Certificate of Acceptance

Similar documents
Certificate of Acceptance

Council of the European Union Brussels, 18 July 2014 (OR. en)

NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation Edition DRAFT

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

Certificate of Acceptance

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation

Note: it is a criminal offence to give false information in this application.

Technical Specification for 12kV and 24kV Powder Filled Fuse-Links and Fuse Holders

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

Technical Specification for 12kV and 24kV Current Limiting Fuse- Links for Overhead Applications

PRE-RELEASE VERSION (FDIS)

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Technical Specification for 12kV Powder Filled Current Limiting Fuse-Links for Use in Switchgear (In Oil)

Land Transport Rule: Vehicle Standards Compliance 2002 Rule 35001/1 Rule requirements...2

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

Rail Safety and Standards Board

Technical Specification for 12kV and 24kV Powder Filled Current Limiting Fuse Links for Use in Switchgear (In Air)

Track Circuit Assister Configuration for Rail Vehicles

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Compatibility Between Electric Trains and Electrification Systems

(Text with EEA relevance)

POSITION PAPER Version 3.0

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

Mechanical Trainstop Systems

HyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):

Data Link Services Airworthiness and Conformance to Commission Regulation (EC) No 29/2009

INCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL

Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

(Non-legislative acts) DECISIONS

SPECIFICATIONS FOR MOTOR OPERATED VALVES

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

TECHNICAL SPECIFICATION

Certification Memorandum. Additive Manufacturing

DEPARTMENT OF STATE POLICE TRAFFIC SAFETY DIVISION TESTS FOR BREATH ALCOHOL

Construction and Connection of Street Light Assets

ESS Lighting Instruction Pack Original Energy Saver

Certification Scheme

Interconnection Process for Generation Systems

Volume 1 Series 2200 Specification for Road Works. Clause Title Page

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Microgeneration Installation Standard: MCS

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

DEPARTMENT OF TRADE AND INDUSTRY NO APRIL 2016

NPS/003/019 Technical Specification for Electrical Insulating Fluids for use in Plant & Switchgear.

Risk Management of Rail Vehicle Axle Bearings

Reference Number PDS 18 - (RIC Standard: EP SP)

68-253/Issue 1 (DERD 2491) 1 August 1997

Connecting your home or small business generation

QUESTION / CLARIFICATION

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Operating and Maintenance Instructions. Station Road Clowne Chesterfield Derbyshire S43 4AB Tel: Fax:

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Learning Legacy Document

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

FUNCTIONAL SAFETY CERTIFICATE

REBATE APPLICATION. 1. Rebate Applicant Information. 2. Dealer Information OKLAHOMA NATURAL GAS COMPRESSED NATURAL GAS (CNG)

Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD)

The IFSQN ISO Implementation Package Start Up Guide

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Hydraulic Fittings. Design, Manufacture, Distribution

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

KBA Kraftfahrt-Bundesamt

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

Municipality Generator Interconnection Application Single Meter Application Part I

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

ISLE OF WIGHT COUNCIL

Guidance for Low Voltage Electrical Installations

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Guide for the application of the CR ENE TSI

Ballast Water Management Surveyor checklist

VOLUNTARY CODE OF PRACTICE FOR ELECTROMAGNETIC COMPATIBILITY (EMC) OF MOTOR VEHICLES (13 October 2014)

Section V DC Nickel Cadmium Alkaline BATTERY

Lloyd s Register Type Approval System Test Specification Number GT04

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

SwingLift GB100 GAS BOTTLE CRANE

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Installation of parts and appliances without an EASA Form 1 in European Light Aircraft

Permissible Track Forces for Railway Vehicles

Instruction Manual PC104/PC105 3-PHASE SOCKET TESTER. Check out what else you can get from Martindale:

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY

Microgeneration Installation Standard: MCS 023

TECHNICAL SPECIFICATION

Outside of the Walls. Protocol & SOP Changes & Audit Checklists. Outside The Walls - Section 5 1

Policies and Procedures Handbook Procedure No.: T.2 Illinois Institute of Technology Date of Issue: 7/11

INTERNATIONAL STANDARD

(Non-legislative acts) DECISIONS

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations

TOPAS 2130A (Draft v3)

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests

INTERNATIONAL STANDARD

The Project North West Electrification Programme

Transcription:

Class II Hybrid Signalling Power Products Product Description Product Image A range of Class II Hybrid Signalling Transformers, Transformer-rectifiers and Multioutput Power Supplies for Signalling applications. Scope of Acceptance Full Acceptance Can be used where the Signalling Power Distribution is Class I or Class II subject to the Specific Conditions defined in this certificate. They shall not be used in sub-surface environments in accordance with section 12 stations and locations. Network Rail Acceptance Panel (NRAP) hereby authorises the product above for use and trial use on railway infrastructure for which Network Rail is the Infrastructure Manager under the ROGS regulations. Reviewed by: Authorised by: Nigel Edwards Head of Power Distribution HV/LV Vanessa Cumine Process & Change Specialist Jerry Morling BEng MSc CEng MIET, MIRSE Professional Head Signalling Please contact technologyintroduction@networkrail.co.uk Network Rail Infrastructure Ltd Registered Office Kings Place 90 York Way London N1 9AG Registered in England and Wales No. 2904587 www.networkrail.co.uk Version 6.2 September 2013

Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions contained within the General Terms and Conditions section. Failure to adhere to these conditions may result in the withdrawal or suspension of Acceptance of some, or all of the items contained within the accepted configuration. Manufacturer 1) The Routine tests defined in the Quality procedures of Trans-Tronic Ltd shall be applied to all units prior to release. 2) A batch sampling plan in accordance with BS6001 shall be prepared and updated. An appropriate number of samples shall be drawn from each batch to demonstrate compliance has been achieved with NR/L2/SIG/30007 and associated requirements. 3) All enclosures shall satisfy the dielectric test in accordance with BS EN 61439 clause 10.9.4 to a test voltage of 3.5kV. 4) All test records shall be maintained for traceability of tests User 1) Conditions for installation, commissioning and maintenance to be adhered too are defined in the O&M Manual provided by Trans-Tronic Ltd. 2) The following application criteria and constraints apply: a) Installations where compatibility for space, voltage and load are satisfied; b) The Class II Transformers, Transformer-rectifiers and Multi-output Power Supplies are suitable for use in coastal areas; c) Not to be used in sub-surface environments in accordance with section 12 stations and locations; d) Primary Protection of the Class II Hybrid Transformers, Transformer-rectifiers and Multi-output Power Supplies shall be either BS88 Type gg or IEC 60269, 10x38mm gg fuses. Miniature Circuit Breakers shall not be used; e) The Transformer-rectifiers listed on this certificate can be used as a replacement for legacy units compliant to BR865. Page 2 of 10

3) Transformer-rectifier Conditions The load in terms of the maximum number of point machines from each output for each unit, is defined in tables below. For improved reliability, the standard configuration for powering twin-pump, Hy-drive machines is using a 5A, dual output T/J where each pump has a dedicated power supply. This cannot be achieved with single output 10A, T/J which is therefore restricted to powering only one Hy-drive pump. Table 1 TB203. Single Output, 650/120V d.c. 2.5A Transformer-rectifier Table 2 TB206. Single Output, 650/120V d.c. 5A Transformer-rectifier Table 3 TB209. Single output 650/120V d.c. 10A Transformer-rectifier 8 machines Page 3 of 10

Table 4 TB204. Single Output, 400V 440V/120V d.c. 2.5A Transformer-rectifier Table 5 TB207. Single Output, 400V 440V/120V d.c. 5A Transformer-rectifier Table 6 TB210. Single output 400 440V/120V d.c. 10A Transformer-rectifier 8 machines Page 4 of 10

Table 7 TB205. Single Output, 230V/120V d.c. 2.5A Transformer-rectifier Table 8 TB208. Single Output, 230V/120V d.c. 5A Transformer-rectifier Table 9 TB211. Single output 230V/120V d.c. 10A Transformer-rectifier 8 machines Page 5 of 10

Product Configuration Class II Hybrid Transformers Part No. Description Catalogue No. TB126 Class II Hybrid Transformer 650/110V 250VA 054/212570 TB091 Class II Hybrid Transformer 650/110V 500VA 054/212571 TB092 Class II Hybrid Transformer 650/110V 1000VA 054/212572 TB129 Class II Hybrid Transformer 650/110V 1500VA 054/212573 TB093 Class II Hybrid Transformer 650/110V 3000VA 054/212574 TB127 Class II Hybrid Transformer (400-440V)/110V 250VA 054/212575 TB123 Class II Hybrid Transformer (400-440V)/110V 500VA 054/212576 TB095 Class II Hybrid Transformer (400-440V)/110V 1000VA 054/212577 TB130 Class II Hybrid Transformer (400-440V)/110V 1500VA 054/212578 TB096 Class II Hybrid Transformer (400-440V)/110V 3000VA 054/212579 TB128 Class II Hybrid Transformer 230/110V 250VA 054/212580 TB097 Class II Hybrid Transformer 230/110V 500VA 054/212581 TB098 Class II Hybrid Transformer 230/110V 1000VA 054/212582 TB131 Class II Hybrid Transformer 230/110V 1500VA 054/212583 TB099 Class II Hybrid Transformer 230/110V 3000VA 054/212584 TB132 Class II Hybrid Transformer 650/230V 250VA 054/212585 TB133 Class II Hybrid Transformer 650/230V 500VA 054/212586 TB134 Class II Hybrid Transformer 650/230V 1000VA 054/212587 TB143 Class II Hybrid Transformer 650/230V 1500VA 054/212588 TB144 Class II Hybrid Transformer 650/230V 3000VA 054/212589 TB166 Class II Hybrid Transformer 650/110V 5000VA 054/212599 TB169 Class II Hybrid Transformer Input: 650V Outputs: x1 (110/140V, 850VA) Outputs: x1 (110V, 150VA) 0054/212602 TB171 Class II Hybrid Transformer Input: 650V Outputs: x4 (110/140V, 350VA) 0054/212603 Class II Hybrid Multi-output Power Supplies TB167 Class II Hybrid Multi-output Power Supply Input: 650V Outputs: x3 (110/140V, 350VA) Outputs: x1 (110/140V, 500VA) Outputs: x2 (50V, 150W) TB168 Class II Hybrid Multi-output Power Supply Input: 650V Outputs: x2 (110/140V, 450VA) Outputs: x1 (50V, 150W) 0054/212604 0054/212605 Class II Hybrid Transformer-rectifiers Part No. Description Catalogue No. TB203 Class II Hybrid Transformer Rectifier 650V input, 120V dc 054/212590 output, 2.5A output (continuous), 10A output (int. driving). TB206 Class II Hybrid Transformer Rectifier 650V input, 120V dc 054/212591 output, 5A output (continuous), 20A output (int. driving). TB209 Class II Hybrid Transformer Rectifier 650V input, 120V dc output, 10A output (continuous), 40A output (int. driving). 054/212592 Page 6 of 10

Class II Hybrid Transformer-rectifiers Part No. Description Catalogue No. TB204 Class II Hybrid Transformer Rectifier 400-440V input, 120V 054/212593 dc output, 2.5A output (continuous), 10A output (int. driving). TB207 Class II Hybrid Transformer Rectifier 400-440V input, 120V 054/212594 dc output, 5A output (continuous), 20A output (int. driving). TB210 Class II Hybrid Transformer Rectifier 400-440V input, 120V 054/212595 dc output, 10A output (continuous), 40A output (int. driving). TB205 Class II Hybrid Transformer Rectifier 230V input, 120V dc 054/212596 output, 2.5A output (continuous), 10A output (int. driving). TB208 Class II Hybrid Transformer Rectifier 230V input, 120V dc 054/212597 output, 5A output (continuous), 20A output (int. driving). TB211 Class II Hybrid Transformer Rectifier 230V input, 120V dc output, 10A output (continuous), 40A output (int. driving). 054/212598 Page 7 of 10

Assessed Documentation Reference Title Doc. Rev. Date and Applies to Cert. issue No. --- PA05/05321 Acceptance requirements doc --- 02-03-2012 1 --- Acceptance requirements doc --- 02-03-2012 1 --- PA05/05321 Product application form --- 31/08/2013 1 --- Product application form --- undated 1 --- Product evidence zip file. --- 04-07-2013 1 --- Iss3_TT_Evidence (see NR Sharepoint) --- 18-12-15 3 Manuals and Training Materials Reference Title Doc. Rev. Date and Applies to Cert. issue No. --- O&M manual Class II Hybrid Transformer 1.4 26/07/2013 1 Rectifier for point machines --- O&M manual Class II Hybrid FSP Isolating 1.4 26/07/2013 1 Transformer --- O&M manual Class II Hybrid FSP Isolating Transformer 2.0 03/03/15 3 Certificate History Issue Date Issue History 1 26-07-2013 First accepted for use 2 31-07-2013 Re-issued to capture correct part numbers 3 26-01-2016 Re-issued to add new products (TB166, TB169, TB171, TB167 & TB168) Contact Details Manufacturer Richard Turley Trans-Tronic Ltd, Whittington Valley Road, Chesterfield, Derbyshire, S41 9EY. richard@trans-tronic.co.uk Sponsor Ernest Brigden Senior Design Authority Engineer (E&P) Signalling Innovations Group Infrastructure Projects Network Rail ernest.brigden@networkrail.co.uk Page 8 of 10

General Terms & Conditions 1) General 1) This certificate can only be amended by Network Rail Technology Introduction Group. Any alterations made by a different person will invalidate the entire certificate. 2) Failure to abide by the requirements in this Certificate of Acceptance may invalidate the certificate, thereby restricting the right to operate the product and / or limiting the future supply and deployment of the product on the infrastructure. 3) Upon the review date this certificate and the product it relates to is invalid and not accepted for use. Manufacturers are to make an application for a review prior to the review date. 2) Manufacturer The Manufacturer shall: 1) Ensure that all products supplied comply with the standards defined in the Acceptance Requirements or otherwise documented as part of the assessment, including meeting the reliability requirements included in the Acceptance Requirements and in any deed of warranty for the relevant certificate number. 2) Notify Network Rail Technology Introduction Group: a. Within 48 hours, of any deficiencies affecting the quality, functionality or safety integrity of the product (including corrective action undertaken or proposed). b. Of any intended change to the accepted product; changes include: i. a change to the product configuration (to the actual product or its application); ii. a variation to or addition of manufacturing locations or processes; iii. a change in the name or ownership of the manufacturing company; iv. any changes to the ability or intention to support with technical services, spares or repairs. 3) The Manufacturer shall provide Network Rail Technology Introduction Group at least 12 (twelve) months notice of its intention to discontinue supply or to provide such notice as is reasonable if such discontinuance is outside its control and will offer the opportunity of a Last Time Buy to Network Rail together with date for last order placement and supply of the parts affected. The introduction of proposed alternative products shall be communicated to the Network Rail Technology Introduction Group. 4) Provide further copies of operating and maintenance manuals to purchasers / users of the product as necessary (including certificates of conformance, calibration etc). 5) Provide further copies of training manuals and an appropriate level of training to purchasers or users of the product as necessary. 6) Where applicable, specialist technical support, repairs and servicing of the product shall be carried out by the Original Equipment Manufacturer (OEM) or authorised agent only. 7) Network Rail may request information from the manufacturer to prove product compliance with clauses 1 and 2 above and reserve the right to suspend and/or withdraw any application where information is not forthcoming within a reasonable timeframe. 8) In accordance with Network Rail s Quality Assurance Policy Statement 2011, where the specification and/or Product Acceptance Certificates specify quality assurance classifications (QA1 to QA5) for the products, the manufacturer shall comply with the specified level of quality assurance for each product and allow Network Rail access to carry out its quality assurance checks. 9) The manufacturer shall give Network Rail s representatives access at all reasonable times to its premises and allow them to inspect its quality systems and production methods and, if requested, to inspect, examine and test the products both during and after their manufacture and the materials being used in their manufacture. 3) Conditions of Use Specifiers, installers, operators, maintainers, etc. using the product shall: 1) Comply with the certificate conditions. If a condition is not understood guidance must be sought from Network Rail Technology Introduction Group. 2) Check that the application of use complies with the relevant certificate s scope of acceptance. 3) Report any defect if it is a design or manufacturing fault likely to affect performance and/or the safe operation of the railway in writing to Network Rail Technology Introduction Group. 4) Inform Network Rail Technology Introduction Group in writing of a change to the product configuration (or to the actual product or its application). 5) Operate, maintain and service the product in accordance with Network Rail standards and Operation and Maintenance manuals as appropriate. 6) Be appropriately trained and authorised for the installation, maintenance and use of the product. 7) Only send products for repair or reconditioning to the Original Equipment Manufacturer (OEM) or authorised agent. 8) Users are to be aware that Product Acceptance is not a substitute for design approval. Page 9 of 10

4) Compliance Railways and Other Guided Systems (ROGS) Regulations 1) Where the product is to be used in areas where Network Rail is not the Infrastructure Manager (e.g. leased stations), the sponsor shall additionally obtain formal consent from the Infrastructure Manager for the locality where the equipment is to be installed. This may include a requirement for additional safety verification. The decision of that Infrastructure Manager is binding, and cannot be overridden by Network Rail except by the escalation processes established in the ROGS regulations 2) As required in Railway Group Standard GE/RT8270, at each use of this product the project or group responsible for installation and commissioning shall be required to demonstrate compatibility with: a. All rail vehicle types that have access rights over the area affected by the change b. Infrastructure managed by others c. Neighbours. Railway Interoperability Regulations 3) For interoperable constituents of systems the project or group responsible for installation and commissioning shall be required to demonstrate compliance with the relevant Technical Specifications for Interoperability (TSI) where appropriate. 4) An authorisation from the national safety authority (i.e. the Railway Safety Directorate of the Office of Rail Regulation) is required before the equipment is to be used in revenue earning service. 5) Supply Chain Arrangements 1) Certificates of acceptance do not imply any particular quantity of supply nor any exclusivity of supply. 2) Products may be purchased by Network Rail or its agents, suppliers or contractors. 3) Manufacturers should note that it is not necessary to enter into any exclusive supply arrangements with resellers or other suppliers Page 10 of 10