Turbine Lubricant Varnish Removal Case Studies using SVR

Similar documents
Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Up and Down Months of the Stock Market

National Routing Number Administration p-ani Activity and Projected Exhaust Report

ANCR CRU Statistics February 2007 to December 2007

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

TURBINE OILS GST PREMIUM 32 CALTEX LUBRICANTS FORMULATED TO FIGHT SLUDGE AND VARNISH

Graph #1. Micro-Generation Generating Units in Alberta 20

ANCR CRU Statistics Februa.. to December 2007

SELF-STORAGE FOR SALE

1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results

FY2/18 2Q(March 2017~August 2018)

Building 65 Pellet Fired Steam Plant

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

Predict Future Failures From Your Maintenance Records

FOR IMMEDIATE RELEASE

Used Vehicle Supply: Future Outlook and the Impact on Used Vehicle Prices

Construction Sector Indices

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011

December. Next release: 13 February Oct/Sep Nov/Oct Dec/Nov Janu19 January Febru13 February 2018 Oct/Sep Nov/Oct Dec/Nov 2017

NE (SE) Beam

Sunrise: 05:48 N (S) Beam

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

Sound Transit Operations July 2016 Service Performance Report. Ridership

End-use petroleum product prices and average crude oil import costs January 2010

RIDERSHIP TRENDS. July 2018

NJ Solar Market Update As of 6/30/15

November. Next release: 19 January Sep/AugOct/Sep Nov/Oct Dec 14 December Janu 19 January 2018 Sep/AugOct/Sep Nov/Oct 2017

Irish History & Finance Check

MONTHLY PERFORMANCE DASHBOARD

Oriented Strand Board Sheathing (delivered, Los Angeles) 7/16-inch 2005 to 2009

MONTHLY PERFORMANCE DASHBOARD

End-use petroleum product prices and average crude oil import costs March 2011

Climatography of the United States No

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016

FOR IMMEDIATE RELEASE

The Feasibility of Fill-for-Life Turbine Oils. Greg Livingstone Fluitec

Valley Real Estate Review

ISMI 450mm Program Interoperability Test Bed (ITB)

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

RIDERSHIP TRENDS. March 2017

November 2017 Customer Switching Report for the Electricity and Gas Retail Markets

May 2018 Short-Term Energy Outlook

D G A G R I D A S H B O A R D : T O M A T O E S Last update: EU AVG PRICES

MONTHLY PERFORMANCE DASHBOARD

Total Production by Month (Acre Feet)

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

January-March 2017 Customer Switching Report for the Electricity and Gas Retail Markets

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

BizJet International Sales & Support, Inc. FAA Certificated Repair Station Number IY2R915K CAPABILITY LIST. Revision Number: 38

RIDERSHIP TRENDS. April 2018

Your electricity bill

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

September 2016 Water Production & Consumption Data

NJ Solar Market Update As of 2/29/16

Appendix E Water Supply Modeling

MONTHLY PERFORMANCE DASHBOARD

Florida Courts E-Filing Authority Board. Service Desk Report October 2018

Big Red Wraps Big Flavor, Small Price

FOR IMMEDIATE RELEASE

INTECH AUGUST QHSE PERFORMANCE

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

Florida Courts E-Filing Authority Board. Service Desk Report December 2018

FOR IMMEDIATE RELEASE

THE CENTRAL MARIN SANITATION AGENCY TREATMENT PLANT INITIAL ANALYSIS OF CO THICKENING PRIMARY AND SECONDARY SOLIDS

INTECH JUNE QHSE PERFORMANCE

Climatography of the United States No

W (W) Beam

Energy Produced by PV Array (AC):

ELE-OS-E-2002 Start-up Shift Operation Engineer & Permit Coordinator PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

May ATR Monthly Report

Asahi World Environmental Forum 14 September Global trends in clean energy investment. Michael Liebreich Chief Executive

Monthly Operating Report. January 2019

The Changing Relationship Between the Price of Crude Oil and the Price At the Pump

Local Market Update February 2013

METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY

Data Current Through: February, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory 1,

Price Category Breakdown - February 2010

Commuter Rail Update. October 25, 2018

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

2Q06 Results. Investor Relations

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND

August ATR Monthly Report

Algebra II Pacing Guide

Passenger Car and Light Commercial Vehicle Market Showed a Decrease of 59% in January 2019.

Sprinkler System Waiver Application Packet

Copyright 2018 Renewable Energy Group, Inc. AFOA Biomass Based Diesel Market Trends

COMPILED BY GLASS S. Auction Report - LCV November 2013

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Yield Reduction Due to Shading:

ScoreCard February 2014 [Jan 14 Data] Ridership

Transcription:

Turbine Lubricant Varnish Removal Case Studies using SVR

5/14 As of May 14 there are over 4 SVR installations on turbine lubricant reservoirs operating throughout the world. These systems have gained an industry leading reputation for reducing and maintaining low varnish potential including many sites where competing systems have failed. Each SVR installation is supported by a team of experts who will ensure that results are achieved and documented at your facility. This support is included with the purchase of each SVR. Attached are case studies that demonstrate typical results. Once an SVR is installed, the lubricant enters a Restoration phase that last 3-4 months on average. During this phase, previously deposited varnish dissolves back into the purified lubricant where it is removed by SVR. During this clean-up period, the MPC values fluctuate as the varnish content of the fluid varies. Once varnish deposits are removed, varnish is continually removed as it forms and the lubricant enters a Stability phase where MPC values are maintained at <15 (ASTM 7843). Because varnish is continually removed as it forms during the stability phase, varnish does not accumulate in the lubricant reducing the risk of varnish formation to nil. For privacy, all customer specific information has been removed. For additional information, and a complimentary turbine lubricant assessment with lab scale demonstration please contact us at: http://www.cleanoil.com/contact/distributors.html For additional information contact: sales@cleanolil.com

5/14 Case Study #1 Location: MD, USA MW: 35 MW Turbine Type: ST, GE Oil Type: Mobil DTE 732 Volume: 8, Gallons/3,283 Litres Background: This site was experiencing a build-up of varnish on mechanical components. An SVR was installed and initial results described a three-month stabilization period as varnish deposits were adsorbed back into the lubricant. A significant decreasing trend began after four months of operation, which means that varnished mechanical components had been completely cleaned. SVR treatment reduced the fluid varnish potential value to below 1 over the subsequent three months. Varnish potential values are now stable and at historically low values. Reduction Using SVR Mobil DTE 732 6 5 4 3 1 11-May-11 31-May-11 -Jun-11 1-Jul-11 3-Jul-11 19-Aug-11 8-Sep-11 28-Sep-11 18-Oct-11 7-Nov-11 27-Nov-11 17-Dec-11 6-Jan-12 26-Jan-12 15-Feb-12 6-Mar-12 26-Mar-12 15-Apr-12 5-May-12 25-May-12 14-Jun-12

5/14 Case Studies Case Study #2 Location: MD, USA MW: 685MW Turbine Type: ST GE Oil Type: Mobil DTE 732 Volume: 7,45 Gallons/28,1 Litres Background: This site had a history of varnish problems; the customer consistently experienced build-up of varnish on mechanical components. Once SVR was installed, varnish potential numbers fluctuated over a two month period while varnish deposits were adsorbed into the lubricant. Notable reductions were achieved by month three. Consistent reductions continued over the next six months. Permanent use of SVR has been able to reduce varnish potential values by another 6% and to be maintained at 15 or below. Varnish potential values are now stable and at historical low values. 7 Reduction Using SVR Mobil DTE 732 6 5 4 3 1 6-Apr-11 6-May-11 6-Jun-11 6-Jul-11 6-Aug-11 6-Sep-11 6-Oct-11 6-Nov-11 6-Dec-11 6-Jan-12 6-Feb-12 6-Mar-12 6-Apr-12 6-May-12 6-Jun-12 6-Jul-12

5/14 Case Study #3 Location: PA, USA MW: 19MW Turbine Type: GE 7FA Oil Type: Shell Turbo CC 32 Volume: 6, Gallons/23,47 Litres Background: This site had a history of varnish problems with QSA varnish potential values at 75 or higher. Previous efforts on the part of maintenance staff were unable to control varnish potential values, which was a significant concern for the turbine owner. Upon installation of SVR, varnish potential values were quickly reduced. MPC varnish potential values are now at 1 or lower. Reduction Using SVR Shell Turbo CC 32 35 3 25 15 1 5 24-Aug-11 31-Aug-11 7-Sep-11 14-Sep-11 21-Sep-11 28-Sep-11 5-Oct-11 12-Oct-11 19-Oct-11 26-Oct-11

5/14 Case Study #4 Location: CA, USA MW: 4MW Turbine Type: GT, GE 6FB Oil Type: Shell Turbo TX 32 Volume: 1,7 Gallons/6,435 Litres Background: This turbine is used as the primary generator at an oil and gas production facility. High varnish potential values were of concern due to the critical nature of the turbine and the potential loss in production associated with any turbine outage. SVR was installed and quickly reduced varnish potential values by >5%. Further decreases were observed with continued SVR use. Varnish potential values are now less than 5. and stable. Reduction Using SVR Shell Turbo TX 32 35 3 25 15 1 5 6-May-11 6-Jul-11 6-Sep-11 6-Nov-11 6-Jan-12 6-Mar-12 6-May-12 6-Jul-12 6-Sep-12 6-Nov-12 6-Jan-13 6-Mar-13

5/14 Case Study #5 Location: PA, USA MW: 21MW Turbine Type: GT, GE 7FA Oil Type: Mixture Mobile DTE 832/Shell Turbo CC 32 Volume: 6, Gallons/23,47 Litres Background: This unit had a history of varnish problems with multiple unit TRIPS and fail-to-start conditions. SVR systems were installed on all turbines and quickly reduced varnish potential by over 5% with no further turbine failures occurring. Continued long term use of SVR has been able to reduce varnish potential values by another 4% with values now at <15. Varnish potential values are now stable and at historical low values. Reduction Using SVR Mobil DTE 832/Shell Turbo CC 32 Mix 6 5 4 3 1 3-Dec-1 28-Feb-11 3-Apr-11 3-Jun-11 31-Aug-11 31-Oct-11 3-Dec-11 29-Feb-12 3-Apr-12 3-Jun-12 31-Aug-12

5/14 Case Study #6 Location: PA, USA MW: 185MW Turbine Type: GT, GE 7FA CC Oil Type: Mixture Mobile DTE 832/Shell Turbo CC 32 Volume: 6, Gallons/23,47 Litres Background: Unit had a history with multiple trips and fail-to-start conditions. SVR system was installed on this unit and within six months had produced downward trending MPC results. No turbine failures occurred after the SVR system was installed. The length of time prior to decreasing MPC is based on the amount of varnish on system components. The varnish potential is now below 15 and continues to decrease. Reduction Using SVR Mobil DTE 832/Shell Turbo CC 32 Mix 6 5 4 3 1 3-Dec-1 28-Feb-11 3-Apr-11 3-Jun-11 31-Aug-11 31-Oct-11 3-Dec-11 29-Feb-12 3-Apr-12 3-Jun-12 31-Aug-12

5/14 Case Study #7 Location: AB, Canada MW: 1MW Turbine Type: GT, GE 7EA Oil Type: Teresso GTC 32 Volume: 5, Gallons/19, Litres Background: An electrostatic oil cleaner was operational on this system fulltime since turbine commissioning in 9. Within 18 months of initial operation, varnish potential values had increased above 4 to critical levels. SVR was installed February 11 and reduced varnish potential, which then increased as system deposits were adsorbed back into the lubricant. Subsequent element changes performed annually have achieved stable and historically low varnish potential values. Reduction Using SVR Teresso GTC 32 6 5 4 3 1 22-Feb-11 22-Apr-11 22-Jun-11 22-Aug-11 22-Oct-11 22-Dec-11 22-Feb-12 22-Apr-12 22-Jun-12 22-Aug-12 22-Oct-12 22-Dec-12

5/14 Case Study #8 Location: CA, USA MW: 5MW Turbine Type: ST Oil Type: Shell Turbo CC 32 Volume: 3, Gallons/11,356 Litres Background: When initially contacted, this site had extreme varnish potential values. SVR was installed and immediately reduced varnish potential values by >6%. Existing system deposits were then adsorbed back into the lubricant which increased varnish potential values. Based on the level of increase, the results suggest that existing system varnish deposits were above average. Secondary decreases followed by increases also suggest above average levels of varnish deposits were present. The system stabilized after eight months of SVR treatment. No additional operational problems have been experienced and varnish potential values remain at historically low levels. Trending Using SVR Shell Turbo CC 32 9 8 7 6 5 4 3 1 9-Feb-11 9-Mar-11 9-Apr-11 9-May-11 9-Jun-11 9-Jul-11 9-Aug-11 9-Sep-11 9-Oct-11 9-Nov-11 9-Dec-11 9-Jan-12 9-Feb-12 9-Mar-12

5/14 Case Study #9 Location: LA, USA MW: Base load 185MW Turbine Type: GT, GE 7FA Oil Type: Mobil DTE 724 Reservoir Size: 6, Gallons/23,47 Litres Background: At this facility, three GE7FA Gas turbines provide the primary power and steam for the chemical plant. Plant reliability was negatively impacted from elevated varnish potential numbers in the gas turbine. To reduce the risk of outage maintenance staff tried a number of varnish removal systems without success. SVR was installed and had an immediate impact, reducing varnish potential numbers and within three months, values had been reduced by 8% to a varnish potential value of <5. Based on these successful results, SVR has been installed on all three gas turbines at this site. Trending Using SVR Mobil DTE 724 3 25 15 1 5 17-Mar-1 24-Mar-1 31-Mar-1 7-Apr-1 14-Apr-1 21-Apr-1 28-Apr-1 5-May-1

5/14 Case Study #1 Location: TX, USA MW: 16 MW Turbine Type: GT, GE 7EA Oil Type: Chevron GST 32 Volume: 3,5 Gallons/13,249 Litres No specific site notes recorded. Reduction Using SVR Chevron GST 32 6 5 4 3 1 22-Jan-1 1-Aug-1 26-Feb-11 14-Sep-11 1-Apr-12 18-Oct-12 6-May-13

5/14 Case Study #11 Location: GA, USA MW: 185 MW Turbine Type: GT Oil Type: Chevron GST 32 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. Reduction Using SVR Chevron GST 32 3 25 15 1 5 1-Jul-12 29-Aug-12 18-Oct-12 7-Dec-12 26-Jan-13 17-Mar-13

5/14 Case Study #12 Location: CA, USA MW: 55 MW Turbine Type: ST Oil Type: Mobil DTE 832 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. Reduction Using SVR Mobil DTE 832 5 45 4 35 3 25 15 1 5 29-Aug-12 18-Oct-12 7-Dec-12 26-Jan-13 17-Mar-13 6-May-13 25-Jun-13 14-Aug-13

5/14 Case Study #13 Location: PA, USA Turbine Type: GT, Westinghouse Oil Type: Shell Turbo CC 32 Volume: 3,5 Gallons/13,249 Litres No specific site notes recorded. Reduction Using SVR Shell Turbo CC 32 5 45 4 35 3 25 15 1 5 1-Apr-12 21-May-12 1-Jul-12 29-Aug-12 18-Oct-12 7-Dec-12 26-Jan-13 17-Mar-13 6-May-13

5/14 Case Study #14 Location: VA, USA MW: 151 MW Turbine Type: GT, GE 7FA Oil Type: Texaco Regal R&O 32 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. Reduction Using SVR Texaco Regal R&O 32 4 35 3 25 15 1 5 31-May-12 -Jun-12 1-Jul-12 3-Jul-12 19-Aug-12 8-Sep-12 28-Sep-12 18-Oct-12

5/14 Case Study #15 Location: SK, Canada MW: 3 MW Turbine Type: GT, Hitatchi Oil Type: Esso Teresso GTC 32 Volume: 7, Gallons/26,498 Litres No specific site notes recorded. Reduction Using SVR Esso Teresso GTC 32 35 3 25 15 1 5 5-Feb-13 7-Mar-13 6-Apr-13 6-May-13 5-Jun-13 5-Jul-13 4-Aug-13 3-Sep-13

5/14 Case Study #16 Location: PA, USA Turbine Type: GT, GE 7FA Oil Type: ConocoPhillips Hydroclear 32 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. and AN Reduction Using SVR ConocoPhillips Hydroclear 32 6 5.35.3 4 3.25 AN (mgkoh/g). MPC.15.1 AN 1.5. 26-May-13 15-Jun-13 5-Jul-13 25-Jul-13 14-Aug-13 3-Sep-13 23-Sep-13

5/14 Case Study #17 Location: PA, USA Turbine Type: GT, GE 7FA Oil Type: ConocoPhillips Hydroclear 32 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. and AN Reduction Using SVR ConocoPhillips Hydroclear 32 45.35 4.3 35 3.25 25 15 1..15.1 AN (mgkoh/g) MPC AN 5.5. 26-May-13 15-Jun-13 5-Jul-13 25-Jul-13 14-Aug-13 3-Sep-13

5/14 Case Study #18 Location: WI, USA MW: 25 MW Turbine Type: GT, GE 7FA Oil Type: Mobil DTE 832 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. Reduction Using SVR Mobil DTE 832 8 7 6 5 4 3 1 17-Mar-13 11-Apr-13 6-May-13 31-May-13 25-Jun-13 -Jul-13 14-Aug-13 8-Sep-13

5/14 Case Study #19 Location: WI, USA MW: 185 MW Turbine Type: GT, GE 7FA Oil Type: Mobil DTE 832 Volume: 6, Gallons/23,47 Litres No specific site notes recorded. Reduction Using SVR Mobil DTE 832 6 5 4 3 1 17-Mar-13 11-Apr-13 6-May-13 31-May-13 25-Jun-13 -Jul-13 14-Aug-13 8-Sep-13

5/14 Case Study # Location: WV, USA Turbine Type: GT, GE 7FA Oil Type: Shell Turbo CC 32 Volume: 6,5 Gallons/24,65 Litres No specific site notes recorded. Reduction Using SVR Shell Turbo CC 32 7 6 5 4 3 1 26-Jul-11 28-Nov-11 1-Apr-12 4-Aug-12 7-Dec-12 11 Aug-13 14-Aug-13 31-Dec-13