PL14 Plant Operator Scheme Types and Attachments

Similar documents
APPLICATION TO CONVERT FROM A FULL CPCS COMPETENT OPERATOR CARD TO AN MPQC OPERATOR CARD

(Construction) Level 2 NVQ Certificate in Plant Operations (Road/Rail)

Pearson Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF) 601/6018/4

WELCOME TO THE LYNCH PLANT GUIDE

CONSTRUCTION and OFF ROAD EQUIPMENT

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

FEMA's Schedule of Equipment Rates

Occupations (Construction)

Auction Ring 1 -Ramp - North Auction Theatre

(Construction) Minimum credit to be achieved at, or above, the level of the qualification: 49

FEMA's Schedule of Equipment Rates

MACHINE CONTROLLER CRANE CONTROLLER KEY POINT CARDS ATTACHMENT GROUPINGS

Qualification structure for the Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF)

Plant and equipment operation

Schedule of Equipment Rates

Product Guide Americas Edition 2007

RENTAL RATES SALES SERVICE PARTS RENTAL OIL & GAS MUNICIPAL CONCRETE ASPHALT ENVIRONMENTAL SOLID WASTE TOUGH JOBS TOUGH MACHINES

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

WELCOME TO THE LYNCH PRODUCT GUIDE

Auction Ring 1 -Ramp - North Auction Theatre

Eligibility Criteria to Undertake an Advanced Technical Test

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

Complete Equipment Fleet

CONSTRUCTION EQUIPMENT

Agri-Power Series AGCO 4.4, 6.6, 7.4, 8.4 Sisu Common Rail DT 180a DT 200a DT 220a DT 240a RT 110a RT 120a RT 140a RT 155a RT 165a

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Rated Operating Capacity (SAE) Trav el Speed (2-speed option) Engine Oil with Filter

Including. BRISTOL - Gloucester Tel: HARPENDEN - Herts/Beds Tel:

LOLER REGULATIONS INTRODUCTION

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

Work Tool Attachments

Where Quality makes the Difference...

SECTION 11 Mobile work shop truck 100. SECTION 12 Amphibious dredger 12. SECTION 13 Tyre shovel 500. SECTION 14 Fork lift 300

T.A.T Minimum Wage Scale

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

2015 FEMA Schedule of Equipment Rates

This appendix describes various types of equipment that can

Minneapolis, MN March 28, 2017 (Tuesday)

SMALL CONSTRUCTION EQUIPMENTS

EQUIPMENT LINE CARD RENT-CAT

Attachment Lineup. You have a lot of choices in attachments; they re all in here. Make more money with your compact equipment.

EL PASO, TEXAS CATALOG (45) Date: 06/16/2012 Location : Address: City State :

Compact Construction Equipment ATTACHMENTS

G.F. Gordini srl Via E. Mattei, Bagnacavallo (RA) - Italy tel fax

Capacity or Size. hour $ Automobile to 130 Transporting people. mile $ Automobile to 130 Transporting cargo. hour $14.

TAIAN MULTIFUNCTION WHEEL LOADER ATTACHMENTS

EQUIPMENT. Lawn & Garden. Land Surveying Equipment

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

Alquiler y venta de maquinaria para la construcción. products catalogue

EQUIPMENT LINE CARD WE RE READY WHEN YOU ARE. EQUIPMENT LINE CARD RENT-CAT

ONLINE MAY 28, 2015 REGISTER TO BID TODAY AT

Bulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour

1-844-YNC-RENT

PREMIUM SPECIALTY TIRES. Product Catalog. Series. Material Handling Agriculture Industrial & Construction Off The Road


INDUSTRIAL TYRES. STARCO Group product range, starco.com

FEMA s SCHEDULE OF EQUIPMENT RATES

Product. Factory. Duty Rate & Certificate

1 Manitowoc Grove. Cranes. Lattice Boom Crawler Cranes Model, Capacity, Main Boom Length, Fixed Jib on Main Boom

EM, MPT & Industrial Tyres TECHNICAL DATABOOK 12 TH EDITION

BACKHOES, SKIDLOADERS & ATTACHMENTS

Revision 2 Purchasing Agent: Phillip Geurtz Phone: (801)

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Emissions Tier (EPA) Tier 4. Number of Cylinders 4. Starter Horsepower. Rated Operating Capacity (SAE) Trav el Speed (2-speed option)

STATE OF MINNESOTA PRICING PAGE - METHOD # 1 (Typed Responses Required)

Why? Faster To reduce the duration of the process

RENTAL CATALOGUE WHY WESGROUP EQUIPMENT?

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

ACCESS EQUIPMENT 1ST DAY 2ND DAY 5 DAYS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

We have the rental equipment you re looking for... from the Appalachians to the Atlantic

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

Scale Model Replicas 14+ DiecastMasters.com

Bobcat Skid Steer S530

Where Quality makes the Difference...

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

Telescopic Handlers. Product Range

Highway (DOT) Mobile Road Crane: L5, Radial: MS501, MS502, MS503 Loader, Solid: Scraper, Radial: Backhoe, Front 2WD: MS901, MS902, MS903, MS904, MS907

RELIABLE EQUIPMENT FAST SERVICE KNOWLEDGEABLE PEOPLE MACALLISTER RENTALS (877)

Appendix H: Construction Impacts H-3 Air Quality

FarmSmart January 20,2018

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

Transcription:

Plant Type Plant Type Abbreviations Categories Category Abbreviations Attachments Card Codes Fuel Bowser FB Water Bowser WB Tipping Trailer TT Agricultural Tractor Tractor Agri Bucket B Forks F Gritter GR High Pressure Washing Lance WL Snowplough SN All Terrain Utility Vehicle ATUV Barge Operations Barge Ops Rigid Hull RH Tug with Dumb Barge TDB Bitumen Boiler Bit Boiler Rigid R Articulated Art Bitumen Sprayer FTD Bit Sprayer FTD Up to 6 Tonne <6t 6-8 Tonne 6-8t Over 8 Tonne >8t Bitumen Spraying Machine Bit Sprayer M/C Block Splitting Delving BSD Drill Rig DR Loader with Compressor LC Bulldozer Bulldozer Ripper RP Bulldozer Wheeled Bulldozer W Ripper RP Chipping Machine Chipping M/C Hydrostatic Hydro Mechanical Mech Coal Washing Plant Coal WP Compactor Compactor Dockside Crane Crane D/Side Dredge Operations Dredger Ops Suction Dredge SD Grab or Bucket Dredge GD/BD Rigid R Articulated Art Dumptruck Dumptruck Up to 20 Tonnes <20t 21-50 Tonnes 21-50t 51-100Tonnes 51-100t 100+ Tonnes >100t Fixed Plant Crusher Crusher FP Floorsaw Floorsaw v9 September 2016 1 Copyright MPQC 2014

Counterbalance Industrial CBI Forks F Counterbalance Rough Terrain CBR Fork Extensions FKE Reach Truck RT Bale Clamp BC B1 Counterbalance (up to 5 Tonne) B1 Jib J Fork Lift Truck FLT B2 Counterbalance (between 5 & 10 Tonne) B2 Rotating Forks RFK B3 Counterbalance (over 15 Tonne) B3 Working Platform - Non Integrated WPNI Grab G Lifting Beam LIB Lifting Forks LF Double Forks DF Rigid R Front Tipping Dumper FTD Articulated Art Side Tipping Dumper STD Forward Tipping Dumper FTD Up to 6 Tonne <6t High Discharge Skip HDS 6-8 Tonne 6-8t Over 8 Tonne >8t Hot Box Lorry Hot Box Lorry Standard Reach SR Bucket B Long Reach LR Compactor C Up to 30 Tonnes <30t Grab Bucket GB 31-60 Tonnes 31-60t Grapple GP Excavator 360 Exc 360 61-100 Tonnes 61-100t Auger A 100+ Tonnes >100t Grading Bucket GRB Riddle R Flat Edge FE Breaker BRE Rockpad RPD Level Technician (Planer) LT Planer Light Vehicle 4X4 LV 4X4 Trailer T Below 3.5m3 <3.5m3 Loader Compressor Loader Comp Below 7.5m3 <7.5m3 Below 13m3 <13m3 13m3+ 13m3+ Rigid R Crane CR Articulated Art Grab G Lorry Mounted Crane HIAB LMC HIAB Up to 20 Tonnes <30t Bucket B 21-50 Tonnes 31-60t 51-100 Tonnes 61-100t 100+ Tonnes >100t Low Loader Low Loader Lube Truck MEWP Boom Lube Truck MEWP Boom Rigid Lorry Mounted R LM Articulated Self-Propelled Art SP Operating Height (m) 2-20 (m) 2-20 Working Platform - Integrated WPI MEWP Scissor MEWP Scissor Rough Terrain RTE Working Platform - Non Integrated WPNI Standard S Platform Extension PE v9 September 2016 2 Copyright MPQC 2014

Up to 5 Tonne <5t Bucket B Mini Digger Mini Digger 5-9 Tonne 5-9t Grab G Auger A Breaker BRE Jaw Jaw Breaker BRE Mobile Crusher Mobile Crusher Cone Cone Impact Impact Mobile Screen Mobile Screen Tracked TR Wheeled W Motor Grader Motor Grader Paver Paver Under 8 Tonnes <8t Over 8 Tonnes >8t Up to 0.5m <0.5 0.5M - 1.2M <1.2 Planer Cold Milling Machine Planer Over 1.2M >1.2 Wheeled W Tracked TR Pneumatic Tyred Road Roller Crushing/Screening/Washing CSW Mortar Production MP Drying D Concrete CC Asphalt/Coated Materials Production AS Density/Fluid Separation FS Processing Operations Processing Ops Chemical Separation CHS Forming FO Heat Treatment HT Sawing/Splitting/Shaping SSS Packaging PA Water Monitoring WM China Clay Processing CP Deadweight DW Cutting Wheel CW Road Roller (not including hand operated) Road Roller Vibrating under 6 Tonne V<6t Vibrating over 6 Tonne V>6t Pneumatic Tyre PT Road Roller (hand operated only) Road Roller (HO) Coupling Lance CPL Vacuum Gully Sucker VGS Roadsweeper Roadsweeper High Pressure Washing Lance WL Front and Rear High Pressure Spray Bars HPS Right Hand Brush RHB Bars BR Excavator Roped Exc RP Bucket B Drop Ball DP Grab G Screwman Screwman Self-Propelled Fuel Bowser Self-Propelled Water Bowser SP Fuel Bowser SP Water Bowser Rigid Rigid R R Articulated Articulated Art Art v9 September 2016 3 Copyright MPQC 2014

Rigid R Articulated Art Site Lorry Site Lorry Site Slurry Tanker SS Tanker Site Truckmixer Site Truckmixer Wheeled W Bucket B Tracked TR Auger A Forks F Skidsteer Skidsteer Sweeper SW Hydraulic Breaker HB Blade BL Standard ST Skip Handler Skip Handler Short SH STonnee Mastic Asphalt Finisher MA Finisher Stihl Saw Abrasive Wheels Stihl Saw Blade BL Wheel WH Surface Banksman Surface B/man Industrial IND Rough Terrain RTE Rough Terrain Telescopic Handler above 9 metres RTE>9m Forks F Rough Terrain Telescopic Handler below 9 metres RTE <9m Bucket B Industrial Telescopic Handler above 9 metres IND >9m Lifting Hook LH Industrial Telescopic Handler below 9 metres IND<9m Lifting Jib LJ Telehandler Telehandler Working Platform - Integrated WPI Working Platform - Non Integrated WPNI Double Forks DF Fork Extensions FKE Bale Clamp BC Rotating Forks RFK Waste Grab WG Clamp CL Forks with Lifting Equipment FKL Plough PL Tracked Loading Shovel TLS Ripper RP Bucket 4 in 1 B4/1 Up to 30 Tonnes <30t Bucket B 31-60 Tonnes 31-60t Grab G Excavator Wheeled Exc W 61-100 Tonnes 61-100t Grapple GP 100+ Tonnes >100t Grading Bucket GRB Standard Reach SR Breaker BRE Long Reach LR Pecker P v9 September 2016 4 Copyright MPQC 2014

Wheeled Motor Scraper Wheeled Loading Shovel Backhoe Loader 180 Wheeled Loading Shovel (Non Quarry) Motor Scraper W WLS B Loader 180 WLS (Non Quarry) Bucket B Push Tractor PT Scraper Bowl SB Below 3.5m3 <3.5m3 Forks F Below 7.5m3 <7.5m3 Jib J Below 13m3 <13m3 Bucket B 13+m3 >13m3 Vehicle Tank Grab TG Up to 6 Tonne <6t Bucket 4 in 1 B4/1 Above 6 Tonne >6t Bucket 6 in 1 B6/1 Backacter BA Digging & Grading DG Pecker P Forks F Trencher TE Auger A Bucket B Breaker BRE Below 1.5m3 Below 1.5m3 Forks F Below 3.5m3 Below 3.5m3 Jib J Below 7.5m3 Below 7.5m3 Grab G Below 13m3 Below 13m3 Bucket B 13+m3 13+m3 v9 September 2016 5 Copyright MPQC 2014

v9 September 2016 6 Copyright MPQC 2014

v9 September 2016 7 Copyright MPQC 2014

v9 September 2016 8 Copyright MPQC 2014

v9 September 2016 9 Copyright MPQC 2014

v9 September 2016 10 Copyright MPQC 2014