RE: Request for Co-location Dispute Resolution for the Menke and Hauer CSG sites, Docket No. E002/M

Similar documents
May 30, Via Electronic Filing

March 8, Mr. Daniel Wolf Executive Secretary Minnesota Public Utilities Commission 121 Seventh Place East, Suite 350 St. Paul, MN

CERTIFICATE OF SERVICE

December 20, Burl W. Haar Executive Secretary Minnesota Public Utilities Commission 121 7th Place East, Suite 350 St. Paul, Minnesota

CERTIFICATE OF SERVICE

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger PROCEDURAL HISTORY

2200 IDS Center 80 South 8th Street Minneapolis MN tel fax

VIA ELECTRONIC FILING

Re: Application for Approval of Route Permit Amendment, Spans 89-93, 95-97, and

CERTIFICATE OF SERVICE

Docket No. E,G001/D Correction to 2013 Depreciation Petition in Lieu of Repy Comments

The Honorable Jeffrey Oxley Administrative Law Judge 600 North Robert Street VIA ELECTRONIC SERVICE PO Box St. Paul, MN

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

RE: January 9, Electronic Service Only. Marc Weintraub, Esq. Counsel, Applicants Bailey & Glasser, LLP 209 Capitol Street Charleston, WV 25301

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Upper Midwest Integrated Resource Plan Public Meeting. April 2019

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger

STATE OF MINNESOTA THE PUBLIC UTILITIES COMMISSION

Addendum StartPage: 0

CERTIFICATE OF SERVICE

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

UM 1810 Cross-Examination Statement and List of Stipulated Exhibits

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Community Solar Garden (CSG)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Legalectric, Inc. Carol Overland Attorney at Law, MN # Energy Consultant Transmission, Power Plants, Nuclear Waste

: : : : : : : Commonwealth Edison Company ( ComEd ), pursuant to Section of the Public

To that end, we see exciting opportunities for Xcel Energy to enact various components of the e21 vision, including:

Illinois Official Reports

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U338-E) NOTICE OF EX PARTE COMMUNICATION

Re: California Independent System Operator Corporation

STATE OF MINNESOTA Before The Public Utilities Commission. Beverly Jones Heydinger Chair Dr. David C. Boyd Commissioner Nancy Lange

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015

Minnesota Public Utilities Commission Staff Briefing Papers

Filed with the Iowa Utilities Board on September 17, 2018, RMU STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

November 30, 2016 BY HAND DELIVERY AND ELECTRONIC MAIL

Pacific Gas and Electric Company TM

Case KJC Doc 5059 Filed 08/10/18 Page 1 of 6 IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF DELAWARE : : : : : :

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL


Otter Tail Power Company Before the Minnesota Public Utilities Commission

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

August 20, Sincerely,

Case 1:99-mc Document 458 Filed 06/05/12 Page 1 of 12 PageID #: IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.


..t Minnesota Center for

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Coalspur Mines (Operations) Ltd.

July 24, Docket No EI FPL s Petition for Approval of a New Depreciation Class and Rate for Energy Storage Equipment

Legal Considerations Related to Distributed Energy Resources

April 20, Docket No EI Environmental Cost Recovery Clause

Lissa Pawlisch Clean Energy Resource Teams (CERTs) UMN Regional Sustainable Development Partnerships & Extension

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

RIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Filed with the Iowa Utilities Board on July 27, 2018, TF STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

MAINE LEMON LAW SUMMARY

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Overview of Shared Solar Opportunities in the Midwest

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Updates and Modifications to Report

COMMISSION OF THE EUROPEAN COMMUNITIES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

FISCHER, FRANKLIN & FORD Attorneys and Counsellors GUARDIAN BUILDING, SUITE GRISWOLD STREET DETROIT, MICHIGAN

Director of Building and Deputy Chief Building Official

Solar America. Anne Hunt, City of Saint Paul

Merger of the generator interconnection processes of Valley Electric and the ISO;

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

Xcel Energy 2010 Rate Case Status and Overview

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Frequently Asked Questions

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (ztp 32302) TALLAHASSEE, FLORIDA 32301

Solar Opportunities in Mississippi. Presented by: Aaron Hill & Elizabeth Ingram on behalf of Entergy Mississippi, Inc.

SECTION 1 - APPLICANT INFORMATION. 1) Legal Name: 2) Mailing Address: 3) Physical Address (if different from mailing address):

City of Grand Forks Staff Report


IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT. No Non-Argument Calendar. D.C. Docket No. 1:16-cv CC.

Decision on Merced Irrigation District Transition Agreement

RALEIGH COUNTY ALL-TERRAIN VEHICLES (ATV) ORDINANCE

Community Shared Solar for Local Governments

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

. Honorable Mayor and City Council

Ms. Sandra Squire, Executive Secretary West Virginia Public Service Commission Post Office Box 812 Charleston, West Virginia 25323

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION

Nogales Transmission, L.L.C. and Nogales Frontier Operations, L.L.C., Docket No. EL Second Supplement to Petition for Declaratory Order

BILLING CODE P DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM ]

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

City of Lafayette Staff Report Circulation Commission

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

Updates and Modifications to Report

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Transcription:

September 23, 2016 PUBLIC DOCUMENT Heather Eberhardt NextEra Energy 700 Universe Boulevard Juno Beach, Florida 33408 Martin Morud President TruNorth Solar, LLC 5239 Edina Industrial Boulevard Edina, 55439 Mr. James R. Denniston Assistant General Counsel Xcel Energy 414 Nicollet Mall, 5 th Floor 55401 RE: Request for Co-location Dispute Resolution for the Menke and Hauer CSG sites, Docket No. E002/M-13-867 Dear Ms. Eberhardt and Mr. Denniston, Attached please find the decision of the Department of Commerce, Division of Energy Resources on NextEra s August 26, 2016 request for dispute resolution on the issue of co-location of its Menke and Hauer CSG sites. The Department is available to answer any questions you may have. Sincerely, /s/ SUSAN L. PEIRCE Rates Analyst SLP/ja Attachment 1

I. Background Information On August 5, 2016, Xcel Energy (Xcel or Company) notified NextEra (NextEra or Developer) that it considered the Developer s Menke and Hauer CSG sites to be co-located. The Menke project consists of 3 1-MW co-located CSGs located at [TRADE SECRET DATA HAS BEEN EXCISED] Jordan. The Hauer Project consists of 5 1 MW co-located CSGs located at [TRADE SECRET DATA HAS BEEN EXCISED] Jordan. On August 26, 2016, NextEra appealed a determination by Xcel that its Menke and Hauer CSG sites were co-located in excess of the 5 MW limit established by the Commission s August 6, 2015 Order in Docket No. E002/M-13-867 to the Department of Commerce, Division of Energy Resources (Department). On September 6, 2016, Xcel submitted a response to SunEdison s appeal. II. Definition of Co-location In its August 6, 2015 Order, the Public Utilities Commission (Commission) limited co-located CSGs to no more than 5 MWs from any applicant at any given project site for applications submitted prior to September 25, 2015, and to 1 MW for applications submitted after that date. 1 In its December 15, 2015 Order 2, the Commission defined co-located community solar gardens (CSGs) as: Community Solar Gardens shall be considered Co-Located if they exhibit characteristics of a single development, such as: 1. Common ownership structure; 2. An umbrella sale arrangement; 3. Shared interconnection; 4. Revenue-sharing arrangements; and 5. Common debt and equity financing. Community Solar Gardens will not be considered co-located solely because the same person or entity provided tax-equity financing for the garden or garden project. 1 In the Matter of the Petition of Northern States Power Company, dba Xcel Energy for Approval of its Proposed Community Solar Garden Program, Order Adopting Partial Settlement as Modified, Docket No. E002/M-13-867, August 6, 2015. 2 In the Matter of the Petition of Northern States Power Company, dba Xcel Energy for Approval of its Proposed Community Solar Garden Program, Order Approving Tariffs as Modified and Requiring Filing, Docket No. E002/M-13-867, December 15, 2015. 2

In adopting this definition, the Commission stated that the test allows consideration of geographical proximity, but neither proximity nor any other factor is dispositive of whether gardens are part of a single development. 3 III. Summary of NextEra s Response NextEra states that it is developing the Menke and Hauer CSGs as separate projects, and indicates that each project is located on property owned by different and unrelated landowners, with separate lease arrangements. The Menke lease was signed July 1, 2015, and the Hauer lease was signed on September 9, 2015. The Developer states each project is located in a separate zoning district requiring separate permitting from different jurisdictions. Each project is structured as a separate LLC with a single parent LLC, DG 1 Acquisition Co., LLC over each. Both projects will interconnect to the Jordan substation along the same feeder line. NextEra indicates that differences in site characteristics between the two project sites has resulted in significantly different interconnection facilities costs for each project. The interconnection facilities cost for the Menke CSG is estimated at [TRADE SECRET DATA HAS BEEN EXCISED] while the estimated cost for the Hauer CSG is [TRADE SECRET DATA HAS BEEN EXCISED]. NextEra indicates it is providing equity financing for both CSG, but states that each CSG is a separate legal entity required to stand on its own financially. NextEra also indicates that there is no revenue sharing arrangement between the two CSGs. The Developer also acknowledges that both CSGs are working indirectly through NextEra Energy Resources Acquisitions to identify subscribers. Each CSG will execute separate service agreements with each subscriber. IV. Summary of Xcel Response Xcel asserts that both CSG projects are owned by Next Era through wholly-owned subsidiaries. Both interconnect at the Jordan substation along the same feeder line. In addition, the Company states that because both projects draw from the same pool of potential subscribers and share marketing this constitutes an umbrella sales agreement. Although the two projects are separate legal entities and do not have any revenue sharing arrangement, Xcel states all income and losses are consolidated to the parent company for tax purposes. NextEra provides equity financing for both CSGs. Finally, Xcel states that the points of interconnection are approximately 0.71 miles apart, and the closest fence-to-fence distance is 0.56 miles. V. Department Finding The Department reviews co-location disputes to determine if the projects exhibit characteristics of separate unrelated developments, rather than a single development. While no single factor is determinative, based on the guidance provided by the Commission, the intent of the co-location limitation and the statutory directive that there shall be no limitation on the number or cumulative generating capacity of community solar garden facilities other than the limitations imposed under section 216B.164, subdivision 4c, or 3 Id. at 3. 3

other limitations provided in law or regulation, the most significant consideration is whether the projects were originally proposed as a single development or separate unrelated developments. The Department has reviewed the information provided by NextEra and Xcel and concludes that the Menke and Hauer projects are not co-located. While the two projects share common ownership through the parent, DG1 Acquisition Co., LLC, and receive equity financing from NextEra Energy Resources, LLC, ownership alone is not sufficient to determine co-location. The applications for each CSG were submitted separately, are located on property owned by different and unrelated property owners, have separate and distinct lease agreements, and require permits from different permitting authorities. While both projects connect to the same substation, the interconnection costs for both projects are vastly different. Xcel s argument that the two projects are co-located because the projects share interconnection to the same substation, and the points of interconnection are only approximately 0.71 miles apart is not reasonable. The Commission s December 15, 2015 Order defining co-location stated that the test allows consideration of geographical proximity, but neither proximity nor any other factor is dispositive of whether gardens are part of a single development. 4 If shared interconnection is defined as interconnection to the same substation, then the definition of co-location would by default become no more than 5 MW per substation per developer. The Commission s Order establishing a co-location limit of 5 MW, did not limit a developer s ability to interconnect more than one project to a substation. The Department does not find Xcel s argument that the projects share some common marketing efforts persuasive. Developers with more than one project, whether one mile or twenty miles apart are likely to develop common marketing materials to use in attracting subscribers. With respect to the Menke and Hauer CSGs, each subscriber is required to obtain a separate subscription agreement with each CSG, and there is no revenue sharing between the two CSGs. In summary, the facts demonstrate that each of these projects exhibit the characteristics of separate unrelated developments, rather than a single development, and are not co-located. Accordingly, the Department determines that NextEra s Menke and Hauer projects are not co-located. /ja 4 Id. 4

CERTIFICATE OF SERVICE I, Sharon Ferguson, hereby certify that I have this day, served copies of the following document on the attached list of persons by electronic filing, certified mail, e-mail, or by depositing a true and correct copy thereof properly enveloped with postage paid in the United States Mail at. Department of Commerce Public Letter Menke and Hauer Community Solar Garden Docket No. E002/M-13-867 Dated this 23 rd day of September 2016 /s/sharon Ferguson

Michael Allen michael.allen@allenergysol ar.com Julia Anderson Julia.Anderson@ag.state.m n.us All Energy Solar 721 W 26th st Suite 211 Office of the Attorney General-DOC Sara Baldwin Auck sarab@irecusa.org Interstate Renewable Energy Council, Inc. 55405 1800 BRM Tower 445 St 551012134 PO Box 1156 Latham, NY 12110 Kenneth Bradley kbradley1965@gmail.com 2837 Emerson Ave S Apt CW112 Electronic Service Yes OFF_SL_13-867_Official 55408 Michael J. Bull mbull@mncee.org Center for Energy and Environment Jessica Burdette jessica.burdette@state.mn. us Department of Commerce 212 Third Ave N Ste 560 55401 85 7th Place East Suite 500 55101 Joel Cannon jcannon@tenksolar.com Tenk Solar, Inc. 9549 Penn Avenue S Bloomington, 55431 John J. Carroll BADEMAILjcarroll@newportpartners.c om Carl Cronin Regulatory.records@xcele nergy.com Newport Partners, LLC 9 Cushing, Suite 200 Irvine, California 92618 Xcel Energy 414 Nicollet Mall FL 7 554011993 Arthur Crowell Crowell.arthur@yahoo.com A Work of Art Solar 14333 Orchard Rd. Paper Service No OFF_SL_13-867_Official Minnetonka, 55345

Timothy DenHerder Thomas timothy@cooperativeenerg yfutures.com Dustin Denison dustin@appliedenergyinno vations.org James Denniston james.r.denniston@xcelen ergy.com Cooperative Energy Futures 3500 Bloomington Ave. S 55407 Applied Energy Innovations 4000 Minnehaha Ave S Xcel Energy Services, Inc. 55406 414 Nicollet Mall, Fifth Floor 55401 Ian Dobson ian.dobson@ag.state.mn.u s Office of the Attorney General-RUD Jason Edens jason@rreal.org Rural Renewable Energy Alliance Betsy Engelking betsy@geronimoenergy.co m Geronimo Energy John Farrell jfarrell@ilsr.org Institute for Local Self- Reliance Antitrust and Utilities Electronic Service Yes OFF_SL_13-867_Official Division 445 Street, 1400 BRM Tower 55101 3963 8th Street SW Backus, 55435 7650 Edinborough Way Suite 725 Edina, 55435 1313 5th St SE #303 55414 Emma Fazio emma.fazio@stoel.com Stoel Rives LLP 33 South Sixth Street Suite 4200 55402 Sharon Ferguson sharon.ferguson@state.mn.us Department of Commerce 85 7th Place E Ste 500 Saint Paul, 551012198 2

Nathan Franzen nathan@geronimoenergy.c om Geronimo Energy 7650 Edinborough Way Suite 725 Edina, 55435 Karen Gados karen@mysunshare.com SunShare, LLC 1441 18th Street Suite 400 Denver, CO 80202 Hal Galvin halgalvin@comcast.net Provectus Energy Development llc 1936 Kenwood Parkway 55405 Allen Gleckner gleckner@fresh-energy.org Fresh Energy 408 St. Peter Street Ste 220 Saint Paul, 55102 Sean Gosiewski sean@afors.org Alliance for Sustainability 2801 21st Ave S Ste 100 Todd J. Guerrero todd.guerrero@kutakrock.c om Timothy Gulden info@winonarenewableene rgy.com 55407 Kutak Rock LLP Suite 1750 220 South Sixth Street 554021425 Winona Renewable Energy, LLC 1449 Ridgewood Dr Winona, 55987 Michael Harvey mike@weknowsolar.com We Know Solar 265 Mounds View Rd Suite #1 River Falls, WI 54022 Duane Hebert duane.hebert@novelenerg y.biz Novel Energy Solutions Lynn Hinkle lhinkle@mnseia.org Solar Energy Industries Association 1628 2nd Ave SE Rochester, 55904 2512 33rd Ave South #2 55406 3

Jim Horan Jim@MREA.org Rural Electric Association 11640 73rd Ave N Maple Grove, 55369 Jan Hubbard jan.hubbard@comcast.net 7730 Mississippi Lane Brooklyn Park, 55444 John S. Jaffray jjaffray@jjrpower.com JJR Power 350 Highway 7 Suite 236 Excelsior, 55331 Linda Jensen linda.s.jensen@ag.state.m n.us Office of the Attorney General-DOC 1800 BRM Tower 445 Street 551012134 Julie Jorgensen Julie@greenmark.us.com GreenMark Solar LLC 4626 Emerson Ave. S. 55419 Michael Kampmeyer mkampmeyer@a-egroup.com AEG Group, LLC Brad Klein bklein@elpc.org Environmental Law & Policy Center 260 Salem Church Road Sunfish Lake, 55118 35 E. Wacker Drive, Suite 1600 Suite 1600 Chicago, IL 60601 Madeleine Klein mklein@socoreenergy.com SoCore Energy 225 W Hubbard Street Suite 200 Chicago, IL 60654 John Kluempke jwkluempke@winlectric.co m Elk River Winlectric 12777 Meadowvale Rd Elk River, 55330 Jon Kramer jk2surf@aol.com Sundial Solar 4708 york ave. S 55410 4

Michael Krause michaelkrause61@yahoo.c om Kandiyo Consulting, LLC 433 S 7th Street Suite 2025 55415 Dean Leischow dean@sunriseenergyventur es.com Sunrise Energy Ventures 601 Carlson Parkway, Suite 1050 55305 John Lindell john.lindell@ag.state.mn.us Office of the Attorney General-RUD Erica McConnell mcconnell@smwlaw.com Shute, Mihaly & Weinberger LLP Thomas Melone Thomas.Melone@AllcoUS. com Andrew Moratzka andrew.moratzka@stoel.co m Martin Morud mmorud@trunorthsolar.co m Go Solar LLC 1400 BRM Tower 445 St 551012130 396 Hayes St San Francisco, California 94102-4421 222 South 9th Street Suite 1600 55120 Stoel Rives LLP 33 South Sixth St Ste 4200 Tru North Solar 55402 5115 45th Ave S 55417 Rolf Nordstrom rnordstrom@gpisd.net Great Plains Institute 2801 21ST AVE S STE 220 Electronic Service Yes OFF_SL_13-867_Official 55407-1229 Jeff O'Neill jeff.oneill@ci.monticello.mn.us City of Monticello 505 Walnut Street Suite 1 Monticelllo, 55362 Dan Patry dpatry@sunedison.com SunEdison 600 Clipper Drive Belmont, CA 94002 5

Jeffrey C Paulson jeff.jcplaw@comcast.net Paulson Law Office, Ltd. 4445 W 77th Street Suite 224 Edina, 55435 Donna Pickard dpickardgsss@gmail.com Citizen 1215 Lilac Lane Excelsior, 55331 Gayle Prest gayle.prest@minneapolism n.gov Doug Shoemaker dougs@mnrenewables.or g City of Mpls Sustainability 350 South 5th St, #315 MRES 55415 2928 5th Ave S 55408 Eric Swanson eswanson@winthrop.com Winthrop Weinstine 225 S 6th St Ste 3500 Capella Tower 554024629 Thomas P. Sweeney III tom.sweeney@easycleane nergy.com Clean Energy Collective P O Box 1828 Boulder, CO 80306-1828 Pat Treseler pat.jcplaw@comcast.net Paulson Law Office LTD 4445 W 77th Street Suite 224 Edina, 55435 Jason Willett jason.willett@metc.state.m n.us Metropolitan Council 390 Robert St N Saint Paul, 55101-1805 Daniel P Wolf dan.wolf@state.mn.us Public Utilities Commission 121 7th Place East Suite 350 551012147 Electronic Service Yes OFF_SL_13-867_Official 6