TS5620 Series Diaphragm Valve. User Guide

Tracer ORP PockeTester TM Code 1742

6-12 WIDESPREAD 6-12 W. Cleopatra Series INSTRUCTION GUIDE SAVE THIS INSTRUCTION GUIDE

DEMA MODEL 693T FOAM STATION II INSTALLATION INSTRUCTION

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide

Instruction Manual & Warranty Card

OBAE, OBAEXU, ON BOARD Battery Chargers

Model 8309WC Barrier Free Shower & Eye/Face Wash

MODELS 108 and 138 CRAWL SPACE PUMPING SYSTEM PREINSTALLATION CHECKLIST

MODEL 890 / 892 POWER POST 10 TON CAPACITY

# and # FAST Fuel System Kits

AEROMOTIVE Part # Fuel System Prime Kit INSTALLATION INSTRUCTIONS

Container Fountain Kit with LED Light

AEROMOTIVE Part # A2000 Fuel Pump Kit INSTALLATION INSTRUCTIONS

Model 616 Rotating Disk Electrode Instruction Manual

Unilift KP 150, KP 250, KP 350

TS Series. MultiStage Centrifugal Pump Instruction Manual. Walrus America Inc. ISO 9001 Certified

Model 8309WC Barrier Free Shower & Eye/Face Wash

SINGLE-STAGE INJECTOR MODELS 200-3C, 200C, 201C, 202C, 203C, 204C, 206C, 208C

FIXED DEPTH INSERTION METER INSTRUCTIONS

1-BUTTON DISPENSER INSTALLATION INSTRUCTIONS

Air Actuated Hydraulic Bottle Jacks

AEROMOTIVE Part # and F-Body Fuel System Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Mustang 5.0L Fuel System Kit INSTALLATION INSTRUCTIONS

Pressurized Bead Filters

AEROMOTIVE Part # Generic EFI Fuel System INSTALLATION INSTRUCTIONS

HM860 FLOWMETER OPERATOR S MANUAL DO NOT USE OR OPERATE THIS EQUIPMENT UNTIL THIS MANUAL HAS BEEN READ AND THOROUGHLY UNDERSTOOD

ProFlo FatBoy

CARTRIDGE FILTER SYSTEMS OWNER S MANUAL

Intended Use: Explanation of Signal Word Consequences

5874SS/5874PB/5874PBF/VRK5874/PBA6/ PBA6HPB/PBA7 Valve/Push Button

Model BP6150. Triplex Ceramic Plunger Pump Operating Instructions/ Manual

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS For Model 855 Wolo Express TM

Bypass / Filter Feeders Operations & Maintenance Manual

PENBERTHY MODELS GL AND GH GAS OPERATED JET PUMPS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Model GP Triplex Ceramic Plunger Pump Operating Instructions/ Manual

HALLMARK INDUSTRIES INC

SUBMERSIBLE SUMP PUMPS

AEROMOTIVE Part # & ½ L DOHC Return Style Fuel System Kit INSTALLATION INSTRUCTIONS

Submersible Waterfall Pump 1200 Gallons Per Hour

Dual/Triple Manifold Water Filtration Systems Instruction Manual

AEROMOTIVE Part # GM LS1 Fuel Rails INSTALLATION INSTRUCTIONS

OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP

Operating Instructions & Parts Manual. Fuel Tank Adapter

AEROMOTIVE Part # Street Rod Fuel Pump System INSTALLATION INSTRUCTIONS

Operators Manual. Model 3370 Air Cooled Recirculator rev.8/98

MicroCoat. System Operating Manual MC2000 Series. MC785, MC785-WF Spray Valves. US: UK: Mexico:

FTIR PG28 PURGE GAS GENERATOR OPERATIONS & MAINTENANCE

Telescopic Transmission Jacks

AEROMOTIVE Part # Ford 5.4L GT500 Shelby Mustang Fuel Rail Kit INSTALLATION INSTRUCTIONS

Models GP7545GB-180/ GP7555GB-180. Gearbox Versions for Pinion Shaft Drives

INSTALLATION & SERVICE INSTRUCTION MANUAL W.A. KATES FLOW CONTROLLERS FC VALVE MODELS E THRU M

AEROMOTIVE Part # Subaru Fuel Rails for Top Feed Injectors WRX & STI INSTALLATION INSTRUCTIONS

MicroCoat System Operating Manual MC4000 Series MC785M, MC785M-WF Spray Valves

advanced FLOW engineering Instruction Manual P/N: / /

Transcription:

GLOBE FLOWCELL Operating Manual Rola-Chem Flowcell PN 550182 4/01/2013 page: 1 of 8

Table of Contents Section title Page 1.0 Safety Instructions 2 2.0 Description 2 3.0 Installation 3 4.0 Use of Manifold 5 5.0 Maintenance 5 6.0 Trouble Shooting 5 7.0 Parts List 6 8.0 Warranty and Service 7 1.0 Safety Instruction See controller manual for additional safety instructions. A- WARNING: Do not shut down circulating and control system immediately after using pool, spa or hot tub. Systems must operate until water chemistry is stable. Systems must be restarted before water chemistry is out of NSPI recommended ranges or water chemistry must be manually corrected. B- WARNING: Removing power from circulating pump must also remove power from the controller. Provide a properly located outlet controlled by the circulating pump circuit. C- WARNING: Use a devise such as a flow switch to remove power from the controller in the event of pool pump or circulation failure. It is not safe to automatically dispensed chemicals into circulating system that is not running. 2.0 Description The manifold is designed to be used with a controller as part of a chemical automation system, which continuously monitors and maintains ph balance and sanitizer level in a swimming pool or spa. Rola-Chem Flowcell PN 550182 4/01/2013 page: 2 of 8

ORP PROBE ph PROBE PROBE FITTING FLOW SWITCH LEADS FLOAT (INSIDE CELL) SHUT-OFF VALVE FILTER & SHUT-OFF VALVE (OPTIONAL) RECOMMENDED GROUNDING STUD BOTTOM VIEW 3.0 Installation 1. Mount Manifold: Pre-mark hole locations for manifold mounting screws using the manifold. The manifold should not be above the controller unit or other equipment or electrical devices. Manifold holes will accept #10 screws. 2. Install ph and ORP Probes: Note: standard probes have platinum tips. Special gold tipped probes are recommended for application with Salt Chlorine Generators. Probe ends should not dry out. They are packaged within a jar to keep the ends wetted during shipment and storage. Remove the probes from wetting jars by unscrewing the jar cap. Remove the jar cap and grommet from the probe. (Save for future probe storage.) Close left and right manifold valves, and open the center manifold valve. Remove nuts from probe fittings and slide onto probes, noting direction of nut thread. Insert the ph probe into the right probe receptacle. Probe should slide freely through the fitting and into the manifold until it bottoms out inside the manifold. Then raise the probe about 1/8", hold in position and fingertighten the nut onto the fitting. Use a wrench to tighten the cap about another 1/4 turn. DO NOT OVER TIGHTEN. Repeat the procedure for the ORP probe in the left probe fitting. Rola-Chem Flowcell PN 550182 4/01/2013 page: 3 of 8

3. Install Manifold Connections to the Pool Water System Turn off the pool's pump system during this procedure. Check that sufficient tubing (supplied) is available for connecting Manifold prior to drilling holes. Additional tubing may be obtained see parts list for part numbers. Do not exceed a total of 40' of tubing. Select installation points in the Pool Circulation System for the fitting that will provide flow into the Manifold. The inlet to the Manifold should be at a higher pressure than outlet of the Manifold to provide flow though the Manifold. Assuming the inlet connector will be located upstream of the pool filter and the outlet connector is downstream from the pool filter, proceed as follow: Cut a length of black plastic tubing long enough to reach from the left (inlet) Manifold Valve to the installation point on the upstream side of the pool filter. Install this piece of tubing into the left Valve of Manifold. (Turn this Valve 'off.') Cut a length of black plastic tubing long enough to reach from the right (outlet) manifold fitting to the installation point on downstream side of the pool filter. Install this piece of tubing into the right Valve of Manifold. (Turn this Valve 'off.') A length of tube can also be added to the center Manifold Valve for convenience of water sampling. Drill and tap a 1/4" NPT thread into a straight section of water pipe at both installation points. Screw in 1/4" MNPT x TUBE fitting and tighten. Note: use Teflon tape on pipe threads and DO NOT OVER TIGHTEN. Connect the tubes coming from the Manifold Valves into the fittings. Open both the left and right Valves on the Manifold (close the center Valve). Turn on the Pool's pump system and check for water leaks. Fix leaks as required. If flow is backwards, the Float will not move up. Reverse the tubes if needed. Connect the two Probe cables to controller. The ph Probe cable connects to the mating jack on the bottom of the controller labeled "ph Probe." Push the connector onto the jack and turn clockwise about 1/4 turn. The ORP Probe cable connects to the mating jack on the bottom of the controller labeled "ORP Probe." 4. Flow Switch Although the Float is an integral part of the flow switch, it may also be used as a manual flow indicator. On Controllers with a flow switch feature, connect the two lead wires as specified in the Controller manual. 5. Grounding The Manifold is supplied with a titanium grounding stud. It is recommended that this stud be used to ground the manifold to earth ground. Grounding the manifold helps to eliminate ground loop problems that could potentially damage probes and/or cause erroneous readings. Rola-Chem Flowcell PN 550182 4/01/2013 page: 4 of 8

4.0 Use of Manifold 1. Manifold Inlet and Outlet Valves: 1.1 Adjust flow through Manifold. Turn left Valve to full on position. Close the right Valve and then open it until the Float rises to the top of its chamber. The Float will not rise if flow is not sufficient or backwards. 1.2 Removing Probes. The Valves allow the operator to remove Probes without shutting down the pool pump. Close both left and right Valves before loosening the Probe fittings. (Whenever re-inserting Probes in Manifold, open center Manifold Valve before and during insertion to relieve pressure, then close the center Valve after Probe insertion is complete.) 2. Water Sampling Valve: The center Valve on the Manifold can be used to conveniently take water samples from the pool water. 5.0 Maintenance 1. Cleaning- Periodically (approx. each month) remove Probes from Manifold and clean them. Clean more frequently as required (i.e. if bathers use large amounts of oils and sun tan lotions in the pools). Caution: Clean probes every 2 to 3 weeks when using di-chlor or tri-chlor products. Wash Probes with dish washing liquid and cotton swab or cloth, then soak end for three minutes in a solution of muriatic acid diluted 20:1, and then rinse with water. 2. Do not let Probe ends dry out. At year end shutdown, remove Probes from Manifold and return to wetting jars. If it is expected that Manifold may go dry for a long period (several hours), remove them from the Manifold and submerse tips in water. Use ph buffer solution in wetting jar to protect Probes. Drain the Manifold to prevent freeze damage. Plug Probe fitting openings in Manifold to minimize contamination. 3. Refer to Feeder and Controller manuals for their maintenance. 6.0 Troubleshooting 1. If Controller doesn t appear to be reading correctly, check Probes. (See cleaning in Maintenance section) 2. Check the ph Probe with 7.2 ph buffet solution. The OPR Probe can be checked with a solution of 1 drop 5.25% bleach (i.e. household bleach) and 1 pint water. This should provide a 1-2 ppm free chlorine solution (check with test kit) Add one drop of chlorine at a time to adjust test mixture as required. Put ORP Probe in mixture. The ORP reading should be 600 to 800 mv. Note: It may take three to five minutes for Probes to respond to solution. If it takes longer you should replace the Probes. 3. Incorrect ORP/pH reading can occur if water is flowing too fast in the Manifold see Use of Manifold section. 4. Verify that Probe ends are in the flow stream of the Manifold. 5. If Controller shuts down it may indicate inadequate flow is going through the Flow Switch. Rola-Chem Flowcell PN 550182 4/01/2013 page: 5 of 8

7.0 Parts List 1 2 4 3.3 3.2 550591 FILTER KIT (NOT TO SCALE) 3.1 4 3.4 3.6 550592 FILTER KIT (NOT TO SCALE) ITEM NO. PART NO. DESCRIPTION 1 2 3.3 4 550136 1 550209 550135 550089 550591 ORP PROBE- HEAVY DUTY, 8 FT CABLE ORP PROBE- HEAVY DUTY, 3 FT CABLE 1 550201 ORP PROBE- GOLD TIP, 8 FT CABLE ph PROBE- HEAVY DUTY, 8 FT CABLE 2 550208 ph PROBE- HEAVY DUTY, 3 FT CABLE 3 3.1 3.2 550180 550181 550183 FLOWCELL ASSEMBLY, 3/8 TUBE (INCLUDES 3.1 THRU 3.6) FLOWCELL, CLEAR GLOBE FLOW SWITCH PROBE FITTING (qty 2) 3.4 7125190 VALVE, SHUT-OFF, PVC-3/8 TUBE X 1/4 NPT (qty 3 ) 3.5 550194 TUBING,PE, 3/8 OD x 40 FT 3.6 550193 FITTING,PP, 3/8 TUBE X 1/4 NPT (qty 2) FILTER KIT, 3/8 TUBE (LARGE FILTER) (OPTION) 4 550592 FILTER KIT, 3/8 TUBE (SMALL FILTER) (OPTION) ITEMS A-D USED ON FLOWCELLS WITH 1/4 TUBING A B C D 550590 550054 550027 550026 FILTER KIT, 1/4 TUBE VALVE, SHUT-OFF, PVC-1/4 TUBE X 1/4 NPT TUBING, PE, 1/4 OD x 40 FT FITTING, 1/4 TUBE X 1/4 NPT Rola-Chem Flowcell PN 550182 4/01/2013 page: 6 of 8

8.0 Warranty and Service- 8.1 Limited Warranty Rola-Chem Corporation warrants the original purchaser that this unit is free from manufacturing defects in material and workmanship from the date of the original purchase for one (1) year. If this unit fails within the one (1) year period, it will be repaired or replaced at Rola-Chem s option, at no charge, when returned to Rola-Chem Corporation with proof of purchase receipt. This warranty does not apply to any product damage caused by improper use, accident, misuse, improper line voltage, fire, flood lightening, earthquake or other acts of nature, or, if product was altered or opened by anyone other than qualified Rola-Chem personnel. All expendable items- hoses, etc., are not covered under this warranty. Heavy duty probes are warranted from the date of original purchase for one (1) year. Standard duty probes are warranted from the date of original purchase for 90 days. Rola-Chem Corporation under no circumstances shall be liable for any consequential damages directly or indirectly caused by this unit. Please observe all rules and regulations required by state and local regulations, building codes, health codes, OHSA, etc. 8.2 Service Procedure For operation assistance in the United State, please call: (800) 549-4473 or FAX (651)-653-0989 Monday thru Friday 8:00 am-5:00 pm, Central Time. Rola-Chem Corporation has specialized knowledge and equipment to properly test your unit and help you with special problems. After talking to our service personnel, the product in need of service should be shipped with RGA#, freight prepaid, via UPS if at all possible to: Rola-Chem Corporation 5858 Centerville Road St. Paul, MN 55127-6804 Rola-Chem Flowcell PN 550182 4/01/2013 page: 7 of 8

-NOTES- Rola-Chem Flowcell PN 550182 4/01/2013 page: 8 of 8